Combo pump control panel.docx
DOCX document 338 KB Posted
- Solicitation number
- FA485525Q0039
About this file
This document is a Request for Quote (RFQ) issued by the 27th Special Operations Contracting Squadron at Cannon Air Force Base for a specialized pump control panel replacement. The solicitation seeks one DMC Duplex Pump Control Panel (460V / 7.5 HP) with specific technical specifications, including inner swing panel, surge protection, phase monitor, NEMA starters, and four Flygt ENM-10 Liquid Level Sensors with 40' cables, to be installed in Building 1402. The procurement is a 100% small business set-aside with a NAICS code of 335314 and a small business size standard of 750 employees.
Key procurement details include a solicitation issue date of 23 June 2025, with questions due by 26 June 2025 and quotes due by 30 June 2025 at 2:30 PM Mountain Daylight Time. Vendors must be registered in the System for Award Management (SAM) and will be evaluated on technical acceptability, past performance, and price, with award going to the lowest-priced, technically acceptable vendor. Quotes must be submitted via email to SSgt Mauro Madera or 1st Lt Nicholas Cervantes, with strict formatting requirements and no .zip file submissions allowed. The government will not provide contract financing, and invoice instructions will be provided at the time of award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
27TH SPECIAL OPERATIONS CONTRACTING SQUADRON (SOCONS)
Combined Synopsis/Solicitation
| Requirement Title: | Cannon AFB – Replacement pump control panel | |
| Solicitation Number: | FA485525Q0039 | |
| Solicitation Issue Date: | 23 Jun 2025 | |
| Questions Due Date: | 26 Jun 2025 at 2:00 PM Mountain Daylight Time | |
| Response Deadline: | 30 Jun 2025 at 2:30 P.M. Mountain Daylight Time | |
| Point(s) of Contact: | SSgt Mauro Madera, Mauro.madera@us.af.mil, 575-784-6615 or (CO) |
1st Lt Nicholas Cervantes, nicholas.cervantes.1@us.af.mil , 575-784-6689General Information
1. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
2. This solicitation is being issued as a Request for Quotation (RFQ). The Request for Quotation (RFQ) number FA485525Q0039 shall be used to reference any written quote provided under this RFQ.
3. This solicitation document and incorporated provisions and clauses are those in effect through:
| Federal Acquisition Circular | 06/11/2025 | |
| Defense Federal Acquisition Regulation Supplement | 01/17/2025 | |
| Air Force Federal Acquisition Regulation Supplement | 10/16/2024 |
4. This requirement is being set-aside for: 100% Small Business Set-Aside.
The North American Industry Size Classification System (NAICS) code associated with this requirement is 335314 which has a small business size standard of 750 Employees.Requirement Information
Description
Cannon AFB, NM requires requires the purchase and installation of one (1) DMC Duplex Pump Control Panel (FLOAT) 460V / 7.5 HP, N3R Painted Galv Encl w/ Inner Swing Panel, Main CB, Surge Protection, Phase Monitor, Pump CBs, CB for External Transformer, NEMA Starters, Control Power Transformer, Pump Alternator w/ SW, 22mm Pilots and SW, ETMs, Alarm Buzzer w/ Integral Silence, Dry Contacts and Four (4) Flygt ENM-10 Liquid Level Sensors w/ 40' Cable. This is to replace the current inoperative one located in BLDG 1402.
Place of Delivery/Performance/Acceptance/FOB Point:
Cannon AFB, NM 88103 (Exact address will be provided in the purchase order.)
FOB Destination
| Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Extended Price |
| 0001 |
| (1) DMC Duplex Pump Control Panel (FLOAT) 460V / 7.5 HP, N3R Painted Galv Encl w/ Inner Swing Panel, Main CB, Surge Protection, Phase Monitor, Pump CBs, CB for External Transformer, NEMA Starters, Control Power Transformer, Pump Alternator w/ SW, 22mm Pilots and SW, ETMs, Alarm Buzzer w/ Integral Silence, Dry Contacts |
Install Included
| 1 |
| EA |
| 0002 |
| Flygt ENM-10 Liquid Level Sensors w/ 40' Cable |
Install Included
| 4 |
| EA |
TOTAL
Instructions to Offerors
*FAR Provision 52.212-1, Instructions to Offerors – Commercial Items (Jan 2017) applies to this acquisition and the following addendum applies:
The following words stating “offer”, “offeror”, and “proposal” are replaced with “quotation”, “vendor”, and “quote”.
Paragraph (a) first sentence revised as follows: “The NAICS code and small business size standard for this acquisition appear above.”
Paragraph (b) first sentence revised as follows: “Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation.”
Paragraph (c) first sentence revised as follows: “The vendor agrees to hold the prices in its quote firm for 60 calendar days from the date specified for receipt of quotes, unless another time period is specified in an addendum to the quote.”
RFQ due date: 30 JUNE 2025 RFQ due time: 2:30 P.M. Mountain Daylight Time Email to SSGT MAURO A MADERA, MAURO.MADERA@US.AF.MIL OR 1st Lt NICHOLAS CERVANTES, nicholas.cervantes.1@us.af.mil
THIS MUST BE SENT TO MAURO.MADERA@US.AF.MIL OR NICHOLAS.CERVANTES.1@US.AF.MIL AS STATED BELOW. ANYTHING OTHERWISE CAN AND WILL BE CONSIDERED NONRESPONSIVE.
Note: .zip files are not an acceptable format for the Air Force Network and will not go through our email system.
All questions regarding this RFQ must be emailed to MAURO.MADERA@US.AF.MIL OR by 26 JUNE 2025 NICHOLAS.CERVANTES.1@US.AF.MIL at 2:30 P.M Mountain Daylight Time.
Please use this document to provide the following information with your quote:
Company Name: ____________ UEI Number: _______________ Cage Code: _______________ *Number of Employees_____________ *Total Yearly Revenue_______________ *Information required determining size of business for the NAICS referenced above
Estimated Delivery Time: ____________ Payment Terms: _________________________ Warranty: ________________ FOB: Destination Shipping Cost included? Yes
All companies must be registered in the System for Award Management at https://www.sam.gov/portal/public/SAM/ to be considered for award. The Government will not provide contract financing for this acquisition. Invoice instruction shall be provided at time of award.
Evaluation Criteria
FAR Provision *52.212-2, Evaluation -- Commercial Items (Oct 14), applies to this acquisition and the following evaluation is applicable:
(a) The Government will award a contract resulting from this RFQ to the responsible vendor whose quote conforming to the RFQ will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:
1. Technical: Quote must be rated as technically acceptable to be eligible for award. To be deemed technically acceptable, the following evaluation criteria must be met:
- MUST be able to provide and install one (1) DMC Duplex Pump Control Panel (FLOAT) 460V / 7.5 HP, N3R Painted Galv Encl w/ Inner Swing Panel, Main CB, Surge Protection, Phase Monitor, Pump CBs, CB for External Transformer, NEMA Starters, Control Power Transformer, Pump Alternator w/ SW, 22mm Pilots and SW, ETMs, Alarm Buzzer w/ Integral Silence, Dry Contacts and Four (4) Flygt ENM-10 Liquid Level Sensors w/ 40' Cable
2. Past Performance: Award will not be made to any offeror that has relevant negative past performance.
3. Price: Award will be made to the lowest priced vendor meeting all other evaluation criteria.
(b) A vendor must be determined to be responsible by the Contracting Officer in order to be eligible for award. Responsibility is described in Federal Acquisition Regulation (FAR) Subpart 9.1, “Responsible Prospective Contractors.” Part of the determination addresses financial capability. Please provide the names, addresses and points of contact for all financial institution organizations utilized to determine if contractor has adequate financial resources to perform the contract or the ability to obtain them to include written authority to contact the provided financial institution.
(c) A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful vendor within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote’s specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of Provision)Attachments
Attachment 1 – Clauses and Provisions Attachment 2 – Brand Name Justificiation image1.png
File details come from the government source that posted it. Updated .