36C24221B0075 0002.docx

DOCX document 33 KB Posted

Attached to
Z1DA--528A5-18-521 STEAM SYSTEM REPAIRS Federal contract opportunity
Solicitation number
36C24221B0075
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document contains an amendment to a solicitation and responses to bidder questions. The amendment provides responses to questions from bidders, extends the bid opening date to November 25, 2021, and incorporates supplemental COVID-19 safety protocol requirements for federal contractors.

The solicitation is for steam system repairs at the Canandaigua VA Medical Center. The scope of work includes upgrading the medical center's steam distribution system. The procurement number is 36C24221B0075 and the project number is 528A5-18-521. The estimated value is between $1 million and $5 million. A 20% bid bond is required. The NAICS code is 238220 and the small business size standard is $16.5 million. This opportunity is 100% set aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--528A5-18-521 STEAM SYSTEM REPAIRS, newest first.
File Type Posted
S04 Sign In Sheet.jpg JPG image
36C24221B0075 0003.docx DOCX document
DWG-19123-SS309.REV0 STRCTRL PLANS _ SECTIONS AV-7 THRU AV-11.pdf PDF
IMG_0029.jpg JPG image
36C24221B0075 0001.docx DOCX document
IMG_0031.jpg JPG image
IMG_0037.jpg JPG image
IMG_0028.jpg JPG image
IMG_0030.jpg JPG image
IMG_0036.jpg JPG image
IMG_0035.jpg JPG image
IMG_0032.jpg JPG image
IMG_0038.jpg JPG image
IMG_0033.jpg JPG image
IMG_0034.jpg JPG image
36C24221B0075.docx DOCX document
S02 Certification of Vaccination.pdf PDF
specsfull.pdf PDF
completePlans.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation Page

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11/16/2021 N/A 528A5-18-521 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24221B0075

X X x

Contingent on Availability of funds This amendment is to provide responses to question(s), add the VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors and extend the bid opening date.

See Continuation Page

Tanya Baldwin Contracting Officer

BID OPENING:

The bid opening has changed from Thursday, November 18, 2021 to Thursday, November 25, 2021 at 1:15. Proposals should be sent by November 25, 2021 NLT 1:00 P.M. EST to Tanya.Baldwin@va.gov Proposals received after this time will not be accepted.

Q&As Q. When will the project be funded?

A. Not sure yet but the request for the funds has been sent.

Q. We have not been able to locate the design/operating pressures for the High Pressure, Medium Pressure and Low-Pressure portions of the steam piping. This is needed to properly size and price components needed and specified in the documents. Please indicate where these can be found in the documents or provide the information or applicable assumptions.

A. Per the VA Steam, Heating Hot Water, and Outside Distribution Systems Design Manual volume 3:

5.16.6 The designer shall furnish thermal expansion calculations for the supply and return piping using the following design characteristics and installation temperature. The system design conditions shall be 1,034 kPa, 188 C [150 psi, 370 F] or the maximum boiler safety valve setting and associated temperature whichever is higher. The condensate/return shall be designed for 1,034 kPa, 121 C [150 psi, 250 F] or pump dead head whichever is greater.

In our case 150 psi is the controlling limit for the High-Pressure system

Per the VA Steam, Heating Hot Water, and Outside Distribution Systems Design Manual volume 1:

6.1 Definition of steam distribution pressure classes:

Low pressure steam (LPS)………….….0 thru 15 psig Medium pressure steam (MPS)……. Greater than 15 psig but less than 60 psig High pressure steam (HPS)……….…. Greater than 60 psig

For this project design pressures are as follows:

HPS is 150 psi max MPS is 60 psi max LPS is 15 psi max

Q. Drawing MI101 show steam trap monitoring transmitter locations in a number of buildings (i.e. Bldgs 5,6,7,8,9,10,36 and 37) that do not show the installation of steam traps elsewhere in the drawings. Is monitoring required in these buildings? If so can more information be provided to allow for pricing.

A. Intent of MI101 is to include monitoring on the existing main steam trap in each of the indicated buildings, located within the building's primary mechanical space. Design intent was based upon, but does not mandate the use of, Armstrong Steam Eye trap monitoring transmitters.

Q. After reviewing the plans, drawing SS309 is not within our drawing set. Can you provide drawing SS309?

A. See attached for SS309.

Q. Are the sump pump monitoring systems furnished by others and installed by us, or will you need us to quote those?

A. The monitoring system is a part of this project and should be supplied by the contractor.

Q. Drawing ES-101 notes receptacles for the steam trap repeaters. It appears there are a total of (12) rooftop receptacles on that drawing, however drawing MI-101 shows a total of (17) repeaters, (21) transmitters (including one at each new AV), and (1) receiver. Can you confirm the total number of new receptacles that will be required for the system?

A.

· DWG ES101 notes 17 rooftop receptacles in the same locations as the 17 repeaters noted on MI101. The contractor should supply 1 receptacle per repeater as shown. A/E is uncertain as to which 5 receptacles the contractor appears to be overlooking on ES101.

· Per Specification 336300 section 2.12(D), the 21 transmitters are intended to be battery powered and do not require external power. If the contractor elects to utilize a system involving powered transmitters then additional outlets at each transmitter location will be required.

· The receiver does require 120V power. A receptacle will be required in the shop area of Building 118. See MI101 for general location, but contractor should coordinate final location with VA staff Q. Also, for the new transmitters at each AV, will we also need to supply power for those, or is the #18 AWG pulled to each location meant to be part of that monitoring system?

A. As stated above, the transmitters are intended to be battery operated. The #18AWG wire is intended to be used for the sump pump monitoring/high water level alarms at each access vault so equipped.

A. VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors as shown below is hereby incorporated into the scope of work for the subject contract.

VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

------------END OF CHANGES-----------

See attached document: DWG-19123-SS309.REV0 STRCTRL PLANS _ SECTIONS AV-7 THRU AV-11.