Combined Synopsis and Solicitation - HT940626QE117.pdf
PDF 7 MB Posted
- Attached to
- CCF-200 Fit Testers
- Solicitation number
- HT940626QE117
- Issued by
-
Defense Health Agency
About this file
This is a Request for Quotation (RFQ) issued by the Defense Health Agency Contracting Activity (DHACA), Southeastern Healthcare Operations Contracting Division for the procurement of CCF-200 Fit Testers. The requirement is for 40 CCF-200 Fit Tester units and 40 Simulator Wall Mount Bracket units to support Navy and Marine Corps Force Health Protection Command (NMCFHPC) in Portsmouth, Virginia. The vendor must provide all materials, labor, equipment, required travel, and shipping as part of a firm-fixed price purchase order. Delivery is required by October 31, 2026, with quote submission deadline of 8:00 AM Eastern Standard Time on September 21, 2026. The solicitation is classified under NAICS 339112 (Surgical and Medical Instrument Manufacturing) and PSC 6515 (Medical and Surgical Instruments, Equipment, and Supplies). This is a full and open competition procurement with no incumbent contractor.
Quotes must be submitted electronically in four separate volumes: Volume I (Business Summary, 2-page limit), Volume II (Technical Capability, 15-page limit), Volume III (Price), and Volume IV (Completed RFQ with pricing). The Government intends to award without discussions based on best value, evaluating technical capability as the most important factor, followed by price, then business summary. All equipment must be brand new, and the CCF-200 is designed to integrate with existing Benson audiometers. Contractors must be registered in the System for Award Management (SAM) and provide representations and certifications affirming current and accurate information. Payment terms are Net 30 with constructive acceptance within seven calendar days. Vendors must bill electronically via the WAWF system. Questions should be directed to Contracting Officer Melissa Peregrino at melissa.peregrino-white.civ@health.mil with a minimum five-day notice before quote due date. Quotes shall be Free on Board (FOB) Destination with pricing limited to two decimal places.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis/Solicitation
Synopsis/Solicitation Requirement HT940626QE117 is issued as a Request for Quotation (RFQ). This solicitation for commercial products or commercial services is prepared and solicited in accordance with the Federal Acquisition Regulation (FAR) Overhaul Subpart 12.201-1 supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued.
The Defense Health Agency Contracting Activity (DHACA), Southeastern Healthcare Operations Contracting Division intends to procure a firm-fixed price purchase order for CCF-200 Fit Testers in support of Navy and Marine Corps Force Health Protection Command (NMCFHPC) Portsmouth, Virginia.
Provide all materials, labor and equipment to complete the required task. Additionally, the vendor is to provide any required travel and shipping.
This requirement is under North American Industry Classification System (NAICS) number 339112 – Surgical and Medical Instrument Manufacturing, Product Service Code (PSC) 6515 – Medical and Surgical Instruments, Equipment, and Supplies.
Deliver By: 31 October 2026
Competition Approach: Full and Open Competition
Submission of Quote: Prospective contractors are required to follow the instructions and requirements of Addendum to 52.212-1 and Addendum 52.212-2 included in this document.
Questions or Clarifications: All questions are to be submitted via email to the Contracting Officer, Melissa Peregrino, melissa.peregrino-white.civ@health.mil with email subject: RFQ HT940626QE117 – CCF-200 Fit Testers. The Government may not respond to questions received less than 5 days prior to the due date and time for receipt of quotations.
Incumbent Contractor: This is a new contract.
Attachments:
Attachment I – Combined Synopsis / Solicitation – Request for Quote mailto:melissa.peregrino-white.civ@health.mil
ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES.
a. Contract award. The Government intends to evaluate quotes and award a contract without discussions with Contractors. Therefore, the Contractor’s initial quote should contain the Contractor’s best terms. However, the Government reserves the right to conduct discussions, if necessary. The Government may reject any or all quotes if such action is in the public interest, accept other than the lowest quote, and waive informalities and minor irregularities in quotes received. This solicitation does not commit the Government to pay any costs incurred in the preparation and submission of a quote or for any other costs incurred by any contractor submitting a quote in response to this solicitation.
b. Submission of quotes. Submit signed and dated quotes to the office specified in this solicitation at or before the exact time specified in this solicitation. As a minimum, quotes shall include the following:
Proprietary information shall be clearly marked. Proprietary information submitted in response to this solicitation will be protected from unauthorized disclosure as required by Subsection 27 of the Office of Procurement Policy Act as amended (41 U.S.C. 423), hereinafter referred to as “the Act”, as implemented in the FAR.
Contractors must be registered in System for Award Management (SAM) in order to be eligible to be awarded a Department of Defense (DoD) contract.
Contractors must provide the information necessary to evaluate the factors contained in provision at Addendum 52.212-2. The Government will not make assumptions concerning intent, capabilities, or experiences. Clear identification of quote details is the sole responsibility of the offeror. Failure to clearly address all submittal requirements, evaluation criteria and information requirements of the RFQ may result in rejection of the offer.
Submission Requirements: Quote shall be submitted in four (4) separate volumes as shown below:
Volume Factor Title Format Page Limitation
I 1 Business Summary PDF 2
II
Technical Capability PDF 15
IV 3 Completed RFQ (include pricing)
PDF varies
Contractors shall not lock, encrypt, copy as an image, password protect or otherwise place barriers to opening files for their quote submissions. If the Government cannot access the electronic version to complete evaluation, the government will consider the quote invalid, and the quote will be deemed ineligible for award.
Incomplete offers may be considered non-responsive and removed from further consideration.
Additionally, to ensure a fair evaluation process, each contractor is permitted to submit only one quote. If a contractor submits more than one original quote, the government may invalidate all submissions from that contractor, who would then be considered ineligible for the contract award.
This policy does not apply to revised quotes requested by the government.
Format. All materials shall be in typeface Times New Roman 12 point (or Arial 12 point) and formatted to print on 8-1/2 x 11” white paper with one-inch margins all around. Tables and illustrations may use reduced font style but not less than 8-point. All material submitted may be single-spaced. Each page must provide identification of the submitting contractor in the header or footer.
The quote shall not contain any extraneous information such as advertisements or marketing information. Elaborated formats, or color presentations are not desired or required. Oral presentations will not be considered for this solicitation competition. The Government does not require any paper quotes and will not accept faxed quote copies.
Specific Instructions by Volume: Contractors shall provide each volume as explained below:
Volume I - Factor 1 Business Summary:
The contractor’s business summary must include the following details:
• Legal entity name and any "doing business as" alias.
• Full address and phone number.
• The address where the work will be performed (if different from your main address).
• CAGE Code and Unique Entity ID.
• GSA contract number(if applicable)
• Verification statement of their representations and certifications in SAM.gov affirming that these representations and certificates are current, complete, and accurate as of the date quotes are due.
• Period for acceptance of quotes. State whether the Contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes, unless another time period is specified in an addendum to the solicitation.
• Reference the RFQ number.
• Include a statement confirming your agreement with all terms, conditions, and provisions outlined in the solicitation.
• Acknowledgement of all amendments, if any.
• Affirm your company's ability to fulfill the stated requirement.
• Provide the total quoted price.
• The business summary document shall be signed by a company representative who is authorized to obligate the company. This person's contact information must also be included.
Volume II - Factor 2 Technical Capability – Do not include pricing information in this factor document.
Technical Capability Statement Requirements: To demonstrate the ability to meet the requirements of this RFQ, the capability statement must prove the contractor's expertise, qualifications, and authority to provide the required items and services. The submission must address the following areas:
• PWS Compliance and Execution Plan: The contractor must demonstrate a clear understanding of the requirements and detail how they will meet every part of the scope and each specific task in PWS. This section must include an implementation plan and an estimated transition timeframe.
• Proposed Solution Details: The statement must thoroughly describe all proposed items, resources, and methods, including specifications, performance capabilities, delivery schedules, and warranties.
• Equipment Condition: All parts and equipment must be brand new.
Volume III - Factor 3 Price
Use Attachment I- Request for Quote to prepare and submit the price offer. Contractors shall provide the shipping price included in their quoted firm fixed price to facilitated price evaluation. The contractor may add rows, columns, or spreadsheets to accommodate the required pricing information. Contractors shall provide the necessary details and supporting information to address the solicitation requirements and to allow a complete analysis of each line-item price. All quoted prices must not contain more than two (2) decimal places and shall be Free on Board (FOB) Destination.
c. Submissions, Late submissions, modifications, revisions, and withdrawals of quotes.
a. Contractors are responsible for submitting quotes and any modifications or revisions electronically to the Contract Specialist, Luis Zeno-Pimentel, luis.a.zeno-pimentel.civ@health.mil and Contracting Officer, Melissa Peregrino, melissa.peregrino-white.civ@health.mil before or at 8:00am Eastern Standard Time (EST) 21 September 2026.
All correspondence shall reference RFQ HT940626QE117 – CCF-200 Fit Testers in the email subject line and all enclosed documents.
b. Any quote, modification, or revision received after the time specified for receipt of quotes is “late” and will not be considered.
c. Contractors may withdraw their quotes by written notice to the Government received at any time before award.
d. Exceptions/Assumption to TOPR Requirements. Contractors are required to meet all solicitation requirements, such as terms and conditions; representations and certifications; and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. If necessary, contractors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, price, and specific requirements of the solicitation. This information shall be provided in the format and content of table below.
Solicitation Document
Page/paragraph Requirement/Portion Rationale
PWS, Part X, Pricing Template, Past
Applicable Page and Paragraph Numbers
Identify the requirement or portion to which exception
Describe Why the requirement can/will
Performance is taken. not be met.
(End of provision)
ADDENDUM TO 52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES
a. The Government will award a contract resulting from this solicitation to the responsible contractor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered.
The Government intends to evaluate offers and issue a firm fixed price contract based on the initial offers received, utilizing the procedures found at Federal Acquisition Regulation (FAR) Overhaul Subpart 12.203 supplemented with additional information included in this document.
The Government intends to evaluate quotes and award a contract without discussions with Contractors. However, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
Contractors shall include all four (4) volumes listed in Addendum to 52.212-1. Incomplete quotes may be considered non-responsive and removed from further consideration.
BASIS FOR AWARD
This is a Best Value procurement. The Government may elect to award to other than the lowest priced quote where the perceived benefits merit the higher price, and the price is determined fair and reasonable. Conversely, the Government may select a lower-priced quote, and the technical capability is rated as acceptable.
The Government will review quotes to determine if they are complete and compliant with the solicitation requirements. A compliant quote is one that meets all the terms, conditions, and specifications in the solicitation. The contractor shall provide all documents listed and shall comply with all RFQ instructions for the quote to be considered “compliant and complete” with this solicitation. The Government may consider a contractor ineligible for award if any required document was not submitted by the required date and time; it is incomplete (missing items, signatures, etc.), or it does not comply with format requirements.
The following factors shall be used to evaluate quotes:
Factor 1: Business Summary;
Factor 2: Technical Capability;
Factor 3: Price
Factor 2 is more important than Factor 1 and Factor 3, Factor 3 is more important than Factor
1. Evaluation factors other than price when combined are significantly more important than price.
Factor 1 Business Summary: Evaluation of this factor will be for completeness.
Completeness: The business summary will be reviewed to determine the extent to which all the required elements listed in Addendum to 52.212-1 have been addressed. A business summary that fails to address all required elements may be excluded from further consideration.
Factor 2 Technical Capability/Medical Device and Equipment Risk Assessment Form:
Evaluation of this factor is a subjective evaluation of the contractor's understanding/capability/approach, demonstrated resources, and methods to meet all requirements.
The following adjectival ratings/definitions shall be used for the Technical Evaluation Factor. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses and deficiencies in determining technical ratings. Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed below.
The contractor’s quote will be evaluated to determine whether the proposed capability approach demonstrates a clear and unambiguous understanding and a demonstrated ability to meet the requirements. Failure to demonstrate a clear and unambiguous capability approach to meeting the requirements will result in an “Unacceptable” rating for this factor.
Technical
Rating Description
Acceptable Quote meets requirements and indicates an adequate approach and understanding.
Unacceptable Quote does not meet requirements of the solicitation, and thus contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Factor 3 Price: The Government will evaluate price for completeness and whether quoted prices are fair and reasonable. Prices must be entirely compatible with the capability portion of the quote.
Completeness: The Contractor’s pricing sheet will be reviewed to determine the extent to which the quote fulfills the solicitation requirements and whether all the price elements have been addressed.
The Contractor’s proposed price will be evaluated to ensure continuity and traceability of prices to the solicitation requirements. The Government may make a final rating determination based on the quote as submitted without requesting any further information.
Fair and Reasonable: The degree to which the proposed prices, base period and Option periods, compared to the prices, a reasonably prudent person would expect to incur for the same or similar services. The Factor 4 – Price/Attachment II – Pricing Template and any pricing information submitted will be evaluated to identify unusual high-price, inconsistent pricing patterns, and potential misunderstandings of the requirement. Comparison of quoted prices received in response to the solicitation and/or comparison of quoted prices with the Independent Government Estimate and historical prices may be used to determine whether a price is fair and reasonable. A contractor with pricing that reasonableness is determined to be questionable for any period of performance may not be considered for award.
(b) A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful contractor within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the quote’s specified expiration time, the Government may accept a quote (or part of a quote), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
File details come from the government source that posted it. Updated .