Coastal_Empire_Montessori_Roof_Specifications.pdf
PDF 157 KB Posted
- Solicitation number
- PE-55836-NONST-2027-000000002
- Issued by
- Chatham County, Georgia
About this file
This is a project specification document for a roof replacement project at Coastal Empire Montessori Charter School located at 2001 Cynthia Street, Savannah, Georgia. The project scope encompasses the removal and replacement of existing roofing systems on Roof Sections 2, 3, 4, and 5, which have reached the end of their service life and are exhibiting active leaks. Work includes tear-off of existing roofing materials, deck and insulation preparation, installation of new 1.5-inch ISO insulation with mechanical fasteners, installation of a fully adhered 60-mil TPO membrane roofing system, flashing, new TPO pipe boots, retrofit drains, new skylights with safety cages, and all associated demolition and cleanup. Roof Sections 1 and 6 are excluded from this bid. The project is being bid by individual roof section with alternates, allowing the owner to award the project in whole or by individual section at its discretion. A pre-bid site visit is encouraged for contractors to familiarize themselves with existing conditions. The specification document does not provide response dates, bid due dates, award dates, or contract term information, and these details remain pending confirmation with the Georgia Department of Education Facilities Services Unit and the school's legal counsel.
Payment terms include a $50,000 down payment due in December 2026, with the remainder due net 45 days as invoiced. The contractor must provide a full 2-year labor warranty, and the building owner will receive a full, transferable 20-year manufacturer's warranty from Versico Roofing Systems or an owner-approved equal. All work shall comply with International Building Code standards and applicable local Georgia regulations. The procurement compliance disclosures indicate that bonding and insurance requirements depend on threshold confirmation and have not yet been finalized. The owner has completed asbestos remediation, and no environmental compliance issues are anticipated. The delivery method is Design/Bid/Build as approved by the school's Board of Trustees. The document explicitly states that quantities and measurements provided are approximate, and contractors are responsible for verification before bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Coastal_Empire_Montessori_Roof_RFP(1)_docx (1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
Coastal Empire Montessori Charter School 2001 Cynthia St, Savannah, Georgia
Roof Replacement Project — Roof Sections 2–5
Work will take place at Coastal Empire Montessori Charter School, 2001 Cynthia St, Savannah, Georgia.
The base bid shall include all work listed in the scope for Roof Sections 2, 3, 4, and 5, in their entirety.
Alternates are provided for each individual roof section as identified in the Bid Schedule at the end of this document, so that the Owner may, at its discretion, award the project in whole or by individual section.
Roof Sections 1 and 6 are not included in this specification; they are not covered by the referenced contractor proposal and are not part of this bid.
SCOPE OF WORK
The intent of this project is to furnish and install all materials, labor, and services necessary to remove and replace the existing roofing systems on Roof Sections 2, 3, 4, and 5 at Coastal Empire Montessori Charter School. The existing roofing systems have reached or are nearing the end of their expected service life and are exhibiting active leaks. Work includes, but is not limited to, tear-off of existing roofing materials, deck and insulation preparation, installation of new insulation and membrane roofing, flashing, drainage, skylights, and all related components described below.
All associated work, including but not limited to demolition, roof tear-off, and installation of new roofing systems, is included in this scope of work.
PROJECT SUMMARY
The scope of work is as follows:
1. Existing Roof Conditions (background reference for bidders)
a. Roof Sections 3 and 4: existing fully-adhered membrane roof applied over 1.5" ISO insulation over a tectum deck. This roof was installed to the deck level and replaced in approximately 2005 (roughly 20 years old) and is showing signs of deterioration, with several interior leaks and failing prior repairs.
b. Roof Sections 2 and 5: existing membrane roof applied over an existing built-up roof (BUR), using a fanfold cover board to separate the two roof systems. This roof was installed between approximately 2014–2015 (roughly 10–11 years old). Interior inspection showed multiple leaks with no obvious point of water entry on the roof surface.
2. Project Preparation
a. Conduct a pre-job meeting with the Owner's representative to identify any special measures needed to minimize disruption to school operations.
b. Establish lay-down yard, dumpster, and portable toilet locations with the Owner's representative.
c. Pull all permits necessary for the roofing work.
3. Safety Measures
a. All work shall conform to OSHA standards for roofing best practices.
b. The jobsite shall be cleaned daily and kept in an orderly manner.
c. Work shall be performed in a manner that presents no risk to building occupants, including students, faculty, and staff.
d. All equipment and materials that can be stored on the roof shall be secured there, with ladders removed or secured any time workers are not present. Equipment that cannot be stored on the roof shall be stored at a designated, locked location daily.
4. Roof Tear-Off and Surface Preparation
a. Roof Sections 3 and 4: Cut existing membrane to relax in place and remove all wall and curb flashings.
b. Roof Sections 2 and 5: Remove existing TPO roof membrane and cover board in their entirety to avoid a third roof application per code, and remove all existing wall and curb flashings.
c. All demolished and scrap materials in their entirety must be removed off the property in accordance with all applicable Georgia state and local regulations.
5. Insulation Attachment
a. Furnish and install new 1.5" ISO insulation utilizing mechanical fasteners across all roof sections.
6. New Roofing System Installation
a. Furnish and install a fully adhered 60 mil TPO membrane over the prepared roof surface on all sections.
b. Prior to installation, membrane shall be laid out to relax and adjust to outside temperatures.
c. All field welds shall be a minimum 1.5" hot-air weld performed by a robotic welder.
d. All curbs and walls shall be flashed using 60 mil TPO.
e. All detail welding shall be performed with a hand-held hot-air welder, minimum 2" hot-air weld.
f. Furnish and install new TPO pipe boots over all existing pipe penetrations, with a cable clamp placed at the top of each.
g. Furnish and install new TPO retrofit drains at all existing roof drain locations.
h. Membrane shall be terminated around the perimeter with new drip edge; existing gutters shall remain in place.
i. Furnish and install new skylights fitted with safety cages at all existing skylight locations.
7. Clean-Up and Debris Disposal
a. Clean up and dispose of all construction debris daily.
b. All demolished and scrap materials in their entirety must be removed off the property in accordance with all applicable Georgia state regulations.
c. Final clean.
8. General Project Requirements
a. Contractor shall verify all new and existing conditions and dimensions at the job site.
b. Contractor shall coordinate inspections as required. Tie-ins shall be made daily, regardless of weather conditions, to protect the building interior.
c. Contractor is responsible for protection of all surfaces, including those not in the scope of work, from construction dust, debris, or damage during construction, up until final acceptance.
d. Contractor shall be responsible for daily job site clean-up and shall make provisions for disposing of all trade debris. No material or debris shall be left on site that could endanger students, staff, or the public.
e. Contractor shall match all materials as closely as possible to existing materials and colors. Any deviation requires Owner approval.
GENERAL
1. Standard Operating Procedures
a. Contractor shall acquire any permits necessary to complete the roof work.
b. Daily clean-up is mandatory; all waste shall be disposed of in a professional manner.
c. At the end of the project, the job shall be walked and signed off by the Owner's representative.
Any punch list items identified shall be corrected immediately, with the area re-walked upon completion.
2. Submittals
a. All proposed materials must be submitted with associated data and specifications to the Owner for review and approval prior to purchase or installation.
b. Materials purchased for this project that are not approved by the Owner in advance will not be considered for payment and will not be authorized for use on this project.
3. Pre-Bid Site Visit The contractor is encouraged to schedule a pre-bid site visit to familiarize themselves with existing conditions and investigate any conditions that may affect their price. The contractor shall notify the Owner in writing (via email) of any discrepancies between existing conditions and this scope of work that may affect their work or price.
4. Quantities and Measurements Any quantities and measurements provided in this document are approximate and supplied for the contractor's convenience. The contractor is responsible for verifying all quantities and measurements before bidding on this project.
5. Scope, Codes, and Insurance The scope and pricing referenced in the accompanying bid are based on there being no additional requirements set forth by the building owner's insurance carrier. Any change in scope or additional requirements identified must be brought to the Contractor's attention, with price re-evaluated, before work begins. All work shall be performed in accordance with the International Building Code (IBC) and all applicable local codes.
6. Warranty
a. Building Owner shall receive a full, transferable 20-year manufacturer's warranty (Versico Roofing
Systems, or Owner-approved equal).
b. Contractor shall provide a full 2-year labor warranty. Should leaks occur after the roofing system is installed, all warranty repair work must be performed by the awarded Contractor in order to maintain the warranty.
7. Payment Terms
$50,000 due at contract signing / down payment, due in December 2026, with the remainder due net 45 days as invoiced.
8. Final Inspection Prior to final acceptance and payment of the project, the Contractor and Owner's representative will conduct a material completion inspection and/or Final Completion Inspection of the project.
PROCUREMENT COMPLIANCE DISCLOSURES — PENDING
CONFIRMATION
The items below have not yet been confirmed and must be resolved before this project is advertised for bid. None of the dollar thresholds, approval statuses, or requirements listed here should be treated as final until confirmed in writing with the Owner's legal counsel, its charter authorizer, and/or the Georgia Department of Education Facilities Services Unit (GaDOE FSU), as applicable.
a. [Will be Updated after FSU reviews] GaDOE Facilities Services Unit (FSU) Plan and Specification Approval: As of this draft, plans and specifications for this project have not been submitted to or approved by GaDOE FSU. Per GaDOE guidance for charter schools, FSU approval of plans and specifications is required before a construction project may be advertised for bid, and this requirement cannot be waived regardless of funding source.
b. Delivery Method Selection: This is a Design/Bid/Build delivery method as approved by the school’s Board of Trustees.
c. Rights-of-Way and Easements: This project is anticipated to require no new rights-of-way or easements.
d. Bonding and Insurance: Payment and performance bond requirements for Georgia public works contracts apply at or above the statutory threshold referenced above; whether bonding is required depends on resolution of that threshold question. Contractor insurance requirements will be specified once confirmed with the Owner's risk management or insurance advisor.
e. Asbestos / Environmental Compliance: The Owner has conducted an asbestos survey and all remediation related to asbestos has been completed.
BID SCHEDULE
This project is being bid by individual roof section, with alternates, so the Owner may award the project in whole or by individual section at its discretion.
End of Specifications
| SCOPE OF WORK |
| PROJECT SUMMARY |
| 1. Existing Roof Conditions (background reference for bidders) |
| 2. Project Preparation |
| 3. Safety Measures |
| 4. Roof Tear-Off and Surface Preparation |
| 5. Insulation Attachment |
| 6. New Roofing System Installation |
| 7. Clean-Up and Debris Disposal |
| 8. General Project Requirements |
| GENERAL |
| 1. Standard Operating Procedures |
| 2. Submittals |
| 3. Pre-Bid Site Visit |
| 4. Quantities and Measurements |
| 5. Scope, Codes, and Insurance |
| 6. Warranty |
| 7. Payment Terms |
| 8. Final Inspection |