COMPACT_WHEELED_EXCAVATOR_MULTIPURPOSE_TOOL_CARRIER.pdf
PDF 631 KB Posted
- Solicitation number
- IFB 102126
- Issued by
- Barnwell County, South Carolina
About this file
Invitation for Bid Summary
This is an Invitation for Bid (IFB) document issued by Beaufort County Procurement Services for the acquisition of one new, current-production compact wheeled excavator with multipurpose tool carrier capabilities. The equipment must be capable of excavation, forward-facing loader-bucket operation, pallet handling, and use of skid-steer attachments, with all specified equipment and attachments included in the bid price and delivered fully assembled and operational. The solicitation was advertised on October 7, 2026, with a proposal due date of Wednesday, October 21, 2026, at 3:00 p.m. EST. A non-mandatory pre-bid conference was scheduled, though specific details are marked as "NO VALUE" in the document. All responses must be submitted electronically through the Procurement Portal. The County reserves the right to reject all proposals and waive minor informalities and irregularities. Award will be made to the lowest responsible bidder within 90 days of bid opening, and the successful bidder must provide the equipment within 60 days of order receipt with transportation costs included and prepaid.
Bid submissions must include a bid bond equal to five percent of the total bid amount, with the original bond to be received within 10 days after the bid due date; failure to provide a copy by the closing date will result in rejection as non-responsive. The contract requires performance and payment bonds equal to 100 percent of the contract amount. Specific machine configuration requirements include an operating weight of approximately 17,400 pounds (maximum 20,000 pounds), minimum 74 horsepower diesel engine meeting EPA Tier 4 Final standards, four-wheel drive with hydrostatic transmission, minimum 12 mph travel speed, and comprehensive hydraulic capabilities. Required attachments include a full-width loader bucket, heavy-duty digging bucket, pallet forks, and skid-steer plate adapter. Bidders must provide line-by-line compliance statements, manufacturer specifications, attachment documentation, load charts, delivery timeframes, warranty terms, and dealer information. The solicitation emphasizes Small and Minority Business Enterprise (S/MBE) participation requirements, including pre-award good faith efforts documentation and post-award monthly compliance reporting. Insurance requirements include workers' compensation, commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), comprehensive automobile liability ($500,000 combined single limit), and umbrella liability insurance ($2,000,000 minimum).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_4_-_Monthly_Compliance_Status_Report.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
COMPACT WHEELED EXCAVATOR /
MULTIPURPOSE TOOL CARRIER
IFB # TBD
Prepared By: Beaufort County Procurement Services
Dated: Wednesday, October 7, 2026
Proposal Due Date: Wednesday, October 21, 2026, 3:00 pm (EST)
IFB #TBD DOCUMENTS Page 2
IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS
Response submittals for this Invitation For Bid will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Wednesday, October 21, 2026.
All responses must adhere to the following guidelines:
• Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason.
• All requested information and forms MUST be uploaded as indicated in the
PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal.
TITLE VI STATEMENT
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as
“Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (Title
VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language regardless of whether those programs and activities are Federally funded or not. The
County is also committed to assuring every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort County will not retaliate against any person who complains of discrimination or who participates in an investigation of discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination requirements into appropriate documents, directives, and regulations.
https://procurement.opengov.com/portal/bcgov/projects/313166/document?section=undefined
IFB #TBD DOCUMENTS Page 3
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT) and/or the Federal
Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability, religion, or language by providing such a statement in its bidding and contract documents.
Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may determine to be appropriate, including, but not limited to:
• Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
• Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the
Contractor may request the United States to enter into such litigation to protect the interests of the
United States. Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action. Any such complaint must be filed in writing or in person:
Beaufort County Government Post Office Drawer 1228 | Beaufort, SC 29901-1228
843-255-2304 Telephone | E-mail: dthomas@bcgov.net mailto:dthomas@bcgov.net
IFB #TBD DOCUMENTS Page 4
IFB #TBD DOCUMENTS Page 5
INVITATION FOR BID
Dates Advertised: October 7, 2026
This is a Formal Sealed Bid
We require Bids to be Electronically submitted through the Procurement Portal. Please go to https://procurement.opengov.com/portal/bcgov and sign up to submit your bid.
BIDS WILL BE RECEIVED UNTIL 3:00 pm LOCAL TIME ON Wednesday, October 21, 2026.
Bid Title: COMPACT WHEELED EXCAVATOR / MULTIPURPOSE TOOL CARRIER
Bid No: TBD
PREBID CONFERENCE: A Pre-Bid conference will be held on NO VALUE at NO VALUE p.m.
virtually through Teams. This is a Non-Mandatory meeting; all interested bidders and subcontractors are encouraged to attend. Teams: NO VALUE.
All questions must be submitted through the Procurement Portal no later than 5:00 pm on Friday, October 16, 2026.
A Bid Tabulation Will Be Posted On The Procurement Portal After Bid Opening.
BID ACCEPTANCE AND DELIVERY (Prices bid must be firm for a minimum of 90). In compliance with the Invitation, and subject to all conditions thereof, the Offeror agrees, if this bid is accepted within (90) days from date of opening, to furnish any or all items quoted on at prices as set forth after the item and to make delivery within 60 after receipt of order with transportation cost included and prepaid. Unless otherwise stated and accepted herein, the Offeror agrees to complete this proposed contract in less than thirty (30) calendar days after issue date of purchase order.
I M P O R T A N T
IF YOU CONSIDER THESE SPECIFICATIONS AS RESTRICTIVE, SEE GENERAL
PROVISIONS, PARAGRAPH #20, DISCREPANCIES.
Bids received after the time specified for opening cannot be considered.
https://procurement.opengov.com/portal/bcgov
IFB #TBD DOCUMENTS Page 6
BID INVITATION
COMPACT WHEELED EXCAVATOR / MULTIPURPOSE TOOL CARRIER
TBD
Sealed bids submitted through the Procurement Portal will be received electronically until 3:00 pm on Wednesday, October 21, 2026 at which time responses to this request will be recorded in the presence of one or more witnesses in the Procurement Services Department. A Bid Tab will be posted on the Procurement Portal for:
COMPACT WHEELED EXCAVATOR / MULTIPURPOSE TOOL CARRIER
A PRE-BID conference will be held on NO VALUE at NO VALUE p.m. virtually through
Teams. This is a Non-Mandatory meeting; all interested bidders are encouraged to attend.
WebEx: NO VALUE.
Bid documents are available through the Procurement Portal at https://procurement.opengov.com/portal/bcgov.
Beaufort County reserves the right to reject all proposals and to waive minor informalities and irregularities.
All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract amount. A copy of the Bid Bond or Certified
Check must be electronically sent with your bid documents through the Procurement Portal, as indicated in the Vendor Questionnaire Section. The original Bid Bond or Certified Check must be received by the Procurement Services Department within 10 days after the bid due date.
Failure on the bidder’s part to provide a copy of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive bid and rejected by the County. The
Bid Bond shall be forfeited to the County Council of Beaufort County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide Performance and
Payment Bonds within fourteen (14) days after being notified that he has been awarded the
Contract.
The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes required for the construction and installation of this project as required by local, state, and federal regulations. County permits shall be required as applicable, but the fee shall be waived.
This waiver shall apply to the Beaufort County permit fee only and not to any "City or Town" permit fee and/or licenses, when applicable.
https://procurement.opengov.com/portal/bcgov
IFB #TBD DOCUMENTS Page 7
Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the
Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of
1970.
Bidders must certify that they do not and will not maintain or provide for their employees any facilities, which are segregated on the basis of race, color, creed, or national origin.
The Beaufort County Council reserves the right to reject all Bids and waive any formalities. Any claims for cost incurred by any bidders in preparation of any part of, or total package for this project will not be handled for reimbursement by Beaufort County or their representatives.
The Bidding Documents consist of the following, including all addenda issued there with and forms referenced therein, in addition to the drawings:
1. Bid Documents
2. Contract
3. General Conditions
4. Supplemental Conditions
5. General Provisions
6. Special Provisions
7. Specifications
Bid opening will be held at the Procurement Services Department. There will be no Public Bid
Opening. A Bid Tabulation will be posted on the Procurement Portal.
SCOPE OF WORK
Scope of Work
BID SPECIFICATIONS — COMPACT WHEELED EXCAVATOR / MULTIPURPOSE
TOOL CARRIER
General Requirements
Provide one new, current-production, compact wheeled excavator capable of excavation, forward-facing loader-bucket operation, pallet handling, and use of skid-steer attachments. All specified equipment and attachments shall be included in the bid price and delivered fully assembled and operational.
Machine Configuration and Performance
Item Required Specification
IFB #TBD DOCUMENTS Page 8
Operating weight Base machine approximately
17,400 lb; maximum 20,000 lb without attachment
Engine Minimum 74 hp diesel, meeting
U.S. EPA Tier 4 Final requirements
Drive system Four-wheel drive with hydrostatic transmission
Travel speed Minimum 12 mph
Upperstructure Continuous 360-degree rotation
Tail swing radius Maximum 54 inches
Overall width Maximum 92 inches, including tires and dozer blade
Maximum digging depth Minimum 11 feet 5 inches
Maximum reach Minimum 21 feet 10 inches
Bucket breakout force Minimum 11,400 lbf
Main implement hydraulic pump flow
Minimum 38 gpm; this rating shall not be represented as auxiliary attachment flow
Implement hydraulic working pressure
Minimum 4,000 psi
Stabilization Hydraulic dozer blade and hydraulically lockable oscillating axle
Three-Piece Articulated Boom with Hydraulic Offset
1. Machine shall have a factory-engineered three-piece working assembly consisting of main boom, intermediate articulated boom, and dipperstick, together with an integrated hydraulic lateral-offset mechanism.
2. Boom shall provide variable working geometry for excavation, loading, and pallet handling.
3. Hydraulic offset shall permit digging outside the machine’s wheel track on either side without repositioning the undercarriage.
4. Published lateral offset shall be at least 60 inches left and 74 inches right.
5. Boom geometry shall permit forward-facing loader-bucket operation and fork operation both above and below ground level.
6. A conventional monoboom or two-piece boom with only a swing-boom pivot shall not satisfy the articulated-boom requirement.
Hydraulic Quick Coupler
1. Provide an installed, cab-controlled hydraulic quick-coupling system.
IFB #TBD DOCUMENTS Page 9
2. Coupler shall provide positive mechanical attachment retention, hydraulically controlled release, and automatic compensation for attachment-interface wear or play.
3. Coupler shall provide visual and audible warning of improper attachment locking.
4. Coupler shall allow compatible buckets to be mounted in both digging and forward-facing loading orientations.
5. Operator shall be able to couple and uncouple the supplied mechanical attachments from the cab without manually removing attachment pins. Hydraulic hose connections, where applicable, shall be identified separately.
6. All supplied attachments shall be compatible with the furnished coupler, directly or through the specified adapter.
Required Attachments — Included in Base Bid
Attachment Requirement
Full-width skid-steer-style loader bucket
Forward-facing bucket approximately 91 inches wide, minimum 0.74 cubic yard capacity, sized to cover the machine’s tire width. Suitable for scooping, loading, backfilling, and grading.
Digging bucket Heavy-duty toothed excavation bucket compatible with the supplied coupler. Bidder shall state width and capacity.
Pallet forks Boom-mounted pallet fork assembly with adjustable fork spacing. Include manufacturer-required load-holding safety valves and applicable fork load charts. Bidder shall state tine length and rated capacity.
Skid-steer plate adapter Coupler-mounted adapter accepting standard universal skid-steer quick-attach implements.
Include all mounting components and attachment-retention hardware.
Hydraulics and Safety
• Provide proportional auxiliary hydraulics for compatible powered attachments. Bidder shall state available auxiliary flow, pressure, and return-line arrangement.
IFB #TBD DOCUMENTS Page 10
• Include all manufacturer-required load-holding valves for the specified pallet-handling configuration.
• Furnish an enclosed cab with heating and air conditioning, seat belt, work lights, mirrors, horn, and travel alarm.
• Machine and attachment capacities shall be supported by manufacturer documentation for the actual configuration supplied.
Bid Documentation and Acceptance
Bidder shall provide:
• A line-by-line compliance statement identifying any exceptions.
• Manufacturer specifications supporting dimensions, working range, boom configuration, and hydraulic performance.
• Specifications and compatibility documentation for each supplied attachment.
• Applicable lifting and pallet-fork load charts.
• Delivery timeframe, warranty terms, and servicing-dealer information.
• Operator and maintenance manuals and delivery orientation.
Prior to acceptance, supplier shall demonstrate attachment changes, forward-facing loader-bucket operation, digging, lateral boom offset, and pallet-fork operation. All required capabilities shall be demonstrated on the machine and attachments furnished.
Enter Scope Here
SMALL AND MINORITY BUSINESS PARTICIPATION
PLEASE REVIEW THIS SECTION CAREFULLY, PAYING PARTICULAR
ATTENTION TO “PRE-AWARD DOCUMENTS” DUE WITH THE BID/PROPOSAL,
THE “GOOD FAITH EFFORTS CHECKLIST”, AND EXHIBITS 1-3.
FAILURE TO FOLLOW THE PROGRAM REQUIREMENTS AND/OR FURNISH THE
REQUESTED DOCUMENTS MAY RESULT IN THE REJECTION OF YOUR
BID/PROPOSAL.
PRE-AWARD DOCUMENTS
Item/Form SubmissionRequirements
1 Program Overview n/a
2 Self-Performance Affidavit Indicates intention to perform work and/or provide services with own current workforce.
Due with bid/proposal only if self-performing
100%.
IFB #TBD DOCUMENTS Page 11
3 Good Faith Efforts Checklist
Indicates the actions undertook to recruit and solicit small and minority businesses for this project.
Due with bid/proposal.
4 Good Faith Agencies Distribution List
Indicates agencies that should receive notice of solicitation to small and minority businesses for this project.
Copy of notice sent to good faith agencies due with bid/proposal.
5 Outreach Written Notice Example
Sample of notice to be sent to small and minority businesses soliciting their participation for this project.
Copy of notice sent to small and minority businesses due with bid/proposal.
6 Non-Discrimination Statement – Exhibit 1
Certification that this project is open to all businesses and persons and that no business or person shall be excluded from participating in the Beaufort County procurement process.
Due with bid/proposal.
7 Outreach Documentation Log – Exhibit 2
Documents solicitation efforts to obtain small and minority business participation for this project.
Due with bid/proposal.
8 Proposed Utilization Plan – Exhibit 3
Listing of the small and minority businesses that will participate on this project and their proposed contract dollar amounts.
Due with bid/proposal.
POST-AWARD DOCUMENTS
Item/Form SubmissionRequirements
9 Compliance Efforts
If the successful bidder/proposer, indicates the actions required to earnestly carry out the small and minority business utilization plan and document payments thereof.
n/a
10 Monthly Compliance Status Report – Exhibit 4
Certifies monthly usage and payments to small and minority businesses.
Due monthly after work commences throughout the life of the contract.
IFB #TBD DOCUMENTS Page 12
* NOTE: Projects involving Federal funds may have Disadvantaged Business Enterprise
(DBE) participation goals and requirements of 49 CFR Part 26, Regulations of the U.S.
Department of Transportation (USDOT), or other Federal requirements prescribed by the
U.S. Department of Agriculture (USDA) or U.S. Department of Housing and Urban
Development (HUD). Contractors submitting bids on such projects will also have to meet any outlined DBE Program requirements listed in the bid documents and submit items, including but not limited to, the following: (1) Certification of Contractor to Comply with
DBE Requirements; (2) DBE Letter of Intent and Affirmation; (3) DBE Contract Totals and
Percentage; and (4) Bidder’s List Questionnaire. For a current list of South Carolina DBE firms, please visit www.scdot.org and go to “Doing Business with SCDOT”, then see “Office of Business Development and Special Programs” and click on “DBE Directory”. Likewise, any USDA and/or HUD requirements must be met in addition to Beaufort County’s requirements.
PROGRAM OVERVIEW
Introduction
Beaufort County recognizes that the South Carolina General Assembly, in South Carolina Code of
Laws Section 11-35-5210*, has declared that businesses owned and operated by minority persons have been historically restricted from full participation in our free enterprise system to a degree disproportionate to other businesses; and that it is in the state’s best interest to assist minority-owned businesses to develop fully as a part of the state’s policies and programs which are designed to promote balanced economic and community growth throughout the state. Therefore, Beaufort
County wishes to ensure that those businesses owned and operated by minorities are afforded the opportunity to fully participate in its overall procurement process for goods and services. Further, Beaufort County seeks to ensure that small businesses are likewise afforded the same participation opportunity as minority businesses. Consequently, attention of all bidders and proposers is called to contract conditions contained herein pertaining to Beaufort County’s “Small and Minority
Business Participation Program”, as prescribed in the Beaufort County Code of Ordinances
Section 2-537.2.
Definitions
Small Business means a for-profit concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on government contracts, and qualified as a small business under the criteria and size standards in the Code of Federal
Regulations, Title 13, Part 121, as amended. Beaufort County refers to these businesses as Small
Business Enterprises or “SBE”.
Minority Business means a concern at least fifty-one percent (51%) owned by a person determined to be socially and economically disadvantaged. Socially disadvantaged means those persons who have been subject to racial or ethnic prejudice or cultural bias because of their identification as members of a certain group without regard to their individual qualities. Such groups include, but http://www.scdot.org/
IFB #TBD DOCUMENTS Page 13 are not limited to, Black Americans, Hispanic Americans, Native Americans (including American
Indians, Eskimos, Aleuts and Native Hawaiians), Asian Pacific Americans, women and other minorities to be designated by the Beaufort County Council. Economically disadvantaged means those socially disadvantaged persons whose ability to compete in the free enterprise system has been impaired due to diminished capital and credit opportunities as compared to others in the same business area that are not socially disadvantaged. Beaufort County refers to minority businesses as Minority Business Enterprises or “MBE”.
Small and Minority Business Enterprises will be abbreviated as “S/MBE”.
Provisions
The successful bidder or proposer, hereafter referred to as “Contractor”, is required to (1) make specific Pre-Award “Good Faith Efforts” to recruit S/MBE and (2) Post-Award “Compliance
Efforts” of its labors to utilize S/MBE, unless self-performing one hundred percent (100%) of the contract work. Falsification of any pre-award or post-award documents will be considered a serious breach of public trust and funds.
* SOUTH CAROLINA CODE OF LAWS, CHAPTER 35 “SOUTH CAROLINA
CONSOLIDATED PROCUREMENT CODE, SUBARTICLE 1 “ASSISTANCE TO
MINORITY BUSINESSES”
COMPLIANCE EFFORTS (POST-AWARD)
The successful Contractor is required to fulfill any Small and Minority Business Enterprise
(S/MBE) commitments made in conjunction with the “Pre-Award Good Faith Efforts”, unless good cause is demonstrated for any failure to fulfill such commitment.
If the Contractor intends to make any substitutions for any reasons, the Beaufort County
Compliance Office must be notified in writing within ten (10) business days for discussion and approval. No Contractor shall enter into an agreement with any S/MBE that would in any manner limit the S/MBE from selling or acting as a subcontractor to any other party.
Beaufort County shall have the right to inspect the Contractor’s records related to activity and expenditures to S/MBE utilized on its projects, to include related contracts/purchase orders and payment records, such as cancelled check copies. Further, designated Beaufort County personnel are permitted access to all work sites. Contractors and their staff should take measures to cooperate fully with all Beaufort County staff, including, but not limited to the Procurement Services
Director and Compliance Officer.
“Post-Award Compliance Efforts” require the Contractor to not only provide monthly reports regarding activity and expenditures to S/MBE, but also to maintain related records throughout the life of the project regarding its efforts to comply with the Small and Minority Business
Participation Program. The “Monthly Compliance Status Report” must be submitted to the
Compliance Office until the project ends, by the fifth (5th) day, reflecting the activity of the previous month.
IFB #TBD DOCUMENTS Page 14
After the County receives a monthly status report marked as “final”, the Contractor will be issued an affidavit to certify totals regarding S/MBE usage throughout the life of the project.
All questions regarding “Post-Award Compliance Efforts” should be directed to the Compliance
Office vie e-mail at dthomas@bcgov.net or (843) 255-2304.
VENDOR QUESTIONNAIRE
Certification*
I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm or any corporation, firm, or person submitting a bid for the same materials, supplies, or equipment, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this bid and certify that I am authorized by the firm to submit this bid.
☐ Please confirm
*Response required
Contact information of authorized representative?*
Please enter name, title, phone and email of the authorized representative:
*Response required
Please Provide Licenses and Certificate of Insurance*
*Response required
100% Labor and Material Payment Bond*
If awarded, you will be required to submit a 100% Labor and Material Payment Bond when requested.
Please note, this is NOT due at the time of bid submission.
☐ Please confirm
*Response required
Bidder Confirmation*
1. BIDDER has examined all Contract Documents including Addenda.
2. BIDDER understands and accepts the terms and conditions of the Invitation to Bid, Instructions to Bidders, and all other Contract Documents.
3. BIDDER having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and supplies to construct the project in accordance with the contract documents, within the time set forth herein, and at the process stated below, proposed to enter into a contract with the County to provide the necessary machinery, tools, apparatus, all materials and labor, and other
IFB #TBD DOCUMENTS Page 15 means of construction necessary to complete the Work. The undersigned proposes to furnish and construct the items listed in the attached Schedule of Items for the unit prices stated.
4. BIDDER agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract
Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
☐ Please confirm
*Response required
Communications*
Communications concerning this Bid should be addressed to the BIDDER’s company, to the attention of:
Name:
Address:
Email:
Telephone:
*Response required
Are you submitting this bid as a local vendor?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Local Vendor Preference - Participation Affidavit*
Please download the below documents, complete, and upload.
• Local_Vendor_Preference_-_P...
*Response required
Non-Collusion Affidavit of Prime Bidder*
Please download the below documents, complete, and upload.
• Non-Collusion_Affidavit_of_...
*Response required
Will you be using subcontractors?*
☐ Yes
☐ No https://government-project.s3.us-west-2.amazonaws.com/96409/f84b38b5-bce5-4d5d-a82e-e1fd2b3faba8_Local_Vendor_Preference_-_Participation_Affidavit.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H73GR2BT%2F20261008%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261008T114212Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQCIeTalg8%2F6R%2Bqq3yKhyxGKrJEeOVW6zIQ6kfaoOdlLrQIhANYd8634SlKMGRVtpmwBkNhd21wQw%2FpSPUanY%2F%2BzrrMOKowFCCUQAhoMODkyMzY0Njg3NjcyIgw38fvvhxyqjNblRJIq6QTtR3XESEhCZLY%2FDXziYPaclAhSVcHJeFJ8%2BmM3Bv3Tx2vYRw6lT%2BGNIMkIWAWiPE5P%2Bu%2Fkuh0QacLcTsQ70jrjE6jeOGVyrrKxqcNs5usa7uPbkoQvumIDfQO8yHBdWZonRRrLWveDoMj9pFLmDTy7VrX0%2F%2BIKkI1n2r4BsDQUIB%2BAIlImK7UdoDzO7BWdhh7BJUBa6W0QPnqGJsrzesFbnUbbj%2FoqWlulsNN2mz2u4axL5p2GsMVIC1XB3mN8JKZjtz8lya4lYDvvWr1CRlE8Vr7EMIVEEaiCgp9s3s11oa6tbr9aq29Xbz9Eboy3ETooqJ6ikPXP2NZhcp3GqZnV81wcmdKTNBsauuvWTl2idNHwyvAnQdYWJwsGmkUNtxJ5u%2Fi2Z2ZOmR%2BKtHhjOGRlBTJ5udTLeB1vehhGibpdlPbfM%2B7OKlTcWUgy%2Bgln39o%2BrFMhGO7P3QKYUYQ4y8r1SIIo6nLWlt9DmuvmoRffaiFDkSWN%2FM0ystlfheHqVg%2BBFIdGoYdEZZrq9DTMud%2BCnKBnKxp0ZHwrdCadj2ql1tWYH0Y3tO4E3oOOgKfXV3w0aVCUU6%2BvcMHRX7GwxVxL6VYte7bf02lvgzuretmMiwiu9DafyMHgRpD93mAj0dd5rvHizuyXcRAn99KMjiZKUNCj%2F1rV1T%2F2q9muuL6oSxXiO9dMvECQ3GN6C0puVMyw4tRwt1CDzc9jf1A9bKRkR2g5RbbYBvdXxY9CraCJejuQfERCW0%2FunnHXbv2C%2BTS7EcUm142CyFjSZCxSPO4EaWDgq9D71WA5k3rII4z%2B2ccW9NT8HNlpQjCcgp7WBjqYAf8I%2BS%2F44%2BjwujE4g4F7%2B7Z7FC9L87IzTsiPfVEuI0NrtlG0H%2F1CAASbmXL2BSlNfUtQAtoTVcStqSaEROg%2FxKgkTYXD0XhzflFMjfYbzKF4OX2ZHtY0CvFwbjwuF8Q9QGI9IFZeHBL8%2BBLjT6dUwk0bRxmseKL5RZWpTos4K1a%2BBBNEUg6hs3tUzLNMssvnUN69EaoYHMjU&X-Amz-Signature=bdebaaaad3098b47052f166d4f7674756a2628ea8694cb61c7ef6cb736e08eb6&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Local_Vendor_Preference_-_Participation_Affidavit.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/96409/2ac6bb9f-a974-4a14-a297-7d965488dba7_Non-Collusion_Affidavit_of_Prime_Bidder.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H73GR2BT%2F20261008%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261008T114212Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQCIeTalg8%2F6R%2Bqq3yKhyxGKrJEeOVW6zIQ6kfaoOdlLrQIhANYd8634SlKMGRVtpmwBkNhd21wQw%2FpSPUanY%2F%2BzrrMOKowFCCUQAhoMODkyMzY0Njg3NjcyIgw38fvvhxyqjNblRJIq6QTtR3XESEhCZLY%2FDXziYPaclAhSVcHJeFJ8%2BmM3Bv3Tx2vYRw6lT%2BGNIMkIWAWiPE5P%2Bu%2Fkuh0QacLcTsQ70jrjE6jeOGVyrrKxqcNs5usa7uPbkoQvumIDfQO8yHBdWZonRRrLWveDoMj9pFLmDTy7VrX0%2F%2BIKkI1n2r4BsDQUIB%2BAIlImK7UdoDzO7BWdhh7BJUBa6W0QPnqGJsrzesFbnUbbj%2FoqWlulsNN2mz2u4axL5p2GsMVIC1XB3mN8JKZjtz8lya4lYDvvWr1CRlE8Vr7EMIVEEaiCgp9s3s11oa6tbr9aq29Xbz9Eboy3ETooqJ6ikPXP2NZhcp3GqZnV81wcmdKTNBsauuvWTl2idNHwyvAnQdYWJwsGmkUNtxJ5u%2Fi2Z2ZOmR%2BKtHhjOGRlBTJ5udTLeB1vehhGibpdlPbfM%2B7OKlTcWUgy%2Bgln39o%2BrFMhGO7P3QKYUYQ4y8r1SIIo6nLWlt9DmuvmoRffaiFDkSWN%2FM0ystlfheHqVg%2BBFIdGoYdEZZrq9DTMud%2BCnKBnKxp0ZHwrdCadj2ql1tWYH0Y3tO4E3oOOgKfXV3w0aVCUU6%2BvcMHRX7GwxVxL6VYte7bf02lvgzuretmMiwiu9DafyMHgRpD93mAj0dd5rvHizuyXcRAn99KMjiZKUNCj%2F1rV1T%2F2q9muuL6oSxXiO9dMvECQ3GN6C0puVMyw4tRwt1CDzc9jf1A9bKRkR2g5RbbYBvdXxY9CraCJejuQfERCW0%2FunnHXbv2C%2BTS7EcUm142CyFjSZCxSPO4EaWDgq9D71WA5k3rII4z%2B2ccW9NT8HNlpQjCcgp7WBjqYAf8I%2BS%2F44%2BjwujE4g4F7%2B7Z7FC9L87IzTsiPfVEuI0NrtlG0H%2F1CAASbmXL2BSlNfUtQAtoTVcStqSaEROg%2FxKgkTYXD0XhzflFMjfYbzKF4OX2ZHtY0CvFwbjwuF8Q9QGI9IFZeHBL8%2BBLjT6dUwk0bRxmseKL5RZWpTos4K1a%2BBBNEUg6hs3tUzLNMssvnUN69EaoYHMjU&X-Amz-Signature=69699875a6549b8301f40669b94430799a89966611cfc598f5eb16b8b8bc35b3&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Non-Collusion_Affidavit_of_Prime_Bidder.pdf%22&x-id=GetObject
IFB #TBD DOCUMENTS Page 16
*Response required
When equals "Yes"
Non-Collusion Affidavit of Subcontractor*
Please download the below documents, complete, and upload.
• Non-Collusion_Affidavit_of_...
*Response required
Certification By Contractor Regarding Non-Segregated Facilities*
Please download the below documents, complete, and upload.
• Certification_By_Contractor...
*Response required
Business Organization
Type of Business Organization:*
☐ Corporation
☐ Individual
☐ Partnership
☐ Joint Venture
☐ Other
*Response required
If you selected "Other" for your type of business, please explain:*
*Response required
If applicable, please provide name of partners and additional information below:*
Names of Partners:
Date of Organization:
Type of Partnership:
List of General Partners:
Name, Address, & Phone No:
Years of GP:
If not applicable, please state N/A.
*Response required
If your agency is a Corporation:*
If your agency is a Corporation, please provide the State of Incorporation.
If NOT incorporated in South Carolina, please provide the following:
• State Corporation Commission Registration Number https://government-project.s3.us-west-2.amazonaws.com/96409/2570088f-aa3f-49d2-973c-93c896637c3d_Non-Collusion_Affidavit_of_Subcontractor.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H73GR2BT%2F20261008%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261008T114212Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQCIeTalg8%2F6R%2Bqq3yKhyxGKrJEeOVW6zIQ6kfaoOdlLrQIhANYd8634SlKMGRVtpmwBkNhd21wQw%2FpSPUanY%2F%2BzrrMOKowFCCUQAhoMODkyMzY0Njg3NjcyIgw38fvvhxyqjNblRJIq6QTtR3XESEhCZLY%2FDXziYPaclAhSVcHJeFJ8%2BmM3Bv3Tx2vYRw6lT%2BGNIMkIWAWiPE5P%2Bu%2Fkuh0QacLcTsQ70jrjE6jeOGVyrrKxqcNs5usa7uPbkoQvumIDfQO8yHBdWZonRRrLWveDoMj9pFLmDTy7VrX0%2F%2BIKkI1n2r4BsDQUIB%2BAIlImK7UdoDzO7BWdhh7BJUBa6W0QPnqGJsrzesFbnUbbj%2FoqWlulsNN2mz2u4axL5p2GsMVIC1XB3mN8JKZjtz8lya4lYDvvWr1CRlE8Vr7EMIVEEaiCgp9s3s11oa6tbr9aq29Xbz9Eboy3ETooqJ6ikPXP2NZhcp3GqZnV81wcmdKTNBsauuvWTl2idNHwyvAnQdYWJwsGmkUNtxJ5u%2Fi2Z2ZOmR%2BKtHhjOGRlBTJ5udTLeB1vehhGibpdlPbfM%2B7OKlTcWUgy%2Bgln39o%2BrFMhGO7P3QKYUYQ4y8r1SIIo6nLWlt9DmuvmoRffaiFDkSWN%2FM0ystlfheHqVg%2BBFIdGoYdEZZrq9DTMud%2BCnKBnKxp0ZHwrdCadj2ql1tWYH0Y3tO4E3oOOgKfXV3w0aVCUU6%2BvcMHRX7GwxVxL6VYte7bf02lvgzuretmMiwiu9DafyMHgRpD93mAj0dd5rvHizuyXcRAn99KMjiZKUNCj%2F1rV1T%2F2q9muuL6oSxXiO9dMvECQ3GN6C0puVMyw4tRwt1CDzc9jf1A9bKRkR2g5RbbYBvdXxY9CraCJejuQfERCW0%2FunnHXbv2C%2BTS7EcUm142CyFjSZCxSPO4EaWDgq9D71WA5k3rII4z%2B2ccW9NT8HNlpQjCcgp7WBjqYAf8I%2BS%2F44%2BjwujE4g4F7%2B7Z7FC9L87IzTsiPfVEuI0NrtlG0H%2F1CAASbmXL2BSlNfUtQAtoTVcStqSaEROg%2FxKgkTYXD0XhzflFMjfYbzKF4OX2ZHtY0CvFwbjwuF8Q9QGI9IFZeHBL8%2BBLjT6dUwk0bRxmseKL5RZWpTos4K1a%2BBBNEUg6hs3tUzLNMssvnUN69EaoYHMjU&X-Amz-Signature=9b9f2c5c81a10f90ef84adefa3b3903e105bc0c1af720843e97f59bc7e7f357a&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Non-Collusion_Affidavit_of_Subcontractor.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/96409/1488ef02-a573-42d0-b94f-02e833eb1d99_Certification_By_Contractor_Regarding_Non-Segregated_Facilities.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H73GR2BT%2F20261008%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261008T114212Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQCIeTalg8%2F6R%2Bqq3yKhyxGKrJEeOVW6zIQ6kfaoOdlLrQIhANYd8634SlKMGRVtpmwBkNhd21wQw%2FpSPUanY%2F%2BzrrMOKowFCCUQAhoMODkyMzY0Njg3NjcyIgw38fvvhxyqjNblRJIq6QTtR3XESEhCZLY%2FDXziYPaclAhSVcHJeFJ8%2BmM3Bv3Tx2vYRw6lT%2BGNIMkIWAWiPE5P%2Bu%2Fkuh0QacLcTsQ70jrjE6jeOGVyrrKxqcNs5usa7uPbkoQvumIDfQO8yHBdWZonRRrLWveDoMj9pFLmDTy7VrX0%2F%2BIKkI1n2r4BsDQUIB%2BAIlImK7UdoDzO7BWdhh7BJUBa6W0QPnqGJsrzesFbnUbbj%2FoqWlulsNN2mz2u4axL5p2GsMVIC1XB3mN8JKZjtz8lya4lYDvvWr1CRlE8Vr7EMIVEEaiCgp9s3s11oa6tbr9aq29Xbz9Eboy3ETooqJ6ikPXP2NZhcp3GqZnV81wcmdKTNBsauuvWTl2idNHwyvAnQdYWJwsGmkUNtxJ5u%2Fi2Z2ZOmR%2BKtHhjOGRlBTJ5udTLeB1vehhGibpdlPbfM%2B7OKlTcWUgy%2Bgln39o%2BrFMhGO7P3QKYUYQ4y8r1SIIo6nLWlt9DmuvmoRffaiFDkSWN%2FM0ystlfheHqVg%2BBFIdGoYdEZZrq9DTMud%2BCnKBnKxp0ZHwrdCadj2ql1tWYH0Y3tO4E3oOOgKfXV3w0aVCUU6%2BvcMHRX7GwxVxL6VYte7bf02lvgzuretmMiwiu9DafyMHgRpD93mAj0dd5rvHizuyXcRAn99KMjiZKUNCj%2F1rV1T%2F2q9muuL6oSxXiO9dMvECQ3GN6C0puVMyw4tRwt1CDzc9jf1A9bKRkR2g5RbbYBvdXxY9CraCJejuQfERCW0%2FunnHXbv2C%2BTS7EcUm142CyFjSZCxSPO4EaWDgq9D71WA5k3rII4z%2B2ccW9NT8HNlpQjCcgp7WBjqYAf8I%2BS%2F44%2BjwujE4g4F7%2B7Z7FC9L87IzTsiPfVEuI0NrtlG0H%2F1CAASbmXL2BSlNfUtQAtoTVcStqSaEROg%2FxKgkTYXD0XhzflFMjfYbzKF4OX2ZHtY0CvFwbjwuF8Q9QGI9IFZeHBL8%2BBLjT6dUwk0bRxmseKL5RZWpTos4K1a%2BBBNEUg6hs3tUzLNMssvnUN69EaoYHMjU&X-Amz-Signature=94eba102e5da0697d91bd5e9f3a46b4a752f4937b526245da3a73266c9bd31f8&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_By_Contractor_Regarding_Non-Segregated_Facilities.pdf%22&x-id=GetObject
IFB #TBD DOCUMENTS Page 17
• Date of Incorporation:
• Federal ID Number
• Officers o Name o Address o Phone No.
o Position o Years In
If your agency is NOT a corporation, please state N/A.
*Response required
Are you a Subchapter S Corporation?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Please provide Subchapter S Shareholders:*
Name:
Address:
Phone No:
*Response required
If individually owned:*
• Sole-proprietor's o Name:
o Address:
o Phone No:
o Years in business:
*Response required
Have you ever operated under another name?*
☐ Yes
☐ No
IFB #TBD DOCUMENTS Page 18
When equals "Yes"
Please provide all other business names and addresses of principal place of business for each business:*
Also provide:
• Number of years in business under each name
• Contractor’s license number in each state in which a business was operated
*Response required
Bonding
Bid Bond*
Upload your Bid Bond here. Bid Bond must be 5% of your Bid Price
*Response required
Please provide the Bonding information:*
• Bonding Agent o Name o Address o Telephone Number (including area code) o Contact Person
• Bonding Company o Name o Address o Telephone Number (including area code) o Contact Person o Best’s Key Rating of bonding company
• Number of years this bonding company has acted as surety for you
• Bonding Capacity: Maximum single job size o Total bonding limit
IFB #TBD DOCUMENTS Page 19
Do you intend to use any alternative form of security*
☐ Yes
☐ No
*Response required
When equals "Yes"
Indicate the form of security you intend to use and the name, address, point of contact, and telephone number of the banks, savings and loan, or surety you intend to use. (NOTE:
Prequalification will not assure acceptance of any form of security.)*
Also provide:
• Form of Secuirty
• Bank or Savings & Loan
• Contact
• Address & Phone No.
*Response required
Have any Performance or Payment Bond claims ever been paid by any surety on behalf of your organization?*
☐ Yes
☐ No
*Response required
When equals "Yes"
State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. *
*Response required
Have you ever arbitrated or litigated a claim with an Owner, Architect, or Engineer in the last five years?*
☐ Yes
☐ No
When equals "Yes"
IFB #TBD DOCUMENTS Page 20
State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. (Provide attachments if necessary.)*
*Response required
Have you or any officer, partner, or owner of your organization, in any state or territory of the United States, or with respect to any agency of the Federal government:
In the last in the last five years, received any fines or citations for building code violations which were unrelated to design?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been found to be guilty of charges relating to conflicts of interest:*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been convicted on charges related to any criminal activity relating to construction means, methods, or techniques; bidding or bid rigging; or bribery?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, been found guilty of any minority contracting law violations?*
IFB #TBD DOCUMENTS Page 21
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, pleaded no contest in any criminal proceeding related to contracting?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been disbarred from doing Federal, state, or local government work for any reason?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
Ever been terminated on a contract due to your default?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, paid liquidated damages for being late on a project?*
☐ Yes
IFB #TBD DOCUMENTS Page 22
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last five years, been subject to tax collection proceedings?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
*Response required
In the last seven years, filed for bankruptcy?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Provide the name, address, telephone number, contact person, and circumstances relating to the question.*
☐ Yes
☐ No
*Response required
When equals "Yes"
Under what chapter of bankruptcy did you file?*
*Response required
When equals "Yes"
If you filed under Chapter 11 Reorganization, how long did you operate under this status?*
If this does not apply, please state N/A.
*Response required
When equals "Yes"
Are you operating under Chapter 11 status now?*
IFB #TBD DOCUMENTS Page 23
Safety
Have you, in the last three years, been cited for willful violations for failure to abate, or for repeated violations, by the United States Occupational Safety and Health Administration or by the South Carolina Occupational Safety and Health Administration or by any other governmental body?*
☐ Yes
☐ No
*Response required
When equals "Yes"
State date, name, address, telephone number, and contact person for agency issuing citation and the nature of the violation. Also, advise the amount of fines paid, if any. Provide attachments if necessary.*
*Response required
When equals "Yes"
List your worker’s compensation experience modifier for the last three years.*
*Response required
References
Provide at least two references from each industry group listed. Provide other references as requested. Provide current names, addresses, telephone numbers, and contacts.*
• Architects/Engineers:
• Major Subcontractors:
• Financial Institutions:
*Response required
Certification regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion:
The contractor certifies:*
The contractor certifies, by submission of this bid or acceptance of a contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any State, Federal department, or agency. It further agrees by submitting this qualification statement that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the bidder/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/bid. State whether or not your company has been involved in any litigation within the past five (5) years arising out of your performance.
IFB #TBD DOCUMENTS Page 24
☐ No
*Response required
When equals "Yes"
Explain fully if it has been involved in any litigation involving performance. *
*Response required
Small and Minority Business Participation Program
DO WE WANT TO ENTER ALL THE INFO ON THIS FORM?
Are you a Small or Minority Business ?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Upload your Small/Minority Documentation*
Please note that the proposed utilization plan document is still required. You may put your company in that list.
*Response required
Are you self-performing 100%?*
☐ Yes
☐ No
*Response required
When equals "Yes"
Self-Performing 100% Affidavit*
Please download the below document, complete, and upload.
• Self_Performance_Affidavit.pdf
*Response required
When equals "No"
Good Faith Agencies Distribution List*
Please download the below documents, complete, and upload.
Pre-award efforts include the following “good faith efforts” for Contractors intending to use subcontractors, or the bid/proposal may be rejected.
https://government-project.s3.us-west-2.amazonaws.com/96409/ebb4cf5e-d250-4e5f-8dc1-fb6d7e1e4505_Self_Performance_Affidavit.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4H73GR2BT%2F20261008%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261008T114212Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEFwaCXVzLXdlc3QtMiJIMEYCIQCIeTalg8%2F6R%2Bqq3yKhyxGKrJEeOVW6zIQ6kfaoOdlLrQIhANYd8634SlKMGRVtpmwBkNhd21wQw%2FpSPUanY%2F%2BzrrMOKowFCCUQAhoMODkyMzY0Njg3NjcyIgw38fvvhxyqjNblRJIq6QTtR3XESEhCZLY%2FDXziYPaclAhSVcHJeFJ8%2BmM3Bv3Tx2vYRw6lT%2BGNIMkIWAWiPE5P%2Bu%2Fkuh0QacLcTsQ70jrjE6jeOGVyrrKxqcNs5usa7uPbkoQvumIDfQO8yHBdWZonRRrLWveDoMj9pFLmDTy7VrX0%2F%2BIKkI1n2r4BsDQUIB%2BAIlImK7UdoDzO7BWdhh7BJUBa6W0QPnqGJsrzesFbnUbbj%2FoqWlulsNN2mz2u4axL5p2GsMVIC1XB3mN8JKZjtz8lya4lYDvvWr1CRlE8Vr7EMIVEEaiCgp9s3s11oa6tbr9aq29Xbz9Eboy3ETooqJ6ikPXP2NZhcp3GqZnV81wcmdKTNBsauuvWTl2idNHwyvAnQdYWJwsGmkUNtxJ5u%2Fi2Z2ZOmR%2BKtHhjOGRlBTJ5udTLeB1vehhGibpdlPbfM%2B7OKlTcWUgy%2Bgln39o%2BrFMhGO7P3QKYUYQ4y8r1SIIo6nLWlt9DmuvmoRffaiFDkSWN%2FM0ystlfheHqVg%2BBFIdGoYdEZZrq9DTMud%2BCnKBnKxp0ZHwrdCadj2ql1tWYH0Y3tO4E3oOOgKfXV3w0aVCUU6%2BvcMHRX7GwxVxL6VYte7bf02lvgzuretmMiwiu9DafyMHgRpD93mAj0dd5rvHizuyXcRAn99KMjiZKUNCj%2F1rV1T%2F2q9muuL6oSxXiO9dMvECQ3GN6C0puVMyw4tRwt1CDzc9jf1A9bKRkR2g5RbbYBvdXxY9CraCJejuQfERCW0%2FunnHXbv2C%2BTS7EcUm142CyFjSZCxSPO4EaWDgq9D71WA5k3rII4z%2B2ccW9NT8HNlpQjCcgp7WBjqYAf8I%2BS%2F44%2BjwujE4g4F7%2B7Z7FC9L87IzTsiPfVEuI0NrtlG0H%2F1CAASbmXL2BSlNfUtQAtoTVcStqSaEROg%2FxKgkTYXD0XhzflFMjfYbzKF4OX2ZHtY0CvFwbjwuF8Q9QGI9IFZeHBL8%2BBLjT6dUwk0bRxmseKL5RZWpTos4K1a%2BBBNEUg6hs3tUzLNMssvnUN69EaoYHMjU&X-Amz-Signature=a8e56a6ef93d1904a4da058a424748f5456d285fb45242b7f6547a18eacef3cd&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Self_Performance_Affidavit.pdf%22&x-id=GetObject
IFB #TBD DOCUMENTS Page 25
If using subcontractors, return this page (and required supporting documents) with your bid/proposal.
• Divide and/or combine scope of work packages into economically feasible units, if possible.
• Send a written notice at least ten (10) business days prior to the bid/response due date of your intent to submit a bid/response, and express interest in receiving quotes thereof to
(1) potential S/MBEs and (2) “good faith agencies”:
o The written notice should contain the Contractor’s name and contact information;
project name; project number; scope of work/bid packages available for subcontracting; information on availability of plans and specifications; and the
Contractor’s company policy regarding insurance, bonding, and financial requirements, if any.
• Submit with the bid/proposal, copies of the written notice sent specifically to S/MBEs, along with the fax transmittal confirmation slips (if sent by fax), copies of the e-mails (if e-mailed), and/or copies of metered or stamped envelopes (if sent by mail).
• Submit with the bid/proposal, copies of the written notice sent specifically to the “good faith agencies”, along with the fax transmittal confirmation slips (if sent by fax), copies of the e-mails (if e-mailed), and/or copies of metered or stamped envelopes (if sent by mail).
• Complete and submit Exhibits 1-3 with all requested supporting documentation (where applicable):
o Exhibit 1: Non-Discrimination Statement o Exhibit 2: Outreach Documentation Log o Exhibit 3: Proposed Utilization Plan
• Non-Discrimination_Statemen...
• Outreach_Documentation_Log.pdf
• Proposed_Utilization_Plan.pdf
• Outreach_Written_Notice_Exa...
• Good_Faith_Efforts_Checklis...
*Response required…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .