Cobb County Bid 24_6819_Project Drawings and .pdf
PDF 18 MB Posted
- Attached to
- Air Traffic Control Tower Equipment Renovations
- Solicitation number
- PE-77050-NONST-2024-000000007
- Issued by
- Cobb County, Georgia
About this file
The document provided is the Project Drawings for the Air Traffic Control Tower Equipment Renovations project in Cobb County, Georgia. This state and local contract opportunity primarily consists of the replacement and installation of new controller communications and weather electronics equipment within the existing Air Traffic Control Tower (ATCT) at the Cobb County International Airport (RYY), with minor additional related equipment improvements on the roof of the ATCT Cab, as well as on the ground in the vicinity of the ATCT.
The document does not contain information about pricing terms, set asides, incumbents, funding requirements and sources, or other salient contract details. It appears to be solely the project drawings and specifications for the work to be performed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X X
XX
RSA RSA RSA RSA RSA RSA
TSA
TSA TSA
TSATSATSATSA
THE LOCATION, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND
UTILITIES INDICATED ON THE PLANS IS NOT REPRESENTED AS BEING
ACCURATE, SUFFICIENT OR COMPLETE. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH
FACILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND
UTILITIES. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY
THE UTILITY COMPANIES OF HIS OPERATIONAL PLANS AND SHALL OBTAIN
FROM THE RESPECTIVE UTILITY COMPANIES DETAILED INFORMATION AND
ASSISTANCE RELATIVE TO THE LOCATION OF THEIR FACILITIES AND THE
WORKING SCHEDULE OF THE COMPANIES FOR REMOVAL OR ADJUSTMENT
WHERE REQUIRED. IN THE EVENT AN UNEXPECTED UTILITY INTERFERENCE
IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE UTILITY COMPANY OF JURISDICTION. THE
ENGINEER SHALL ALSO BE IMMEDIATELY NOTIFIED. ANY SUCH MAINS AND
SERVICES SHALL BE RESTORED TO SERVICE AT ONCE AND PAID FOR BY
THE CONTRACTOR AT NO ADDITIONAL COST TO THE CONTRACT.
COMMON GROUND ALLIANCE
www.call811.com or Phone: 811
CALL 911 IN THE EVENT IN WHICH DAMAGE
RESULTS IN THE RELEASE OF NATURAL GAS.
AIR TRAFFIC CONTROL TOWER EQUIPMENT RENOVATION
ISSUED FOR BID - COBB COUNTY BID NUMBER 24-6819
FEBRUARY, 2024
CMT JOB NUMBER:
SUBMITTED BY
DATE
CONSTRUCTION PLANS FOR
TOTAL SHEETS:
ATLANTA, GA CHICAGO, IL
COLUMBUS, OH EDWARDSVILLE, IL
INDIANAPOLIS, IN
NASHVILLE, TN ROCKFORD, IL
SPRINGFIELD, IL
ST. LOUIS, MO
SPRINGFIELD, MO
KANSAS CITY, MO
COBB COUNTY INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
KENNESAW, GEORGIA
COBB COUNTY
AURORA, IL
PEORIA, IL
COBB COUNTY
INTERNATIONAL
AIRPORT
TOTAL SHEETS: 10
TAXIWAY A
RUNWAY 9-27
AIRPORT
ADMIN
OFFICE
PROJECT LIMITS
SHEET SET INDEX
SHEET
NUMBER
SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES AND SUMMARY OF QUANTITIES
3 PROJECT LAYOUT PLAN
4 PROJECT SAFETY & PHASING PLAN
5 PROJECT SAFETY & PHASING DETAILS
6 PROJECT SITE PLAN
7 FLOOR PLANS LEVEL 6 AND 7
8 SECONDARY WEATHER TOWER DETAILS - 1
9 SECONDARY WEATHER TOWER DETAILS - 2
10 SECONDARY WEATHER TOWER DETAILS - 3
AutoCAD SHX Text 23005651
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
COBB COUNTY INTERNATIONAL AIRPORT
AutoCAD SHX Text N
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text N
GENERAL NOTES
23005651- NOTES.DWG
EON
JJM
EON
MJR
23005651-00
G-101
GENERAL NOTES
SAFETY AND SECURITY
HAUL ROUTES, STAGING AREAS AND CONSTRUCTION ACTIVITIES
TEMPORARY MARKINGS, BARRICADES, TRAFFIC CONTROL
UTILITIES
ANY LEAKS OR SPILLS OF PETROLEUM PRODUCTS WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTAIN, CONTROL, AND REMEDIATE IN ACCORDANCE WITH ALL LOCAL,
STATE AND FEDERAL GUIDELINES, ORDINANCES, AND LAWS.
POLLUTANTS OF POTENTIALLY HAZARDOUS MATERIALS, SUCH AS FUELS, LUBRICANTS,
LEAD PAINT, CHEMICALS OR BATTERIES, SHALL BE TRANSPORTED, STORED AND UTILIZED
IN A MANNER TO PREVENT LEAKAGE OR SPILLAGE INTO THE ENVIRONMENT. THE
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PROPER AND LEGAL DISPOSAL OF ALL
SUCH MATERIALS. EQUIPMENT, ESPECIALLY CONCRETE OR ASPHALT TRUCKS, SHALL NOT
BE WASHED OR CLEANED OUT ON THE PROJECT EXCEPT IN AREAS WHERE UNUSED
PRODUCT CONTAMINANTS CAN BE PREVENTED FROM ENTERING WATERWAYS.
SPILL PREVENTION
S-1. THE CONTRACTOR WILL OBTAIN, HAVE KNOWLEDGE OF, AND INCORPORATE THE
FOLLOWING SAFETY PROVISIONS INTO THE CONSTRUCTION PROJECT:
* OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION
- AC 150/5370-2G.
* AIRPORT SAFETY SELF-INSPECTION - AC 150/5200-18C.
* PAINTING, MARKING, AND LIGHTING OF VEHICLES USED ON AIRPORT
- AC 150/5210-5D.
S-2. CONTRACTORS SHALL MAINTAIN RADIO COMMUNICATION WITH AIRPORT GROUND
CONTROL AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL HAVE
WORKING RADIO(S) ON-SITE AT ALL TIMES DURING CONSTRUCTION AND SHALL
ASSIGN RESPONSIBLE PERSONNEL TO CONTINUOUSLY MONITOR THE GROUND
CONTROL FREQUENCY (119.000MHz). PROVIDE A RADIO AT EACH SEPARATE
WORK LOCATION.
S-3. NOTICE TO AIRMEN (NOTAMS) - THE CONTRACTOR SHALL SCHEDULE AND
PROVIDE THE NECESSARY INFORMATION ON CONSTRUCTION CONDITIONS SO
THAT OWNER CAN ADVISE THE FLIGHT SERVICE STATION AND ISSUE NOTAM(S) IN
ACCORDANCE WITH ESTABLISHED CRITERIA.
S-4. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA
THROUGH THE PROJECT ACCESS GATES SHOWN ON THESE PLANS.
S-5. AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS.
THE CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED
AREAS AT ANY TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE ENGINEER OR
AIRPORT OWNER.
S-6. ALL VEHICLES USED ON THE AIRFIELD SHALL MEET AIRPORT REQUIREMENTS FOR
MARKING AND LIGHTING.
S-7. FOR ADDITIONAL SAFETY AND SECURITY REQUIREMENTS, SEE SPECIFICATIONS.
(SECTION 01030)
C-1. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS
SHOWN ON THE PROJECT LAYOUT AND SAFETY PLAN AND HIS APPROVED
PHASING PLAN. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
ACTIVITIES WITH THE AIRPORT TO MINIMIZE DISRUPTION TO AIRPORT
OPERATIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE
COMPLIANCE WITH SAFETY REQUIREMENTS AND TO MINIMIZE INTERFERENCE
TO AIRCRAFT OPERATIONS DURING CONSTRUCTION.
C-2. THE CONTRACTOR'S STAGING AREA AND HAUL ROUTES SHOWN ON THE PLANS
ARE GENERAL AND FOR INFORMATION PURPOSES ONLY. THE ACTUAL SIZE
AND LOCATION OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY
OWNER PRIOR TO CONSTRUCTION.
C-3. ALL EXISTING GRASSED AREAS WHICH ARE DISTURBED AS PART OF THE
CONTRACTOR'S ACCESS ROAD, CONTRACTOR'S STAGING AREA, AND HAUL
ROUTES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AFTER
COMPLETION OF THE PROJECT. IN ADDITION, ALL EXISTING ROADS THAT WILL
BE USED AS THE CONTRACTOR'S HAUL ROUTE SHALL BE MAINTAINED DURING
CONSTRUCTION AND RESTORED TO THEIR PRE-CONSTRUCTION CONDITION.
NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.
C-4. EXCEPT WHERE DESIGNATED ON PLANS OR AS AUTHORIZED BY ENGINEER,
CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING
RUNWAYS OR TAXIWAYS AS PART OF THE HAUL ROAD.
C-5. ALL EQUIPMENT MUST BE RETURNED TO THE STAGING AREA AT THE END OF
EACH WORK DAY AND WHEN NOT ENGAGED IN THE CONSTRUCTION DURING
NON-WORKING DAYS AND NIGHTS. OWNER WILL DESIGNATE AREAS FOR
CONTRACTOR'S EMPLOYEES AUTO PARKING.
C-6. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL
PERMANENT AND TEMPORARY UTILITY CONNECTIONS TO THE STAGING AREA.
C-7. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY.
C-8. CONTRACTOR SHALL CONTROL DUST TO AN ACCEPTABLE LEVEL.
C-9. CONTRACTOR SHALL BE REQUIRED TO MOVE MEN AND EQUIPMENT OUTSIDE
TAXIWAY SAFETY AREAS AND OBJECT FREE AREAS AS REQUIRED FOR
AIRCRAFT OPERATIONS.
C-10. ALL LIGHTS, SIGNS AND CIRCUITS ARE TO BE TESTED "DAILY" PRIOR TO
CONTRACTOR LEAVING SITE TO ENSURE ALL ITEMS ARE DEEMED TO BE IN
PROPER WORKING ORDER. ALL RUNWAY AND TAXIWAY CIRCUITS SHALL BE
OPERATIONAL PRIOR TO THE CONTRACTOR LEAVING THE SITE EACH DAY.
C-11. CONTRACTOR MUST COORDINATE WITH OWNER AND OTHERS INVOLVED WITH
ALL CONSTRUCTION PROJECTS AT THE AIRPORT.
C-12. CONTRACTOR IS SOLELY RESPONSIBLE FOR OBTAINING ALL PERMITS
REQUIRED FOR THE PROJECT PRIOR TO ANY CONSTRUCTION ACTIVITIES.
E-1. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING
CONSTRUCTION AND REPORT TO ENGINEER ANY VARIATIONS FROM THE
INFORMATION SHOWN ON CONSTRUCTION PLANS.
E-2. THE LOCATION OF UNDERGROUND UTILITIES AS INDICATED ON THE PLANS HAS
BEEN OBTAINED FROM EXISTING RECORDS. NEITHER THE OWNER, NOR THE
PROJECT ENGINEER ASSUMES ANY RESPONSIBILITY WHATSOEVER IN RESPECT
TO THE ACCURACY, COMPLETENESS, OR SUFFICIENCY OF THE INFORMATION.
THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS,
SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED
ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED IN THE CONSTRUCTION.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL
LOCATION OF ALL SUCH FACILITIES, INCLUDING SERVICE CONNECTIONS TO
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL
NOTIFY THE UTILITY COMPANY AND FAA OF HIS OPERATIONAL PLANS. THE
CONTRACTOR SHALL MAKE ARRANGEMENTS FOR DETAILED INFORMATION AND
ASSISTANCE IN LOCATING UTILITIES. IN THE EVENT AN UNEXPECTED UTILITY
INTERFERENCE IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE UTILITY COMPANY, THE OWNER, AND THE
RESIDENT PROJECT REPRESENTATIVE. ANY SUCH MAINS AND/OR SERVICES
DISTURBED BY CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY
AT THEIR EXPENSE TO THE SATISFACTION OF THE OWNER AND THE ENGINEER.
E-3. FAA CABLES WILL BE LOCATED AND MARKED BY FAA PRIOR TO CONSTRUCTION.
CONTRACTOR IS TO NOTIFY FAA 30 DAYS IN ADVANCE SO THAT FAA CAN
SCHEDULE THE REQUIRED MARKING TO PROTECT CABLES DURING
CONSTRUCTION. ANY CABLES DAMAGED DURING CONSTRUCTION WILL BE
REPLACED BY CONTRACTOR. CONTRACTOR SHALL PAY ALL COSTS ASSOCIATED
WITH THE REPAIR OF DAMAGED CABLES AT NO COST TO OWNER.
E-4. CONTRACTOR SHALL PROTECT ALL EXISTING LIGHTING SYSTEMS THAT ARE TO
REMAIN, OR IF TO BE REMOVED, UNTIL THEY ARE DESIGNATED FOR REMOVAL.
E-5. ANY UNPLANNED, UNAPPROVED OR ACCIDENTAL SHUTDOWN OR INTERRUPTION
OF SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES
IMMEDIATE NOTIFICATION OF THE AIRPORT MANAGER AND ENGINEER BY THE
CONTRACTOR. ALL NECESSARY REPAIRS WILL BE MADE IMMEDIATELY AND AT
CONTRACTOR'S EXPENSE.
E-6. THE CONTRACTOR WILL BE RESPONSIBLE FOR STAKING AND GRADE CONTROL OF
ALL ELEMENTS OF THE CONSTRUCTION.
T-1. SEE SPECIFICATION SECTION 01030 AND 01530.
SP-1.
SP-2.
PROJECT: AIR TRAFFIC CONTROL TOWER EQUIPMENT UPGRADES
CONTRACTOR: TBD
OWNER: COBB COUNTY INTERNATIONAL AIRPORT
1723 MCCOLLUM PARKWAY NW
KENNESAW, GA 30144
(770)422-4300
LAND LOT: 169
SITE ACREAGE: 0.26 ACRES
EMERGENCY CONTACT: TBD
NUMBER OF PARKING SPACES: 0
SHEET OF
SHEET TITLE
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
K
:\C ob bC O
\2
1-
_R Y
Y D
A T
C T
R en ov at io ns
\D ra w \S he et s\
N ot es .d w g
D at e:
W ed ne sd ay
, M ar ch
3, 9:
:5
A M
DESIGNED BY:
APPROVED BY:
OWNER
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
BASE BID
ITEM ITEM
NO DESCRIPTION UNIT PLAN FINAL
1 MOBILIZATION L. SUM 1
REPLACE/UPGRADE COMMUNICATIONS EQUIPMENT, INCLUDING
VOICE SWITCH, RADIOS (MAIN, DESKTOP BACK-UP, & 3
HAND-HELDS), VOICE RECORDER, LIGHT GUN, & GPS
SYNCHRONIZED TIME DEVICE, COUNTER, & 2 DISPLAYS,
INSTALLED, COMPLETE
L. SUM 1
3 REPLACE/UPGRADE AIRFIELD LIGHTING CONTROL PANEL,
INSTALLED, COMPLETE L. SUM 1
REPLACE/UPGRADE SECONDARY WEATHER TOWER, INCLUDING
SENSORS (WIND SPEED & DIRECTION, TEMPERATURE DEW POINT,
& BAROMETRIC), INSTALLED, COMPLETE
L. SUM 1
5 REPLACE/UPGRADE WEATHER EQUIPMENT, INCLUDING ATIS,
ATIS/AWOS INTERFACE SWITCH, & DASI, INSTALLED, COMPLETE L. SUM 1
6 INSTALL SAFETY SLIP RESISTENT COVERING ON STAIRS INTO CAB
FROM CAB ENTRY DOOR, INSTALLED, COMPLETE L. SUM 1
7 REPLACE/UPGRADE NEW RAIN GAUGE, INSTALLED, COMPLETE L. SUM 1
X X
XX
XX
XX
XX
A B
DC
E
E
E
E
E
E
E
E E
XX
XX
XX
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
TSA TSA TSA TSA
TSA
TS
A
TSA
TSA
TSA TSA TSA
A B
D
C
E
CB
CB
E
E
23005651 PROJECT LAYOUT PLAN.DWG
EON
JJM
EON
MJR
23005651-00
LEGEND
WORK AREA
CONTROL POINT
EXISTING ACCESS
GATE
EXISTING AIRPORT ADMIN OFFICE
ACTIVE AIRFIELD APRON
EXISTING
EMERGENCY
GENERATOR
EXISTING
ELECTRICAL
VAULT
EXISTING
MAINTENANCE
BUILDING
EXISTING AIR
TRAFFIC CONTROL
TOWER
(ATCT)
EXISTING ACCESS GATE
MCCOLLUM PARKWAY
RUNWAY 9-27
TAXIWAY A
EXISTING
ELECTRICAL
HOMERUN
SEE INSET VIEWPORT BELOW
EXISTING
ELECTRICAL
HANDHOLE
SHEET OF
SHEET TITLE
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
K
:\C ob bC O
\2
1-
_R Y
Y D
A T
C T
R en ov at io ns
\D ra w \S he et s\
P ro je ct L ay ou t P la n.
dw g D at e:
W ed ne sd ay , M ar ch
3, 9:
:1
A
M
DESIGNED BY:
APPROVED BY:
OWNER
SECONDARY WEATHER TOWER
DRAIN INLET
DRAIN INLET
WORK AREA COORDINATES
POINT LATITUDE LONGITUDE ELEVATION
A N34° 00' 54.03" W84° 35' 55.79" 1001
B N34° 00' 54.05" W84° 35' 54.63" 1002
C N34° 00' 51.10" W84° 35' 55.72" 1000
D N34° 00' 51.12" W84° 35' 54.55" 1004
E N34° 00' 51.23" W84° 35' 55.01" 1003
BENCHMARK
CONCRETE
MONUMENT
ELEV. 1009.30
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
Feet 0 250 500
Feet 0 50 100
PROJECT LAYOUT
PLAN
GP-401
X X
XX
XX
XX
XX
B R
L
BRL
BRL
BRL
BRL
PAPI PAPI PAPI PAPI
CB CBCBCBCB
CB
CB
CB
CBCB
CB
CBCB
CB
CB
CB
CB
CB CB
CB CB CBCB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB CB
CB
CB
CB
CB
CB
CB
CB
CB
PAPI
E
E
E
E
E
E
E E
XX
XX
XX
120'
CB
CB
E
E
23005651 PHASING DETAILS.DWG
EON
EON
23005651-00
EXISTING
AIRPORT
ADMIN
OFFICE
ACTIVE AIRFIELD APRON
EXISTING
EMERGENCY
GENERATOR
EXISTING
ELECTRICAL
VAULT
EXISTING
MAINTENANCE
BUILDING
EXISTING AIR
TRAFFIC CONTROL
TOWER
(ATCT)
EXISTING ACCESS GATE
MCCOLLUM PARKWAY
RUNWAY 9-27
TAXIWAY A
EXISTING
ELECTRICAL
HOMERUN
EXISTING
ELECTRICAL
HANDHOLE
SHEET OF
SHEET TITLE
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
K
:\C ob bC O
\2
1-
_R Y
Y D
A T
C T
R en ov at io ns
\D ra w \S he et s\
P ha si ng D et ai ls .d w g
D at e:
W ed ne sd ay
, M ar ch
3, 9:
:4
A M
DESIGNED BY:
APPROVED BY:
OWNER
DRAIN INLET
DRAIN INLET
CAUTION!!! ACTIVE
MOVEMENT AREA.
REFER TO NOTE 1.
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXX
X
X X
X X
SEE INSET VIEWPORT BELOW
CONTRACTORS
WORK AREA
LEGEND
WORK AREA
HAUL ROUTE
CONTROL POINT
FLAGGER (NOTE 1)
EXISTING ACCESS
GATE
LOW PROFILE
BARRICADE
FLAG LINE
XXXX
NOTES:
1. CONTRACTOR SHALL PROVIDE FLAGGERS AT THE
LOCATIONS SHOWN TO PREVENT CONSTRUCTION
TRAFFIC FROM ENTERING PAVEMENTS OCCUPIED BY
AIRCRAFT.
BENCHMARK
CONCRETE
MONUMENT
ELEV. 1009.30
Feet 0 250 500
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
Feet 0 50 100
PROJECT SAFETY
& PHASING PLAN
PROJECT SAFETY
& PHASING PLAN
GP-402
SHEET OF
SHEET TITLE
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
K
:\C ob bC O
\2
1-
_R Y
Y D
A T
C T
R en ov at io ns
\D ra w \S he et s\
P ha si ng D et ai ls .d w g
D at e:
W ed ne sd ay
, M ar ch
3, 9:
:4
A M
DESIGNED BY:
APPROVED BY:
OWNER
36"
36"
1. VEHICULAR MARKINGS: CONTRACTOR VEHICLES AND
EQUIPMENT SHALL BE MARKED WITH CHECKERED FLAGS
AND LIGHTED WITH FLASHING BEACONS TO COMPLY WITH
REQUIREMENTS OF FAA AC 150/5210-5D.
NOTES:
2. THE FLAG SHALL BE A 3 FOOT SQUARE HAVING A CHECKERED
PATTERN OF ORANGE AND WHITE SQUARES AT LEAST 1
FOOT ON EACH SIDE.
3. NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE
FOR TRUCK SIGNAL FLAGS.
TRUCK SIGNAL FLAG2 NOT TO SCALE
8'±
OMNI-DIRECTIONAL
SOLAR RED FLASHER
MIN. 6" ORANGE
REFLECTIVE STRIPES
WATER
RELEASE
VALVE
<18"
OMNI-DIRECTIONAL
SOLAR RED FLASHER
LOW-LEVEL LIGHTED BARRICADE DETAIL1 NOT TO SCALE
BARRICADE NOTES:
1. FLASHER OR STEADY BURN LIGHTS SHALL BE BATTERY OR
SOLAR POWER OPERATED. LENS SHALL BE RED AND BE ABLE TO
ROTATE 90º.
2. BARRICADES SHALL BE COMPLIANT WITH FAA AC 150/5370-2
(LATEST VERSION).
3. BARRICADES TO BE PLACED WITH A MAXIMUM OF 10' SPACING
CENTER TO CENTER ALONG OPERATIONAL PAVEMENT
ADJACENT TO CONSTRUCTION
4. FLASHER OR STEADY BURN LIGHTS SHALL BE SECURED TO THE
BARRICADES.
5. BARRICADES SHALL BE OF LOW MASS, EASILY COLLAPSIBLE
UPON CONTACT WITH AN AIRCRAFT OR ANY OF ITS
COMPONENTS, AND WEIGHTED TO AVOID BEING BLOWN OVER.
6. PROVIDE OMNI-DIRECTIONAL LIGHTS (2 PER BARRICADE) AND 20"
X20" SAFETY FLAGS (2 PER BARRICADE).
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING,
REPLACING, AND DISPOSING OF BATTERIES AS REQUIRED. OLD
BATTERIES SHALL BE DISPOSED OFF AIRPORT PROPERTY.
8. PAYMENT WILL BE MADE UNDER THE UNIT PRICE FOR
MOBILIZATION.
23005651 PHASING DETAILS.DWG
EON
EON
23005651-00
SEE NOTE 4
EXISTING GROUND LINE
FLAG POLE 2" SCHEDULE 40
PVC PIPE OR WOOD LATHE
20" x 20" FLUORESCENT
ORANGE PLASTIC FLAG
SECURE FLAG TO POLE
1. SPACE FLAG POLES ON 50 FOOT CENTERS.
2. THE CONTRACTOR SHALL ERECT THE FLAG LINE AT THE
LOCATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE
ENGINEER.
3. THE CONTRACTOR SHALL SECURE THE FLAG POLES SO THAT
THE TOP OF THE FLAG IS 4 FEET ABOVE THE GROUND.
4. THE FLAG POLES SHALL BE ADEQUATELY SECURED TO
WITHSTAND JETBLAST AND REMAIN ERECT AND STABLE.
5. INSPECT FLAGS DAILY. REPAIR OR REPLACE DAMAGED OR
WORN FLAGS AND POLES BY THE START OF THE NEXT DAY'S
WORK ACTIVITIES.
6. INCIDENTAL TO ITEM GP-105 MOBILIZATION.
NOTES:
4'
50'
FLAG LINE DETAIL3 NOT TO SCALE
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
PROJECT SAFETY
& PHASING
DETAILS
GP-501
XX
XX
XX
XX
XX
XX
XX
XX
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
TSA
TS
A
T S
A
TSA TSA TSA
TS
A
TSA
23005651 SITE.DWG
EON
JJM
EON
MJR
23005651-00
AIR TRAFFIC
CONTROL TOWER
REPLACE SECONDARY WEATHER TOWER
SHEET OF
SHEET TITLE
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
K
:\C ob bC O
\2
1-
_R Y
Y D
A T
C T
R en ov at io ns
\D ra w \S he et s\
S ite .d w g
D at e:
W ed ne sd ay
, M ar ch
3, 9:
:0
A M
DESIGNED BY:
APPROVED BY:
OWNER
DRAIN INLET
DRAIN INLET
EXISTING ELECTRICAL VAULT
EXISTING MAINTENANCE BUILDING
EXISTING HANGARS
EXISTING AIRPORT ADMIN OFFICE
EXISTING HANGAR
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
Feet 0 30 60
PROJECT SITE
PLAN
GI-401
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
Z
:\A jt
E ng in ee rin g\
A ir
T ra ffi c
C on tr ol
T ow er s\
C ob b C ou nt y A
T C
T \D ra w in gs
\W or ki ng
\A rc h\ R
Y Y
A
F lo or
P la ns .d w g
D at e:
T ue sd ay , F eb ru ar y
, 2
:5
2:
A M
DESIGNED BY:
APPROVED BY:
OWNER
KEYNOTES:
INSTALL RUBBER TREADS RISERS AND LANDINGS ON THE CAB STAIR
SEE SHADED AREA
RUBBER TILE, TREADS, RISERS & LANDINGS
Submit catalog data and color samples RUBBER BASE - “ROPPIE”700 series, 4 “ toe RUBBER TREADS RISERS AND LANDING - “ ROPPIE “raised square design, color as selected by Airport.
FLOOR TRANSITION STRIPS - “ ROPPIE “, snap down T divider, ADHESIVE - per manufacturers specifications
NOTE: ALL ITEMS THIS SHEET ARE NON MEL AND SHALL BE BROKEN
OUT SEPARATELY ON THE BID SHEET.
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
FLOOR PLANS
LEVEL 6 AND 7
A-3
ISSUED FOR BID
RYYA03 - FLOOR PLANS.DWG
FH
PD
23005651-00
PD
MJR
3/13/2024
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
Z
:\A jt
E ng in ee rin g\
A ir
T ra ffi c
C on tr ol
T ow er s\
C ob b C ou nt y A
T C
T \D ra w in gs
\W or ki ng
\W ea th er
\C ob b C ou nt y W ea th er .d w g
D at e:
T ue sd ay , F eb ru ar y
, 2
:5
2:
A M
DESIGNED BY:
APPROVED BY:
OWNER
COBB COUNTY WEATHER.DWG
FH
PD
23005651-00
PD
MJR
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
SECONDARY
WEATHER TOWER
DETAILS
W-001
ISSUED FOR BID
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
Z
:\A jt
E ng in ee rin g\
A ir
T ra ffi c
C on tr ol
T ow er s\
C ob b C ou nt y A
T C
T \D ra w in gs
\W or ki ng
\W ea th er
\C ob b C ou nt y W ea th er .d w g
D at e:
T ue sd ay , F eb ru ar y
, 2
:5
2:
A M
DESIGNED BY:
APPROVED BY:
OWNER
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
SECONDARY
WEATHER TOWER
DETAILS
W-002
ISSUED FOR BID
COBB COUNTY WEATHER.DWG
FH
PD
23005651-00
PD
MJR
COPYRIGHT:
PROJECT NO:
CAD DWG FILE:
DRAWN BY:
CHECKED BY:
DESCRIPTIONDATEMARK
CONSULTANTS
CRAWFORD, MURPHY & TILLY, INC. 2022
P at h:
Z
:\A jt
E ng in ee rin g\
A ir
T ra ffi c
C on tr ol
T ow er s\
C ob b C ou nt y A
T C
T \D ra w in gs
\W or ki ng
\W ea th er
\C ob b C ou nt y W ea th er .d w g
D at e:
T ue sd ay , F eb ru ar y
, 2
:5
2:
A M
DESIGNED BY:
APPROVED BY:
OWNER
COBB COUNTY
INTERNATIONAL AIRPORT
KENNESAW, GEORGIA
AIR TRAFFIC CONTROL
TOWER EQUIPMENT
RENOVATION
SECONDARY
WEATHER TOWER
DETAILS
W-003
ISSUED FOR BID
COBB COUNTY WEATHER.DWG
FH
PD
23005651-00
PD
MJR
Technical Specifications Replace and Upgrade
Communications and Weather Equipment at the Airport Traffic Control Tower
Cobb County International Airport-McCollum Field
(RYY)
Kennesaw, Georgia
ISSUED FOR BID
Cobb County Intl Airport UPGRADE ATCT COMMUNICATIONS AND WX EQUIPMENT
© AJT Engineering, Inc. Page 1
Table of Contents‐Technical Specifications
PART 1 – GENERAL
1.1 RELATED SECTIONS
1.2 REFERENCES
1.3 QUALIFICATIONS
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.6 COORDINATION
1.7 TRANSPORTATION HANDLING AND STORAGE
1.8 WARRANTY, SUPPORT AND SPARES
1.9 ON SITE TRAINING
1.10 COMMISSIONING AND ON-SITE REPRESENTATIVE
PART 2 – PRODUCTS
GENERAL REQUIREMENTS
2.1 VOICE COMMUNICATIONS CONTROL SYSTEM (VCCS) REQUIREMENTS
2.2 MAIN RADIO TRANSMITTERS AND RECEIVERS
2.3 TUNABLE BACKUP TRANSCEIVERS
2.4 ANTENNAS
2.4 RADIO FILTERS
2.5 AUTOMATED TERMINAL INFORMATION SYSTEM (ATIS)
2.6 ATIS/AWOS INTERFACE SWITCH
2.7 VOICE RECORDER
2.8 SECONDARY METEOROLOGICAL SYSTEM
2.8 DIGITAL ALTIMETER SETTING INDICATORS (DASI)
2.9 GLOBAL POSITIONING SYSTEM (GPS) SYNCHRONIZED CLOCK
2.10 UNINTERRUPTABLE POWER SUPPLY (UPS)
2.11 SIGNAL LIGHT GUN
2.12 AIRCRAFT COUNTER
2.13 AIRFIELD LIGHTING CONTROL PANEL
2.24 CABLING, WIRING AND RACKS
PART 3 – EXECUTION
1.1 INSTALLATION
3.2 TESTING
3.3 FAA SCOPE
3.4 TOUCH UP AND REPAIR
Appendix A ATCT Drawings
Appendix B Existing Tower Photographs
Appendix C FAA Minimum Equipment List
© AJT Engineering, Inc. Page 2
PART 1 – GENERAL
This specification is for the supply, installation, testing and commissioning of the Replacement Cobb County International Airport (the Airport) Airport Traffic Control Tower (ATCT) Communications and Weather Equipment as detailed in this specification. It is the contractors’ responsibility to deliver a fully operational communications, Airfield Lighting Control Panel and secondary weather system that is in compliance with the FAA Minimum Equipment List (see Appendix F).
Contractor shall provide all labor, tools, materials and equipment and perform all work required for the installation, wiring, connecting, adjusting, testing, commissioning and training and warranting all items detailed in these specifications, field wiring, punch down and distribution blocks, racks, grounding, and control systems for the ATCT Equipment within the ATCT.
The airport is in a well-developed thriving city with many hotels, restaurants, and big box stores in close vicinity. The airport is located approximately 1 hour from the Atlanta Hartsfield Airport. Access is through an airside gate with paved drive and parking close to the entrance. Full access to the tower will be provided as needed. The tower operates from 7 AM to 11 PM.
FAA Equipment The airport is complete with an FAA owned Automated Weather Observation System (AWOS), STARS Light TDW, Flight Data Input/Output (FDIO), Clearance Delivery Radios, shout and 2 digit dial and FAA Mission Support, through the FAA Telecommunications Infrastructure (FTI) contract.
© AJT Engineering, Inc. Page 3
Radios Telco Function Frequency Power 2 Digit Dial Ground VHF 119.0 10 W Shout Line Local (Tower) VHF 125.9 10 W One POTS Tower lines
AWOS/ATIS VHF 128.125 2 W
FAA Clearance Delivery* VHF 121.0 -
*New radio and antenna NOT required Excerpt sheets from the original tower construction drawings are provided in Appendix A.
TABULAR SCOPE
Provide the following works of this Section:
1. Procure, install and integrate, remove and replace existing with new equipment as follows:
1. Voice Communications Control System (VCCS) handsets, headsets, foot peddles, spares and Touch Entry Device (TED) and monitor mounts.
2. Two (2) VHF Transmitters, Four (4) VHF Receiver radios, one (1) ATIS Transmitter.
3. One (1) Desktop VHF Transceiver
4. Three (3) VHF handheld transceivers
5. Six (6) Antennas
6. Reuse existing Radio Filters
7. Automated Terminal Information System (ATIS) recorder
8. ATIS/FAA AWOS Interface Unit (AAIU)
9. Voice Recorder
10. Secondary Weather Tower (see also drawing package)
11. Secondary Meteorological Barometric sensor, Temperature and Dewpoint Sensors, two
(2) DASIs, temp and dewpoint and wind tracker Displays
12. Rain Guage (Priced separately as Non MEL) (see also drawing package)
13. Global Positioning System (GPS) Synchronized Clock and Displays
14. Uninterruptable Power Supplies (UPS)
15. Light Gun
16. Counter
17. Airfield Lighting Control Panel (see also drawing package)
18. Cabling, Wiring and Polyphaser
All other items required to provide an overall functional system.
2. Site Acceptance Testing.
3. Installation of speakers and volume controls into existing wood/plastic laminate counters.
4. Configure existing recorder, GPS clock and new voice switch equipment for main and standby radios to the new equipment.
5. Coordinate, install and integrate the 4 wire shout, 2 digit dial, commercial phone lines and data lines to the Approach Control Center (ACC).
6. Remove/Clean up existing wiring not in use.
7. Salvage/provide all equipment to and as directed by the Airport.
8. Train ATCT controllers on the operation of the new equipment.
9. Procure and provide spares for all systems.
10. Provide maintenance and warranty agreements.
11. Salvage all existing equipment to be removed as directed by the Airport
© AJT Engineering, Inc. Page 4
1.1 RELATED SECTIONS
Not applicable
1.2 REFERENCES
Install all equipment and structures in accordance with manufacturer’s written instructions, and with recognized industry practices. All work shall be accomplished in accordance with the current applicable International Building Code, National Fire Protection Agency (NFPA), the National Electric Code, the FAA Minimum Equipment List and all other applicable local and state codes.
Radios shall be configured and tuned in accordance with FAA Orders and Advisory Circulars.
1.3 QUALIFICATIONS
A. The Contractor’s installers shall provide evidence with their proposal of prior experience on at least three (3) locations within the last five (5) years where as they have demonstrated the ability to install, configure and integrate all equipment needed to meet FAA minimum equipment standards as laid out in FAA Advisory Circular 90-93A and the FAA Contract Tower Minimum Equipment List. Contractor shall provide copies of FCC radiotelephone license for radio certification, at least three (3) ATCT ATM names, emails and phone numbers of locations installed and names of projects and factory training certifications. The installation technicians shall have sound experience in the field of Airport Traffic Control VCCS and systems. Airport has the right, for any reason, to refuse unqualified Contractors regardless of bid price. See previous specification sections for local licensing and permitting that may be required.
1.4 SUBMITTALS
A. Submit shop drawings in accordance with the Conditions of the Contract. As a minimum, the Contractor shall submit for review overall wiring schematic, detailed wiring schematic, console drawings and manufacturers Literature. Submittals are required on all systems listed in Section
1.1. Data sheets shall show all pertinent deviations, if any, and data for the fabrication and complete installation. Data sheets shall be submitted indicating the necessary installation dimensions, materials and performance information.
As a minimum, the Contractor shall provide one (1) hard copy and soft copy of the following:
1. Work Plan and Schedule
2. Catalogue Data of all items listed on previous page
3. Manual of all purchased equipment after delivery
4. Wiring Diagrams-Completely integrated on all systems
5. Touch Entry Device Layout
6. Factory Acceptance Tests, Plan and Procedures (prior to delivery of VCCS)
7. Site Acceptance Testing Plan and Procedures
8. Uninterruptible Power Supply Size Calculations
9. Controller Training Presentation and Documentation
10. Warranty Documentation
A. Operation and Maintenance Instructions: The Contractor shall furnish data covering model, type and serial numbers, capacities, maintenance and operation of each major item of equipment or apparatus in accordance with the Requirements of the contract documents. Operating instructions shall cover all phases of control. Unless noted otherwise, contractor shall provide, as a minimum the following:
© AJT Engineering, Inc. Page 5
Complete user and maintenance manuals of the following:
Voice Communications Switching System (VCCS) (to include configuration settings) All Radios and Antennas ATIS Recorder
AAIU
Voice Recorder All Secondary Weather Systems as applicable GPS Clock All miscellaneous equipment and all appurtenances
Prior to final inspection, Contractor shall provide, as a minimum, two (2) copies of the following documentation in both hardcopy and softcopy format. Softcopy shall be provided on thumb drive.
Documentation shall be furnished as described below:
Submit in D size side ring binders with durable plastic covers fifteen days prior to final inspection:
Prepare binder cover with printed title "OPERATION AND MAINTENANCE
INSTRUCTIONS", Title of project, and subject matter of binder when multiple binders are required.
Internally subdivide binder contents with permanent page dividers, logically organized as described below; with tab titling clearly printed under reinforced laminated plastic tabs.
Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.
Contents: Prepare Table of Contents for each volume, with each product or system description identified, typed on white paper, in two parts as follows:
Figure 1 Existing AWOS, FDIO and DASI
© AJT Engineering, Inc. Page 6
Part 1: Operation and maintenance instructions, arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Identify the following:
Significant design criteria.
List of equipment.
Parts list for each component.
Operating instructions.
Maintenance instructions for equipment and systems.
Maintenance instructions for special finishes, including recommended cleaning methods and materials, and special precautions identifying detrimental agents.
Part 2: Project documents and certificates, including the following:
Shop drawings and product data.
Certificates.
Originals of warranties and bonds.
Include Table of Contents and assemble in three D side ring binder with durable plastic cover.
B. Test Reports: The Contractor shall submit test reports for review.
C. Spare Parts: A stock of spare parts shall be delivered at the turnover of the project to the Owner that consists of parts required for maintenance for a minimum of 5 years.
D. As Built Drawings: The Contractor shall submit the as built drawings and diagrams for review and approval. Complete As Built Wiring, circuit and pin out Diagrams to include, as a minimum, all telephone circuits, all radio circuits as wired into the voice switch circuits.
1.5 QUALITY ASSURANCE
B. All materials and products shall be new, sound and uniform in quality, size, shape, color and texture and shall be free from defects. The work shall be carried out in accordance with this specification, the contract drawings and the standards listed hereunder. The codes and standards specified herein provide an acceptable level of quality for materials and products.
C. All materials and products included in this specification section shall be coordinated and be compatible with each other.
D. The Contractor shall be responsible for ensuring that the required standards of quality control are met.
E. Provide proof of application of a quality procedure complying with standards. As a minimum, provide the following:
1. Use of a quality manual approved and signed by a management representative.
2. Regular updating of this manual so that it reflects the most recent applicable quality control procedures.
F. The Installation Test will be carried out by the Contractor in the presence of the Air Traffic Manager (ATM) or designated representative.
© AJT Engineering, Inc. Page 7
1.6 COORDINATION
The Contractor shall be held responsible for the proper coordination of all phases of the work under this contract to include AT&T / FAA coordination with the operation of the shout and 2 digit dial lines.
Contractor shall coordinate this support prior to mobilization.
1.7 TRANSPORTATION HANDLING AND STORAGE
A. Deliver, store, protect and handle products to site as per manufacturer’s instructions.
B. Store all equipment in clean, conditioned and dry space. Inspect for damage. Maintain factory wrapping or provide an additional heavy canvas or heavy plastic cover to protect units from dirt, water, construction debris and traffic.
1.8 WARRANTY, SUPPORT AND SPARES
A. Warranty: Submit written warranty signed by the Contractor and manufacturer for the minimum period of two (2) years from the date of acceptance. The warranty shall cover all labor for the repair and replacement of defective materials and workmanship as directed by the Airport.
During the warranty period, any failures (whether they be consumables or line replaceable modules (LRMs) shall be replaced at no cost to the Airport, in sufficient time to ensure that the operational availability of the System is not compromised, but no later than 1 week from the date that the Contractor is advised of the failure. Response time for trouble calls shall be by telephone or email within four (4) hours of the call or email from the Airport. Repairs, if required, shall initiate within 24 hours of the call or email from the Airport and shall be completed within 4 days or as mutually agreed. Noncritical repairs, as defined by the Airport, may be allowed for longer periods.
The Contractor shall provide Maintenance Procedures (documentation) detailing all the recommended preventive (periodic) maintenance routines and the related test equipment and technical skills required by the user to maintain the hardware. These documents shall also state the frequency (period) and expected durations for each preventive maintenance action.
Contractor shall provide, as a minimum, yearly maintenance or as prescribed by the manufacturer for a period of two (2) years.
B. Spares: As part of the main equipment supply, a full set of spares shall be provided sufficient to support continuous operation of the Contractor Supplied Equipment over a three (3) year period.
1. The quality of the spares, including components, shall be the same as that of the originally installed parts and shall be supplied by the respective OEM or his approved (third party) OEM/spare parts manufacturer.
2. All spares shall be supplied in their original packaging, duly protected against moisture with dehydrating agents or silica. Spare parts shall be labelled with clear indication of the part number(s), name(s) and quantity of spares in each package.
3. The Contractor shall guarantee the availability of all spare parts and modules for the equipment under offer (both inclusive of and exclusive of those items in the recommended spares list) for a period of not less than 10 years.
4. In the case of obsolescence, and if known by the Contractor, the Contractor shall advise the Customer in sufficient time to ensure that there is no risk to the operational capability of the ATCT, on the following:
a. Lifetime buy of spares.
b. Off-the-shelf replacements for the obsolete component.
c. Suitable re-design, if appropriate
© AJT Engineering, Inc. Page 8
5. At the end of the warranty period, the Contractor shall ensure that the spares holding (both consumables and LRM) is replenished to the levels originally supplied under the contract.
1.9 ON SITE TRAINING
On-Site Training: Operator personnel shall receive a formal training course on all the equipment installed by the contractor. Sufficient documentation shall be provided by the Contractor for the operator to adequately operate the equipment and complete minor trouble shooting included as part of this element. This would include all manuals, schematics, diagrams, and any other related material for the equipment.
This training will include, but is not limited to, discussion and review of the following:
a. System operation
b. Power Up and Power Down sequences
c. Graphical User Interface (GUI) Screens (hands-on)
d. Touch Screen Operation
e. Voice Recorder
f. Alarm and Warning messages
g. Failsafe operations
h. System block diagram
i. System assemblies and wiring diagrams
j. Minor Maintenance and Troubleshooting (hands-on) for all systems
At least a three (3) day notice shall be provided to the Airport for personnel scheduling before performing the on-site training classes. Two (2) hour sessions will be required to accommodate controllers’ and Airport Operations personnel schedules. Assume that this training will occur just after initial installation and final checkout. All training sessions will be held in the tower. The installing Contractor shall provide all required visual aids required for the training prior to the sessions.
1.10 COMMISSIONING AND ON-SITE REPRESENTATIVE
A. Factory Acceptance Test shall include documentation of validation by testing the operation of the equipment and spares provided by this contract.
B. Final acceptance of the system will not be given until the Contractor has successfully completed all tests and after all defects in installation material or operation have been corrected. The installing technician shall be present during testing and inspection.
C. The Contractor shall test all installed equipment in accordance with the manufacture’s procedures. If there are no requirements, the contractor shall devise a testing procedure in conjunction with and approved by each manufacturer. The Contractor shall demonstrate the operation of all equipment as a complete ATCT system. The Airport has the authority to approve or disapprove any and all test procedures submitted and require test procedure resubmittal.
Contractor shall be present during all testing and inspection.
D. The Contractor shall be available “on call” within 1 hour during the first 24 hours of full operation.
© AJT Engineering, Inc. Page 9
PART 2 – PRODUCTS
GENERAL REQUIREMENTS
This project shall include all necessary construction, wiring, software, programming, computers, manuals, on-site commissioning, on-site testing, on-site training, and any other materials, tools and equipment to provide a fully functional and complete system to the satisfaction of the Airport.
The material specifications listed below are to be considered “or approved equal.” Substitution will require written submittal detailing specification conformance and product equivalence and is subject to approval by the Airport prior to bid. Contractor will be at risk if substitution is purchased or installed and not approved by the Airport. All equipment, materials and supplies shall be new. All dimensions, system configurations and interfaces shall be field verified by the contractor.
2.1 VOICE COMMUNICATIONS CONTROL SYSTEM (VCCS) REQUIREMENTS
The Contractor shall provide and install all components necessary for a new voice communications switching system for the ATCT facility. This new system shall be capable of providing connectivity between the airport traffic controllers and the voice communications equipment at the ATCT. The VCCS shall provide, as a minimum, the ability to the airport traffic controller specialists (ATCS) to control the existing radios, telecommunications, voice recorder, telephone/data dedicated circuits and provide intercom system between positions, position relief brief recording system, provide redundant capability between positions and software. The system shall be programmable either at station or remotely. The control components for these positions shall be touch screens surface mounted on the cab console under the direction of the Airport Manager or his/her designated representative as well as a maintenance position mounted on the VCCS component rack.
The Contractor shall provide, install and integrate a new Frequentis Liberty Star III, pure3020X10 or approved equal and suitable to meet, as a minimum, these specifications. Contractor shall follow the VCCS installation documentation to provide the airport with a complete and working system.
The VCCS and associated components shall be rack mountable into the existing racks.
The TED layout shall be coordinated with the ATM during the submittal and installation phases.
Minimum Specifications (VCCS) Two (2) Controller Positions One (1) Commercial Phone Lines Three (3) Radio Communication Channels:
ATIS (run through VCCS)
Main and Standby radios for Ground Main and Standby radios for Local
One (1) Dedicated 4-wire Telephonic Communications to include 4-wire Voice Page (Shout Line) One (1) 2 Digit Direct Ring-Down lines Interface with E1 2Mps (G703) dual redundant link One-Button Call Feature that will seize a telephone line to automatically dial a preprogrammed number Local and Ground Control Units shall be configured identically for interconnectivity Busy Out Feature/Capable of Group Call-Out on all Channels Remote maintenance position to include keyboard and display provided for the equipment room
© AJT Engineering, Inc. Page 10
Audio outputs for use with the existing voice recorder System clock shall display a min. ¾” numbers and shall be synchronized through the new GPS Clock Touch screen shall be a minimum 12” diagonal measure, mounted on a swivel stand that allows tilt left-right swivel, mounted into the new console panel (see paragraph above) Flush or surface mounted Speakers
SPARE PARTS FOR VCCS
Provide the following, as a minimum or as recommended by the VCCS manufacturer, all spares shall be completely configured and tested:
Two (2) Position Electronics Equipment, including TED and Computer Radio Interface Module Telephone Interface Module Four (4) Jackboxes Two (2) Handsets Power Supply
HANDSET, MICROPHONES AND HEADSETS
Contractor shall provide the following items that are provide by and compatible with the VCCS:
Two (2) Handsets Two (2) Headsets Two (2) Foot Peddles All devices shall be complete with their related jackbox plug and cabling provided and fabricated compatible with VCCS. Alternate items not provided by the manufacturer but compatible with the VCCS may be acceptable with review and approval.
SPEAKERS
Provide one new speaker per position, integrated into the console and connected to the VCCS.
Speakers shall be Kenwood KFCX-133, Frequentis D3210213-1 or approved equal and shall be complete with volume controls.
2.2 MAIN RADIO TRANSMITTERS AND RECEIVERS
The Contractor shall provide and install two (2) main and use two (2) existing Park Air radios as standby.
New VHF radios shall be Single Channel General Dynamics CM-300/350 Series Version 2 Transmitters and Receivers, and one (1) VHF Single Channel TR-7750 Jotron Transmitter for ATIS used for the purpose of two-way air traffic control communications and continuous ground station use. Ground and Local transmitters shall be tuned to 10 watts output power and ATIS tuned to 2 watts. Note that Bid Schedule 2 includes providing TR-7750 Jotron transmitters and receivers in lieu of General Dynamics radios.
Transmitters & Receivers shall be certified to the frequency issued for the airport ground control communication, air traffic local control and AWOS/ATIS communication channels. Note: Assume that the new antenna locations will demand the need for radio filters. Contractor shall include installation into existing filters in this project.
© AJT Engineering, Inc. Page 11
These radios shall be installed so that all frequencies are available to each controller position in the cab area. Radios shall be rack mounted in the existing equipment rack in the equipment room level.
Ground all radios and rack to ground plate provided in the equipment room.
Wire radios into the VCCS such that the radios function as Main and Standby.
2.3 TUNABLE BACKUP TRANSCEIVERS
The Contractor shall furnish one (1) VHF Tunable Transceiver Base Station Radio (Model #ICOM IC- A220B or approved equal) with PS-80 Power Supply complete with microphone for the purpose of redundant backup two-way air traffic control communications. The radio shall be connected to the recorder. The radio stations will be utilized as a dedicated backup for both the ground control and local control frequencies as well as access to the Emergency frequency.
Frequency ranges will match Main Radio Transmitters and Receivers.
Base Station shall utilize a separate roof mounted antenna system provided and installed by the contractor. The Contractor shall provide a TACO D 5076 antenna or approved equal. Antenna shall be complete with integral grounding and lightning protection. Attach pipe required for antenna mount to the existing handrails with U bolts and shown in photos depicting existing antenna mounts. Attach ground wire to building ground, not lightning ground system. All ground wire shall be a minimum #6 copper with green insulation jacket. Sharp angles in grounding cabling are not permitted. A Polyphaser, or equal, coax surge protection device shall be installed in line prior to entry into the cab.
Antenna lightning protection ground wire shall be grounded to the roof top building ground. Tie all cabling a minimum one foot spacing. Cabling shall not rest on the roof surface.
2.4 ANTENNAS
The Contractor shall provide six (6) Taco D-5076 VHF antennas for ATIS, ground and local main and standby and tunable cab desktop transceiver. Antennas shall be complete with integral grounding and lightning protection. Attach ground wire to building ground. All ground wire shall be a minimum #6 copper with green insulation jacket. A Polyphaser coax surge protection device shall be installed, one per antenna cable. Polyphasers shall be for the frequency that it is protecting. Install into existing ground box on the roof. Antenna lightning protection ground wire shall be grounded to the roof top building ground which is existing close to the polyphaser box.
The tower has existing antenna mounting pipes on the roof. Contractor is responsible for locating antennas as necessary to avoid bleedover and blindspots, fabricating hole into cable tray and providing and installing waterproof grommet, if necessary to move. Antennas should, if possible, be a minimum 6 ft. from lightning protection down conductors. Ground all antenna pipe with #2 copper wire fastened to the pipe with strap and to the 4/0 lightning protection counterpoise with a connection manufactured for that purpose.
Minimum Specifications (Antennas) VHF Frequency Range: 118 - 136 MHz and UHF 225-400 Mhz Wind Velocity/Loading: 132 MPH nominal at 100 ft. above ground level Lightning Protection: Direct Ground
Note: All roof and exterior hardware shall be 316 Stainless Steel. This includes all nuts, bolts, washers and Unistrut attachment hardware.
© AJT Engineering, Inc. Page 12
2.4 RADIO FILTERS
Reuse existing filters. See Appendix B for photos.
2.5 AUTOMATED TERMINAL INFORMATION SYSTEM (ATIS)
Provide and install One (1) ATIS SBX2 by Interalia complete with remote handset installed in the cab or through the voice switch for recording messages.
2.6 ATIS/AWOS INTERFACE SWITCH
Provide and install a new ATIS/AWOS interface unit (AAIU). Install in the cab console as directed by the ATM. New AAIU shall be by Wolen LLC, or DBT or approved equal.
2.7 VOICE RECORDER
The Contractor shall furnish and install (1) voice-activated industrial-quality voice recorder by Eventide Nexlog Model 740 DX, or approved equal. Recorder shall be complete with LAN network integration.
The recorder shall have the capability to record a minimum 24 channels simultaneously. The purpose of this component is to provide a means for the recording, playback, and duplication of all radio and telephone communications to and from the control tower, with the exception of the dedicated facsimile and non-essential telephone lines that are not being used by controller positions. Capabilities shall include: synchronized recording of time, playback without recording interruption, re-recording to suitable portable storage media. Any internal storage media shall be redundant and must be configured to preclude retention of data older than 45 days. Recording systems integrated into VCSS are NOT acceptable. Software licensing shall be concurrent with warranty and any extended warranty options.
Recorder shall be compatible with the VCSS and shall be synchronized through the GPS clock.
Contractor shall integrate the recorder into the tower LAN and coordinate password access with the airport. Provide remote visual alerts on system failure located in tower cab shall be provided using the a contact closure. Mount alarm light into a flush mounted box on the console as directed by the ATM. Coordinate LAN connection with the Airport.
2.8 SECONDARY METEOROLOGICAL SYSTEM
The Contractor shall provide and install new secondary wind, temperature probe and rain tipping bucket on new secondary tower transmitting temperature/dewpoint data to cab indicators via existing cabling.
Contractor shall test existing cabling for adequacy of function. Share/allow witness of Airport representative during testing. See drawing package.
Provide two (2) new Temperature Tracker displays in the cab, coordinate location with the ATM.
Installation shall include sensors and indicators for a complete system in accordance with the MEL with all components approved by the FAA Weather Group. Sensors and data display shall include Wind speed and direction, Temperature and Dewpoint. System shall be by RM Young and shall include the following devices:
a. Two (2) RM Young 06201 Wind Tracker
b. One (1) RM Young Temperature/Relative Humidity Sensor 41382LC2 complete with shield
c. Two (2) RM Young Temp Tracker 46203
d. Two (2) RM Young Spread Spectrum RF Modems 41382LC2
© AJT Engineering, Inc. Page 13
e. One (1) RM Young Heavy Duty Wind Monitor HD 05108
f. One (1) RM Young Tipping Rain Guage 52202-20 (product and installation priced separately)
The cab indicators shall be internally illuminated and mounted on the control tower cab console as directed by the ATM.
2.8 DIGITAL ALTIMETER SETTING INDICATORS (DASI)
Replace existing DASIs with two (2) new Setra 370 Digital Pressure Gauge 20 psi. Pressure shall be adjusted and certified to airfield ground elevation and the existing airport AWOS. Install (replace) new exterior barometric sensor tube and Outdoor Air Static Pressure Pickup Port on existing catwalk steel pipe as per manufacturer’s instructions. Coat pipe ends with cold galvanizing and provide cap. Use elevation of instrument as the elevation point for calibration.
2.9 GLOBAL POSITIONING SYSTEM (GPS) SYNCHRONIZED CLOCK
One (1) 24-hour digital clock with slave LED display. Clock shall integrate all time in all equipment to include new VCCS and existing recorder with the source time being Global Positioning System (GPS)…