Combined Construction Drawings for the roof replacement on the Kenai AK VOR Building.pdf

PDF 31 MB Posted

Attached to
Notice of Termination for the KNA VOR roof replacement located in Kenai, Alaska.
Solicitation number
6973GH-21-C-00056
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPPERS IDE TINNED

TO W IDTH OF

APPROXIMATELY

3/,f AS SHOWN.

TINNING FLUX

TO BE ROSIN

ONLY.THIS

ONE EDGE.

I " 30 l�'RAD.

23 /2 RAD.

UNDERSIDE TINNED TO

WIDTH OF APPROXIMATELY ¥4

11 AS SHOWN.

Tl NNI NG FLUX TO BE

ROSIN ONLY. THESE 3

EDGES.

�-------------------------- 28" ----------------�

NOTES:

I. TERNE PLATE IX OR I C (30 GAUGE),

40 POUND COATING IN ACCORANCE

WITH FEDERAL SPEC. QQ-T-201.

2. WOOD SCREWS, R.H.,# 14 X I" LONG,

50 REQUIRED .

3. SCREWS, TYPE Z , BLU NT POINT,#14X 1/l'LONG, PHILLIPS SELF-TAPPING, 50 REQUIRED.

4. AT CONTRACTOR'S OPTION, PIECE MAY BE

TINNED, BOTH SIDES, OVER ENTI R E

S URFACE, TINNING FLUX TO BE ROSIN ONLY.

7 REQ'D.

SPEC. FAA-R-1224 a

FEDERAL AVIATION AGENCY

BUREAU OF FACILITIES

NAVIGATIONAL AIDS ENGINEERING DIVISION

VOR ANTENNA PEDESTAL

MOUNTING SUPPORT

BONDI SEG

CKD. SUBMITTED:

A ADDED NOTE

L

•19•9013(

A KO. DRN. WT -

ENA VOR Reference part 3 of 3.pdf
B-50403-A
DR D-5000-4
DR D-5047-3
DR D-5099-2
DR D-5288-1
DR D-5288-2
DR D-5288-3
DR D-5288-4
DR D-5288-5b
ena204-000
ena020001
ena201001
ena201002
ena201003
ena201006
ena201007
ena201008
ena201009
ena201010
ena201011
ena205001

File details come from the government source that posted it. Updated .