completePlans.pdf
PDF 8 MB Posted
- Attached to
- Z1DA--528A5-18-521 STEAM SYSTEM REPAIRS Federal contract opportunity
- Solicitation number
- 36C24221B0075
About this file
This is a pre-solicitation notice for an upcoming competitive solicitation to provide steam system repairs at the Canandaigua VA Medical Center. The project scope includes upgrading the steam distribution system with a magnitude between $1,000,000 and $5,000,000. A 20% bid bond will be required and bids are due on or about October 12, 2021. The NAICS code is 238220 with a $16.5 million small business size standard. This project is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S04 Sign In Sheet.jpg | JPG image | |
| 36C24221B0075 0003.docx | DOCX document | |
| DWG-19123-SS309.REV0 STRCTRL PLANS _ SECTIONS AV-7 THRU AV-11.pdf | ||
| 36C24221B0075 0002.docx | DOCX document | |
| IMG_0029.jpg | JPG image | |
| 36C24221B0075 0001.docx | DOCX document | |
| IMG_0028.jpg | JPG image | |
| IMG_0030.jpg | JPG image | |
| IMG_0036.jpg | JPG image | |
| IMG_0031.jpg | JPG image | |
| IMG_0037.jpg | JPG image | |
| IMG_0035.jpg | JPG image | |
| IMG_0032.jpg | JPG image | |
| IMG_0038.jpg | JPG image | |
| IMG_0033.jpg | JPG image | |
| IMG_0034.jpg | JPG image | |
| 36C24221B0075.docx | DOCX document | |
| S02 Certification of Vaccination.pdf | ||
| specsfull.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL NOTES AND LEGENDS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29 C-001
SITE
585A5-18-521
SBV HMS
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
GENERAL NOTES:
1. CONTRACTOR SHALL MAINTAIN THE WORK SITE IN AN ORDERLY CONDITION AND PROVIDE FOR REGULAR CLEAN UP OF THE
CONSTRUCTION AREA ON A DAILY BASIS.
2. UPON COMPLETION OF ALL WORK, CONTRACTOR SHALL REMOVE ANY TEMPORARY FACILITIES, EQUIPMENT, SURPLUS MATERIAL AND
SUPPLIES. FINAL CLEANUP SHALL LEAVE THE SITE IN AN ORDERLY CONDITION.
3. PERFORM ALL EXCAVATION IN ACCORDANCE WITH OSHA "CONSTRUCTION STANDARDS FOR TRENCHING AND EXCAVATION, 29 CFR, PART 1926, SUBPART P" GUIDELINES AND SITE PROCEDURES.
4. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING
WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE COR AND REQUEST
CLARIFICATION.
5. THE LOCATIONS AND DEPTHS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON PLANS ARE APPROXIMATE. OTHER UNDERGROUND UTILITIES NOT SHOWN MAY BE ENCOUNTERED. THE CONTRACTOR SHALL PERFORM TEST PITS TO VERIFY THE LOCATION AND ELEVATION OF UTILITIES AT INTERCONNECTIONS AND CROSSINGS AS SHOWN, DIRECTED OR REQUIRED. THE CONTRACTOR SHALL EXCAVATE IN ADVANCE OF THE UTILITY WORK AND EXPOSE ALL EXISTING UNDERGROUND UTILITIES TO PREVENT DAMAGE DURING CONSTRUCTION AND TO DETERMINE REQUIRED CHANGES IN GRADE NECESSARY TO INSTALL THE
UTILITIES TO AVOID CONFLICTS.
6. ALL SAW CUTS ARE TO BE FULL DEPTH. CONTRACTOR TO MATCH PAVEMENT WITH EXISTING OR AS NOTED.
7. THE CONTRACTOR SHALL BE PRESENT AND ASSIST IN THE FINAL WALK INSPECTION. THE CONTRACTOR SHALL PROVIDE SUFFICIENT
PERSONNEL AND EQUIPMENT TO DEMONSTRATE TO THE COR THAT ALL UTILITIES OPERATE AS REQUIRED.
8. NO HOLES, TRENCHES OR STRUCTURES SHALL BE LEFT OPEN OVERNIGHT IN ANY EXCAVATION.
9. UNDERGROUND UTILITY LOCATIONS HAVE BEEN APPROXIMATED FROM AVAILABLE RECORD PLAN DRAWINGS.
10. CONTRACTOR TO FIELD VERIFY LOCATIONS OF ALL SUBSURFACE UTILITIES PRIOR TO CONSTRUCTION.
11. OTHER INACTIVE UTILITY LINES MAY BE ENCOUNTERED DURING EXCAVATION. NOTIFY COR IF ANY UTILITY LINES ARE UNCOVERED
THAT ARE NOT IDENTIFIED ON DRAWINGS.
12. THE PLANS SHOW SUBSURFACE STRUCTURES, ABOVE GROUND STRUCTURES AND/OR UTILITIES FROM FIELD LOCATION AND RECORD
MAPPING, EXACT LOCATION OF WHICH MAY VARY FROM THE LOCATIONS INDICATED. IN PARTICULAR, THE CONTRACTOR IS WARNED THAT THE EXACT OR EVEN APPROXIMATE LOCATION OF SUCH PIPELINES, SUBSURFACE STRUCTURES AND/OR UTILITIES IN THE AREA MAY BE DIFFERENT FROM THAT SHOWN OR MAY NOT BE SHOWN AND IT IS HIS RESPONSIBILITY TO PROCEED WITH GREAT CARE IN
EXECUTING ANY WORK.
13. THE CONTRACTOR SHALL LOCATE, MARK, SAFEGUARD, AND PRESERVE ALL SURVEY CONTROL MONUMENTS IN THE AREAS OF
CONSTRUCTION.
14. THE PROPERTY LINES AND RIGHT-OF-WAY LINES SHOWN ON THE PLANS ARE FOR INFORMATION ONLY, AND NO WARRANTY IS MADE
AS TO THEIR CORRECTNESS.
15. THE CONTRACTOR SHALL MAINTAIN IN SERVICE ALL EXISTING SEWERS, CULVERTS, DITCHES, MANHOLES, AND CATCH BASINS DURING
CONSTRUCTION.
16. CONSTRUCTION STAKEOUT: THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION STAKEOUT.
17. TRAFFIC SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. INGRESS AND EGRESS TO DRIVEWAYS, PARKING LOTS, AND SERVICE
ROADS SHALL BE CONTINUOUSLY MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION, TO THE EXTENT DELINEATED ON THE
PHASING DRAWINGS.
18. THE CONTRACTOR SHALL TAKE CARE TO PREVENT DAMAGE TO EXISTING UTILITIES. DAMAGED UTILITIES SHALL BE IMMEDIATELY
REPAIRED BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, ETC. AND SHALL COMPLY WITH ALL REQUIRED PERMITS.
20. ALL WORK SHALL BE DONE IN STRICT COMPLIANCE WITH ALL APPLICABLE NATIONAL AND STATE CODES, STANDARDS, ORDINANCES, RULES, AND REGULATIONS.
21. MISCELLANEOUS WORK NOT SPECIFICALLY SHOWN ON THE CONTRACT DRAWINGS SUCH AS PATCHING, BLOCKING, TRIMMING, ETC.
SHALL BE PERFORMED AS REQUIRED TO MAKE THE WORK COMPLETE.
22. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE ALL PLAN SHEETS AND COORDINATE WORK WITH ALL OTHER CONTRACTS FOR
THE SITE.
23. THE CONTRACTING OFFICER AND CONTRACTING OFFICER'S REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING, OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK SHALL NOT VARY FROM THE PLANS WITHOUT PRIOR
WRITTEN APPROVAL OF THE CONTRACTING 0FFICER.
24. THE CONTRACTOR SHALL RESTORE LAWNS, DRIVEWAYS, CULVERTS, SIGNS, AND OTHER PUBLIC OR PRIVATE PROPERTY DAMAGED OR REMOVED TO AT LEAST AS GOOD A CONDITION AS BEFORE BEING DISTURBED AS DETERMINED BY COR. ANY DAMAGED TREES, SHRUBS, AND/OR HEDGES SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
25. UNSUITABLE MATERIALS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED.
GENERAL LINETYPES
NEW HIGH PRESSURE STEAMHPS
EXISTING SANITARY SEWERSA
EXISTING COMMUNICATIONSCOMM
EXISTING STORM WATERST
W EXISTING WATER
UE EXISTING UNDERGROUND ELECTRIC
ABBREVIATIONS
EXISTING GASGAS
PROPERTY BOUNDARY
EXISTING HIGH PRESSURE STEAM
EXISTING ABANDONED HIGH PRESSURE STEAM
HPS
AHPS
ABAND ABANDONED
BLDG BUILDING
CB CATCH BASIN
CONC CONCRETE
DI DUCTILE IRON
ELEC ELECTRICAL
ELEV ELEVATION
EX EXISTING
FF FINISHED FLOOR
HP HIGH PRESSURE STEAM
HYD HYDRANT
INV INVERT
LF LINEAR FEET
LPR LOW PRESSURE RETURN
MH MANHOLE
RET RETAINING
SAN SANITARY
ST STORM
SW SIDEWALK
SWR SEWER
TYP TYPICAL
WTR WATER
CIVIL LEGEND
BUILDING
BOLLARD/POST
SIGN
GATE VALVE
PIPE REDUCER
VALVE IN VALVE BOX
FIRE HYDRANT
MANHOLE VARIES
NEW STEAM ACCESS VAULT
CATCH BASIN
VEGETATION
LIGHT POLE
ELECTRIC PULLBOX
DEMOLITION LINE PAVEMENT
CONCRETE
GRASS
EXISTING DRAIN LINED
EXISTING GRAVITY CONDENSATE RETURNGR
LPS EXISTING LOW PRESSURE STEAM
LIMIT OF DEMOLITION
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORKNEW CONDENSATE PUMP DISCHARGEPC
UE NEW UNDERGROUND ELECTRIC
PB
10/29/2019
BLDG 12
BLDG 11
BLDG 16
BLDG 10
BLDG 6
BLDG 7
BLDG 8
PROPERTY BOUNDARY
PROPERTY BOUNDARY
PR
OP
ER
TY
B
OU
ND
AR
Y
PROPERTY BOUNDARY
PROPERTY BOUNDARY
BL
DG
BLDG 37
SA
SA
SA
SA
SA
SA
10"
ST
W W
W W
W
ST
ST
ST
T T
T T
E E
E E
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W W
W
W
W
W W W W
W
W
W
W
TTT
PC
PC
HPS
ST
ST
W W
W W
W
WWW
W W
W W
SA
SA
SA
SA
SA
SA
SA
SA
ST
ST
ST
ST
ST
ST
ST
ST
SASA
SA
SA
SA SA SA SA
W W
W W
W
W
W
W
W
W
W
W
W
W
W
E
E
E E
E
E
E
E
E
EEE
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E E
E E
E
ST ST ST
ST
SA
SA
SA
SA
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSTST
ST
ST
ST
ST
ST
ST
ST
ST
SA
SA
SA
SA
SA
SAE
SA
SA
SA
SA
SA
SA
SA
SA
STSTST
ST
ST
ST
ST
ST
WW
W
W
W
W
W
W
W
W
W
T E
ST
ST
E
SA
SA
SA
SA
SA
SA
SA
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
ST
ST
ST
ST
SA
SA
HP
S
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HP
S
HP
S
LP
S
LP
S
LP
S
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AH
PS
AH
PS
AHPS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AHPS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
HPS
HPSHPS
ST
ST
ST
ST
ST
T
TST
W
W
W
W
W
W
W
W
T
T
T
E
E
E
E
ST
ST
SA
ST
SA SA
STSTST
ST
ST
ST
W
WWW
ST
ST
ST
STST
SA
SA
W
ST
E
E
E
E
E
E
E
ST
ST
ST
ST
ST
STST
ST
ST
ST
ST
ST
8"
6"
6"
6"
ABAND 6"
AB
AN
D 6"
AB
AN
D 6"
4"
6"
EX
4"
S T
10"
4"
6"
12"
10"
12"
18"
8"
6" 6"
8"
15"12"
6"
8"
6"
4"
3"
6"
6"
6"
4"
6"
8" 8"
8"
6"
6"
8"
6"
8"
15"
8"
8" ABAND
8"
6"
12" 8"
8"
8"
8"
8"
4"
8"
10"
EX
S
T
6"
6"
6"
EX
4"
S T
4" 8"
8"
12"
12"
12"
8"
6"
EX 4" ST
WELL
WISH
8" ABAND
W
W W
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HPS
E
E
E
E E E
ST
ST
ST
DEMO ±6,300 SF
PAVEMENT AREA
DEMO ±1,500 SF LAWN AREA
DEMO ±375 SF
EX SIDEWALK
DEMO ±30 LF 18" STORM
ABANDON ±685 LF EX STEAM
IN PLACE
DEMO ±1,000 SF LAWN AREA
DEMO AREA FOR
NEW ACCESS VAULT
INSTALLATION
DEMO AREA FOR
NEW ACCESS VAULT
INSTALLATION
DEMO AREA FOR
NEW ACCESS VAULT
INSTALLATION
DEMO AREA FOR
NEW ACCESS VAULT
INSTALLATION
DEMO ±2,120 SF LAWN AREA
DEMO ±2,650 SF
PAVEMENT AREA
DEMO ± 200 SF
EX SIDEWALK
DEMO ±1,150 SF
EX SIDEWALK
DEMO ±2,300 SF LAWN AREA
DEMO ±650 SF LAWN AREA
21'
DEMO ±1,400 SF LAWN AREA
DEMO ±200 SF LAWN AREA
LIMITS OF DEMOLITION
DEMO AREA FOR
NEW ACCESS VAULT
INSTALLATION
CS501
1 3
DEMO ±105 LF 8" EX
ABANDONED WATER
DEMO ±200 LF CURB
DEMO ±175 LF CURB
DEMO ±32 LF UNDERGOUND ELECTRIC
DEMO ±735 SF
PAVEMENT AREA
DEMO ±825 SF LAWN AREA
DEMO ±565 SF
PAVEMENT AREA
DEMO ±1075 SF
PAVEMENT AREA
DEMO ±3,000 SF LAWN AREA
DEMO ±460 SF LAWN AREA
DEMO ±150 LF 2" CONDENSATE
LIMITS OF DEMOLITION
DEMO ±100 LF 8" EX WATER
DEMO PIV AND
±20 LF 4" EX WATER
DEMO ±650 SF
PAVEMENT AREA
28'
23'
16'
15'
5'
5'
12'
16'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL DEMOLITION PLAN 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CD101
SITE
585A5-18-521
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
SBV HMS
SCALE: 1" = 40'
CIVIL DEMOLITION PLAN1
GENERAL NOTES
1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.
2. EX STEAM SYSTEMS TO BE ABANDONED IN PLACE. EXISTING STEAM SYSTEMS TO
BE DEMOLISHED AND REMOVED ONLY WHERE LOCATION CONFLICTS WITH NEW
TUNNEL CONSTRUCTION.
KEYED NOTES
1 REMOVE SIGNS WITHIN DEMO LIMITS. STORE ONSITE AND REPLACE WHEN WORK IS
COMPLETE.
2 REMOVE AND RELOCATE LIGHT POLE AND BASE.
3 PROTECT EX UTILITIES TO REMAIN, IN PLACE.
4 CUT AND CAP EX ABANDONED WATER MAIN.
CURB
CURB
ASPHALT
CURB
LAWN
CONC SIDEW
ALK
CO
NC
S W
LAWN
LAWN
CO
NC
S W
CURB
CONC SW
BLDG 12
BLDG 11
BLDG 16
BLDG 10
BLDG 6
BLDG 7
BLDG 8
LAWN
LAWN
PROPERTY BOUNDARY
PROPERTY BOUNDARY
PR
OP
ER
TY
B
OU
ND
AR
Y
PROPERTY BOUNDARY
PROPERTY BOUNDARY
LAWN
CONC SW
CURB
CURB
CU
RB
LAWN
LAWN
LAWN
CO
NC
R
ET
W
AL
L
PAVILION
CONC SW.
BL
DG
SWING
CHAIR
ASPHALT
PARKING
LOT
VALVE
VAULT
ABAND
SAN MH
ASPHALT
PARKING
LOT
BLDG 37
NEW AV-4
NEW AV-3
NEW AV-2
NEW AV-1
NEW AV-5
EX ACCESS VAULT
NEW AV-6
NEW AV-7
NEW AV-8
NEW AV-9
NEW AV-10
NEW AV-11
CS501
CS501
CU502
CS501
CS501
CS501
CS501
CS501
E-501
RESTORE PAVEMENT AREA
& STRIPING AS NECESSARY
RESTORE SIDEWALK
RESTORE LAWN AREA
RESTORE PAVEMENT AREA
RESTORE SIDEWALK
RESTORE SIDEWALK
RESTORE LAWN AREA
RESTORE LAWN AREA
REPLACE 30 LF CURB
REPLACE 200 LF CURB
RELOCATED SIGNS (TYP)
NEW STORM CATCH BASIN
TYP
TYP
TYP
TYP
RESTORE LAWN AREA
RELOCATED LIGHT POLE AND BASE
REPLACE 175 LF CURB
RESTORE PAVEMENT AREA
TYP
26.34'
23.30'
27.58'
15.98'
26.71'
23.33'
17.14'
23.98'
CONCRETE BOLLARDS
(TYP)
TYP
RESTORE SIDEWALK
.63
.50
.90
.00
RESTORE PAVEMENT AREA
RESTORE LAWN AREA
ELECTRIC PULLBOX
RESTORE PAVEMENT AREA
RESTORE LAWN AREA
RESTORE LAWN AREA
RESTORE PAVEMENT AREA
RESTORE PAVEMENT AREA
E-501
TYP
5.00'
2.50'
TYP
2.50'
TYP
CU502
CU501
SS303
SS305
SS304
SS302
SS301
SS306
SS307
SS309
SS309
SS309
SS309
SS309
CU502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL SITE PLAN 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CS101
SITE
585A5-18-521
SBV HMS
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
SCALE: 1" = 40'
CIVIL SITE PLAN1
GENERAL NOTES
1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.
2. RESTORE SITE TO PRE-CONSTRUCTION CONDITIONS AND MATCH EXISTING GRADES.
3. SEE STRUCTURAL DRAWINGS FOR TRENCH AND ACCESS VAULT PLANS.
NOTES:
1. ALL CONCRETE CURBS AND TRANSITIONS, SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF 2,500 PSI.
2. MAXIMUM SPACING ON SCORED JOINTS SHALL BE 15' .
3. 1/2" THICK EXPANSION JOINTS SHALL BE LOCATED AT TANGENT
POINTS IN CURB RETURNS, TRANSITIONS, AND AT A MAXIMUM OF
60' INTERVALS. EXPANSION MATERIAL SHALL ALSO BE PLACED
BETWEEN CURBS AND ADJACENT STRUCTURES, SIDEWALKS,
DRIVEWAYS AND CURB ACCESS RAMPS. THE 1/2" JOINT FILLER
SHALL EXTEND THE FULL DEPTH OF THE CONCRETE.
4. CONCRETE SHALL BE FINISHED WITH A STEEL TROWEL FOLLOWED
BY BRUSHING WITH A FINE BRUSH ALONG THE LENGTH OF THE
CURB OR CURB AND GUTTER.
5. SINGLE CURB MAY BE CONSTRUCTED BY THE USE OF FORMS OR
MAY BE SLIP FORMED.
6. ALL EXPOSED EDGES AND HAND TOOLED JOINTS SHALL BE
FINISHED WITH A TOOL HAVING A 1/4" RADIUS UNLESS A LARGER
RADIUS IS INDICATED BY THE APPLICABLE STANDARD DETAIL OR
PROJECT PLANS.
6 TO 1 (MAX)
ROADWAY &
PAVEMENT
WIDTH
CONCRETE VERTICAL CURB
9 1/2"
6"
6"
1:4 CURB
BATTER
CONCRETE CURB TERMINAL SECTION
6" M
IN DESIGN END OF CURB 1/2" BITUMINOUS
JOINT FILLER
TOP OF CURB
PAVEMENT
SURFACE3/4" R
2" R
NOTES:
1. POST BARRICADES SHALL BE PAINTED WITH ONE PRIME COAT
OF RED OXIDE (PAINT NO.1). ONE FINISH COAT OF DULL BLACK
ENAMEL PER VA SPECIFICATIONS AND STRIPES CONSISTING
OF 4" BANDS OF YELLOW REFLECTORIZED TAPE SHALL BE
USED UNLESS OTHERWISE SPECIFIED ON THE PLANS.
2. FINISH COLOR COMBINATIONS, OTHER THAN THAT SPECIFIED
ABOVE, SHALL BE SUBMITTED TO THE COR FOR APPROVAL.
4"
3'- 6"
3'- 3"
9"
UTILITY CONCRETE PER
VA SPECIFICATIONS
6"Øx7'-0"
STANDARD PIPE
POST BARRICADE
CONCRETE FILLED
NOTES:
1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB
OR OTHER ADJACENT STRUCTURES.
2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS
AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE.
3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' OR AT A
SPACING THAT MATCHES THE ADJACENT CURB.
4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" RADIUS.
5. SCORED JOINTS SHALL BE 1/4" DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF
SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB.
6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A
FINE BRUSH IN A TRANSVERSE DIRECTION.
7. 1/4" DEEP SCORED JOINTS (TYP) SPACED AT 6' OR EQUAL TO SIDEWALK WIDTH.
8. FINISH CONCRETE WITH PICTURE FRAME 2" IN FROM EDGE IN ACCORDANCE WITH CAMPUS
STANDARD.
1% MIN,
2% MAX
1% MIN,
2% MAX
6" M
IN
VARIES PER PLANS 0' MIN
10.5' MAX
TYPICAL SECTION EXPANSION AND SCORED JOINT DETAIL
60' MAX
EXPANSION JOINT TO EXPANSION JOINT
60' MAX
EXPANSION JOINT TO EXPANSION JOINT
SEE NOTE 7
(TYP) PL
AN
S
P
ER
P
ER
PL
AN
S
PLAN
4,000 PSI CONCRETE
1" SCORED OR SAWCUT
CONTRACTION JOINT
1/4" R (TYP) FORMED
JOINTS ONLY
1/4" DEEP
SCORED
JOINTS3/1
6"
6" (T
YP
EXPANSION JOINT WITH 1/4"
BITUMINOUS JOINT FILLER
TOP OF CURB
GRASS
GEOTEXTILE FABRIC
EXISITING SUB-GRADE
NOTES:
1. GRASS TO BE HYDROSEEDED WITH FERTILIZER AND TACKIFIER.
2. MINIMUM BROADCAST RATE 3-5 LBS PER 1000 SQ. FT.
3. SEED MIX TO BE 30% KENTUCKY BLUEGRASS, 30% ALLSTAR 3
PERENNIAL RYE, 30% EXACTA II PERENNIAL RYEGRASS, 10%
DUTCH WHITE CLOVER
MINIMUM 4" TOPSOIL
GRASS
GEOTEXTILE FABRIC
MINIMUM 4" TOPSOIL
18' MIN
20' MAX
5' 8'
MI
N
4" WIDE WHITE STRIPES
TYP
EDGE OF PAVEMENT
ACCESSIBILITY
SYMBOL (TYP)
2"X2" WOODEN STAKE
10' LINEAL SPACING (TYP)
COMPOST SILT SOCK
WATER FLOW
WORK AREA
AREA TO BE
PROTECTED
3"
4"
2"X2" WOODEN STAKE
10' LINEAL SPACING (TYP)
COMPOST SILT SOCK
12" TYP
WORK AREA
AREA TO BE
PROTECTED
NOTES:
1. FILTER SOCK DEPICTED IS FOR MINIMUM SLOPES. GREATER
SLOPES MAY REQUIRE LARGER SOCKS, PER ENGINEER.
2. COMPOST MATERIAL TO BE DISPERSED ON SITE AS
DETERMINED BY ENGINEER.
PLAN
TYPICAL SECTION
MATERIALS:
1. PERFORATED POSTS SHALL BE SQUARE TUBE FORMED FROM 0.105 U.S.S.
GAUGE ASTM A-366 COLD ROLLED CARBON STEEL. THE SQUARE TUBES
SHALL BE WELDED DIRECTLY IN THE CORNER BY HIGH FREQUENCY
RESISTANCE WELDING OR EQUAL. THE POSTS SHALL BE EXTERNALLY
SCARFED TO AGREE WITH STANDARD CORNER RADII OF 5/32" TO 1/64".
2. PERFORATED POSTS SHALL BE GALVANIZED TO CONFORM TO ASTM A-525.
COATING DESIGNATION G-90.
3. ALL HARDWARE SHALL CONFORM TO ASTM A-307 CLASS A.
4. ALL HARDWARE SHALL BE GALVANIZED TO CONFORM TO ASTM A-153 OR
CADMIUM PLATED TO CONFORM TO ASTM A-165.
5. ALL CONCRETE SHALL BE 2500 PSI.
NOTES:
1. FOUNDATION WILL BE CONSTRUCTED WITH 1 3/4"x1 3/4" STARTER SIGN
POST. STARTER SIGN POST SHALL BE REMOVED AFTER CONCRETE HAS SET
AND EXPOSED SQUARE TUBING WRAPPED AND SEALED WITH DUCT TAPE.
2. FOUNDATION LOCATED 1' FROM EDGE OF PAVEMENT.
3. FOUNDATION LOCATION TO BE APPROVED BY ENGINEERING.
4. POST FOUNDATIONS SHALL BE PERPENDICULAR TO THE PAVED SURFACE.
5. BOLT WITH NUT AND LOCK WASHER TO BE 7/16"x3" GALVANIZED.
6. REFER TO SIGN POST LOCATION DETAIL, DETAIL 4, THIS SHEET FOR
INSTALLATION LOCATION.
12" SQUARE
8"
2 1 /2"
12" SQUARE
2 1 /2"
2'- 2 1
/2"
2'- 8 1
/2"
2'- 9"
8" SQUARE
2 1/4"x2 1/4"
PERFORATED
POST
1 3/4"x1 3/4"
PERFORATED POST
2"x2" PERFORATED POST
EXPANSION MATERIAL
(TYPICAL IN
CONCRETE AREAS)
FINISH WITH
LANDSCAPE
MATERIAL
FINISHED
GRADE
4"
7/16" HOLE DIAMETER
SPACED AT 1" 0C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL SITE DETAILS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CS501
SITE
585A5-18-521
SBV HMS
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: NTS
CONCRETE CURB AND TERMINAL SECTION1
CS101 SCALE: NTS
CONCRETE BOLLARD3
CS101
SCALE: NTS
CONCRETE SIDEWALK5
CS101
SCALE: NTS
TYPICAL GRASS PLANTING6
CS101
SCALE: NTS
TYPICAL STRIPING DETAIL4
CS101
SCALE: NTS
COMPOST FILTER SOCK DETAIL7
CD101
CS101
SCALE: NTS
SIGN POST DETAIL SQUARE TUBE FOUNDATION2
CS101
BLDG 16
BLDG 10
BLDG 6
BLDG 7
BLDG 8
PROPERTY BOUNDARY
PROPERTY BOUNDARY
PR
OP
ER
TY
B
OU
ND
AR
Y
PROPERTY BOUNDARY
PROPERTY BOUNDARY
BL
DG
BLDG 37
NEW AV-4
NEW AV-3
NEW AV-2
NEW AV-1
NEW AV-5
EX ACCESS VAULT
NEW AV-6
NEW AV-7
NEW AV-8
NEW AV-9
SA
SA
SA
SA
SA
SA
10"
ST
W W
W W
W
ST
ST
ST
T T
T T
E E
E E
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W W
W
W
W
W W W W
W
W
W
W
TTT
PC
PC
HPS
ST
ST
W W
W W
W
WWW
W W
W W
SA
SA
SA
SA
SA
SA
SA
SA
ST
ST
ST
ST
ST
ST
ST
ST
SASA
SA
SA
SA SA SA SA
W W
W
W
W
W
W
W
W
W
W
W
W
E
E
E E
E
E
E
E
E
EEE
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E E
E E
E
ST ST ST
ST
SA
SA
SA
SA
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSTST
ST
ST
ST
ST
ST
ST
ST
ST
SA
SA
SA
SA
SA
SAE
SA
SA
SA
SA
SA
SA
SA
SA
STSTST
ST
ST
ST
ST
ST
WW
W
W
W
W
W
W
W
W
W
T E
ST
ST
E
SA
SA
SA
SA
SA
SA
SA
SA
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
ST
ST
ST
ST
SA
SA
HP
S
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HP
S
HP
S
HPS
LP
S
LP
S
LP
S
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AH
PS
AH
PS
AHPS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AHPS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
HPS
HPSHPS
ST
ST
ST
ST
ST
T
TST
W
W
W
W
W
W
W
W
T
T
T
E
E
E
E
ST
ST
SA
ST
SA SA
STSTST
ST
ST
ST
W
WWW
ST
ST
ST
STST
SA
SA
W
ST
E
E
E
E
E
E
E
ST
ST
ST
ST
ST
STST
ST
ST
ST
ST
ST
HP
S
HP
S
HP
S
HP
S
HPSHPS
HPS
HPS
HPS
HP
S
HP
S
6" HP STEAM
5" VAC RETURN
4" LPR
(EX TO REMAIN)
6" HP STEAM
4" VAC RETURN
2" LPR
(EX TO REMAIN)
4" HP STEAM
1 1/4" VAC RETURN
4" LPR
(EX TO REMAIN)
8" HP STEAM
5" VAC RETURN
4" LPR
(EX TO REMAIN)
4" HP STEAM
8" HP STEAM
5" VAC RETURN
4" LPR
(EX TO REMAIN)
4" STEAM
(EX TO REMAIN)
NEW 2" PC
8" HP STEAM
3" LPR
(EX TO REMAIN)
NEW 140 LF
8" HPS
3" GR
STEAM
(EX TO REMAIN)
4" HP STEAM
8" HP STEAM
5" VAC RETURN
4" LPR
(EX TO REMAIN)
8" HP STEAM
3" LPR
(ABANDON IN PLACE)
NEW 95 LF
8" HPS
3" GR
NEW 110 LF
8" HPS
3" GR
NEW 150 LF
8" HPS
3" GR
NEW 115 LF
8" HPS
3" GR
8"
6"
6"
6"
ABAND 6"
AB
AN
D 6"
AB
AN
D 6"
4"
6"
EX
4"
S T
10"
4"
6"
12"
10"
12"
18"
8"
6" 6"
8"
15"12"
6"
8"
6"
4"
3"
6"
6"
6"
4"
6"
8" 8"
8"
6"
6"
8"
6"
8"
15"
8"
8" ABAND
8"
6"
12" 8"
8"
8"
8"
8"
4"
8"
10"
EX
S
T
6"
6"
6"
EX
4"
S T
4" 8"
8"
12"
12"
12"
8"
6"
EX 4" ST
WELL
WISH
EX STRUCTURE
NEW 115 LF
8" HPS
3" GR
8" ABAND
W
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HPS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
E
E
E
E E E
W W
ST
ST
ST
ST
ST
ST
ST
UE
ST
ST
ST
ST
MP501
CU502
CU501
1 CU502
CU501
RELOCATED LIGHT POLE
AND BASE
E-501
TYP
NEW STORM CB
RIM: 798.5
INV THRU: 788.65
CONNECT NEW STORM TO
EXISTING STRUCTURE
RIM: 796.0
EX INV N (CAP): 791.67
EX INV W: 787.56
EX INV E: 787.56
NEW INV N: 788.35
NEW PULLBOX (TYP)
NEW ELECTRIC CONDUIT
NEW ELECTRIC CONDUIT
NEW ELECTRIC CONDUIT
EXT-PMP-003N
EXT-PMP-002N
EXT-PMP-001N
EXT-PMP-011S
EXT-PMP-010S
EXT-PMP-011S
EXT-PMP-009S
EXT-PMP-008S
EXT-PMP-007S
NEW 95 LF 8" SDR35 WATER
CONNECT TO EX 8" WATER WITH 2-45
MJ BENDS DEFLECT AS NECESSARY
CONNECT TO EX 8" WATER WITH MJ COUPLING
8" 45° MJ BEND
DEFLECT AS NECESSARY
NEW PIV
CONNECT TO EX 4" WATER
NEW 8"X4" MJ TEE
8" CAP
8" CAP
2" FORCE MAIN
2" FORCE MAIN
EX STORM MH
RIM: 791.0
EX INV E/N: UNK
NEW 2" INV E: 790.24
NEW 2" INV W: 790.24
EX CB
RIM: 784.0
EX INV N/W: UNK
NEW 2" INV S: 783.24
EX CB
RIM: 797.5
EX INV E/N: UNK
NEW 2" INV E: 796.74
NEW 2" INV W: 796.74
2" FORCE MAIN
2" FORCE MAIN
CU502
CU502
CU502
EX STORM MH
RIM: 805.5
EX 4" INV S: UNK
EX 12" INV E/W: 798.67
NEW 2" INV N: 803.5
CU501
CU501
CU502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL UTILITY PLAN 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CU101
SITE
585A5-18-521
SCALE: 1" = 40'
CIVIL UTILITY PLAN1
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SBV HMS
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
GENERAL NOTES
1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.
2. SEE STRUCTURAL DRAWINGS FOR TRENCH AND ACCESS VAULT PLANS.
3. SEE CU201 FOR NEW TUNNEL PROFILE VIEW.
KEYED NOTES
1 33 LF 18" PVC STORM PIPE @ 1% MINIMUM
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+25
EX 8" SAN SEWER
STA: 2+84.94
RELOCATED 18" STORM
STA:7+07.83
INV:788.50
EX ELECTRIC
STA: 5+05.60
EX ELECTRIC
STA: 5+01.10
EX GRADE
3.5 0'
3.5 0'
NEW AV- 4
STA: 3+41.49
RIM: 803.82
BOTTOM: 795.03
NEW AV- 3
STA: 2+33.31
RIM: 804.44
BOTTOM: 796.08
NEW AV- 2
STA: 1+39.02
RIM: 806.22
BOTTOM: 797.19
NEW AV- 1
STA: 0+03.66
RIM: 806.55
BOTTOM: 798.10
NEW AV- 5
STA: 4+90.11
RIM: 801.87
BOTTOM: 791.67
EX ACCESS VAULT
RIM: 796.7
BOTTOM: 788.13.5
0'
3.5 0'
3.5 0'
3.5 0'
EX 6" STORM
STA:0+51.49
EX 12" STORM
STA:0+59.90
NEW 8" WATER
STA: 0+64.09
NEW AV- 6
STA: 6+03.25
RIM: 800.18
BOTTOM: 790.23
MI
N
NEW 8" WATER
STA: 1+03.86
MI
N
NEW 8" WATER
STA: 1+45.02
MI
N
NEW 8" WATER
STA: 2+73.00
MI
N
NEW 8" WATER
STA: 2+65.50
MI
N
EXT-PMP-003N
EXT-PMP-002N
EXT-PMP-001N
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8 797
BLDG 8
NEW AV-4
NEW AV-3
NEW AV-2
NEW AV-1
NEW AV-5
EX ACCESS VAULT
NEW AV-6
NEW CB
W
W
W
W W
W
W
W
W
W
W
W
WW
W
W
W
W
W
W W
PC
PC
PC
PC
PCST
ST
ST
W
W
W
W
W
W
W
W
W
W
W W
SA
SA
W
W
COMM
COMM
COMM
COMM
COMM
COMM
UE
UE
UE
UE
UE
UE
UE
UE
ST
ST
ST
ST
ST
ST
ST
ST
ST
SA
SA
SA
SA
SA
SA
SA
SA
SA
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STST
ST
ST
ST
W
COMM
COMM
UE
UEGAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
SA
SA
SA
SA
SA
SA
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HPS
HPS
HPS HPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
ST
ST
ST
W W
W W
W
W
W
ST
ST
ST ST
ST
ST
STSTSTSTSTST
ST
ST
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
NEW 2" PC
NEW 140 LF
8" HPS
3" GR
8" HP STEAM
3" LPR
(ABANDON IN PLACE)
NEW 95 LF
8" HPS
3" GR
NEW 110 LF
8" HPS
3" GR
NEW 150 LF
8" HPS
3" GR
NEW 115 LF
8" HPS
3" GR
8"
6"
ABAND 6"
ABAND 6"
6"
EX 4" ST
18"
15"
6"
6"
8"
15"
12"
6"
4"15"
8" ABAND
8"
8"
4"
EX ST
6"
EX STRUCTURE
NEW 115 LF
8" HPS
3" GR
8" ABAND
W
W
W
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
W
W
W
W
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
RELOCATED LIGHT POLE
AND BASE
NEW ELECTRIC
NEW 8" WATER
NEW PIV
NEW 2" FORCE MAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL UTILITY PROFILES 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CU201
SITE
585A5-18-521
SBV HMS
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
SCALE: HORIZ: 1" = 20', VERT: 1" = 5'
STEAM TRENCH PROFILE2
SCALE: 1" = 20'
STEAM TRENCH PLAN1
GENERAL NOTES
1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.
2. SEE STRUCTURAL DRAWINGS FOR TRENCH AND ACCESS VAULT PLANS.
FINISHED GRADE
EXISTING CATCH BASIN
PIPE BEDDING
18" CMP
FILL VOID WITH GROUT OR EPOXY
.5"
FRAME AND GRATEGRASS
ALL PIPES SHALL BE FLUSH
WITH THE INSIDE OF THE
WALL AND SEALED
3'-0" 6"
6" MI
N
2'- 8"
8" MI
N
INSTALL PUMP STAND UNDER PUMP
TO PROVIDE A SETTLING BASIN
NEMA 6P ENCLOSURE
UNION AND CHECK VALVE
1 1/2" SCH40 PVC DISCHARGE PIPE
SUBMERSIBLE PUMP
TURN
ON
TURN
OFF
LOCKING TYPE RECEPTACLE
2'X2'X2'
FUSED DISCONNECT SWITCH
FINISHED
SURFACE
VALVE BOX
LENGTH TO BE
ADJUSTABLE
GATE
VALVE
CO
VE
R
MECHANICAL
JOINTS
CONCRETE
COLLAR
FINISH GRADE
(1) #3 REBAR ALL
AROUND 6" MIN LAP
ADJUSTABLE VALVE
BOX
COMPACTED SUBGRADE
1"
8"
6"
GATE VALVE
FINISH GRADE
INDICATOR TO BE
FACED TOWARD ROAD
5'
MI
N
MECHANICAL JOINT
CONNECTIONS
MJ GLAND SEAL
FITTING STIFFNER
MJ END ON VALVE OR
PIPE
HDPE ADAPTOR WITH HEAVY
WEIGHT C110 METAL GLAND
SEWER MAIN
WATERMAIN
" M
IN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL UTILITY DETAILS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CU501
SITE
585A5-18-521
SBV HMS
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: NTS
CONNECTION TO EXISTING STRUCTURE DETAIL2
CU101
SCALE: NTS
RECTANGULAR CATCH BASIN DETAIL1
CU101
CS101
SCALE: NTS
SUMP PUMP DETAIL3
CU101
PUMP SCHEDULE
MARK GPM TDH (FT) HP V/PH/HZ AMPS FUSE RATING LOCATION
EXT-PMP-007S
EXT-PMP-008S
EXT-PMP-009S
EXT-PMP-010S
EXT-PMP-011S
100 86.5 1/2 200/3/60 6.0A 20A SOUTH LOOP ACCESS VAULTS:
7, 8, 9, 10, 11
EXT-PMP-001N
EXT-PMP-002N
EXT-PMP-003N
7 44 2/5 115/1/60 8.5A 20A NORTH LOOP ACCESS VAULTS:
1, 2, 3
SCALE: NTS
VALVE BOX DETAIL4
CU101
SCALE: NTS
VALVE BOX COLLAR DETAIL5
CU501
SCALE: NTS
POST INDICATOR VALVE DETAIL6
CU101
SCALE: NTS
MJ CONNECTION DETAIL7
CU501
SCALE: NTS
TYPICAL WATER MAIN CROSSING8
CU101
PIPE OD + 2"
18" CMP
SUITABLE
EXCAVATED
MATERIAL
TOPSOIL & SEED 4" FINISHED GRADE
6" BEDDING MATERIAL
LAWN/ FIELD PAVEMENT/ DRIVEWAY
UNDISTURBED
EARTH
DETECTABLE TAPE, IN TRENCH
1'-6" BELOW GRADE
#2 CRUSHER RUN
OR STONE
PIPE BEDDING #1 STONE
WATERMAIN
SIZE AND TYPE PER PLAN
UNDISTURBED
EARTH
EXISTING GRADE
RESTORE IN-KIND
(GRASS)
NATIVE BACKFILL
6" MIN OF #1
STONE (ABOVE
& BELOW PIPE)
2" PIPE
UNDISTURBED EARTH
18" MIN
VA
RI
ES
EXISTING GRADE
MA
TC
H
EX
IS
TI
NG
T
RE
NC
H
DE
PT
H
2'
MI
NI
MU
M
CONDUIT JACKET
POLYURETHANE FOAM
3" CONDENSATE PIPE
STEEL CONDUIT
INSULATION
SUPPORT ASSEMBLIES
EXISTING GROUND
COMPACTED NATIVE BACKFILL
6" MI
N
6" MI
N
SAND BEDDING
NOTES:
1. CONTRACTOR TO COMPACT AND LEVEL SOIL
PRIOR TO PLACING BEDDING.
2. NO BEACH SAND OR SAND WITH CHLORITE
SHALL BE USED.
RESTORE IN-KIND (GRASS)
TOPSOIL & SEED 4"
WIDTH VARIES PER DEPTH OF TRENCH
BACKFILL
WITH NATIVE
MATERIAL
SAW CUT EX ASPHALT
FULL DEPTH BOTH SIDES
TACK COAT (TYP)
EXISTING
PAVEMENT
KEYED NOTES:
2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER
IS GREATER.
BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY
FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6'.
4" MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE
COURSE MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER
IS GREATER.
ASPHALTIC CONCRETE
ABC 100% MIN COMPACTION
SELECT FILL
TYP
8" MIN 8" MIN
UNDISTURBED SOIL
SLOPE SIDES OF TRENCH AT 1:1 MIN SLO
PE SIDES OF TRENCH AT 1:1
MIN
DE
PT
H
VA
RI
ES
P
ER
P
RO
FI
LE
GRASS
GEOTEXTILE
FABRIC
MINIMUM 4"
TOPSOIL
RESTORE TURF AREA RESTORE PAVED AREA
EX GROUND
WIDTH VARIES PER DEPTH OF TRENCH
BACKFILL
WITH NATIVE
MATERIAL
CONCRETE SIDEWALK
SELECT FILL
TYP
8" MIN 8" MIN
UNDISTURBED SOIL
SLOPE SIDES OF TRENCH AT 1:1 MIN
DE
PT
H
VA
RI
ES
P
ER
P
RO
FI
LE
GRASS
GEOTEXTILE
FABRIC
MINIMUM 4"
TOPSOIL
RESTORE TURF AREA RESTORE SIDEWALK
EX GROUND EX GROUND
SLO
PE SIDES OF TRENCH AT 1:1
MIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
CIVIL UTILITY DETAILS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
CU502
SITE
585A5-18-521
SBV HMS
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: NTS
STORM DRAIN TRENCH CROSS-SECTION4
CU101
SCALE: NTS
WATER LINE TRENCH DETAIL5
CU101
SCALE: NTS
FORCE MAIN TRENCH DETAIL3
CU101
SCALE: NTS
BUILDING 10 CONDENSATE RETURN REPLACEMENT DETAIL6
CU101
SCALE: NTS
STEAM TUNNEL TRENCH1
CS101
SCALE: NTS
STEAM TUNNEL WITH DUCT BANK TRENCH2
CS101
10/30/2019
AV-6 (CAST IN PLACE)
EXISTING STRUCTURE
(12) 8'-0" PRE-CAST TUNNEL SECTIONS
63°
117°
110'-10 1/8"
108'-1 3/8"
AV-5 (CAST IN PLACE) AV-6 (CAST IN PLACE)
(12) 8'-0" PRE-CAST TUNNEL SECTIONS
104°
83°
97°
SS306
SS501
SS305
PRE-CAST TUNNEL SECTION
106'-6 13/16"
105'-11 1/8"
AV-5 (CAST IN PLACE)
104°
83°
97°
PRE-CAST TUNNEL SECTION
AV-4 (CAST IN PLACE)
(16) 8'-0" PRE-CAST TUNNEL SECTIONS
139°
110°
142'-9 7/16"
140'-2 1/4"
PRE-CAST TUNNEL SECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
STRUCTURAL TUNNEL PLANS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
SS102
SITE
585A5-18-521
SBV VAR
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
SCALE: 1/4" = 1'-0"
AV-4 TO AV-5 TUNNEL PLAN1
SCALE: 1/4" = 1'-0"
AV-5 TO AV-6 TUNNEL PLAN2
SCALE: 1/4" = 1'-0"
AV-6 TO EXISTING STRUCTURE PLAN3
GENERAL NOTES
1. SEE S-001 FOR S-SERIES NOTES AND LEGENDS.
2. SEE CIVIL DWGS FOR TRENCH LAYOUT.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL NOTES AND LEGENDS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29 E-001
SITE
585A5-18-521
SBV CJR
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SWITCH, NORMALLY OPEN TIME DELAY
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
HIGH-VOLTAGE OIL CIRCUIT BREAKER
HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
GENERATOR, POWERG
BATTERY
CAPACITOR
LIGHTNING ARRESTOR
POTHEAD
STRESS CONE
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
ELECTRICAL SYMBOLS - SCHEMATICS
PANELBOARD CABINET, FLUSH MOUNTED
PANELBOARD CABINET, SURFACE MOUNTED
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX ON EMERGENCY POWER
RECEPTACLE, DUPLEX W/ GROUND FAULT CIRCUIT INTERRUPTER
RECEPTACLE, QUADRAPLEX
RECEPTACLE, SINGLE
RECEPTACLE, SINGLE WITH SWITCH
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R
RECEPTACLE, SWITCHED DUPLEX
DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE,
GROUNDING TYPE, 20A, W/ #12 CONDUCTORS IN FLEXIBLE
CORD (CENTERLINE OF OUTLET: 6'-6" AFF MIN)
JUNCTION BOX
TRANSFORMER, PLAN
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
WYE CONNECTION
EARTH GROUND
PB PULL BOX
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
VARIABLE FREQUENCY DRIVE
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER F = FUSED SWITCH
K = KEY OPERATED L = LOCK
LM = LOW VOLT MASTER LV= LOW VOLTAGE
M = MANUAL MOTOR STARTING MC = MOMENTARY CONTACT
Mo = OCCUPANCY SENSOR MP = MOTOR SNAP W/ PILOT LIGHT
P = WITH PILOT LIGHT (THERMAL TYPE) PB= PUSH BUTTON STATION
RC= REMOTE CONTROL T = TIMER OPERATED
WP= WEATHER PROOF X = EXPLOSION PROOF
LIGHT FIXTURE, DIRECTIONAL
PHOTOCELLPC
GENERAL NOTES
1. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS.
EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED
EQUIPMENT GROUNDING CONDUCTOR.
2. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF
EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS
BETWEEN DEVICES.
3. DRAWINGS ARE DIAGRAMMATIC IN NATURE, CONTRACTOR RESPONSIBLE FOR
DETERMINING EXACT ROUTINGS AND DEVICE PLACEMENT IN FIELD.
GENERAL NOTES DEMOLITION
1. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES,
CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY REMOVE
CONDUIT AND WIRING TO THE OVERCURRENT PROTECTIVE DEVICE.
2. DISCONNECT ALL ABANDONED WIRING TO ALL TYPES AT THE OVERCURRENT
PROTECTIVE DEVICE. COMPLETELY REMOVE ALL ABANDONED WIRING.
3. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS
PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
NAMING DESIGNATIONS FOR ELECTRICAL EQUIPMENT
01-SBA-70-4160N-SWGR-001A
EXTENDED IDENTIFIER (OPTIONAL) A,B,C, ...
NUMBER IN SEQUENCE 001,002,003, ...
EQUIPMENT TYPE
ATS AUTOMATIC TRANSFER SWITCH
CB SEPARATELY ENCLOSED CIRCUIT BREAKER
DS UN-FUSED DISCONNECT SWITCH
FDS FUSED DISCONNECT SWITCH
PNLB PANEL BOARD
SWBD SWITCHBOARD
SWGR SWITCHGEAR
T TRANSFORMER
MTS MANUAL TRANSFER SWITCH
ELECTRICAL SYSTEM BRANCH
C CRITICAL BRANCH
EQ EQUIPMENT BRANCH
L LIFE SAFETY BRANCH
N NORMAL BRANCH
E EMERGENCY POWER, NON EES
I ISOLATED POWER SYSTEM
NFPA 70, ARTICLE 517
ESSENTIAL ELECTRICAL
SYSTEM (EES)
BUILDING NUMBER
BUILDING FLOOR
SB SUB-BASEMENT
B BASEMENT
1 1st FLOOR 2 2nd FLOOR
ETC.
BUILDING WING
(IF NEEDED)
A B C
ETC...
NOMINAL VOLTAGE CLASS
4160V 480V 208V
ROOM NUMBER(IF APPLICABLE)
EXT-EXTERIOR
OCCUPANCY SENSOR, CEILING MOUNTEDOC
TRANSFORMER
ELECTRICAL MANHOLE (EXISTING)
AUTOMATIC TRANSFER SWITCH
1P SINGLE POLE
2P TWO POLE
3P THREE POLE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
AMP/A AMPERE
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
BIL BASIC INSULATION LEVEL
BLDG BUILDING
BRKR/BKR BREAKER
BYP BY PASS
CALC CALCULATE
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
COAX COAX CABLE
COMM COMMUNICATION
COMP COMPUTER
CONC CONCRETE
CRI COLOR RENDERING INDEX
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DN DOWN
DS DISCONNECT SWITCH
DWG DRAWING
DECON DECONTAMINATION
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
EMER EMERGENCY
EMT ELECTRICAL METALLIC TUBING
EQUIP EQUIPMENT
ETC ETCETERA
EXIST EXISTING
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FT FEET OR FOOT
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G OR GND GROUND OR GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
HID HIGH INTENSITY DISCHARGE
HP HORSEPOWER
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IT INFORMATION TECHNOLOGY
J-BOX JUNCTION BOX
KA KILOAMPERE
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER
LB POUNDS
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NO NORMALLY OPEN
NTS NOT TO SCALE
OL OVERLOAD
ELECTRICAL ABBREVIATIONS
PB/PNLB PANEL BOARD, PULL BOX, OR PUSHBUTTON
PNL PANEL
PSI POUNDS PER INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RGS/GRC RIGID GALVANIZED STEEL
RM ROOM
SCBA SELF CONTAINED BREATHING APPARATUS
SPEC SPECIFICATION
SPD
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TC TIME CLOCK
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
W/ WITH
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
T
ELECTRICAL SYMBOLS - POWER PLAN
FUSED SWITCH
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
J
RECEPTACLE, DUPLEX W/ GROUND FAULT CIRCUIT INTERRUPTER
ON EMERGENCY POWER
GFCI
S
S
GFCI
BRANCH CIRCUIT HOMERUN TO PANEL. NEUTRAL CONDUCTOR; SHORT LINE,
PHASE CONDUCTOR WITH SWITCH LEGS; LONG LINE. ALL HOMERUNS WILL
INCLUDE GREEN INSULATED GROUND CONDUCTOR; NOT SHOWN
OCCUPANCY SENSOR, WALL MOUNTEDOC
LIGHT POLE, ONE MAST ARM, ONE LUMINAIRE
NEW UNDERGROUND ELECTRIC
DEMOLITION
EXISTING WATER LINE
FENCE LINE
GROUND LINEGND
GENERAL LINETYPES
HPS
GR
COMM
ST
UE
SA
W
COMMUNICATION LINE
EXISTING STORM WATER LINE
EXISTING SANITARY SEWER
NEW HIGH PRESSURE STEAM LINE
GRAVITY RETURN LINE
OCB
WH
W
V
A
M
LIGHT POLE, POST TOP MOUNT LUMINAIRE
NEW ABOVE GROUND ELECTRICE
GAS
EXISTING ABANDONED HIGH PRESSURE STEAMAHPS
LPS EXISTING LOW PRESSURE STEAM
NEW CONDENSATE PUMP DISCHARGEPC
EXISTING UNDERGROUND ELECTRICUE
EXISTING GAS
HPS EXISTING HIGH PRESSURE STEAM LINE
TRANSITION TO RGS CONDUITS
FOR BUILDING ENTRANCE
PVC CONDUIT ADAPTER COUPLING
RACEWAY
PROVIDE CONDUIT SLEEVE AND
"LINK SEAL" FOR ALL PENETRATIONS
BELOW GRADE (REFER TO
SPECIFICATIONS)
WALL
PULL BOX
VA
RI
ES
12"
GRADE, FEATHER AND TAMP
BACKFILL TO CREATE FLUSH
INSTALLATION AND POSITIVE
DRAINAGE AWAY FROM BOX
PULLBOX (SEE
SPECIFICATIONS)
LINE SIDES OF
EXCAVATION WITH
30LB FELT PAPER
(4) CONCRETE
BRICKS 2"X8"X16"
CLEAN 3/4"
CRUSHED ROCK
CONDUIT(S) WITH BELL ENDS, (TYP)
SIZE, QUANTITY AND WIRING AS
INDICATED ON PLANS
GRADE
RESTORE SURFACE
TO MATCH EXISTING
WARNING TAPE
BACKFILL IN
6" LIFTS
3,000 PSI CONCRETE
PROVIDE PLASTIC
SPACER AT
MAXIMUM OF 5 FEET
SPACING
NATIVE SOIL
#4 REBAR (TYP)
CONCRETE
#4 TIE BAR ALL
AROUND,
EVERY 5 FT MIN
CL
PVC CONDUIT, SIZE AS
INDICATED
3"
" M
IN
" M
IN
3"
3"
3"
2'- 6"
M
IN
2'- 0"
M
IN
NOTES:
1. BACKFILL, CONCRETE, REINFORCING STEEL, AND ANCHOR BOLTS ARE
SHOWN FOR REFERENCE ONLY. STRUCTURAL DESIGN IS SHOWN ON
SB302 DETAIL 4.
2. REFER TO SPECIFICATION SECTION 26 56 00 FOR MOUNTING AND
LEVELING REQUIREMENTS.
FINISHED PAVING
2-PIECE BOLT COVER PLATE
POLE GROUNDING STUD
3" X 5" REINFORCED HAND HOLE
WITH TAMPER RESISTANT SCREWS.
PROVIDE IN-LINE SCREW TYPE
FUSE HOLDER(S) WITH FUSE(S)
PVC CONDUIT
ADAPTER COUPLING
PVC CONDUIT
UNDISTURBED SOIL
OR SELECT BACKFILL
COMPACTED, SEE
NOTE BELOW
#4 BARE COPPER
GROUND 20FT COILED
BELOW BASE
CONCRETE BASE AND
REINFORCING STEEL,
SEE NOTE BELOW
EMPTY CONDUIT
WITH CAP (WHERE
SHOWN ON PLANS)
ANCHOR BOLTS PER POLE
MANUFACTURER'S REQUIREMENTS
WITH LEVELING NUTS ABOVE AND
BELOW BASE PLATE
LIGHT POLE PER LIGHT
FIXTURE SCHEDULE
RIGID STEEL CONDUIT
SECTION "A"
ELEVATION
" M
AX
" M
AX
A
CAST METAL, 2-GANG
NEMA 3R JUNCTION BOX
WITH THREADED HUBS.
CAST METAL "WHILE
-IN-USE" WP COVER(S)
AND RECEPTACLES
RIGID STEEL
CONDUIT FOR
SUPPORT PER
N.E.C. ART.314
RIGID STEEL
CONDUIT FOR
WIRING
E-501
NOTES:
1. MAINTAIN A MINIMUM CLEARANCE OF 12" ON ALL SIDES OF ROOF PENETRATION
FROM WALLS, CURBS, AND OTHER PROJECTIONS TO FACILITATE PROPER
FLASHING.
2. FLANGES OF ADJACENT FLASHINGS SHALL NOT BE CUT OR OVERLAPPED.
3. VERIFY ROOF AND STRUCTURAL SYSTEM WITH ARCHITECT.
4. COORDINATE FLASHING INSTALLATION WITH ROOFING CONTRACTOR TO
ENSURE PROPER METHODS AND MATERIALS ARE USED TO MAINTAIN ROOF
WARRANTY.
ROOF MEMBRANE
SEALANT AT
PENETRATION TO
MEMBRANE JUNCTURE
BY ROOFING
CONTRACTOR
PREFABRICATED RUBBER
BOOT CAMP WITH
GRADUATED STEPS AND
WEATHER-PROOF
PRESSURE SEAL TO
COLLAR
STAINLESS CLAMP, TYP
SEAL-OFF
FITTING,
TYP
CONDUIT, TYP
BATT INSULATION
PREFABRICATED FORMED 0.06"
THICK ALUMINUM FLASHING
ROUND COLLAR WITH MIN 3" WIDE
FLANGE. ATTACH TO ROOF PER
MANUFACTURERS INSTRUCTIONS
MULTIPLE MEMBRANE STRIPPING
PLIES FEATHERED AT FIELD OF
ROOF BY ROOFING CONTRACTOR.
PRIME FLANGE BEFORE STRIPPING
STEEL
EXPANSION
ANCHOR
3/8" MIN GALVANIZED
THREADED ROD, TYP
LOCKING SQUARE
WASHER AND
LOCKNUT
INTEGRAL GALVANIZED
LIPPED STEEL
MOUNTING CHANNEL
CONDUIT CLAMP,
SIZE AS REQUIRED
ROOF
WATER CUT-OFF
MASTIC COMPATIBLE
WITH ROOF
MEMBRANE
CONDUIT CLAMP,
SIZE AS REQUIRED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL DETAILS 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29 E-501
SITE
585A5-18-521
SBV CJR
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: NTS
TYPICAL CONDUIT PENETRATION INTO BUILDING1
SCALE: NTS
TYPICAL UNDERGROUND
CONCRETE PULLBOX -TURF AREAS3
ES401
SCALE: NTS
CONCRETE ENCASED DUCT
BANK SECTION - 2 CONDUITS2
ES401
SCALE: NTS
POLE BASE DETAIL - TURF AREAS4
ES401
CS101
SCALE: NTS
TYPICAL RECEPTACLE ROOF
MOUNTING DETAIL5
SCALE: NTS
TYPICAL CONDUIT ROOF PENETRATION DETAIL6
BLDG 16
BLDG 10
BLDG 6
BLDG 7
BLDG 8
PROPERTY BOUNDARY
PROPERTY BOUNDARY
PR
OP
ER
TY
B
OU
ND
AR
Y
PROPERTY BOUNDARY
BLDG 9
BL
DG
BLDG 36
BLDG 37
NEW AV-4
NEW AV-3
NEW AV-2
NEW AV-1
NEW AV-5
EX ACCESS VAULT
NEW AV-6
NEW AV-7
NEW AV-8
NEW AV-9
CO
MM
CO
MM
UE
UE
COMM
PC PC
HPS
UE
UE
UE
UE
UEUE
COMM
COMM
COMM
COMM
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
HPS
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HP
S
HPS
LP
S
LP
S
LP
S
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
HPSHPS
COMM
COMM
COMM
UE
UE
UE
UE
UE
UE
UE
UE
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HPS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
W
ST
ST
ST
ST
UE
ST
ST
ST
ES401
ES402
ES403
A
A
A
A A
A
A
A
A
A
A
AA
A
A
A
A
PB
E E E E E
PB
PB
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL SITE PLAN 100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
ES101
SITE
585A5-18-521
SBV CJR
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
SCALE: 1" = 40'
ELECTRICAL SITE PLAN1
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. CONTRACTOR TO PROVIDE RECEPTACLES FOR CONNECTION TO STEAM TRAP
REPEATERS.
KEYED NOTES
1 PROVIDE NEW RECEPTACLE FOR STEAM TRAP MONITORING SYSTEM REPEATER.
COORDINATE LOCATION WITH MECHANICAL CONTRACTOR. CONNECT TO NEAREST
NORMAL POWER PANEL BOARD, COORDINATE CONNECTION POINT WITH VA COR.
2 SEE E-501 DETAIL 5 FOR TYPICAL RECEPTACLE ROOF MOUNTING DETAIL AND
DETAIL 6 FOR TYPICAL CONDUIT ROOF PENETRATION DETAIL.
BLDG 7
BLDG 8
NEW AV-4
NEW AV-3
NEW AV-2
NEW AV-1
NEW AV-5
EX ACCESS VAULT
NEW AV-6
COMMCOMM
PC
SA SA SA SA SA SA
UE
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
COMM
UE UE
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
GAS
GAS
GAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
SA
SA
SA SA
HP
S
HP
S
HP
S
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AHPS
AH
PS
AH
PS
AH
PS
COMM
COMM
UE
UE
UE
SA SA
ST
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HPSHPSHPSHPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HP
S
UE UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE
W W
W
ST
ST
ST
ST
ST
ST
ST
ST ST
A
A
A
(2) 2" SCH 40 PVC CONDUITS
(1) CONTAINING:
(3) #4 AWG
(1) #8 AWG GROUND
(1) CONTAINING:
(12) #18 AWG CONTROL WIRING
E-501
UE E E E E E E
(1) 2" RGS CONDUIT
(12) #18 AWG CONTROL WIRING
(2) 2" SCH 40 PVC CONDUITS
(1) CONTAINING:
(3) #4 AWG
(1) #8 AWG GROUND
(1) CONTAINING:
(12) #18 AWG
PANEL D
(LOCATED IN GROUND
FLOOR OF BUILDING 8)
PB
1'x1' HANDHOLE
SEE E-501, DETAIL 3
1'x1' HANDHOLE
SEE E-501, DETAIL 3
1'x1' PULLBOX
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL SITE PLAN ENLARGED
- NORTH LOOP
100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
ES401
SITE
585A5-18-521
SBV CJR
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: 1/2" = 1'-0"
ELECTRICAL SITE PLAN ENLARGED NORTH LOOP1
ES101
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. CONTRACTOR TO PROVIDE PULL BOXES AS NEEDED.
KEYED NOTES
1 EXISTING LIGHT POLE TO BE RELOCATED, COORDINATE WITH CIVIL CONTRACTOR.
2 SEE E-501, DETAIL 4 FOR POLE BASE DETAIL.
3 SUMP PUMP RECEPTACLE LOCATED IN ENCLOSURE WITHIN SUMP PIT. SEE CU501,
DETAIL 6 FOR ADDITIONAL INFORMATION.
4 PROVIDE NEW 50 AMP GFCI PROTECTED CIRCUIT BREAKER.
5 CONTRACTOR TO AVOID ACCESS VAULT WHEN ROUTING NEW CONDUIT.
6 INTERCEPT AND RE-ROUTE EXISTING PARKING LOT LIGHTING CIRCUIT TO AVOID
NEW STEAM TRENCH.
7 CONTRACTOR TO PROVIDE SUMP PUMP MONITORING/ALARM PANEL. PANEL TO
INDICATE PUMP FAILURE/HIGH WATER LEVEL ALARMS FOR EACH ACCESS VAULT.
A
EXT-120N-FDS-001N EXT-120N-FDS-002N EXT-120N-FDS-003N
A A
EXT-PMP-001N EXT-PMP-002N EXT-PMP-003N
PANEL D
DISCONNECT SWITCH SCHEDULE
DESIGNATION
TYPE
VOLTAGE AMPERAGE
RATING PHASE FUSE RATING FED FROM LOAD NEMA
TYPE LOCATION COMMENTSFU
SE
D
UN
FU
SE
D
LO
CK
AB
LE
OP
EN
LO
CK
AB
LE
CL
OS
ED
EXT-120N-FDS-001N X X 120 30 1 30 PANEL D (BLDG 8) EXT-PMP-001N 6P AV-1
EXT-120N-FDS-002N X X 120 30 1 30 PANEL D (BLDG 8) EXT-PMP-001N 6P AV-2
EXT-120N-FDS-003N X X 120 30 1 30 PANEL D (BLDG 8) EXT-PMP-001N 6P AV-3
AV-1 AV-2 AV-3
SCALE: NTS
ONE-LINE DIAGRAM2
HPS
HPS
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
LP
S
LP
S
LP
S
LP
S
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AHPS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AH
PS
AHPS
HPS
HPSHPSHPS
UE
UE
UE
UE
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HPS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
ST
ST
ST
ST
ST
ST
ST
UE
F
F
F
F
F
(2) 2" SCH 40 PVC CONDUITS
(1) CONTAINING:
(3) #8 AWG
(1) #10 AWG GROUND
(1) CONTAINING:
(20) #18 AWG CONTROL WIRING
(2) 2" SCH 40 PVC CONDUITS
(1) CONTAINING:
(3) #8 AWG
(1) #10 AWG GROUND
(1) CONTAINING:
(20) #18 AWG CONTROL WIRING
E-501
PB PB
1'x1' HANDHOLE
SEE E-501, DETAIL 3
1'x1' HANDHOLE
SEE E-501, DETAIL 3
1'x1' HANDHOLE
SEE E-501, DETAIL 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
ELECTRICAL SITE PLAN ENLARGED
- SOUTH LOOP
100% CONSTRUCTION
DOCUMENT
DESIGN STEAM SYSTEM REPAIRS -
CANANDAIGUA VAMC
400 FORT HILL AVE.
CANANDAIGUA, NY 14424
2019-10-29
ES402
SITE
585A5-18-521
SBV CJR
REV 0 - CONSTRUCTION DOCUMENT 2019-10-29
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
SCALE: 3/8" = 1'-0"
ELECTRICAL SITE PLAN ENLARGED SOUTH LOOP1
ES101
KEYPLAN
B16 B11
B10
B6
B7
B8 B5
B4B2 B3
B1
B9
B37
B36
B118
B34
B33
B17
B14
B12
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. CONTRACTOR TO PROVIDE PULL BOXES AS NEEDED.
KEYED NOTES
1 SUMP PUMP RECEPTACLE LOCATED IN NEMA 6P ENCLOSURE WITHIN SUMP PIT. SEE
CU501, DETAIL 6 FOR ADDITIONAL INFORMATION.
F
EXT-208N-FDS-007S EXT-208N-FDS-008S EXT-208N-FDS-009S
F F
EXT-PMP-007S EXT-PMP-008S EXT-PMP-009S
PANEL PP-1
EXT-208N-FDS-010S EXT-208N-FDS-011S
F F
EXT-PMP-010S EXT-PMP-011S
DISCONNECT SWITCH SCHEDULE
DESIGNATION
TYPE
VOLTAGE AMPERAGE
RATING PHASE FUSE RATING FED FROM LOAD NEMA
TYPE LOCATION COMMENTSFU
SE
D
UN
FU
SE
D
LO
CK
AB
LE
OP
EN
LO
CK
AB
LE
CL
OS
ED
EXT-208N-FDS-007S X X 208 30 3 30 PANEL PP-1 (BLDG 12) EXT-PMP-007S 6P AV-7
EXT-208N-FDS-007S X X 208 30 3 30 PANEL PP-1 (BLDG 12) EXT-PMP-008S 6P AV-8
EXT-208N-FDS-007S X X 208 30 3 30 PANEL PP-1 (BLDG 12) EXT-PMP-009S 6P AV-9
EXT-208N-FDS-007S X X 208 30 3 30 PANEL PP-1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .