PRE-CAST CONCRETE BLDG | HELLGATE WATER SYSTEM Federal contract opportunity
Solicitation number
140R6025Q0050
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a Statement of Work (SOW) for the supply and delivery of a pre-cast concrete utility building for the Bureau of Reclamation's Missouri Basin Regional Office at the Hellgate Campground in Canyon Ferry Reservoir, Montana. The project requires a supplier to provide a 10.5 ft by 20 ft Schweitzer II Utility Building manufactured by CXT Concrete Building or LB Foster Company, with specific characteristics including a barn wood wall texture, 60" wide by 68" high bi-fold door assembly, Java Brown color, and cedar shingle roof texture.

The supplier is responsible for delivering the utility building within 90 days of the Notice to Proceed, with specific requirements including off-loading and setting the building in its final location. The supplier must submit manufacturer's product data and installation instructions at least 28 days prior to manufacturing, and floor block-out drawings at least 14 days prior to ordering. The building must match existing pre-cast concrete utility buildings at the campground, and will be furnished with seven-pin Best Interchangeable Core lock cylinders with a temporary construction core system. The total procurement will be handled as a supply contract, with government forces responsible for the actual construction of the project.

View the file

Other files for this federal contract opportunity

Other files attached to PRE-CAST CONCRETE BLDG | HELLGATE WATER SYSTEM, newest first.
File Type Posted
_Q0050_-_Combined_Synopsis.pdf PDF
_Q0050_-_P_Cs.pdf PDF
Sol_140R6025Q0050.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOR-SOW

Water Distribution and Storage Material Supply

Statement of Work

Precast Building Bureau of Reclamation

CANYON FERRY RESERVOIR, MT

1.0 Background

The Bureau of Reclamation’s Missouri Basin Regional Office (MBRO) anticipates the award of a purchase order for the supply and delivery of the following to an area on the Hellgate Campground at Canyon Ferry Reservoir:

A. Pre-cast concrete utility building.

Government forces will construct the project. This Statement of Work is for procurement of materials to build the project. Measurement and Payment sections of these specifications are in reference to this Supply Contract. Specialty Items that include work beyond procurement as part of this Contract are as follows:

A. Pre-Cast Concrete Utility Building: Supplier shall off-load the building and set it in its final location.

2.0 Scope

The Supplier shall provide all labor, equipment, tools, materials, transportation, expertise, supervision, and other items and incidental services necessary to supply and deliver the specified materials needed for the construction of the project as shown in the project Plans and Specifications. Supplier is responsible for reviewing and understanding the Plans in order to assure reasonable material supply.

3.0 Objectives

The project will consist of the supply and delivery of the specified materials on site. The Contract includes all buildings and appurtenances to construct the project Plans following the Specifications.

4.0 Reference Standards

Reference Standards are defined in applicable Specifications.

5.0 Tasks

The Supplier shall provide all labor, equipment, tools, materials, transportation, expertise, supervision, and other items and incidental services necessary to supply and deliver the specified materials needed for the construction of the project. The following Exhibits are incorporated into this Contract:

A. The Bid Schedule is included in Exhibit A as Section B – Supplies and Prices.

B. The project Plans and Specifications are included in Exhibit B:

6.0 Delivery

The supplier shall furnish everything (equipment, materials, supplies, incidentals, etc.) required to successfully complete the tasks identified in the purchase order.

Supplier of the Utility building shall provide equipment and personnel to pick and set the building in its final place.

Delivery Dates:

Utility Building shall be delivered and set in place within 90 days of Notice to Proceed.

Supplier shall notify Onsite Delivery Contact at least 3 days in advance of delivery.

Onsite Delivery Contact:

Dustin Ramoie Office: (406) 475-3922 Cell: (406) 217-2560

7.0 Site Conditions

The Government will provide a suitable location for the Supplier to stockpile delivered materials. The Government will provide equipment and personnel to off-load delivered items with the exception of the Utility Building.

8.0 Place of Performance

Work will be performed at the following location:

Department of the Interior Bureau of Reclamation Hellgate Campground Canyon Ferry Reservoir Lewis and Clark County, MT

Approximate GPS Coordinates: 46.612637° N, -111.649702° W

9.0 Definitions

A. Days: Calendar days.

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. CO indicates Contracting Officer.

10.0 Submittals

RSN Submittal Submittal Required Due date or Delivery

Time Submit to

13 34 25-1 Manufacturer’s Information

Product Data and Installation Instructions

Minimum of 28 days prior to Manufacturing

CO

13 34 25-2 Shop Drawings Floor Cutouts Minimum of 14 days prior to Ordering

CO

Hellgate Campground Water Distribution System Expansion � Precast Building

Price Schedule B - 1

SECTION B � SUPPLIES OR SERVICES AND PRICES

HELLGATE CAMPGROUND WATER DISTRIBUTION SYSTEM EXPANSION

PRECAST BUILDING

CANYON FERRY RESERVOIR

Canyon Ferry, Montana

B.1 PRICE SCHEDULE

(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Definitions:

(1) CLIN � Contract Line Item Number

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 13 34 25 Pre-Cast Concrete Utility Building

For the lump sum of $

TOTAL FOR PRICE SCHEDULE $_________________

END OF SUPPLIES OR SERVICES AND PRICES

Price Schedule B - 2

This page intentionally left blank.

Table of Contents

00 01 10 - 1

SECTION C - DESCRIPTION / SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 25 Utility Building

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors

51 13 34 Photographs

DIVISION 52 - DRAWINGS

52 00 00 Drawings

END OF CONTENTS

Table of Contents

00 01 10 - 2

Utility Building

13 34 25 - 1

SECTION 13 34 25

UTILITY BUILDING

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Pre-Cast Concrete Utility Building:

1. Measurement: Each Pre-Cast Concrete Utility Building supplied, designed, delivered, and placed at site.

2. Payment: Unit Price offered in the Price Schedule.

1.02 SUBMITTALS

A. RSN 13 34 25-1, By Supplier. Manufacturer�s Information:

1. Manufacturer�s product data.

2. Manufacturer�s installation instructions.

B. RSN 13 34 25-2, By Supplier. Show Drawings

1. Location of floor block outs

PART 2 PRODUCTS

2.01 UTILITY BUILDING

A. Utility Building shall match existing pre-cast concrete utility buildings at the

Campground (see Section 51 13 34 � Photographs).

B. Model Schweitzer II Utility Building manufactured by CXT Concrete Building Model

Schweitzer II Utility Building as manufactured by LB Foster Company, 606 N. Pines

Road, Suite 202, Spokane Valley, WA 99206, lbfoster.com or approved equal having the following salient characteristics:

1. 10.5 ft by 20 ft Utility Building.

2. Wall Texture: Barn Wood

3. 60� wide by 68� high bi-fold door assembly

4. Color: Java Brown.

5. Roof Texture: Cedar Shingles

2.02 PIPE PENETRATION

A. Design and install pipe penetrations in the floor as shown on plans.

Utility Building

13 34 25 - 2

B. Design and install wall pipe penetrations for tank overflow piping as shown on plans.

2.03 LOCK CYLINDERS AND KEYING

A. Furnish locks with seven-pin, Best Interchangeable Core, lock cylinders.

1. Furnish lock cylinders with temporary construction core system which can be voided after contract completion.

2. Key locks alike.

B. Government will furnish permanent core system after contract completion.

C. Stamp construction keys with "U.S. Property - Do Not Duplicate" and appropriate key numbers.

D. Furnish three construction keys to CO for Government�s use during construction.

E. Deliver all construction keys to COR at jobsite after completion of work when directed by CO.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer�s instructions.

1. Offload and set building in its final location.

END OF SECTION

Information Available to Offerors

51 00 00 - 1

SECTION 51 00 00

INFORMATION AVAILABLE TO OFFERORS

PART 1 GENERAL

1.01 ORDER OF PRECEDENCE

A. In case of differences between sections in Division 51 - Information Available to

Offerors and sections in other divisions of the specifications, the requirements in the other divisions will govern.

B. The Government assumes no responsibility for deductions, interpretations, or conclusions made by the Supplier based on information made available by the Government, in accordance with the clause at FAR 52.236-3 �Site Investigations and Conditions

Affecting the Work.�

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Information Available to Offerors

51 00 00 - 2

Photographs

51 13 34 - 1

SECTION 51 13 34

PHOTOGRAPHS

PART 1 GENERAL

1.01 ORDER OF PRECEDENCE

A. Photographs showing the existing conditions and areas identified in this project are provided in this section. These photographs provide general information of existing site conditions.

B. The photographs are solely for the information of the Contractor.

C. The Government assumes no responsibility for deductions, interpretations, or conclusions made by the Supplier based on information made available by the Government, in accordance with the clause at FAR 52.236-3 �Site Investigations and Conditions

Affecting the Work.�

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Photographs

51 13 34 - 2

Figure 1. View of existing pre-cast concrete Utility Building at Hellgate Campground. New

Utility Building to match. January 18, 2023

Drawings

52 00 00 - 1

SECTION 52 00 00

DRAWINGS

PART 1 GENERAL

1.01 DISCREPANCIES, ERRORS, OR OMISSIONS

A. Promptly inform the CO of discrepancies discovered on the drawings and specifications.

The CO will make a determination in writing.

B. In case of discrepancies, written specifications take precedence over drawings unless otherwise specified. Anything mentioned in the written specifications and not shown on the drawings, or shown on the drawings and not mentioned in the written specifications, shall be of like effect as if shown or mentioned in both. In case of differences between drawings and written specifications, the written specifications shall govern.

1.02 PROJECT CONDITIONS

A. Where there are differences as determined by the CO between Details and dimensions shown on drawings and Details and dimensions of existing features at jobsite, use Details and dimensions of existing features at jobsite.

1.03 SPECIFICATION DRAWINGS

A. Reference drawings referred to on specification drawings and not considered necessary for contract purposes are not included in specifications.

B. Parts of work for which dimensions are not shown have been drawn to scale as nearly to final dimensions as possible before purchase of machinery or equipment and development of final general and detailed designs.

1.04 STANDARD DRAWINGS

A. Standard drawings may show Details which are not a part of work under this contract.

Disregard Details shown on these drawings which are not applicable to work under this contract.

1.05 LIST OF DRAWINGS

A. Drawings listed in Table 52 00 00A - List of Drawings, are made a part of Section C -

Description/Specifications.

PART 2 PRODUCTS

Drawings

52 00 00 - 2

PART 3 EXECUTION

Drawings

52 00 00 - 3

Table 52 00 00A - List of Drawings

Sheet

No.

Drawing No. Title

1 296-600-60157 Canyon Ferry Reservoir � Recreation Area � Hellgate

Campground � Water Distribution System Expansion �

Site Plan and Notes

2 296-600-60164 Canyon Ferry Reservoir � Recreation Area � Hellgate

Campground � Water Distribution System Expansion �

Storage Tank Building

Drawings

52 00 00 - 4

SOW Hellgate Campground Water Expansion Precast Building #33490
Specifications Precast Building Hellgate Water System #33490
00 00 50 - Section B
00 01 10 - Table of Contents
13 34 25 - Utility Building
51 00 00 - Information Available to Offerors
51 13 34 - Photographs
52 00 00 - Drawings

File details come from the government source that posted it. Updated .