COC Cinch Hook Pit C and S SOW.pdf
PDF 154 KB Posted
- Attached to
- 127EAX22R0019 - Cinch Hook Crush and Stockpile
- Solicitation number
- 127EAX22R0019
About this file
This document provides details for a federal construction contract opportunity with the USDA Forest Service. The solicitation is for a Cinch Hook Crush and Stockpile project located on the Coconino National Forest in Arizona. The project scope involves mobilization, clearing, drilling, blasting, testing, surveying, crushing, and stockpiling aggregate materials. The contract will be a firm-fixed-price award using FAR Part 15 procedures and best value tradeoff source selection. The acquisition is a 100% small business set-aside for NAICS code 212319 with a size standard of 500 employees. Proposals are due by June 9, 2022 and shall be submitted electronically to the Contracting Officer. No formal site visit is scheduled but individual requests can be made to the listed COR.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK/ SPECIFICATIONS
C.1 – STATEMENT OF WORK
Cinch Hook Pit Crush and Stockpile Project: This project will include mobilization, clearing and grubbing, drilling, blasting, sampling and testing, stockpile surveying for quality control and crushing and stockpiling of an aggregate material in accordance with the plans and specifications.
Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
SUBMITTAL/NOTIFICATION TIMELINES per FP-14 Specs
Required Submittal/Notification
Deadline for Receipt by the Government
Applicable Specification
Work Schedule At Pre-Work Meeting 151 - Mobilization
Hazardous Spill Plan Before beginning any work 107 – Legal Relations & Responsibility to the Public
Contractor Quality Control Plan
Before beginning any work 153.02 Contractor Quality Control Plan
Equipment Mobilization Notification
1 week prior to moving equipment onto Coconino National Forest
151 - Mobilization
Traffic Control Plan 14-days prior to prework conference
156-Public Traffic
Aggregate Gradation*** During aggregate production FSSS 703 Plan of Operations 14-days prior to prework conference.
FSSS 314
Blasting Plan 14-days prior to drilling and blasting operations
205 – Rock Blasting; FSSS 205
*** Items to be tested:
1. Gradation (AASHTO T 11)
2. Gradation (AASHTO T 27)
3. Liquid Limit (AASHTO T 89)
4. Plastic Limit (AASHTO T 90)
5. LA Abrasion (AASHTO T 96)
6. Sodium Sulfate Soundness (AASHTO T 104)
7. Durability (AASHTO T 210)
8. Fractured Faces (ASTM D 5821)
9. Specific Gravity and Absorption of Course Aggregate
C.2 – LOCATION OF PROJECT
The project is located on the Mogollon Rim Ranger District of the Coconino National Forest located in Coconino County, Arizona. From Camp Verde head East on AZ-260 approximately
31.6 miles. The Site will be Located Directly ahead at the junction of AZ-260 and AZ-87.
File details come from the government source that posted it. Updated .