combined spec CGRESD Storage Building and Greenhouse 2.21.20.pdf
PDF 1 MB Posted
- Attached to
- New Storage Building & Greenhouse
- Solicitation number
- RFP CGRE 200000001157 5
- Issued by
- Gladwin County, Michigan
About this file
This is a project manual and specification document for a state and local construction contract opportunity issued by Clare Gladwin Regional Education Service District (CGRESD) in Michigan for the design and construction of a new storage building and greenhouse facility. The project, identified as TDF #2020-18, was designed by The Design Forum Inc. and includes both a pole-frame storage building and a prefabricated greenhouse structure. Sealed bids were due on Wednesday, March 10, 2020, at 2:30 PM local time at the Office of the Superintendent in Clare, Michigan. The project involves construction of a clear-span pole building with metal siding and roofing, a concrete foundation and floor slab, overhead and pass-through doors, and a complete greenhouse package (High Garden Grower model) pre-priced at $26,127.00 plus optional installation at $16,610.00. Construction is sequenced in two phases: greenhouse completion by July 1, 2020, with sitework and pole building construction beginning August 14, 2020, coordinating with student labor from the district's Construction Trades Classes, who will perform carpentry, concrete, metal installation, and door work at no cost to the contractor under licensed instructor supervision.
Bid security of five percent of the bid amount is required, with successful bidders obligated to provide 100% performance and labor-material bonds within ten days of award. The contract is awarded on a lump-sum basis for all general construction trades including mechanical and electrical work, with the greenhouse package cost and optional installation costs specified as line items. The school district determined that prevailing wages are not required on this project. Contractor responsibilities include all permits, inspections, county building permits with associated costs to be included in the bid, site preparation, utility connections, temporary facilities, quality control testing, and final cleanup. The contractor must submit a detailed cost breakdown within ten days of contract acceptance and maintain a full-time superintendent on site. The project specifies compliance with AIA Document A201 (2017 General Conditions), Michigan Building Code, and applicable OSHA and environmental regulations, with a one-year warranty required on all work from the date of substantial completion. Bidders were required to submit three notarized affidavits addressing familial relationships with school board members, school safety initiative compliance, and Iran Economic Sanctions Act compliance at the time of bid submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
for
NEW STORAGE BUILDING & GREENHOUSE
CLARE GLADWIN RESD
TDF #2020-18
THE DESIGN FORUM INC.
ARCHITECTS / PLANNERS
560 FIFTH St NW, Suite 302
Grand Rapids, Michigan 49504
Date: February 20, 2020
NEW STORAGE BLDG & GREENHOUSE Section 00 01 15
Clare Gladwin RESD Division 00 2
TDF # 2020-18 The Design Forum Inc.
00 01 10 TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 Title Page
00 01 10 Table of Contents
00 01 15 List of Drawing Sheets
00 11 13 Advertisement For Bids
00 21 13 Instructions To Bidders
00 41 00 Bid Form
00 43 43 Wage Rates
00 45 13 Bidder's Qualifications
00 54 00 Bid Supplement
00 72 00 General Conditions of the Contract
00 73 00 Supplementary Conditions
00 73 36 Equal Employment Opportunity
DIVISION 01 GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 25 00 Substitution Procedures
01 29 00 Application for Payment
01 45 00 Quality Control
01 51 13 Temporary Electric System
01 51 23 Temporary Heating and Ventilating
01 51 33 Worksite Communication
01 51 36 Temporary Water, Toilets, Facilities and Controls
01 70 00 Project Closeout
DIVISION 02 EXISTING CONDITIONS
02 41 19 Selective Demolition
DIVISION 03 CONCRETE
03 11 00 Concrete Formwork
03 20 00 Concrete Reinforcement
03 30 00 Cast-in-place Concrete
DIVISION 04 MASONRY (NOT USED)
DIVISION 05 METALS
05 50 00 Metal Fabrications
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
06 20 00 Finish Carpentry
Clare Gladwin RESD Division 00 3
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 92 00 Joint Sealers
DIVISION 08 OPENINGS (NOT USED)
DIVISION 09 FINISHES
09 91 00 Painting
DIVISION 10 SPECIALTIES (NOT USED)
DIVISION 11 EQUIPMENT (NOT USED)
DIVISION 12 FURNISHINGS (NOT USED)
DIVISION 13 SPECIAL CONSTRUCTION
13 34 13 Greenhouse
13 34 23 Pole Building
DIVISION 31 EARTHWORK
31 11 00 Clearing and Grubbing
31 20 00 Earthwork
31 25 13 Slope Protection & Erosion Control
31 31 16 Termite Control
DIVISION 32 EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving
32 92 00 Seeding
Clare Gladwin RESD Division 00 4
00 10 15 LIST OF DRAWING SHEETS
DRAWING NO. TITLE
C1.1 SITE PLAN
A1.1 STORAGE BUILDING
A1.2 GREENHOUSE
NEW STORAGE BLDG & GREENHOUSE Section 00 11 13
Clare Gladwin RESD Division 00 5
00 11 13 ADVERTISEMENT FOR BID
PROJECT: NEW STORAGE BUILDING & GREENHOUSE
OWNER: GLARE GLADWIN RESD
BID PLACE AND TIME
Sealed bids for the above captioned project will be received as follows:
LOCATION: The Office of the Superintendent
Clare Gladwin RESD
4041 E Mannsiding
Clare MI 48617
DATE AND TIME: Wednesday, March 10, 2020 at 2:30 PM Local Time
Bids received thereafter will be void.
Bids will be publicly opened at that time.
DOCUMENTS ON FILE
The Drawings and Project Manual may be examined at the following places:
Builders and Traders Exchange, Grand Rapids, Traverse City, Kalamazoo, and Lansing, Michigan.
F.W. Dodge, Grand Rapids, Flint, Southfield, Michigan.
Construction Association of Michigan, Bloomfield Hills, Michigan.
DOCUMENT DEPOSIT
Prospective bidders may obtain electronic files of Drawings and Project Manuals from the Architect free of charge.
BIDDER QUALIFICATIONS
The Owner may make such investigations as necessary to determine the ability of the bidder to perform the work. The Owner may request the bidder to furnish all such information and data for this purpose.
The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract.
Clare Gladwin RESD Division 00 6
BID SECURITY
A certified check or bidder's bond, payable to the Owner for the sum of not less than 5% of the amount of the bid will be required with each bid to secure the Owner from loss or damage by reason of withdrawal of the bid or the failure of the bidder to enter into a Contract if the bid is accepted by the Owner.
If the successful bidder fails to furnish satisfactory bonds and insurance within 10 days after notice of award, such security shall be forfeited as liquidated damages to the Owner to compensate for losses due to delay and/or increased costs of the work. The securities of the three lowest bidders will be retained until the bonds and insurance of the successful bidder have been approved by the Owner. The securities of other bidders will be returned within 10 days after bid opening.
ACCEPTANCE
The Owner reserves the right to accept or reject any or all of the bids. The Owner is not obligated to accept the lowest or any other bid. The Owner reserves the right to waive any informalities in any or all bids and to accept any one or combination of alternate bids in the interest of the Owner.
WITHDRAWAL
Bidder may withdraw bid at any time prior to scheduled closing time for receipt of bids. No bid may be withdrawn or modified within a 60 day period from the time of its presentation and opening.
EQUAL EMPLOYMENT OPPORTUNITY
In connection with the execution of this work, the successful bidder shall not discriminate against any employee or applicant for employment. Take affirmative action to insure that applicants are employed, and that employees are treated during their employment without regard to their race, religion, color, sex, handicap, or national origin. Such actions shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
AFFIDAVITS REQUIRED
Provide in compliance with MCL 380.1267. Attach are three notorized, sworn statements regarding disclosure of any familial relationship that exists between the Owner or an employee of the bidder and any member of the school district board, intermediate school district board, or superintendent(s) of said boards, an affidavit of Bidder for compliance with school safety initiative legislation and an afficavit of compliance with the Iran Economic Sanctions Act. All three must be submitted with the bid.
WAGE RATES
The school district's legal counsel has advised that prevailing wages are not required on this project.
ASBESTOS AWARENESS AND IDENTIFICATION
This project does not include any asbestos work.
Clare Gladwin RESD Division 00 7
ASBESTOS-FREE CERTIFICATION
No asbestos containing materials shall be purchased or installed as part of this project. The Contractor shall be required to certify that no asbestos containing materials have been placed in this project.
END OF SECTION
NEW STORAGE BLDG & GREENHOUSE Section 00 21 13
Clare Gladwin RESD Division 00 8
00 21 13 INSTRUCTIONS TO BIDDERS
BID INFORMATION
Refer to ADVERTISEMENT FOR BID for the following:
Date, time, and place for bid receipt - BID PLACE AND TIME
Location to examine bid documents - DOCUMENTS ON FILE
Deposit on Drawings and Project Manual - DOCUMENT DEPOSIT
Qualifications of Bidder - BIDDER QUALIFICATIONS
Bid Security Requirement - BID SECURITY
Acceptance of Bid by Owner - ACCEPTANCE
Withdrawal of Bid - WITHDRAWAL
Equal Employment Requirements - EQUAL EMPLOYMENT OPPORTUNITY
Prevailing Wages - WAGE RATES
Asbestos Awareness - ASBESTOS AWARENESS
AND IDENTIFICATION
Asbestos-Free Certification - ASBESTOS FREE CERTIFICATION
INTERPRETATION OF DOCUMENTS
If the true meaning, spirit, and intent of the Drawings, Project Manual or any part of the proposed contract documents are in doubt, a bidder may request for interpretation thereof, provided the request is received by the Architect in sufficient time to issue an Addendum. ANY INTERPRETATION OF BIDDING
DOCUMENTS, if made, WILL BE BY ADDENDUM ONLY, duly issued to each bidder receiving a copy of said documents. The Owner and Architect are not responsible for any other explanations or interpretations made prior to closing time for receipt of bids. NO EXPLANATIONS OR INTERPRETATIONS MADE
ORALLY WILL BE CONSIDERED BINDING.
BIDDERS OBLIGATIONS
Before submitting bids, carefully examine the Drawings, Project Manual, and proposed Contract Documents, including Addenda. Visit the proposed site of work to assess all conditions which can affect the work or cost thereof. Report to the Architect errors, inconsistencies or ambiguities discovered.
Use complete sets of Bidding Documents in preparing Bids; neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents by bidders or sub-bidders, suppliers, etc.
Each Bidder is responsible for calling to the attention of the Architect any ambiguities, inconsistencies, discrepancies, errors, or omissions which occur in the Contract Documents for his part of the Work. Failing to request clarification, the Bidder will be expected to overcome such conditions without additions to his bid prices.
Should conflicts, errors, or discrepancies remain unresolved within the final seven days before bids are due, estimate on and furnish the greater quantity or better quality unless resolution is received in writing from the
Architect.
Clare Gladwin RESD Division 00 9
Fill in all blanks in the bid forms. Mark non-applicable portions with NA or line out. Incomplete bid forms may be grounds for disqualification of the bid at the discretion of the Owner or Architect.
The bidder is responsible to divide the Work identified in the Drawings and Specifications among the various trades, subtrades, vendors, and his/her own work force. The Work appears in the Drawings and these specifications in an arbitrary arrangement of drawing titles and specification sections. It is not intended to define the work of each trade, subtrade, or vendor by means of this arrangement. It will be assumed that
Work not assigned to a trade, subtrade, or vendor will be responsibility of the Contractor and is included in the bid. No exceptions will be considered unless clearly written on a separate sheet attached to the Bid Form at the time of bid.
GREENHOUSE PACKAGE
The Greenhouse package has been pre-selected but not ordered. The cost of that package ($26,127.00) is to be included in the cost of the work and the delivery of the package is to be received by the Contractor. This price includes shipping but does not include installation. Installation is to be by the Contractor. If desired, bidders may contract with the Greenhouse Provder (Greenhouse Megastore) for the installation. The cost of that work as quoted by the provider is $16,610.00. Gas, water, drain and electrical connections to each piece of equipment are to be provided by the Contractor. Coordinate the location of those feeds with the
Greenhouse installation. Floor slab, concrete stoops, sitework, foundation and trench drain are to be provided by the Contractor and are not part of the Greenhouse Package.
STUDENT LABOR
It is the intent of The Owner to involve the Construction Trades Classes of the RESD in the construction of the pole building. Students will not be involved in the construction of the Greenhouse. The instructor of the class is a licensed home builder and will be present and responsible for the students when they are on site.
The Clare Gladwin RESD will cover all insurance for the students working on the project so there will be no cost to the Contractor. Students are capable of performing the following work: Rough and Finish Carpentry, installation of metal siding and roofing, installation of swing doors and hardware and forming and pouring concrete. They are not able to perform any electrical work, sitework or paving. The construction of this building will be their primary class involvement for the fall semester of 2020. The CGRESD would like to have them involved to the maximum extent possible. There is no charge for their services, however bidders should know that the timeframe of construction will be longer than normal due to the limits on the student availability, time of day, etc. To that extent, bidders should allow for ample supervision time to cover the extended construction period. The CGRESD has a fork lift, a skid steer and a tractor that are available for use on the project and the students will all have their own tools. The CGRESD requests that the bidders estimate the amount of student worker time that is incorporated in their bid and state that figure in the space provided on the bid form. All materials are to be furnished by the Contractor.
BID SUBMITTAL
Submit 3 copies of the bid on forms (or copies of forms) provided by the Architect. Deliver in sealed, opaque envelope bearing the following inscription:
Bid for CGRESD Storage Building and Greenhouse
Clare Gladwin RESD Division 00 10
Address bids to: Ms Sheryl Presler
Clare Gladwin RESD
4041 E Mannsiding
Clare MI 48617
Submit Bid Supplement with bid, completely filled in, on form provided by the Architect. Failure to submit said form may be considered grounds for rejection of bid.
All bids, notifications, claims, and statements shall be signed as follows:
Corporations: Signature of officials shall be accompanied by a certified copy of the Resolution of the Board of Directors authorizing the individual signing to bind the corporation.
Partnerships: Signature of official shall be accompanied by a certified copy of the Power of Attorney authorizing the individual signing to bind all partners.
No responsibility shall attach to the Architect, the Owner, or the authorized representatives of either one, for the premature opening of any bid which is not properly addressed and identified.
No telephonic, facsimile, or telegraphic bids will be considered.
TAXES
Include applicable sales and use taxes in the bid. Include amounts estimated to be payable for taxes by any taxing authority on the sale, purchase, or use of materials, supplies, or equipment connected with the project.
PERMITS & INSPECTIONS
Include in the bid all costs to obtain permits, licenses, and inspections as required by State, Federal Law and local ordinance. Provide a copy of such license, permit, etc., within three days of receipt of same to
Architect.
Drawings and specifications have been submitted to Clare County for agency plan review. Costs associated with submittals for review will be paid by the Owner. The Contractor is responsible for obtaining and paying for building permits issued by the County including general building, plumbing, mechanical and electrical.
Inspections will be carried out by the County and the cost of those inspections along with the cost of the permits are to be included in the bid.
FULL TIME SUPERINTENDENT
A competent superintendent of construction employed by the Bidder receiving a Contract shall be in attendance at the Project site during the performance of the Work. Superintendent shall coordinate, direct, and supervise the Work and receive communications from the Architect regarding the Work.
Clare Gladwin RESD Division 00 11
CONSTRUCTION SCHEDULE
The Bidder receiving a Contract shall prepare a proposed schedule of the Work within 7 days of notice of award of the Contract and prior to commencing Work at the site. The schedule shall conform with the time limits of the Contract. The Owner desires to have the Greenhouse ready for occupancy by July 1, 2020.
Construction on the Pole Building will not start until the beginning of the fall school semester in late August.
Sitework should be completed for that project during the summer so that the site is prepared and ready for construction of the Pole Building by August 14, 2020.
COST BREAKDOWN
Within 10 days after the acceptance of any bid by the Owner, the successful bidder shall submit a cost breakdown on the continuation sheet of the Application and Certificate for Payment form, A.I.A. Document
G703. Enter all costs applicable to the contract broken down by trades and or subcontracts. Overhead and profit shall be pro-rated over each item such that the sum of all items will tally with the amount of the contract. Copies of these forms shall be submitted for partial payment requests. Cost breakdown shall be acceptable to the Owner and Architect.
NOTICE OF ADDITIONAL SURETIES
Within 10 days after acceptance of any bid by the Owner, the successful bidder shall furnish the following:
Performance Bond in the amount of 100% of the contract.
Labor and Material Bond in the amount of 100% of the contract.
Evidence of Worker's Compensation Insurance as required by State of Michigan.
Evidence of Public Liability Insurance (including automobiles).
Evidence of Property Damage Insurance (including automobiles).
METHOD OF AWARD
The base bid quotation shall include all work indicated in the Bidding Documents unless specifically indicated as an Alternate. It shall not reflect acceptance of any alternates.
Selection of specified Alternates will be made by the Owner, acting upon the Architect's recommendations, for the best interest of the project commensurate with available funds. The Contract will be awarded with the combination of Base Bid plus any individual Alternate or combination of Alternates which the Owner may select.
Bidders may offer voluntary alternates by submittal in writing, along with supporting literature and other data, at the time the bid is submitted. Although they will be given consideration after award of the Contract, voluntary alternates will not be considered in the Owner's judgment about award of the Contract. Change in the Contract price proposed for the voluntary alternate(s) shall reflect all possible costs to be encountered should the voluntary alternate be accepted and incorporated in the work. Costs shall include: required changes to work of general, mechanical, electrical, or other trades and dimensional or structural changes.
The Owner reserves the right to let other contracts in connection with the work.
Clare Gladwin RESD Division 00 12
FORM AND EXECUTION OF THE CONTRACT
The successful bidder will be required to sign AIA Document A101 latest edition, "Standard Form of
Agreement Between Contractor and Owner Where the Basis of Payment is a Stipulated Sum" as modified by the School District’s Legal Counsel.
The successful bidder shall accept the terms and conditions contained and expressed in the Contract, Drawings, Project Manual, and the Instructions to Bidders as forming the basis for the bid and Contract.
Bidders shall also comply with applicable statutes, regulations, etc. The contract documents, when executed, shall be deemed to include the entire agreement between the parties thereto, and contractors shall not claim any modification thereof resulting from any representation or promise made at any time by any officer, agent, or employee of the Owner or by any other person.
NEW STORAGE BLDG & GREENHOUSE Section 00 41 00
Clare Gladwin RESD Division 00 13
00 41 00 BID FORM
TO: MS SHERYL PRESLER, SUPERINTENDENT
CLARE GLADWIN RESD
Submitted by (firm)
Official Address
Telephone # Fax #
BASE BID
RE: GLARE GLADWIN RESD NEW STORAGE BUILDING & GREENHOUSE TDF #2020-18
We, the undersigned, having familiarized ourselves with local conditions affecting the cost of work and having examined the Bidding Documents for the subject project prepared by The Design Forum Inc, hereby propose to furnish all labor, materials, equipment, services and do all trades work required for the proper completion of:
GENERAL CONSTRUCTION (All trades including General, Structural, Mechanical, and Electrical) work, including all Addenda issued thereto, for the lump sum of:
______________________________________________________________DOLLARS ($____________)
ACKNOWLEDGMENT OF ADDENDA - The following Addenda have been received, are hereby acknowledged, and their execution is included in the above bid amount.
Addendum No._____ Dated ________ Addendum No._____ Dated_________
Addendum No._____ Dated ________ Addendum No.______ Dated________
WAGE RATES AND ESCALATION - We the undersigned state that:
A. We have reviewed the labor wage rates situation and that no escalation of the Contract will be requested on account of any increase of said labor wage rates.
B. All material and equipment prices incorporated in the Lump Sum Bid are firm and not subject to escalation.
BID SECURITY - The undersigned further agrees that the certified check in the amount of
$_____________ or Bid Bond in the amount of 5% of the bid (strike out one) is a guarantee of good faith. If the undersigned is the successful bidder and fails to execute the contract and furnish satisfactory Labor, NEW STORAGE BLDG & GREENHOUSE Section 00 41 00
Clare Gladwin RESD Division 00 14
Materials and Performance Bonds within ten (10) days after notice of award, such guarantees shall be forfeited to the Owner as liquidated damages.
STUDENT LABOR
The Bidder hereby acknowledges that the following number of estimated hours of student labor have been incorporated into the bid:
__________________________________________________________________ HOURS
OTHER CONDITIONS
If awarded this contract, the undersigned agrees to be ready to begin work within 10 days of receipt of written notice of execution of the contract given by the Prime Contractor, and to complete all the work in accordance with the schedule as noted in the Instructions To Bidders.
In submitting this Bid it is understood that it includes all the Work identified in the Drawings and
Specifications. No exceptions will be considered unless clearly written on a separate sheet attached to the
Bid Form.
In submitting this Bid it is understood that the right is reserved by the Owner to accept or reject any or all of the bids. The Owner is not obligated to accept the lowest or any other bid and reserves the right to waive any informalities in any or all bids.
The Bidding Documents include the Bid Advertisement or Invitation, Instructions To Bidders, General
Conditions, Supplementary Conditions, Specification Sections, and Drawings.
Bid shall be accompanied by a sworn and notorized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Board, any Director, Superintendent, or the Chief Executive Officer. Owner shall not accept a bid that does not include this sworn and notorized disclosure statement.
This Bid may not be withdrawn for a period of sixty (60) days after the opening thereof.
Respectfully submitted this____day of_________________ , _______.
Signature
WITNESS
Name Typed
Title
INSTRUCTIONS: Prepare (4)
Submit (3)
NEW STORAGE BLDG & GREENHOUSE Section 00 54 00
Clare Gladwin RESD Division 00 15
00 54 00 BID SUPPLEMENT
The following list shall name the trade name or supplier for equipment or material to be incorporated into this project. Submit with bid. Where specific classification is not applicable for this particular project, the
Bidder shall write "NONE" in space provided.
TRADE NAME SUPPLIER OR
SUBCONTRACTOR
GENERAL TRADES
Excavating and
Grading _________________________ _______________________
Asphalt Paving _________________________ _______________________
Concrete Work _________________________ _______________________
Caulking _________________________ _______________________
Pole Building Package _________________________ _______________________
ELECTRICAL TRADES
Instructions: Place an 'x' in the space provided, indicating the equipment manufacturer on which bid is based. In the blank space labeled "Other", insert only manufacturer's names who have been approved by written addendum.
WIRING DEVICES
General Electric _____
Hubbell Inc. _____
Leviton _____
Pass & Seymour _____
Other:_________________ _____
PANELBOARDS
ITE _____
Square D _____
Seimens _____
NEW STORAGE BLDG & GREENHOUSE Section 00 54 00
Clare Gladwin RESD Division 00 16
DISCONNECT SWITCHES
ITE _____
Square D _____
Seimens _____
LIGHTING
Lithonia _____
Metalux _____
Other:____________ _____
Official Bidder Name
Authorized Signature
Date
INSTRUCTIONS: Prepare (4)
Submit (3)
NEW STORAGE BLDG & GREENHOUSE GENERAL CONDITIONS
Clare Gladwin RESD Division 00 17
GENERAL CONDITIONS OF THE CONTRACT
The "General Conditions of the Contract for Construction", AIA Document A201, 2017 edition, of the
American Institute of Architects, Article 1 to 15 inclusive, is hereby made part of the Contract Documents to the same extent as if bound herein, except that any provisions therein which may be in conflict or inconsistent with any of the Supplementary Conditions which appear herein shall be void to the extent of such conflict or inconsistency. The General Conditions and Supplementary Conditions shall apply to all contractors and subcontractors. Copies of the AIA General Conditions of the Contract may be examined or obtained at the Architect's Office. Each contractor and subcontractor is responsible to have acquainted himself with these AIA Articles of the General Conditions titled:
ARTICLE 1 GENERAL PROVISIONS
ARTICLE 2 OWNER
ARTICLE 3 CONTRACTOR
ARTICLE 4 ARCHITECT
ARTICLE 5 SUBCONTRACTORS
ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
ARTICLE 7 CHANGES IN THE WORK
ARTICLE 8 TIME
ARTICLE 9 PAYMENTS AND COMPLETION
ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY
ARTICLE 11 INSURANCE AND BONDS
ARTICLE 12 UNCOVERING AND CORRECTION OF WORK
ARTICLE 13 MISCELLANEOUS PROVISIONS
ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT
ARTICLE 15 CLAIMS AND DISPUTES
NEW STORAGE BLDG & GREENHOUSE SUPPLEMENTARY CONDITIONS
Clare Gladwin RESD Division 00 18
SUPPLEMENTARY CONDITIONS
SUPPLEMENTS - The following supplements modify, change, delete from or add to AIA document A201
– 2007 General Conditions of the Contract. Where any Article of the General Conditions is modified or any
Paragraph, Subparagraph or Clause thereof is modified, added, or deleted by these supplements, the unaltered provisions of that Article, Paragraph, Subparagraph or Clause shall remain in effect.
Amend ARTICLE 1 - GENERAL PROVISIONS As Follows
Add Subparagraphs to 1.1.6:
1.1.6.1 Division 1 (01 01000) - General Requirements governs the execution of all sections of the
Specifications.
1.1.6.2 Referenced documents shall be the latest standard specification, manual, code, laws, or regulations in effect at the time of the opening of bids (or on the effective date of the agreement if there are no bids); unless a specific date is referenced along with the referenced document.
Modify paragraph 1.6 by adding the following statement at the end of the paragraph:
“Wherever communication in writing is required this shall include email.”
Amend ARTICLE 3 - CONTRACTOR As Follows:
Add Subparagraphs to 3.3.
3.3.4 Contractor may not use Owner’s trash containers. Burning of rubbish on site will not be permitted.
Amend ARTICLE 4 - ARCHITECT As Follows:
Add to subparagraph 4.1.1:
"The Architect is The Design Forum Inc., Architects / Planners, 560 Fifth St. NW, Suite
302, Grand Rapids, Michigan 49504; telephone (616) 454-1398."
"The Designer is the Project Architect from the office of the Architect responsible for the design of the project."
Clare Gladwin RESD Division 00 19
Amend ARTICLE 10 - PROTECTION OF PERSONS AND PROPERTY As Follows:
Add new Subparagraphs to 10.2.3:
10.2.3.1 Contractor shall confine his operations and vehicular traffic to existing paved walks and roads and shall park vehicles and store materials only in locations approved by the Owner.
10.2.3.2 Because buildings may be occupied during the work period, the Contractor shall coordinate access to buildings with the Owner.
Add new Subparagraph to 10.1.1:
10.3.1.1 Contractor shall provide for the control of materials which can leach into the ground.
Contractor shall remove from the site immediately after the completion of the Work all delivered, manufactured, spilled, disposed of, or stored chemicals, lime-based materials, hazardous materials and toxic substances used on Owner’s property as part of the project or
Work, or part of the Contract. Contractor shall dispose of these hazardous materials and toxic substances in accordance with laws and regulations. Contractor agrees to indemnify the Owner against obligations and liabilities arising out of claims made or suits resulting from environmental contamination due to the acts of the Contractor or any Subcontractors acting under this Contract. Contractor shall insure that Subcontractors fully comply with these provisions.
Amend ARTICLE 11 - INSURANCE AND BONDS As Follows:
Add 11.1.2.1 to Subparagraph 11.1.2:
11.1.2.1 The insurance required by Subparagraph 11.1.1 shall be written for not less than the following limits or greater if required by law:
Workers Compensation - Statutory
Comprehensive or Commercial General Liability, Contractual Liability, and Automobile Liability:
Bodily Injury - Each person - $100,000
- Each occurrence - $300,000
Property Damage - Each occurrence - $100,000
True Commercial Umbrella
Excess Liability - $1,000,000
Delete Section 11.3.1.4 and substitute the following:
11.3.1.4 The Contractor shall at the Contractor’s own expense provide insurance coverage for materials stored off the site after written approval of the Owner at the value established in the approval, and also for portions of the Work in transit until such materials are permanently attached to the Work.
Add 11.3.1.6 to Subparagraph 11.3.1:
Clare Gladwin RESD Division 00 20
11.3.1.6 The insurance required by Section 11.3 is not intended to cover machinery, tools, or equipment owned or rented by the Contractor that are utilized in the performance of the
Work but not incorporated into the permanent improvements. The Contractor shall at the
Contractor’s own expense, provide insurance coverage for owned or rented machinery, tools, or equipment, which shall be subject to the provisions of Section 11.3.7.
NEW STORAGE BLDG & GREENHOUSE Section 00 73 36
Clare Gladwin RESD Division 00 21
00 73 36 EQUAL EMPLOYMENT OPPORTUNITY
00 73 36 PART 1 GENERAL
1.1 INCLUDED PROVISIONS - The General Conditions and Supplementary Conditions apply to this work.
1.2 EQUAL EMPLOYMENT OPPORTUNITY - All contractors shall comply with the
Executive Directive l975-76 for "Civil Rights Compliance in State and Federal Contracts" and in particular the following paragraphs of that Directive: "In any program or activity funded in whole or in part with State funds, a recipient or contractor may not (directly or indirectly through contractual arrangements) subject any individual to unlawful discrimination on the basis of race, religion, color, national origin, age, or sex in its employment practices. These practices include recruitment, recruitment advertising, hiring, layoff, termination, upgrading, demotion, transfer, rates of pay or other forms of compensation, use of facilities, and all other terms and conditions of employment.
1.3 EMPLOYEE SELECTION PROCEDURES - The Michigan Department of Civil Rights in carrying out its responsibilities under the Michigan Constitution and Public Act 251, has adopted and promulgated the Guidelines on Employee Selection Procedures as published by the U.S. Equal Employment Opportunity Commission (EEOC), to assist in establishing and maintaining equal employment opportunities. Among other things, these Guidelines forbid the use of employee selection practices, procedures, and devices (e.g., tests, minimum educational levels, experience) which disqualify a disproportionate number of minority individuals or women for employment and which are not related to job performance.
1.4 SEX DISCRIMINATION
A. The Michigan Department of Civil Rights has adopted and promulgated Guidelines on
Sex Discriminations as published by the EEOC. Among special requirements related to equal opportunity for women are:
1. There can be no distinction based upon sex in employment opportunities, wages, hours, the granting of fringe benefits, leave, mandatory or optional retirement age, and other terms and conditions of employment.
2. Medically verifiable disabilities caused or contributed to by pregnancy, miscarriage, abortion, childbirth, and recovery therefrom are for all job related purposes, temporary disabilities and shall be treated as such under any health or temporary disability insurance policies or sick leave plans available in connection with employment.
3. Written and unwritten employment policies and practices involving matters such as the commencement and duration of leave, the availability of extensions, the accrual of seniority and other benefits and privileges, reinstatement, and payment under any health or temporary disability insurance policies or sick leave plans, formal or informal shall be applied to disability due to pregnancy or childbirth on the same terms and conditions as they are applied to other temporary disabilities.
B. Advertisements for employment in newspapers and other media must not express a sex preference. The placement of an advertisement in columns "Male" or "Female" will be considered to be discriminatory limitation.
C. Nothing in these procedures shall prohibit the hiring of employees of one sex, provided sex is an established bona fide occupational qualification. A bona fide occupational qualification will be interpreted narrowly; e.g., the assumption that women are not aggressive or that co- workers or customers prefer one sex or the other does not establish a bona fide occupational qualification.
NEW STORAGE BLDG & GREENHOUSE Section 00 73 36
Clare Gladwin RESD Division 00 22
1.5 RELIGIOUS DISCRIMINATION - The Michigan Department of Civil Rights has adopted the promulgated Guidelines on Religious Discrimination, requiring in part that employers make "reasonable" accommodations to the religious needs of employees and applicants for employment. These procedures shall not apply to a religious corporation, association, or society with respect to the employment of an individual of the same religion to perform work connected with carrying on its religious activities.
1.6 NATIONAL ORIGIN - The Michigan Department of Civil Rights has adopted and promulgated guidelines on National Origin Discrimination. In addition to the protection guaranteed to all minorities, requiring proficiency in the English language where it is not a requirement for satisfactory performance on the job is prohibited.
1.7 AGE - Any recipient/contractor shall not refuse to hire, or otherwise discriminate against, a person with respect to employment because an individual is between the ages of 18 and 60.
It shall not be an unfair employment practice to refuse to select an individual over the age of 35 because of that individual's age for an apprenticeship or on-the-job training program intended to have a duration of more than four (4) months.
1.8 REPORTING REQUIREMENTS
A. Department of State recipients/contractors subject to these procedures are required to submit a Statement of Equal Opportunity in the provision of Services, Activities and
Programs (Par. IV-C), and employment reports covering their present and projected work force to the Contracting or Administering Department and the Michigan
Department of Civil Rights (Par VII). Department of State prime recipients/contractors are further required to secure the above Affirmation and
Minority-Female Status Report from subcontractors and/or subrecipients. Such forms are to be forwarded to the Contracting/Administering Agency and the Michigan
Department of Civil Rights attached to the prime contractor's reports.
B. The recipient/contractor is required to keep employment and other records used in preparation of the reports, to permit Administering Agency, the Michigan Department of Civil Rights, or other authorized persons as may be necessary to ascertain compliance with Executive Directive l975-6.
Affidavit of Bidder – Familial Relationships Form
The undersigned, the owner or authorized officer of (the “Bidder”), pursuant to the familial disclosure requirement provided in the Clare-Gladwin Regional Education Service District’s (the
“District”) RFP, hereby represent and warrant, except as provided below, that no familial relationships exist between the Bidder or any employee of the above mentioned District, and any member of the Boards of Education of the District or the Superintendents of the District.
List any Familial Relationships:
BIDDER: ___________________________________
By: ___________________________________
Its: ___________________________________
STATE OF ____________________
COUNTY OF__________________
This instrument was acknowledged before me on the______ day of ________________2019, by
_________________________________, Notary Public
_______________________________County, _________
My Commission Expires: _________________________
Acting in the County of: _________________________
Affidavit of Bidder - Compliance with School Safety Initiative Legislation
The undersigned, the owner or authorized officer of (the “Bidder”), certifies to Clare-
Gladwin Regional Education Service District (the “District”), that any and all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any District property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g and have not been convicted of any “listed offenses”.1 The Bidder further warrants and represents that all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any District property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g. In this regard, Bidder agrees, without limitation, to report within three (3) business days to the District when any such person is charged with a crime listed in Section 1535a(1) of the Revised School Code2 or a substantially similar law, and to immediately report to the District if that person is subsequently convicted, pled guilty or pled no contest to that crime.
BIDDER: _____________________________________
By: _____________________________________
Its: ____________________________________
STATE OF ____________________
COUNTY OF__________________
This instrument was acknowledged before me on the______ day of ________________2019, by
_________________________________, Notary Public
_______________________________County, ________
My Commission Expires: _________________________
Acting in the County of: _________________________
1The term listed offenses means those defined in section 2 of the Sex Offenders Registration Act (SORA), MCL
28.722
2MCL.380.1535a(1). 50
AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner or authorized officer of the below-named contractor (the
“Contractor”), pursuant to the compliance certification requirement provided in the
______________________ (the “School District”) Request For Proposals For
_____________________________ (the “RFP”), hereby certifies, represents and warrants that the
Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the
“Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned
RFP, the Contractor will not become an “Iran linked business” at any time during the course of performing any services under the contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School District’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date the it is determined that the person has submitted the false certification.
CONTRACTOR:
Name of Contractor
By:
Its:
Date:
STATE OF )
)ss.
COUNTY OF ____________ )
This instrument was acknowledged before me on the _____ day of ____________, 2019, by
, Notary Public
______________ County, __________
My Commission Expires:___________
Acting in the County of :___________
NEW STORAGE BLDG & GREENHOUSE Section 01 11 00
Clare Gladwin RESD Division 01 1
01 11 00 SUMMARY OF THE WORK
01 11 00 PART 1 GENERAL
1.1 INCLUDED PROVISIONS - The General Conditions and Supplementary Conditions apply to this work.
1.2 INTENT
A. Imperative language: This project manual is written with sentences in the imperative and abbreviated form. This imperative language is directed at the Contractor unless specifically noted otherwise. The word “all” shall be implied by inference unless specifically limited. Incomplete sentences shall be completed by inserting "shall", "shall be" and similar mandatory phrases by inference. Except as worded to the contrary, fulfill (provide, install, and/or perform) indicated requirements whether stated in the imperative or otherwise.
B. Division of the Work: The scope of Work appears in the Drawings and these
Specifications in an arbitrary arrangement of drawing titles and specification sections.
It is not intended to define the work of each trade, subtrade, and vendor by means of this arrangement. It is the Contractor's obligation to perform the Work regardless of where it appears in the Drawings and Specifications. The Contractor is obligated to divide the Work among his/her own work force, the trades, subtrades, and vendors.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Construction of a new Storage Building and Greenhouse. Close cooperation and coordination of student work on the Storage Building will be required and should be included in the scope of work for which this bidder is submitting this proposal. All work shall be in accordance with the requirements of the Bidding Requirements, Contract Forms, General Conditions, Specifications, and Drawings. The limits of construction are described on the Drawings.
1.4 WORK SEQUENCE
A. The Greenhouse Package is desired to be usable by July 1, 2020. Sitework for the
Storage Building can be done any time during the summer but must be completed by
August 14, 2020. The actual installation of the Storage Building is not to commence until school starts and student labor is available.
1.5 CONTRACTS
A. This project shall be executed under one combined Contract: General Construction, including General, Mechanical, and Electrical trades.
1.6 DIAGRAMMATIC DRAWINGS - In certain cases drawings are by necessity diagrammatic and do not specifically show installation dimensions. The work covered in this manner shall be installed in close cooperation with the Architect and the trades involved in the project in order to avoid interface problems or interferences. Careful investigation of structural and finish conditions is mandatory. Anticipatory planning and attentive consideration for the collective work of all trades is a part of acceptable performance.
Clare Gladwin RESD Division 01 2
1.7 CONDITIONS, DIMENSIONS AND MEASUREMENTS - Refer to General Conditions, Article 3, and;
A. Site and Job Information: Preliminary investigations, such as the survey, location of utilities, existing structures, and existing grades may appear as information and/or drawings in the contract documents. While such data has been collected with reasonable care, there is no expressed or implied guarantee that conditions so indicated are entirely representative of those actually existing or that unforeseen developments may not occur. Each trade must interpret the results of such investigations and be satisfied as to materials upon which that trade's work may be placed. Such information is based on available records but is not guaranteed to be complete or correct; it is merely given to assist each contractor.
B. Data Verification: Verify grades, lines, levels, locations, and dimensions. Errors due to failure to field verify grades, lines, levels, locations, and dimensions shall be corrected at the expense of the responsible trade or supplier.
B. Installation Conditions: Examine conditions of installation including substrates and related environmental requirements prior to commencing work. Report necessary corrections in writing to the Project Superintendent and/or manager and copy the
Architect. Commencing work implies acceptance.
C. Responsibility: Contractor shall have SOLE responsibility for accuracy of all measurements, estimates of material quantities and sizes, and conditions that will affect work.
1.8 LAYING OUT THE WORK
A. Prior to beginning work at the site, locate general reference points and take such action as necessary to prevent their destruction.
B. Using datum furnished by the Owner, the lot lines and present levels have been established as indicated. Establish and maintain other grades, lines, levels, and bench marks needed for construction.
C. As work progresses, lay out on forms and floor(s) exact locations of all partitions as a guide and fix center lines and walls.
1.9 COORDINATION
A. Contractors, subcontractors, trades, and vendors shall cooperate with each other and coordinate the Work, regardless of whether the Owner awards separate contracts for any trades, subtrades, vendors, branches or items of work and equipment. Conduct operations in such manner that no jurisdictional disputes arise regarding loading, unloading, handling, installations, and connections of the various items of the several trades involved.
B. It may be necessary to temporarily omit certain portions of the work in order to install certain materials or finishes. The trade whose work is involved shall omit such parts of their work as is necessary until other said work and/or materials have been installed.
This trade shall then return and install such omitted parts of the work as part of this
Contract and without additional cost to the Owner.
C. Sleeves and inserts shall be furnished by the trade requiring them unless noted otherwise.
D. The concrete trade shall place sleeves and inserts correctly for pipes, conduits, and similar items in forms, walls, ceilings, roofs, and floors in ample time so as not to delay concreting operations. Do not place sleeves so they pass vertically through beams, girders, and similar construction, unless approved by the Architect.
E. Each trade shall do all fitting of their own work as required to make its several components fit together or to receive the work of other trades.
Clare Gladwin RESD Division 01 3
1.10 SHOP DRAWINGS - Refer to General Conditions, Article 3, and;
A. All shop drawings are to be submitted via e-mail:
B. Copies must be checked by and bear the approval stamp of the Prime Contractor prior to submittal to Architect. Stamp indicates reviewer has:
1. Verified dimensions and quantities.
2. Verified construction criteria, materials, catalog numbers, field dimensions, etc.
3. Reviewed and coordinated submittal data with requirements of the Contract
Documents.
4. Certified that submittals comply with the Contract Documents.
5. Verified voltage, GPM, PSI, CFM, etc. of equipment.
1.11 PROGRESS MEETINGS - At the request of the Architect, meetings shall be held periodically at the site to determine the degree of completion, receive instructions from the
Architect and/or Owner, and to expedite the progress of the work. Contractors for the major trades shall be represented at these meetings by persons with full authority to act for them in regard to all portions of the work.
1.12 SAFETY AND PROTECTION
A. Refer to the General Conditions, Article 10, and include the following:
1. Provide and maintain easy access to the entire building or project for the public fire department and maintain unobstructed and free passage for egress from same.
2. Provide and maintain the required amount of fire extinguishers and familiarize all persons working on the project with their location and operation.
3. Provide, erect, and maintain barricades, guard rails, temporary walkways, stairs, ladders, ramps, etc., as required by Federal, State, and Local laws to protect all persons within and immediately adjacent to the project boundary from injury or harm due to construction operations or drop-offs at edges of openings, floors, roofs, excavations, and ways of access. The means of construction of such barricades, guards, etc., are the responsibility of the contractor.
4. Provide and maintain shoring and bracing to prevent earth from caving or washing into the project excavations, and to protect existing underground structures, utilities, sewers, etc., encountered during excavation work from collapse or other type of damage.
5. Provide and maintain protection against rain, snow, wind, ice storms or heat so as to maintain all work, materials, apparatus, and fixtures incorporated in the work, free from injury or damage. At the end of the day's work, cover all work likely to be damaged. Remove snow and ice as necessary for safety and proper execution of the work.
6. Protect adjoining property from damage.
7. Flammable liquids shall not be stored within the building. Paint thinners and gasoline shall be handled inside the building only in approved safety containers.
8. No wheeling of any loads over roofs, either with or without plank protection, will be permitted in anything except carriers with rubber tired wheels.
1.13 PROJECT SECURITY
A. Protect unfinished work, stored materials, and equipment from damage by the elements and vandalism, and store to prevent damage to other materials and persons.
If storing materials outside, block at least 8" above grade and cover watertight, except masonry.
Clare Gladwin RESD Division 01 4
B. Avoid damage to existing lawns, pavements, sidewalks, building surfaces, etc., disturbed through the installation of the work, or in the delivery of materials or equipment. The responsible party shall pay all costs in connection with the repairing of same. In the event a responsible party cannot be identified, the costs shall be prorated among the parties performing work at the time of the damage.
C. Take care to maintain security and guard against unauthorized entry, vandalism, etc.
Maintain the building continuously locked against entry during non-work hours.
1.14 FIELD OFFICES
A. A site field office is not required.
B. Contractor shall have cel phone service available at the site whenever work is in progress.
C. A current set of plans…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .