This document includes a solicitation for a firm fixed-price construction contract and a description of the required work. The USDA Forest Service, Coconino National Forest is seeking a contractor to perform mobilization, clearing and grubbing, drilling, blasting, sampling and testing, stockpile surveying, and crushing and stockpiling of aggregate material at the Cinch Hook site in accordance with provided plans and specifications. The solicitation is a 100% small business set-aside for NAICS code 212319 with a size standard of 500 employees. Offers are due by June 9, 2022 and award will be made using a best value tradeoff source selection method based on technical and price factors. The contractor will be required to complete a topographic survey before, during, and after operations. Payment will be made only for work under pay items in the Schedule of Items.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

PAGE OF1 4

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING

DATE

FOREST SUPERVISOR DATE

RO FACILITIES PROGRAM MANAGER

DATE

INDEX OF SHEETS

SHEET SHEET TITLE PAGE

G-01 COVER SHEET 1

G-02 VICINITY MAP 2

G-03 GENERAL NOTES 3

C-01 PROPOSED SITE PLAN 4

N/A

N/A

N/A

N/A

N/A

N/A

N/A N/A

VICINITY MAP

TRAVEL DIRECTIONS:

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

FROM CAMP VERDE HEAD EAST ON AZ-260 FOR APPROXIMATELY

31.6 MILES. THE SITE WILL BE DIRECTLY AHEAD AT THE

INTERSECTION OF AZ-87 AND AZ-260.

CINCH HOOK PIT CRUSH AND

STOCKPILE (FY22)

(R03) SOUTHWESTERN REGION

COCONINO NATIONAL FOREST

COCONINO COUNTY

ARIZONA

AZ-260

TO CAMP

VERDE

AZ-87 TO

COC-3/FLAGSTAFF

9385L

PIT BOUNDARY

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/18

/21

:4 7 N

W

AR

NK

E

C:

\U

SE

RS

\N W

AR

NK

E\

BO

X\

CO

NT

RA

CT

A

DM

IN

\C

OC

ON

IN

O\

PI

TS

\C

IN

CH

H

OO

K

PI

T\

E

NT

RY

\R

EQ

UI

SI

TI

ON

\A

CA

D-

DW

GS

\C

IN

CH

H

OO

K V2

F Y2

1.D W

G;

(R03)

SOUTHWESTERN

CINCH HOOK PIT

CRUSH AND

STOCKPILE

COCONINO NATIONAL

FOREST

MOGOLLAN RIM RD

VICINITY MAP

04/19/2021

O.GOATSONJAMES

O.GOATSONJAMES

S.UNTALAN

G-02 2 4

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

GENERAL NOTES:

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/18

/21

:4 7 N

W

AR

NK

E

C:

\U

SE

RS

\N W

AR

NK

E\

BO

X\

CO

NT

RA

CT

A

DM

IN

\C

OC

ON

IN

O\

PI

TS

\C

IN

CH

H

OO

K

PI

T\

E

NT

RY

\R

EQ

UI

SI

TI

ON

\A

CA

D-

DW

GS

\C

IN

CH

H

OO

K V2

F Y2

1.D W

G;

(R03)

SOUTHWESTERN

CINCH HOOK PIT

CRUSH AND

STOCKPILE

COCONINO NATIONAL

FOREST

MOGOLLAN RIM RD

GENERAL NOTES

04/19/2021

O.GOATSONJAMES

O.GOATSONJAMES

S.UNTALAN

G-03 3 4

AutoCAD SHX Text

1. IF FEDERALLY THREATENED/ENDANGERED SPECIES, FOREST SERVICE SENSITIVE IF FEDERALLY THREATENED/ENDANGERED SPECIES, FOREST SERVICE SENSITIVE SPECIES, OR BALD OR GOLDEN EAGLES ARE NESTING WITHIN THE VICINITY OF 0.5 MILES OF THE PROJECT AREA, THEN SEASONAL RESTRICTIONS TO OPERATIONS ARE EFFECTIVE DURING THE BREEDING SEASON (MARCH 1 TO SEPTEMBER 1) TO PREVENT DISTURBANCE OF THE AFFECTED SPECIES. AT THIS TIME, THERE ARE NO KNOWN IMPACTS. 2. THE CONTRACTOR SHALL PLAN FOR 10 FT DEEP ENTRY FOR INITIAL DRILLING. THE CONTRACTOR SHALL PLAN FOR 10 FT DEEP ENTRY FOR INITIAL DRILLING. THE PROPOSED FOOTPRINT CAN BE MODIFIED AS NECESSARY TO ACCOMMODATE THIS DEPTH. 3. STOCKPILE SIDE SLOPES SHALL BE NO FLATTER THAN 1V:1.5H AGGREGATES STOCKPILE SIDE SLOPES SHALL BE NO FLATTER THAN 1V:1.5H AGGREGATES AND SHALL BE STOCKPILED IN ACCORDANCE WITH FP-14 SECTION 314.05. 4. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR THIS TYPE OF CONSTRUCTION, INCLUDING ANY ASSOCIATED FEES. ADEQ AIR QUALITY PERMIT AND NOI (INCLUDING A SWPPP AND EROSION CONTROL PLAN) ARE REQUIRED. 5. OVERBURDEN SHALL BE PLACED IN AN ATTEMPT TO BRING PRE-EXISTING PIT OVERBURDEN SHALL BE PLACED IN AN ATTEMPT TO BRING PRE-EXISTING PIT SLOPES TO 2:1. 6. THE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN SECURITY. A TEMPORARY THE CONTRACTOR IS RESPONSIBLE FOR THEIR OWN SECURITY. A TEMPORARY FENCE AND GATE CAN BE INSTALLED AND REMOVED UPON COMPLETION OF CONTRACT. 7. PROPOSED PIT PLAN LOCATIONS AND DIMENSIONS ARE APPROXIMATE AND WILL PROPOSED PIT PLAN LOCATIONS AND DIMENSIONS ARE APPROXIMATE AND WILL BE FURTHER IDENTIFIED IN THE FIELD BY THE COR. 8. THERE IS NO MOISTURE CONTENT REQUIREMENT FOR STOCKPILED AGGREGATE. THERE IS NO MOISTURE CONTENT REQUIREMENT FOR STOCKPILED AGGREGATE. 9. THE CONTRACTOR IS ALLOWED TO CAMP AT THE SITE DURING THE THE CONTRACTOR IS ALLOWED TO CAMP AT THE SITE DURING THE CONSTRUCTION PERIOD. THIS MAY REQUIRE A DISTRICT ISSUED CAMPING PERMIT AT NOT COST. 10. NO GOVERNMENT WATER SOURCE IS AVAILABLE ONSITE. NO GOVERNMENT WATER SOURCE IS AVAILABLE ONSITE. 11. MERCHANTABLE TIMBER AS DEFINED BY THE UTILIZATION STANDARDS SHALL MERCHANTABLE TIMBER AS DEFINED BY THE UTILIZATION STANDARDS SHALL BE HANDLED ACCORDING TO SECTION 204 AND ALL APPLICABLE SUPPLEMENTS AND DECKED IN LOCATIONS DESIGNATED BY THE COR. 12. ALL EXISTING OVERSIZED BOULDERS SHALL BE UTILIZED FOR AGGREGATE ALL EXISTING OVERSIZED BOULDERS SHALL BE UTILIZED FOR AGGREGATE PRODUCTION PRIOR TO ANY ROCK BLASTING/ROCK EXCAVATION AND/OR PIT EXPANSION WITH APPROVAL FROM THE COR. 13. ALL EXISTING SLOPES AND ANY NEW SLOPES CREATED DURING OPERATIONS ALL EXISTING SLOPES AND ANY NEW SLOPES CREATED DURING OPERATIONS SHALL BE LAID AT A MAXIMUM 2:1 SLOPE. 14. THERE WILL BE PIT EXPANSION ALLOWED IN THIS CONTRACT AS SHOWN ON THERE WILL BE PIT EXPANSION ALLOWED IN THIS CONTRACT AS SHOWN ON SHEET 4. 15. THE BOTTOM OF THE PIT SHALL SLOPE A MINIMUM OF 1% TO PROVIDE THE BOTTOM OF THE PIT SHALL SLOPE A MINIMUM OF 1% TO PROVIDE POSITIVE DRAINAGE. ALL SIDE SLOPES SHALL BE APPROXIMATELY 2:1 AFTER COMPLETION OF THE CRUSHING OPERATION. 16. ALL OVERSIZED MATERIAL SHALL BE REDUCED TO A MAXIMUM SIZE OF 2'X2'X2' ALL OVERSIZED MATERIAL SHALL BE REDUCED TO A MAXIMUM SIZE OF 2'X2'X2' THROUGHOUT THE PROJECT SITE ON THIS CONTRACT

AutoCAD SHX Text

17. ONE 50 GALLON SPILL KIT OR TWO 30 GALLON SPILL KITS MUST BE LOCATED ON-SITE DURING USE OF HEAVY EQUIPMENT. 18. GRADATION OF STOCKPILE SHALL BE "G" PER FP-14 FOREST SERVICE GRADATION OF STOCKPILE SHALL BE "G" PER FP-14 FOREST SERVICE SUPPLEMENTAL SPECIFICATION TABLE 703-3. 19. AGGREGATE SHALL HAVE A MAXIMUM OF 10% FLAT AND ELONGATED PARTICLES. IF AGGREGATE SHALL HAVE A MAXIMUM OF 10% FLAT AND ELONGATED PARTICLES. IF APPARENT FLAT AND ELONGATED PARTICLES ARE OBSERVED IN THE MATERIAL. THE CONTRACTOR SHALL HAVE THE MATERIAL TESTED FOR FLAT AND ELONGATED PARTICLES AT THE REQUEST OF THE COR PER ASTM D4791 (1:3 RATIO, PLUS 3/8" SEIVE, CALCULATED BY MASS, WEIGHTED AVERAGE) AT THE CONTRACTOR'S EXPENSE. 20. PROTECT IN PLACE ALL EXISTING EQUIPMENT ON SITE. PROTECT IN PLACE ALL EXISTING EQUIPMENT ON SITE. 21. THE FINISHED SLOPE TO WEST OF ENTRANCE SHALL HAVE 5 TO 10 FT WIDE THE FINISHED SLOPE TO WEST OF ENTRANCE SHALL HAVE 5 TO 10 FT WIDE BENCHES. THE INTENT IS TO DISCOURAGE SNOW PLAY DURING THE WINTER MONTHS. 22. CONTRACTOR SHALL COMPLETE A TOPOGRAPHIC SURVEY OF SITE PRIOR TO, DURING CONTRACTOR SHALL COMPLETE A TOPOGRAPHIC SURVEY OF SITE PRIOR TO, DURING AND POST OPERATIONS. THE SURVEY TO BE PERFORMED BY A LICENSED AND INSURED COMPANY AND PAID UNDER LINE ITEM 154 IN THE SCHEDULE OF ITEMS. 23. THE SITE TOPOGRAPHIC SURVEY DATA SHALL BE DELIVERED TO THE GOVERNMENT THE SITE TOPOGRAPHIC SURVEY DATA SHALL BE DELIVERED TO THE GOVERNMENT IN THE FOLLOWING FORMS: AUTOCAD 2019 SURFACE FILE OR OTHER FORMAT APPROVED BY THE COR AND CLEARLY STATING THE ANALYZED VOLUME OF THE STOCKPILE AND VISUALLY REPRESENTATIVE OF THE STOCKPILE THAT WAS ANALYZED. TABLE 1-1 GRADATION SPEC

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AZ-87

AZ-87

9385L

DRAWING TITLE

PROJECT NAME

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

/18

/21

:4 7 N

W

AR

NK

E

C:

\U

SE

RS

\N W

AR

NK

E\

BO

X\

CO

NT

RA

CT

A

DM

IN

\C

OC

ON

IN

O\

PI

TS

\C

IN

CH

H

OO

K

PI

T\

E

NT

RY

\R

EQ

UI

SI

TI

ON

\A

CA

D-

DW

GS

\C

IN

CH

H

OO

K V2

F Y2

1.D W

G;

R3

SOUTHWESTERN REGION

CINCH HOOK PIT

CRUSH AND

STOCKPILE

COCONINO NATIONAL

FOREST

MOGOLLON RIM RANGER

DISTRICT

PROPOSED SITE PLAN

4/19/2021

M BURKETT

O.GOATSONJAMES

S.UNTALAN

C-01

PROPOSED

OPERATION AREA

NEPA PIT

BOUNDARY

ROAD

LEGEND

SITE PLAN NOTES:

1. CRUSHED AGGREGATE SHALL BE

STOCKPILED IN ACCORDANCE

WITH THE SPECIFICATIONS

OUTLINED IN FP-14 SECTION 314.

NO PIT EXPANSION

IN THIS AREA

PROTECT IN PLACE

SHOWN FOR REFERENCE

ONLY, MAY HAVE BEEN

RELOCATED.

PROPOSED

EXPANSION AREA -

BENCHES

PROPOSED

EXPANSION AREA

EXISTING STOCKPILE

PROTECT.

BENCH

10'W@2% SLOPE TO DRAIN,

MAX GRADE 12%

EVERY 10-FT ELEV

EXISTING STOCKPILE

LOCATIONS

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Cinch Hook v2 FY21-COVER
Cinch Hook v2 FY21-MAP
OLE1
Cinch Hook v2 FY21-GEN NOTES
OLE1

Cinch Hook v2 FY21-TYP1

File details come from the government source that posted it. Updated .