Combined Synopsis Solicitation 6933A226Q000011.pdf
PDF 423 KB Posted
- Solicitation number
- 6933A226Q000011
About this file
This is a Combined Synopsis/Solicitation (RFQ) issued by the U.S. Department of Transportation, Maritime Administration (MARAD) for drydocking and repair services of the PF205 Patrol Boat. The solicitation number is 6933A226Q000011, with quotations due by June 1, 2026 at 12:00 PM (ET) and award anticipated at or around June 8, 2026. This is a total small business set-aside under NAICS code 336611 (Hazardous Waste Collection) with a size standard of 1,300 employees and PSC code J019; only certified small businesses are eligible to participate.
MARAD will deliver the PF205 to the contractor's facility located in the Hampton Roads area (including the James River, Elizabeth River branches, York River, Mobjack Bay, and tributaries) for a 60-day drydocking period upon completion of delivery and tender. The contract will be awarded as a firm fixed price purchase order based on a Lowest Price Technically Acceptable (LPTA) evaluation methodology. Quoters must provide experience/past performance information documenting up to three relevant projects completed within the past three years of similar or greater size, scope, and complexity, along with pricing submitted on the provided price worksheet. Technical acceptability, past performance, and price are the three evaluation factors, with only the lowest-priced offer evaluated for technical acceptability initially; if unacceptable, evaluation continues with the next lowest-priced offer until a technically acceptable submission is identified. Questions must be submitted to Contracting Officer Krystle Jones at krystle.jones@dot.gov by May 18, 2026 at 1:00 PM (ET). The contract incorporates multiple FAR and TAR clauses by reference, including provisions related to labor standards, insurance (requiring comprehensive general liability, ship repairers legal liability, and pollution coverage), indemnification, and supplemental work procedures with a $10,000 individual authorization limit.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6933A226Q000011 Solicitation Page 1
Combined Synopsis/Solicitation Solicitation Number: 6933A226Q000011
For:
Drydocking and Repair of the PF205 Patrol Boat
1. This is a combined synopsis/solicitation for commercial products and/or commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12 Acquisition of Commercial Products and Commercial Services. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
2. Solicitation number 6933A226Q000011 is issued as a Request For Quotation (RFQ) for the Drydocking and Repair of the PF205 Patrol Boat.
3. This procurement is a total small business set-aside under North American Industry Classification System (NAICS) code 336611, Hazardous Waste Collection, with a small business size standard of 1300. The Product Service Code (PSC) is J019. To be considered eligible to participate in this procurement, contractors must be certified as a small business under NAICS code 336611.
4. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide and https://www.acquisition.gov/tar.
5. The Government intends to award a firm fixed price purchase order at or around June 8, 2026, as a result of this Combined Synopsis/Solicitation. A list of line-item number(s) and items, quantities, and system of measure is included in Attachment 2, Price Sheet.
6. Description of Requirements
The U.S. Department of Transportation (DOT), Maritime Administration (MARAD), James River Reserve Fleet (JRRF), located in Ft. Eustis, Virginia, has a requirement to perform the dry docking and repair of the PF205 Patrol Boat according to this Statement of Work (SOW).
MARAD will deliver the PF205 to the Contractor’s facility that will be in the Hampton Roads area, area to include the James River, all branches of the Elizabeth River, York River, Mobjack Bay, and their tributaries. The dry-docking Period of Performance (POP) will be 60 days upon completion of delivery and tender.
7. Required Responses
Questions or comments regarding this solicitation shall be submitted to Contracting Officer Krystle Jones via email at krystle.jones@dot.gov by May 18, 2026 at 1:00 PM (ET), to allow the Government sufficient time to respond. Any questions received after this date are not guaranteed to be addressed.
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acquisition.gov/tar mailto:krystle.jones@dot.gov
6991PE26Q000001 Solicitation Page 2
Quotations shall be submitted electronically via email to Contracting Officer Krystle Jones via email at krystle.jones@dot.gov by June 1, 2026 at 12:00 PM (ET). Late quotations may not be considered.
Please reference the solicitation number in the subject line.
8. Solicitation Provisions
8.1 Solicitation Provisions Incorporated By Reference
*System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in DOT solicitations. Examples include:
• 52.222-25, Affirmative Action Compliance.
• 52.212-3(d), Offeror Representations and Certifications – Commercial Products and Commercial Services.
• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals – Representation.
• 52.212-3(t), Offeror Representations and Certifications – Commercial Products and Commercial Services.
Contracting officers will not need to consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
9. Contract Clauses
9.1 Contract Clauses Incorporated By Reference
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements Representation (JAN 2017)
FAR 52.204-7 System for Award Management – Registration (NOV 2024) (DOT Class Deviation No. 2025-18 SEP 2025)
FAR 52.212-1 Instructions to Offerors – Commercial Products and Commercial Services (SEP 2023)(DOT Class Deviation No. 2026-22 JAN 2026)
FAR 52.217-5 Evaluation of Options (JULY 1990) (DOT Class Deviation No. 2025-35
OCT 2025)
FAR 52.222-18 Certification Regarding Knowledge of Child Labor for Listed End Products (FEB 2021)
FAR 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (SEP 2025)(DOT Class Deviation No. 2025-24 SEP 2025)
FAR 52.252-5 Authorized Deviations and Provisions (NOV 2020) mailto:krystle.jones@dot.gov
6991PE26Q000001 Solicitation Page 3 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide and https://www.acquisition.gov/tar.
FAR 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) FAR 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (JAN 2017) FAR 52.204-13 System for Award Management – Maintenance (OCT 2018) (DOT Class
Deviation No. 2025-18 SEP 2025) FAR 52.209-6 Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment JAN 2025 (DOT Class Deviation No. 2026-22 JAN 2026)
FAR 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) (DOT Class Deviation No. 2026-22 JAN 2026)
FAR 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services (NOV 2023) (DOT Class Deviation No. 2026-22 JAN 2026)
FAR 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) (DOT Class Deviation No. 2026-21 NOV 2025)
FAR 52.222-3 Convict Labor (JUN 2003(DOT Class Deviation No. 2026-17 OCT 2025) FAR 52.222-19 Child Labor—Cooperation with Authorities and Remedies (MAR 2026) (DOT
Class Deviation No. 2026-17 OCT 2025) FAR 52.222-41 Service Contract Labor Standards (AUG 2018) (DOT Class Deviation No.
2026-17 OCT 2025)
FAR 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) (AUG 2018)(DOT Class Deviation No. 2026-17 OCT 2025)
FAR 52.222-50 Combating Trafficking in Persons (OCT 2025) (DOT Class Deviation No.
2026-17 OCT 2025)
FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022) (DOT Class Deviation No. 2026-17 OCT 2025)
FAR 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2004)
FAR 52.232-33 Payment by Electronic Funds Transfer—System for Award Management
(OCT 2018)
FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)
FAR 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) FAR 52.233-3 Protest After Award (AUG 1996) (DOT Class Deviation No. 2025-25 SEP
2025) FAR 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) (DOT Class
Deviation No. 2025-25 SEP 2025) FAR 52.240-91 Security Prohibitions and Exclusions (SEP 2025) (DOT Class Deviation No.
2025-24 SEP 2025)
TAR 1252.201-70 Contracting Officer's Representative (NOV 2022)
TAR 1252.223-71
TAR 1252.223-70
Accident and Fire Reporting (NOV 2022) Removal or Disposal of Hazardous Substances - Applicable Licenses and Permits. (NOV 2022)
6991PE26Q000001 Solicitation Page 4
9.2 Contract Clauses Incorporated in Full Text
FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage – Fringe Benefits 23850 Rigger: WG-10 23960 Welder, Combination, Maintenance: WG-10
TAR 1252.232-70 Electronic Submission of Payment Requests (TAR CLASS DEVIATION 2025-02
AUG 2025)
a) Definitions. As used in this clause -
(1) Contract financing payment has the meaning given in FAR 32.001.
(2) Payment request means a bill, voucher, invoice, or request for contract financing payment or invoice payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Content of Invoices,” this clause, and the applicable Payment clause included in this contract.
(3) Electronic form means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.
(4) Invoice payment has the meaning given in FAR 32.001.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Governmentwide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) Processing system. The Department of Transportation utilizes the DELPHI system for processing invoices. The DELPHI module for submitting invoices is called iSupplier. Access to DELPHI is granted with electronic authentication of credentials (name & valid email address) utilizing the GSA credentialing platform login.gov. Vendors submitting invoices are required to submit invoices via iSupplier (DELPHI) and authenticated via www.login.gov.
(d) Invoice requirements. To receive payment and in accordance with the Prompt Payment Act, all invoices submitted as attachments in iSupplier (DELPHI) shall contain the following:
(1) Invoice number and invoice date.
TAR 1252.242-72 Dissemination of Contract Information (NOV 2022) http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5341&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5341&num=0&edition=prelim
6991PE26Q000001 Solicitation Page 5
(2) Period of performance covered by invoice.
(3) Contract number and title.
(4) Task/Delivery Order number and title (if applicable).
(5) Amount billed (by CLIN), current and cumulative.
(6) Total ($) of billing.
(7) Cumulative total billed for all contract work to date.
(8) Name, title, phone number, and mailing address of person to be contacted in the event of a defective invoice.
(9) Travel. If the contract includes allowances for travel, all invoices which include charges pertaining to travel expenses will catalog a breakdown of reimbursable expenses with the appropriate receipts to substantiate the travel expenses.
(10) The following statement “The Contractor certifies that, by submitting this invoice to the Government, the supplies and/or services billed have been shipped, rendered, or delivered in accordance with instructions issued by the ordering officer; that they are reflected in the quantities and/or period of performance stated on the invoice; and that such supplies and/or services conform to the quantity and quality requirements specified in the applicable contract, order, or blanket purchase agreement.
Furthermore, pursuant to Executive Order 14173, Ending Illegal Discrimination And Restoring Merit-Based Opportunity, the Contractor certifies that it is in compliance with the Equal Protection principles of the Constitution and all applicable Federal anti-discrimination laws, and acknowledges that such compliance is material to the Government’s payment decision under the False Claims Act (31 U.S.C. § 3729(b)(4)). The Contractor also affirms that it does not operate any diversity, equity, and inclusion (DEI) initiatives that are inconsistent with the Equal Protection principles of the Constitution and the non-discrimination requirements of Federal law, as interpreted by the Supreme Court in Students for Fair Admissions v. Harvard, 600 U.S. 181 (2023).”
(e) Payment system registration. All persons accessing the iSupplier (DELPHI) will be required to have their own unique user ID and password and be credentialed through login.gov.
(1) Electronic authentication. See www.login.gov for instructions.
(2) To create a www.login.gov account, the user will need a valid email address and a working phone number. The user will create a password and then www.login.gov will reply with an email confirming the email address.
(3) iSupplier (DELPHI) registration instructions: New users should navigate to: http://einvoice.esc.gov to establish an account. Users are required to log in to iSupplier (DELPHI) every 45 days to keep it active.
(4) Training on DELPHI. To facilitate use of DELPHI, comprehensive user information is available at http://einvoice.esc.gov.
(5) Account Management. Vendors are responsible to contact their assigned COR when their firm's points of contacts will no longer be submitting invoices, so they can be removed from the system.
(f) Waivers. For contractors/vendors who are unable to utilize DOT's DELPHI system, waivers may be considered by DOT on a case-by-case basis. Vendors should contact their Contracting Officer's Representative (COR) for procedures.
6991PE26Q000001 Solicitation Page 6
(g) Exceptions and alternate payment procedures. If, based on one of the circumstances set forth in 1232.7002(a) or (b), and the contracting officer directs that payment requests be made by mail, the contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. If alternate payment procedures are authorized, the Contractor shall include a copy of the Contracting Officer's written authorization with each payment request. If DELPHI is succeeded by later technology, the Contracting Officer will supply the Contractor with the latest applicable electronic invoicing instructions.
(End of clause)
9.3 MARAD Clauses
MCL.E-1 Delegation of Inspection and Acceptance (AUG 2005)
The Contracting Officer's Technical Representative shall be delegated the responsibility and authority to conduct inspection and acceptance duties for this contract.
MCL.G-2 Schedules and Schedule Updates for Ship Repair (Aug 2005)
(a) The Contractor shall, within a period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer, with a copy to the COR, for approval, an electronic copy or other format as directed by the Contracting Officer, a practicable, detailed schedule using appropriate project management software and technology, showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials and equipment). Format of the schedule and supporting information shall be in the electronic form and format directed by the Contracting Officer. The schedule shall include a summary in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a complete schedule package within the time prescribed, the Contracting Officer may withhold notice to proceed until the Contractor submits the required schedule.
(b) Periodically, with each invoice submitted, or at other intervals as directed by the Contracting Officer, the Contractor shall update the schedule showing the actual progress and estimated times and resources at completion compared with initial project elements. Failure to submit updated schedules with the invoice shall be grounds for the Contracting Officer's rejection of the entire invoice. The revised progress schedule information shall be delivered to the Contracting Officer in the format and at the times directed by the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the initial approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of facilities, and to submit for approval any supplementary schedule or schedules as the Contracting Officer deems necessary to demonstrate how the required rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is
6991PE26Q000001 Solicitation Page 7 not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
(d) The Contractor shall plan and schedule all Open, Inspect, and Report Items as required by the Specifications such that they are accomplished within the first 25% of the availability, unless otherwise agreed by the Contracting Officer.
MCL.H-2 Supplemental Work Requests (Aug 2005)
(a) In the complex world of ship repairs, supplemental work often emerges as a result of test, inspection, or discovery of unknown or otherwise differing conditions. The extent and nature of such supplemental work can neither be identified in bid or proposal specifications, and both parties recognize the possibility that such work may arise. Notwithstanding the possibility of the identification of such work, MARAD does not guarantee the award of any supplemental work during contract performance.
(b) Although MARAD shall be under no obligation to award supplemental work during contract performance, MARAD has, in the past as needed, provided an estimate for labor (in labor hours) and material (in dollars) for such work in the Schedule (Section B of the solicitation under applicable supplemental work contract line item numbers (CLIN or CLINs)). The offeror was required to specify an hourly composite billing rate in its bid or proposal for supplemental work labor. The composite labor-billing rate would be the rate applicable to labor for all supplemental work that MARAD orders under the applicable supplemental CLIN of the resulting contract. Any supplies or subcontracts required to complete supplemental work will be charged as a direct cost reimbursable under the applicable supplemental work CLIN; additional indirect charges for materials and subcontracts will not be allowed.
(c) During the performance of the contract, when conditions indicate a need for supplemental work if needed, the Contracting Officer's Representative (COR) is empowered to provide technical direction, negotiate the amount of labor and material, and authorize the contractor to perform supplemental work through the issuance of a written authorization. The COR will issue authorizations for supplemental work if needed in accordance with the following:
(1) When conditions make supplemental work appropriate, the COR shall submit to the contractor a supplemental work request that identifies the work to be accomplished.
(2) The Contractor shall promptly review each supplemental work request upon receipt and shall, within seventy-two (72) hours of issuance, or sooner, as specified by the COR, provide the COR with a proposed price for the supplemental work. Price proposals for all supplemental work must be broken down by labor hours, materials, and subcontracts and allocated to the applicable supplemental work CLIN as appropriate. The contractor shall price the supplemental work to be performed in accordance with the composite labor rate bid or proposed under the supplemental work CLIN in the contract. If necessary, the Contractor shall submit prices for subcontractors, which will be negotiated and treated as direct materials. Once the COR and contractor agree on the technical direction and price to accomplish the supplemental work, the contractor and COR shall sign the authorization for supplemental work, which shall be final and binding on the contractor and MARAD. Subject to paragraphs (c.)(3.) through (c.)(6.), if urgent circumstances do not permit waiting for a written authorization, the parties may orally agree and follow up with written confirmation.
6991PE26Q000001 Solicitation Page 8
(3) Notwithstanding the preceding, the COR shall not authorize and the contractor shall not accept individual supplemental work authorizations from the COR in excess of the price ceiling established by the Contracting Officer pursuant to paragraph (d.)(10.). In addition, the COR shall not authorize and the contractor shall not accept a supplemental work authorization from the COR that, when combined with all previously authorized supplemental work under the contract, exceeds the amount of labor hours and materials specified in the applicable supplemental work CLINs.
(4) If the contractor requests an adjustment to the contract completion date in its proposal for the supplemental work, the COR must refer the issue to the Contracting Officer for resolution, which could include modifying the performance period of the contract. All supplemental work must be accomplished within the contract performance period. The COR shall not authorize and the contractor shall not accept supplemental work authorizations from the COR that cannot be completed within the contract performance period.
(5) If the COR and contractor cannot agree upon the price, the time required, or any other term of a supplemental work request, the matter shall be referred to the Contracting Officer who may resolve the issue in accordance with the procedures contained in the Changes clause incorporated in the contract. Specifically, the Contracting Officer shall have the option of (i) directing that the Contractor perform the work at a price and within a time period determined by the Contracting Officer to be reasonable, or (ii) withdrawing said supplemental work request. The Contractor's refusal to perform the work as directed by the Contracting Officer shall constitute an event of default under the default clauses of the contract. Disputed issues resulting from supplemental work unilaterally directed by the Contracting Officer may be handled under the disputes clause of the contract.
(6) If the Contracting Officer directs the Contractor to perform the work at a price and within a time period determined by the Contracting Officer to be reasonable, the Contractor shall maintain and submit to MARAD on a daily basis, report sheets itemizing materials used, the costs and man hours of all labor (direct, indirect, and impact), production schedule activities affected by and/or related thereto, and charges for equipment, whether furnished by the Contractor, subcontractors or others. Material charges shall be substantiated by valid copies of materials and/or suppliers invoices. Such invoices shall be submitted with the daily report sheets or, if not available, as soon as reasonably practicable thereafter. Said daily reports shall also include an indication as to which specific schedule activity(ies) are affected by the order which are the subject of the daily report sheets. To the extent the contractor fails or refuses to submit the aforementioned daily report sheets on a daily basis, such failure or refusal shall constitute a basis for the Contracting Officer to suspend payment for work completed under the supplemental work until appropriate documentation required by the contract is provided.
(d) The following rules apply to supplemental work authorizations:
(1) The COR shall authorize supplemental-work only during the period of performance of the contract.
(2) All authorizations for supplemental work are subject to the terms and conditions of the contract and must be within the scope of the contract.
(3) If mailed, an authorization is considered "issued" when MARAD deposits the order in the mail. Authorizations may also be issued orally, or by written communications, that is hand-delivered or sent by facsimile or electronic transmission. Oral orders must be followed up by written confirmation as soon as practicable thereafter.
6991PE26Q000001 Solicitation Page 9
(4) Unless otherwise explicitly noted in the authorization for supplemental work, all authorizations for supplemental work are firm fixed price. The agreed upon price shall cover all costs including, but not limited to, direct and indirect labor and material, overhead, delay, acceleration, and disruption caused by the supplemental work. Where the parties are unable to agree that an order establishes mutually agreeable terms, the parties shall note the specific differences that are not agreed upon in the text of the proposed work authorization and refer the matter to the Contracting Officer for resolution pursuant to paragraph (c.)(5.).
(5) Unless the contractor otherwise explicitly notes in the supplemental work authorization, in consideration of the price of the order, the Contractor remises, releases, and forever discharges MARAD, its officers, agents, employees, and sureties from any and all civil claims and requests for equitable adjustment whatsoever, relating to, arising out of, or connected with said supplemental work authorization. Such release is full and final settlement of all claims and requests for equitable adjustment relating to, arising out of, or connected with the work authorization, as modified, including, but not limited to, all impact claims such as delay, acceleration, disruption, and cumulative effects of the instant and all previously issued supplemental work authorizations. The executed work authorization constitutes a complete and final adjustment of the price and the delivery schedule.
(6) When MARAD requires supplies or services covered by the contract in an amount less than the total value of the contract, MARAD is not obligated to award supplemental work for the balance of the price bid or proposed for supplemental work. The Contractor is not obligated to honor additional supplemental work in excess of the estimated labor hours identified in the Schedule. This subparagraph does not affect or change the Contracting Officer's authority under the changes clause of the contract.
(7) Except for limitations of labor hours estimated in the Schedule, there is no limit to the number of supplemental work authorizations that may be issued. MARAD may issue supplemental work authorizations requiring delivery or performance in multiple locations, if the contract contemplates multiple locations.
(8) In the event a supplemental work authorization covers a series of related procedures, the Contracting Officer may request the Contractor to furnish separate prices for each item of the work.
(9) If not otherwise provided, the Contracting Officer may request at any time during performance of supplemental work a list of subcontractors performing work covered by the supplemental work, the dollar value of the respective subcontracts, and a description of the subcontracted work and the contractor shall promptly provide the requested information.
(10)The COR shall not issue and the contractor shall not accept supplemental work authorizations from the COR that exceeds $10,000.
MCL.H-3 Indemnity and Insurance (Aug 2005)
The Contractor shall indemnify and save and keep harmless the Government against any or all loss, cost, damage, claim, expense or liability whatsoever because of accident or injury to persons or property of others occurring in connection with the operations under this contract.
The Contractor shall secure, pay the premiums for and keep in force until the expiration of this contract, and any renewal thereof, adequate insurance. Such insurance to specifically include liability assumed by the Contractor under this contract.
6991PE26Q000001 Solicitation Page 10
Each policy of insurance shall contain an endorsement that any cancellation or material change in the coverage adversely affecting the Government's interest shall not be effective unless the insurer or the Contractor gives written notice of cancellation or change as required to the Contracting Officer. When the coverage is provided by self-insurance, the Contractor shall not change or decrease the coverage without the Administrative Contracting Officer's prior approval.
A certificate of each policy of insurance shall be furnished to the Contracting Officer within ten
(10) days after notice of award certifying, among other things, that the policy contains the aforesaid endorsement. The insurance companies providing the above insurance shall be satisfactory to the Government. Notices of policy changes shall be furnished to the Contracting Officer.
The contractor shall provide at the Contractor's expense, within five days of request from the MARAD contracting officer, a copy of all original insurance policies. These may be sent by mail or facsimile machine.
MCL.H.4 Indemnity and Insurance (Additional) (Aug 2005)
(a) INDEMNITY
(1) The Contractor shall exercise reasonable care and use its best efforts to prevent accidents, injury or damage to all employees, persons and property in and about the work, and to the vessel or portion thereof upon which work is done.
(2) Except as provided elsewhere in this contract, including any guarantee clause, the MARAD assumes the risk of physical loss or damage to any part of the vessel, its machinery, equipment, stores, and other property including cargo if owned by the Government except to the extent that such loss or damage is caused by the negligence, fault, error, act or omission of the Contractor, its subcontractors, agents, or employees. The burden of proving freedom from fault shall be borne by the Contractor. Unless the loss or damage was caused by the willful misconduct of the Contractor, its executive officers, or superintendents the Contractor's liability under this Contract shall not exceed total damage to the ship or ships including total loss up to $1,000,000 per accident or occurrence per vessel, and shall not exceed in the aggregate per accident or occurrence the sum of total damage to the ship or ships including total loss up to $1,000,000 multiplied by the number of MARAD's vessels in the care, custody or control of the Contractor at the location and at the time of the accident or occurrence giving to the loss or damage.
(3) As to third parties, including, but not limited to, agents, employees or servants of the Contractor, or any subcontractor, the Contractor will defend, indemnify and hold harmless the Government, the vessel, its owners and charterers, from all claims, actions, suits, costs, demands and expense of all descriptions arising out of disease, illness, personal injury, death or property damage to any third party in any way related to or arising out of the performance of work under this contract except to the extent caused by the fault, error, act or omission, or negligence of the Government, its agencies or employees. The burden of proving fault of the Government, its agencies or employees shall be borne by the Contractor.
(4) As to loss and damage which are the responsibility of the Government, the Government shall be subrogated to any claim, demand, or course of action against third parties which exists in favor of the Contractor, and the Contractor shall, if required, execute a formal assignment or transfer of such claim, demand, or course of action, and shall aid in securing information, 6991PE26Q000001 Solicitation Page 11 evidence, obtaining of witnesses, and cooperate with MARAD in all matters MARAD may deem necessary in defense of any claim, or suit or appeal from any judgment or in effecting indemnity, provided, further, that nothing contained in this paragraph shall create or give rise to any right, privilege or power in any person except the Contractor, nor shall any person (except the Contractor) be or become entitled thereby to proceed directly against the Government, its agencies or instrumentalities, or to join the Government, its agencies or instrumentalities, as a codefendant in any action against the Contractor brought to determine the Contractor's liability or for any other purpose.
(b) TYPES OF INSURANCE AND MINIMUM COVERAGE. The Contractor shall at its own expense, provide and maintain the following insurances during the entire performance of this contract.
(1) Workmen's Compensation, including Longshoremen & Harbor Worker's Act coverage - Covering all agents, servants, borrowed servants, statutory employees of Contractor for all compensation and other benefits required by applicable state and federal law or by governmental authority on account of injury, death, sickness or disease - Statutory - no minimum.
(2) Comprehensive General Liability to include coverage for (but not limited to) products and completed operations liability, property damage liability and contractual liability - $1 million combined single per occurrence limit for bodily injury and property damage and $1 million in the aggregate.
(3) Ship Repairers Legal Liability - coverage to be provided under the standard London or American Institute forms or their equivalent $5 million per vessel, per occurrence or such other amount as may be requested.
(4) Pollution - sudden and accidental liability - $1 Million per occurrence.
(c) All such insurance shall be subject to the approval of the Division of Marine Insurance and will contain thirty (30) calendar days advance notice of cancellation or of any non-renewal which is the option of the insurer, said notice to be provided to the U.S. Maritime Administration, Division of Marine Insurance MAR-710, 1200 New Jersey Avenue SE, Washington, DC 20590.
(d) FORM OF CONFIRMATION
(1) The pollution insurance may be a separate policy or part of the Comprehensive General Liability policy, but the coverage must be specifically shown on the required confirmation of insurance. Excess liability and umbrella liability policies may be used in the excess of primary policies to meet the minimum limit requirements. The United States of America shall be an additional assured in the Ship Repairs Legal Liability policy, Comprehensive General Liability Policy and Pollution Policy. Such policies shall contain a clause statement that there is no recourse against the United States of America for payment of premium. All such insurance shall be subject to the approval of the Division of Marine Insurance and must contain thirty (30) calendar days advance notice of cancellation (without disclaimer) or of any non-renewal which is the option of the insurer, said notice to be provided to the U.S. Maritime Administration, Division of Marine Insurance MAR-710, 1200 New Jersey Avenue SE, Washington, DC 20590.
(2) The Contractor shall have its insurance broker provide a detailed certificate of insurance, cover note or policy confirming the above required coverage. The confirmation shall name the Contractor and United States of America as assureds and confirm the types of coverage, policy forms, policy periods, deductibles (if any) and underwriters with their percentage of participation. The N.Y. Suable Clause or Service of Suit USA Clause must be confirmed for any
6991PE26Q000001 Solicitation Page 12
Foreign underwriter placements. The policy amounts, terms and conditions, deductibles and underwriters shall at all times be satisfactory to the Maritime Administration.
(e) The contractor shall insert the substance of this clause in subcontracts under this contract that require work on a Government installation.
MCL.H-6 Standards of Employee Conduct (AUG 2005)
The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, and integrity, and shall be responsible for taking such disciplinary action with respect to its employees as may be necessary.
MCL.H-13 Supervision (AUG 2005)
The Contractor shall provide at all times the quantity and quality of supervision necessary for the effective and efficient management of the operation. All supervisors shall have an intimate knowledge of the various tasks, equipment, and materials so as to be able to properly train and direct the workers in their individual tasks and to maintain and control an effective operation.
10. SUBMITTAL INSTRUCTIONS
In addition to the referenced provision at FAR 52.212-1, Instructions to Offeror – Commercial Items, quoters shall follow the instructions below.
10.1 General Instructions
(1) Format. Non-price quotations shall be formatted for viewing/printing using 8.5 by 11 inch paper size, 1 inch margins, using at least a Times New Roman 11 point font.
(2) System for Award Management (SAM) Registration. SAM REGISTRATION IS REQUIRED.
Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.sam.gov. Lack of registration in SAM may make a quoter ineligible for award. Information on how to register and the time required is detailed in FAR 52.204-7.
10.2 Quotation Instructions
At a minimum, include the following:
(1) Experience/Past Performance. Provide a listing of up to three (3) relevant projects completed within the past three (3) years. Relevant is defined as a project of similar or greater size, scope, and complexity to the requirements of the SOW. Each project shall not exceed one (1) page and include the following information as applicable:
• Project name
• Name and address of client organization
• Contract number and order number
• Contract type https://www.sam.gov/
6991PE26Q000001 Solicitation Page 13
• Total contract value
• Period of performance
• Description of work performed
• Points of contact including name, telephone number and email address
(2) Price Quotation. Submit pricing using the price worksheet in Attachment 2. Please ensure that the price quotation is valid for at least 30 days from the date of established for receipt of quotations. The price quotation should be included in a separate document to facilitate an independent evaluation.
11. Basis of Award and Evaluation Criteria
Award will be made on a Lowest Price Technically Acceptable (LPTA) basis. The Government plans to award a single purchase order to a sole responsible quoter with the lowest total evaluated price meeting or exceeding technical acceptability standards, having an acceptable or neutral past performance.
The Government plans to evaluate quotations and make award without conducting discussions.
Quoters may be given the opportunity to clarify certain aspects of their quotation or resolve minor or clerical errors. The Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.
10.1 Evaluation Factors
The following factors shall be used to evaluate quotations:
1. Technical Acceptability - Technical information will be evaluated to determine if the quoter’s technical submittal information is sufficient to meet the requirements described in the Statement of Work.
2. Past Performance - Past performance information will be evaluated to determine the quoter’s ability to perform the contract successfully and degree of performance risk associated with a quoter. MARAD will use its discretion to determine the sources of past performance information, and the information may be obtained from references provided, MARAD’s knowledge of contractor performance, other government agencies or commercial entities, or past performance databases.
3. Price - Total evaluated price will be the sum of quotations for all contract line items.
10.2 Difference Between Experience and Past Performance
Experience is the “type of work” the quoter has performed whereas past performance examines “how well” the quoter has performed as indicative as to how well the quoter will perform on this procurement. For the purpose of evaluating experience/past performance, relevant is defined as a project of similar or greater size, scope, and complexity to the requirements of the SOW. A quoter with no relevant past performance for work completed
6991PE26Q000001 Solicitation Page 14 within the past three (3) years will be evaluated with neither a favorable nor unfavorable rating.
However, a quoter without a history of relevant experience for work completed within the past three (3) years will receive an “Unacceptable” rating for the Technical Acceptability factor.
The government may, if requested within 3 days after the notification of contract award (i.e., posting to sam.gov), provide a brief explanation of the award decision to unsuccessful quoters.
The brief explanation may include the following information:
• The number of quotations received;
• The name of each quoter receiving an award;
• The total order price; and
• In general terms, the reason the quoter’s quotation was not selected, unless the price information shared readily reveals the reason.
Evaluation Method: Only the lowest priced offer will be evaluated for Technical Acceptability.
Should the lowest priced offer not receive an acceptable technical and neutral or acceptable past performance rating, the process will continue in order of lowest priced offer until the lowest priced, technically acceptable offer is identified.
ATTACHMENTS:
1. Statement of Work
2. PF-205 Price Sheet
3. FAR Deviation Text
4. GFE List
5. E-Invoicing Instructions
File details come from the government source that posted it. Updated .