addendum 1 2.25.2020.pdf
PDF 18 KB Posted
- Attached to
- New Storage Building & Greenhouse
- Solicitation number
- RFP CGRE 200000001157 5
- Issued by
- Gladwin County, Michigan
About this file
This is Addendum No. 1 to a bid document for a new storage building and greenhouse project for Clare Gladwin RESD, prepared by The Design Forum Inc. (Project TDF#2020-18) and issued on February 25, 2020. The addendum amends the original bid documents by clarifying and revising structural requirements for the project. Bidders are required to acknowledge this addendum on their bid forms and include all associated costs in their bids. The work covered by this addendum is subject to the Instructions to Bidders, General Conditions, Supplementary Conditions, General Requirements, and Specifications outlined in the project manual.
The addendum includes drawing changes referenced on reissued sheet A1.1, which contains clarifications and revisions to the required structure including foundation sizing adjustments, header revisions, and required cross-bracing specifications. All changes are highlighted on the drawing for easy identification. No specification changes or general information modifications are included in this addendum. Bidders must review the updated drawings and incorporate any cost implications into their final bid submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW STORAGE BUILDING & GREENHOUSE ADDENDUM NO. 1
CLARE GLADWIN RESD The Design Forum Inc.
TDF#2020-18 February 25, 2020
Page | 1
NOTICE: The bid documents are amended in certain particulars, as stated herein, which add to and/or supersede conflicting information in the Project Manual or Drawings.
Work covered by this Addendum is subject to the Instructions to Bidders, General
Conditions, Supplementary Conditions, General Requirements and Specifications.
Acknowledge this Addendum on the Bid Form and include the cost of the work herein specified in the Bid.
DRAWINGS INCLUDED: A1.1.
1.1 GENERAL INFORMATION (NONE)
1.2 SPECIFICATION CHANGES (NONE)
1.3 DRAWING CHANGES
A. Refer to sheet A1.1 reissued with this addendum. Clarifications have been made to the required structure including sizing for the foundation, revisions to the headers and required cross bracing. These changes are highlighted on the drawing.
END OF ADDENDUM 1
File details come from the government source that posted it. Updated .