Combined_SOW_Specs_Precast_Building_Hellgate_Water_System__33490.pdf
PDF 1 MB Posted
- Attached to
- PRE-CAST CONCRETE BLDG | HELLGATE WATER SYSTEM Federal contract opportunity
- Solicitation number
- 140R6025Q0050
About this file
This document is a Statement of Work (SOW) for the supply and delivery of a pre-cast concrete utility building for the Bureau of Reclamation's Missouri Basin Regional Office at the Hellgate Campground in Canyon Ferry Reservoir, Montana. The project requires a supplier to provide a 10.5 ft by 20 ft Schweitzer II Utility Building manufactured by CXT Concrete Building or LB Foster Company, with specific characteristics including a barn wood wall texture, 60" wide by 68" high bi-fold door assembly, Java Brown color, and cedar shingle roof texture.
The supplier is responsible for delivering the utility building within 90 days of the Notice to Proceed, with specific requirements including off-loading and setting the building in its final location. The supplier must submit manufacturer's product data and installation instructions at least 28 days prior to manufacturing, and floor block-out drawings at least 14 days prior to ordering. The building must match existing pre-cast concrete utility buildings at the campground, and will be furnished with seven-pin Best Interchangeable Core lock cylinders with a temporary construction core system. The total procurement will be handled as a supply contract, with government forces responsible for the actual construction of the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| _Q0050_-_Combined_Synopsis.pdf | ||
| _Q0050_-_P_Cs.pdf | ||
| Sol_140R6025Q0050.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOR-SOW
Water Distribution and Storage Material Supply
Statement of Work
Precast Building Bureau of Reclamation
CANYON FERRY RESERVOIR, MT
1.0 Background
The Bureau of Reclamation’s Missouri Basin Regional Office (MBRO) anticipates the award of a purchase order for the supply and delivery of the following to an area on the Hellgate Campground at Canyon Ferry Reservoir:
A. Pre-cast concrete utility building.
Government forces will construct the project. This Statement of Work is for procurement of materials to build the project. Measurement and Payment sections of these specifications are in reference to this Supply Contract. Specialty Items that include work beyond procurement as part of this Contract are as follows:
A. Pre-Cast Concrete Utility Building: Supplier shall off-load the building and set it in its final location.
2.0 Scope
The Supplier shall provide all labor, equipment, tools, materials, transportation, expertise, supervision, and other items and incidental services necessary to supply and deliver the specified materials needed for the construction of the project as shown in the project Plans and Specifications. Supplier is responsible for reviewing and understanding the Plans in order to assure reasonable material supply.
3.0 Objectives
The project will consist of the supply and delivery of the specified materials on site. The Contract includes all buildings and appurtenances to construct the project Plans following the Specifications.
4.0 Reference Standards
Reference Standards are defined in applicable Specifications.
5.0 Tasks
The Supplier shall provide all labor, equipment, tools, materials, transportation, expertise, supervision, and other items and incidental services necessary to supply and deliver the specified materials needed for the construction of the project. The following Exhibits are incorporated into this Contract:
A. The Bid Schedule is included in Exhibit A as Section B – Supplies and Prices.
B. The project Plans and Specifications are included in Exhibit B:
6.0 Delivery
The supplier shall furnish everything (equipment, materials, supplies, incidentals, etc.) required to successfully complete the tasks identified in the purchase order.
Supplier of the Utility building shall provide equipment and personnel to pick and set the building in its final place.
Delivery Dates:
Utility Building shall be delivered and set in place within 90 days of Notice to Proceed.
Supplier shall notify Onsite Delivery Contact at least 3 days in advance of delivery.
Onsite Delivery Contact:
Dustin Ramoie Office: (406) 475-3922 Cell: (406) 217-2560
7.0 Site Conditions
The Government will provide a suitable location for the Supplier to stockpile delivered materials. The Government will provide equipment and personnel to off-load delivered items with the exception of the Utility Building.
8.0 Place of Performance
Work will be performed at the following location:
Department of the Interior Bureau of Reclamation Hellgate Campground Canyon Ferry Reservoir Lewis and Clark County, MT
Approximate GPS Coordinates: 46.612637° N, -111.649702° W
9.0 Definitions
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. CO indicates Contracting Officer.
10.0 Submittals
RSN Submittal Submittal Required Due date or Delivery
Time Submit to
13 34 25-1 Manufacturer’s Information
Product Data and Installation Instructions
Minimum of 28 days prior to Manufacturing
CO
13 34 25-2 Shop Drawings Floor Cutouts Minimum of 14 days prior to Ordering
CO
Hellgate Campground Water Distribution System Expansion � Precast Building
Price Schedule B - 1
SECTION B � SUPPLIES OR SERVICES AND PRICES
HELLGATE CAMPGROUND WATER DISTRIBUTION SYSTEM EXPANSION
PRECAST BUILDING
CANYON FERRY RESERVOIR
Canyon Ferry, Montana
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Definitions:
(1) CLIN � Contract Line Item Number
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 13 34 25 Pre-Cast Concrete Utility Building
For the lump sum of $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SUPPLIES OR SERVICES AND PRICES
Price Schedule B - 2
This page intentionally left blank.
Table of Contents
00 01 10 - 1
SECTION C - DESCRIPTION / SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 25 Utility Building
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors
51 13 34 Photographs
DIVISION 52 - DRAWINGS
52 00 00 Drawings
END OF CONTENTS
Table of Contents
00 01 10 - 2
Utility Building
13 34 25 - 1
SECTION 13 34 25
UTILITY BUILDING
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Pre-Cast Concrete Utility Building:
1. Measurement: Each Pre-Cast Concrete Utility Building supplied, designed, delivered, and placed at site.
2. Payment: Unit Price offered in the Price Schedule.
1.02 SUBMITTALS
A. RSN 13 34 25-1, By Supplier. Manufacturer�s Information:
1. Manufacturer�s product data.
2. Manufacturer�s installation instructions.
B. RSN 13 34 25-2, By Supplier. Show Drawings
1. Location of floor block outs
PART 2 PRODUCTS
2.01 UTILITY BUILDING
A. Utility Building shall match existing pre-cast concrete utility buildings at the
Campground (see Section 51 13 34 � Photographs).
B. Model Schweitzer II Utility Building manufactured by CXT Concrete Building Model
Schweitzer II Utility Building as manufactured by LB Foster Company, 606 N. Pines
Road, Suite 202, Spokane Valley, WA 99206, lbfoster.com or approved equal having the following salient characteristics:
1. 10.5 ft by 20 ft Utility Building.
2. Wall Texture: Barn Wood
3. 60� wide by 68� high bi-fold door assembly
4. Color: Java Brown.
5. Roof Texture: Cedar Shingles
2.02 PIPE PENETRATION
A. Design and install pipe penetrations in the floor as shown on plans.
Utility Building
13 34 25 - 2
B. Design and install wall pipe penetrations for tank overflow piping as shown on plans.
2.03 LOCK CYLINDERS AND KEYING
A. Furnish locks with seven-pin, Best Interchangeable Core, lock cylinders.
1. Furnish lock cylinders with temporary construction core system which can be voided after contract completion.
2. Key locks alike.
B. Government will furnish permanent core system after contract completion.
C. Stamp construction keys with "U.S. Property - Do Not Duplicate" and appropriate key numbers.
D. Furnish three construction keys to CO for Government�s use during construction.
E. Deliver all construction keys to COR at jobsite after completion of work when directed by CO.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install in accordance with manufacturer�s instructions.
1. Offload and set building in its final location.
END OF SECTION
Information Available to Offerors
51 00 00 - 1
SECTION 51 00 00
INFORMATION AVAILABLE TO OFFERORS
PART 1 GENERAL
1.01 ORDER OF PRECEDENCE
A. In case of differences between sections in Division 51 - Information Available to
Offerors and sections in other divisions of the specifications, the requirements in the other divisions will govern.
B. The Government assumes no responsibility for deductions, interpretations, or conclusions made by the Supplier based on information made available by the Government, in accordance with the clause at FAR 52.236-3 �Site Investigations and Conditions
Affecting the Work.�
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
Information Available to Offerors
51 00 00 - 2
Photographs
51 13 34 - 1
SECTION 51 13 34
PHOTOGRAPHS
PART 1 GENERAL
1.01 ORDER OF PRECEDENCE
A. Photographs showing the existing conditions and areas identified in this project are provided in this section. These photographs provide general information of existing site conditions.
B. The photographs are solely for the information of the Contractor.
C. The Government assumes no responsibility for deductions, interpretations, or conclusions made by the Supplier based on information made available by the Government, in accordance with the clause at FAR 52.236-3 �Site Investigations and Conditions
Affecting the Work.�
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Photographs
51 13 34 - 2
Figure 1. View of existing pre-cast concrete Utility Building at Hellgate Campground. New
Utility Building to match. January 18, 2023
Drawings
52 00 00 - 1
SECTION 52 00 00
DRAWINGS
PART 1 GENERAL
1.01 DISCREPANCIES, ERRORS, OR OMISSIONS
A. Promptly inform the CO of discrepancies discovered on the drawings and specifications.
The CO will make a determination in writing.
B. In case of discrepancies, written specifications take precedence over drawings unless otherwise specified. Anything mentioned in the written specifications and not shown on the drawings, or shown on the drawings and not mentioned in the written specifications, shall be of like effect as if shown or mentioned in both. In case of differences between drawings and written specifications, the written specifications shall govern.
1.02 PROJECT CONDITIONS
A. Where there are differences as determined by the CO between Details and dimensions shown on drawings and Details and dimensions of existing features at jobsite, use Details and dimensions of existing features at jobsite.
1.03 SPECIFICATION DRAWINGS
A. Reference drawings referred to on specification drawings and not considered necessary for contract purposes are not included in specifications.
B. Parts of work for which dimensions are not shown have been drawn to scale as nearly to final dimensions as possible before purchase of machinery or equipment and development of final general and detailed designs.
1.04 STANDARD DRAWINGS
A. Standard drawings may show Details which are not a part of work under this contract.
Disregard Details shown on these drawings which are not applicable to work under this contract.
1.05 LIST OF DRAWINGS
A. Drawings listed in Table 52 00 00A - List of Drawings, are made a part of Section C -
Description/Specifications.
PART 2 PRODUCTS
Drawings
52 00 00 - 2
PART 3 EXECUTION
Drawings
52 00 00 - 3
Table 52 00 00A - List of Drawings
Sheet
No.
Drawing No. Title
1 296-600-60157 Canyon Ferry Reservoir � Recreation Area � Hellgate
Campground � Water Distribution System Expansion �
Site Plan and Notes
2 296-600-60164 Canyon Ferry Reservoir � Recreation Area � Hellgate
Campground � Water Distribution System Expansion �
Storage Tank Building
Drawings
52 00 00 - 4
| SOW Hellgate Campground Water Expansion Precast Building #33490 |
| Specifications Precast Building Hellgate Water System #33490 |
| 00 00 50 - Section B |
| 00 01 10 - Table of Contents |
| 13 34 25 - Utility Building |
| 51 00 00 - Information Available to Offerors |
| 51 13 34 - Photographs |
| 52 00 00 - Drawings |
File details come from the government source that posted it. Updated .