Coastal_Empire_Montessori_Roof_RFP(1)_docx (1.pdf

PDF 2 MB Posted

Attached to
CEMCS Roof Replacement Project - Roof Sections 2-5
Solicitation number
PE-55836-NONST-2027-000000002
Issued by
Chatham County, Georgia

About this file

Summary

This is a Request for Proposals (RFP) issued by Coastal Empire Montessori Charter School (CEMCS), a public charter school in Savannah, Georgia, for roof replacement services on four roof sections (2, 3, 4, and 5) at its facility located at 2001 Cynthia St, Savannah, Georgia 31406. The project involves complete tear-off and replacement of existing roofing systems, with Sections 3 and 4 currently featuring a fully-adhered membrane over 1.5" ISO insulation over a tectum deck (installed circa 2005), and Sections 2 and 5 featuring membrane over existing built-up roof with fanfold cover board (installed circa 2014-2015). The new system will consist of a fully adhered 60 mil TPO roofing membrane with 1.5" mechanically fastened ISO insulation, new flashing, drainage components, and skylights with safety cages. The RFP was released on November 9, 2026, with a submission deadline of December 8, 2026, at 3:00 PM. A voluntary pre-bid site visit was scheduled for November 15, 2026, at 8:00 AM. The Notice of Award is anticipated on December 9, 2026, with the Notice to Proceed and contract start date also on December 9, 2026, and substantial completion required by January 6, 2027. The Owner reserves the right to award the entire project or individual roof sections at its discretion.

The project has a board-approved budget of $249,000. Pricing must be submitted by individual roof section using the provided Bid Schedule format in Appendix B, with the Owner retaining flexibility in award decisions. Payment terms specify $50,000 due at contract signing as a down payment, with the remainder due net 45 days as invoiced. Qualified roofing contractors holding current, valid Georgia licenses (Utility Contractor or General Contractor classification) are eligible to respond. The awarded contractor must provide a full, transferable 20-year manufacturer's warranty (Versico Roofing Systems or Owner-approved equivalent) and a full 2-year labor warranty. Standard insurance requirements and bonding capacity documentation are mandatory; bonding requirements are pending confirmation based on GaDOE Facilities Services Unit threshold determination. No set-asides are indicated. Evaluation will be based on technical qualifications (650 points), cost (100 points), and references/interviews/site visits (250 points), for a total of 1,000 points. All proposals must be submitted electronically to Issuing Officer Wanda Morrison at wanda.morrison@cemco.org.

View the file

Other files

File Type Posted
Coastal_Empire_Montessori_Roof_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

For

ROOF REPLACEMENT

Roof Sections 2, 3, 4, and 5 2001 Cynthia St, Savannah, Georgia 31406

RFP NUMBER: 20261028

RELEASED ON:

11/9/2026

DUE ON:

12/8/2026

INTRODUCTION

Purpose of Procurement

The objective of this Request for Proposals (“RFP”) is to obtain the services of a qualified, Georgia-licensed roofing contractor to furnish all labor, materials, equipment, and supervision necessary to remove and replace the existing roofing systems on Roof Sections 2, 3, 4, and 5 at Coastal Empire Montessori Charter School (the “Owner” or “CEMCS”), located at 2001 Cynthia St, Savannah, Georgia, in accordance with the Project Specifications incorporated as Appendix F to this RFP.

The full technical scope of work is detailed in Appendix F – Project Specifications, which is incorporated into this RFP by reference. The Offeror must price its proposal in accordance with the Bid Schedule format provided in Appendix B, by individual Roof Section (2, 3, 4, and 5), with the Owner reserving the right to award the project in whole or by individual Roof Section at its discretion.

About Coastal Empire Montessori Charter School

Coastal Empire Montessori Charter School is a public charter school located in Savannah, Georgia, and is the first public Montessori charter school in the State of Georgia. The school serves approximately 250 students in PreK through Grade 5. As a public charter school, CEMCS is accountable to its students, families, staff, Governing Board, authorizer, funders, and the broader Savannah community, and conducts its procurement activity in accordance with applicable Georgia law and Georgia Department of Education (GaDOE) requirements for charter schools.

OVERVIEW OF RFP PROCESS

The objective of this RFP process is to select a qualified, licensed roofing contractor to provide the services outlined in this RFP to the Owner. This process will be conducted to gather and evaluate responses from Offerors for potential award. All qualified Offerors are invited to participate by submitting responses, as further defined below. After evaluating all Offeror responses received prior to the closing date of this RFP and following negotiations (if any) and resolution of any contract exceptions, the results of the RFP process will be announced, including the names of all participating Offerors and the evaluation results.

Schedule of Events

The schedule of events set out below represents the Owner's best estimate of the schedule to be followed.

Delays in the procurement process may occur and may necessitate adjustments to the proposed schedule.

Any changes to dates up to the closing date of this RFP will be posted prior to the closing date. After the closure of the RFP, the Owner reserves the right to adjust the remainder of the proposed dates, including dates for evaluation, negotiations, award, and the start of the contract term, on an as-needed basis with or without notice.

Description Date Time Release of RFP 11/9/2026 Voluntary Pre-Bid Site Visit (recommended) 11/15/2026 8:00AM Deadline for Written Questions (sent via email to Issuing Officer)

11/17/2026 5:00PM

Responses to Written Questions Issued 11/20/2026 5:00PM Proposals Due / Close Date and Time 12/8/2026 3:00PM Proposal Evaluation Completed (on or about) 12/8/2026 Notice of Intent to Award (on or about) 12/8/2026 Notice of Award (on or about) 12/9/2026 Notice to Proceed / First Day of Contract 12/9/2026

Official Issuing Officer

Issuing Officer: Wanda Morrison, Director of Operations, and wanda.morrison@cemco.org is the Owner's designated point of contact for this RFP. No communications regarding this RFP should be directed to any other Owner staff, board member, or representative (see Restrictions on Communicating with Staff, below).

Definition of Terms

a. Owner / CEMCS – Coastal Empire Montessori Charter School, the public charter school issuing this

RFP.

b. Offeror – the roofing firm(s) or contractor(s) responding to this RFP.

c. GaDOE – Georgia Department of Education.

d. GaDOE FSU – Georgia Department of Education Facilities Services Unit.

e. GPR – Georgia Procurement Registry.

f. BAFO – Best and Final Offer.

Appropriated Budget: the Owner's board-approved and/or appropriated funding amount available for this project is $249,000.

Contract Term

This Contract shall commence upon the date of Notice to Proceed and shall continue through Substantial Completion and Final Acceptance of the Work, as further described in Appendix D (Contract) and Appendix F (Project Specifications).

Construction Schedule: Start date commences when award notification is received and continues through the required completion date of January 6, 2027 (e.g., coordinated around the school calendar/summer break).

Instructions to Offerors

By submitting a response to this RFP, the Offeror acknowledges that the Offeror: (1) has read the information and instructions contained herein, and (2) agrees to comply with the information and instructions contained herein.

OFFEROR RESPONSIBILITIES, QUALIFICATIONS AND

REQUIREMENTS

Scope of Service – Roof Replacement The full technical scope of work, existing roof condition reports, and specifications for this project are set out in Appendix F – Project Specifications, which is incorporated into this RFP by reference and which the Offeror must read in its entirety before submitting a proposal. A summary of the scope follows:

a. Existing Roof Conditions: Roof Sections 3 and 4 consist of an existing fully-adhered membrane roof over 1.5" ISO insulation over a tectum deck (installed approximately 2005). Roof Sections 2 and 5 consist of an existing membrane roof over an existing built-up roof (BUR) with a fanfold cover board (installed approximately 2014–2015). See Appendix F, Figure 1 for an aerial view identifying each roof section.

b. Tear-off and surface preparation of all four roof sections, including removal of existing membrane, cover board (Sections 2 and 5), and all wall/curb flashings.

c. Furnish and install new 1.5" ISO insulation, mechanically fastened.

mailto:wanda.morrison@cemco.org

d. Furnish and install a fully adhered 60 mil TPO roofing membrane system, including all field welds, detail welds, flashing, pipe boots, retrofit drains, drip edge, and new skylights with safety cages, as detailed in Appendix F.

e. Daily clean-up and final removal of all construction debris.

f. Compliance with all safety, submittal, and general project requirements described in Appendix F.

Mandatory Responsibilities

a. Contractor must hold a current, valid Georgia contractor license appropriate to this scope of work

(Utility Contractor or General Contractor classification, as applicable) and must provide evidence of licensure with its proposal.

b. Contractor shall be responsible for coordination and implementation of all services described in Appendix F, with or without the presence of Owner staff.

c. Contractor shall perform all work in a professional manner and to the satisfaction of the Owner, and shall acknowledge requests from the Owner within one (1) business day.

d. Contractor shall conform to all OSHA standards for roofing best practices and shall maintain a jobsite that presents no risk to building occupants, including students, faculty, and staff, consistent with Appendix F.

e. Contractor shall acquire any permits necessary to complete the roof work and shall coordinate all required inspections.

f. Contractor shall submit all proposed materials, with associated data and specifications, to the Owner for review and approval prior to purchase or installation.

g. Contractor shall provide all manufacturer's and labor warranties described in Appendix F, and shall maintain all insurance and bonding required under this RFP and the resulting Contract.

h. Contractor agrees to abide by all policies, procedures, and guidelines of the Owner, including but not limited to policies protecting the safety of students and staff, and keeping any client or school information confidential.

Technical Qualifications (Mandatory Scored) To demonstrate the ability to perform the requirements while delivering a quality product within specified timeframes, the Offeror shall provide the following information:

Company Background, Proposed Organization, and Staffing for the Contract

a. Brief description of Offeror's firm's background and history, including years in business and any parent, affiliated, or subsidiary company.

b. Evidence of current Georgia contractor licensure (Utility Contractor or General Contractor, as applicable) in good standing, including license number.

c. Organization chart and list of principals, identifying the individual(s) who will serve as Project Manager and/or Superintendent for this project.

d. Biographies and relevant roofing experience of key personnel assigned to this project.

e. Short description of any details that may create a conflict or appearance of a conflict of interest.

f. Disclosure of whether, within the last five years, Offeror's organization or an officer or principal has been involved in any business litigation or other legal proceedings. If so, provide an explanation and current status.

Roofing Experience and Qualifications

a. Description of Offeror's experience with commercial or institutional roof replacement projects of similar scope and materials (TPO membrane, tectum deck, built-up roof removal) completed within the past five years.

b. Description of experience performing roofing work on occupied K-12 school campuses, including safety practices and approach to minimizing disruption to students and staff.

c. Evidence of manufacturer certification (e.g., Versico or Owner-approved equal) necessary to provide the warranty required in Appendix F.

d. Evidence of bonding capacity sufficient for this project. [See Appendix F, Procurement Compliance Disclosures, Item f – bonding requirement applicability is pending confirmation.]

e. Evidence of current insurance coverage meeting the Standard Insurance Requirements of this RFP.

f. List of three (3) to five (5) references from comparable completed roofing projects within the past five years, including project owner name and contact information.

g. Description of Offeror's safety program, including Experience Modification Rate (EMR) for the past three years and any OSHA citations within that period.

Results Measurement and Ability to Provide Services within Stated Deadlines

Offeror's written RFP submission should demonstrate, to the Owner's satisfaction, the ability to provide quality services within proposed deadlines. This response should include a proposed project schedule from Notice to Proceed through Substantial Completion, and a description of the Offeror's process for quality control and timely completion.

Additional Requirements (Additional Scored)

a. Offeror must indicate familiarity working on occupied public-school campuses and describe its approach to noise, dust, and student-safety management during construction.

b. Offeror must disclose any OSHA citations or safety violations within the past three years.

c. Offeror must demonstrate the ability to begin work and complete the project within a schedule that minimizes disruption to the school calendar.

RFP RULES AND RESPONSIBILITIES

Restrictions on Communicating with Staff

From the issue date of this RFP until the final award is announced, Offerors are not allowed to communicate for any reason with any Owner staff, board member, or representative except through the Issuing Officer named herein, or during a pre-bid conference (if any), or as otherwise defined in this RFP. Prohibited communication includes all contact or interaction, including but not limited to telephonic communications, emails, faxes, letters, or personal meetings. The Owner reserves the right to reject the proposal of any Offeror violating this provision.

Owner's Right to Request Additional Information

Prior to an award, the Owner must be assured that the selected Offeror has all of the resources to successfully perform under the contract, including adequate personnel, equipment, financial resources, and experience in similar endeavors. If the Owner is unable to assure itself of an Offeror's ability to perform, the Owner has the option of requesting any information deemed necessary to determine the Offeror's responsibility, and the Offeror will be permitted approximately seven (7) business days to submit the information requested.

Failing to Comply with Submission Instructions

Proposals received after the identified due date and time, or submitted by any means other than those expressly permitted by this RFP, will not be considered. Proposals must be complete in all respects, as required in each section of this RFP.

Rejection of Proposals; Owner's Right to Waive Immaterial Deviation

The Owner reserves the right to reject any or all proposals, to waive any irregularity or informality in a proposal, and to accept or reject any item or combination of items, when to do so would be to the advantage of the Owner. It is also within the right of the Owner to reject proposals that do not contain all elements and information requested in this RFP.

Owner's Right to Amend and/or Cancel the RFP

The Owner reserves the right to amend this RFP prior to the end date and time. Amendments will be made in writing and sent to each Offeror. Each Offeror is individually responsible for reviewing addenda and making any necessary or appropriate changes and/or additions to the Offeror's response. The Owner reserves the right to cancel this RFP at any time.

Costs for Preparing Proposals

Each proposal should be prepared simply and economically, avoiding the use of elaborate promotional materials beyond those sufficient to provide a complete presentation. The cost for developing the proposal and participating in the procurement process is the sole responsibility of the Offeror. The Owner will not provide reimbursement for such costs.

Public Access to Procurement Records

As a public charter school, the Owner is subject to the Georgia Open Records Act (O.C.G.A. § 50-18-70 et seq.). If an Offeror considers any portion of its proposal to be trade secret or otherwise not subject to public disclosure, the Offeror must provide a separate redacted copy of its proposal, clearly marked, and briefly describe, as to each item redacted, the grounds for claiming exemption from the public records law. Pricing information is not considered confidential or proprietary.

Submittal Instructions

This RFP consists of this document and any and all documents provided by the Owner as attachments to this RFP. Please carefully review all information contained in the RFP, including all attachments. Any difficulty accessing the RFP or its attachments should be reported immediately to the Issuing Officer.

Submitting Questions

All questions concerning this RFP must be submitted in writing via email to the Issuing Officer by the deadline identified in the Schedule of Events. No response other than written will be binding upon the Owner. All vendor questions and corresponding answers will be issued to each Offeror as an official addendum to this RFP.

Preparing and Packaging a Response

The Offeror's proposal, in response to this RFP, is preferred to be divided into two (2) appropriately labeled sections – a Technical Proposal and a Cost Proposal:

a. Technical Proposal – Proposal Certification (Appendix A); Technical Proposal response (including all required attachments per Appendix C); and Contract Exceptions (Appendix E), if any. Do not include any cost information in the Technical Proposal.

b. Cost Proposal – the Offeror must use the Cost Proposal / Bid Schedule format provided in Appendix B.

The Offeror's proposal may be submitted as a quote as long it contains all the necessary information for scoring.

Submitting the Response

Number of Copies and Delivery Location: One electronic response copy must be emailed to the Issuing Officer by the submission deadline.

Selection Process

Contractor will be selected based on qualifications, relevant roofing experience, licensing and bonding capacity, references, and proposed cost, in accordance with the Scoring Criteria set out below. All qualified Offerors will be considered but may not receive an interview.

OFFEROR INFORMATION

This section requests basic information concerning the Offeror and establishes certain minimum insurance, bonding, and/or other requirements the Offeror must meet to be considered eligible for award. Please read each section carefully.

Company Information

The Offeror will provide the company name, company address, Georgia contractor license number, and the name, telephone number, and email address of the person(s) authorized to represent the company regarding all matters related to the proposal.

Certification Regarding Status as a “Scrutinized Company”

Any Offeror that currently and/or previously, within the last three years, has had business activities or other operations outside the United States, must certify that it is not a “scrutinized company” as defined in O.C.G.A. § 50-5-84. False certification may result in civil penalties, contract termination, ineligibility to bid on state or local public contracts for three or more years, and/or any other available remedy. Each Offeror must respond to this section with its submitted response.

Standard Insurance Requirements

If awarded a contract, the Offeror shall procure and maintain insurance which shall protect the Offeror and the Owner (as an additional insured) from claims for bodily injury, property damage, or personal injury arising out of or related to the Offeror's performance under the contract. Within ten (10) business days of award, the awarded Offeror must provide the Owner with Certificates of Insurance referencing the contract.

Proposal Certification

MANDATORY: The Offeror must complete and attach a signed copy of the Proposal Certification, included as Appendix A to this RFP. Do not modify or alter the Proposal Certification in any way. Failure to attach a signed copy will result in rejection of the Offeror's proposal.

COST PROPOSAL

Each Offeror is required to submit a cost proposal as part of its response. The cost proposal will be evaluated and scored. By submitting a response, the Offeror agrees that it has read, understood, and will abide by the following instructions/rules:

a. The submitted cost proposal must include all costs of performance pursuant to the resulting contract, itemized by Roof Section (2, 3, 4, and 5) using the Bid Schedule format in Appendix B;

and

b. The prices quoted and listed in the cost proposal shall be firm throughout the term of the resulting contract, unless otherwise noted in the RFP or contract; and

c. This project is being bid by individual roof section, with alternates, so the Owner may award the project in whole or by individual section at its discretion, as described in Appendix F.

PROPOSAL EVALUATION, NEGOTIATIONS AND AWARD

All timely proposals will be evaluated in accordance with the following steps. The objective of the evaluation process is to identify the proposal which represents the best value to the Owner based on a combination of technical and cost factors.

Administrative/Preliminary Review

Proposals will first be reviewed by the Issuing Officer to determine compliance with the following: (1) proposal was received by deadline; (2) proposal is complete and contains all required documents; (3) Technical Proposal does not include any pricing from the Cost Proposal.

Evaluating Proposal Factors

If the Offeror's proposal passes the Administrative/Preliminary Review, the Offeror's responses will be reviewed and scored in accordance with the Scoring Criteria below, on a pass/fail basis for Mandatory Responsibilities and a point basis for Technical Qualifications and Additional Requirements.

Scoring Criteria

The point allocation below mirrors the Owner's standard RFP scoring structure and is provided as a suggested default; the Owner's evaluation committee or board should confirm or adjust these weights before release.

Category Criteria Points Cost Cost of proposed roofing services (Appendix B) 100 points Technical – Mandatory “Mandatory Responsibilities” Pass/Fail Technical – Proposal Factors “Technical Qualifications” and “Additional

Requirements” responses 650 points

Interview / Site Visit References, interview, and/or site visit (if conducted) 250 points Total 1,000 points

Selection and Award

The Owner desires to make an award to the highest-scoring Offeror based on each Offeror's total combined score, subject to the procurement compliance items described in Appendix F.

Site Visits / Oral Presentations / Interviews

The Owner reserves the right to conduct site visits, to invite Offerors to present their technical solutions to the evaluation team, or to request interview(s) with the Offeror.

Public Award Announcement

The awarded Offeror will be notified by the Owner via official written notification. Announcement of the winning Offeror will be made consistent with the Owner's standard public notice practice.

CONTRACT TERMS AND CONDITIONS

The contract that the Owner expects to award as a result of this RFP will be based upon this RFP, the successful Offeror's final response as accepted by the Owner, and the contract terms and conditions attached as Appendix D. Offerors should plan on the contract terms and conditions contained in Appendix D being included in any award resulting from this RFP; all costs associated with complying with these requirements should be included in pricing quoted by Offerors.

Exception to Contract

By submitting a proposal, each Offeror acknowledges its acceptance of the RFP specifications and the contract terms and conditions without change, except as otherwise expressly stated in the submitted proposal. If an Offeror takes exception to a contract provision, the Offeror must state the reason for the exception and propose specific alternative language, submitted as Appendix E. Proposed exceptions must not conflict with or attempt to preempt mandatory requirements specified in this RFP.

LIST OF RFP ATTACHMENTS

The following documents make up this RFP. Any difficulty locating or accessing the following documents should be immediately reported to the Issuing Officer.

a. Appendix A: Proposal Certification

b. Appendix B: Cost Proposal / Bid Schedule

c. Appendix C: Required Content of Proposal

d. Appendix D: Contract

e. Appendix E: Contract Exceptions

f. Appendix F: Project Specifications (includes aerial roof diagram and Procurement Compliance Disclosures)

Appendix A

PROPOSAL CERTIFICATION

By responding to this RFP, the Offeror understands and agrees to the following:

a. That the submitted proposal constitutes an offer, which when accepted in writing by the Owner, and subject to the terms and conditions of such acceptance, will constitute a valid and binding contract between the undersigned and the Owner; and

b. That the Offeror has read the specifications and requirements shown or referenced in this RFP and that the Offeror's proposal is made in accordance with the provisions of such specifications and requirements, except as expressly stated otherwise in the Offeror's proposal; and

c. That the Offeror guarantees and certifies that all items included in the Offeror's proposal meet or exceed any and all such stated RFP specifications; and

d. That, if awarded a contract, the Offeror will deliver services that meet or exceed the RFP specifications and requirements, except as expressly stated otherwise in the Offeror's proposal;

and

e. That the Offeror holds a current, valid Georgia contractor license appropriate to the scope of work described in this RFP; and

f. That the technical and cost proposals submitted by the Offeror shall be valid and held open for a period of one hundred and twenty (120) days from the final RFP closing date; and

g. That this proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same materials, supplies, equipment, or services and is in all respects fair and without collusion or fraud. The Offeror understands and agrees that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards; and

h. That the provisions of the Official Code of Georgia Annotated, Sections 45-10-20 et seq. have not been and will not be violated in any respect.

DO NOT MODIFY THE PROPOSAL CERTIFICATION TERMS IN ANY WAY. THIS FORM MUST BE COMPLETED, SIGNED AND SUBMITTED WITH YOUR TECHNICAL PROPOSAL.

Contractor's Full Legal Name (PLEASE TYPE

OR PRINT):

Georgia Contractor License Number:

Authorized Signature:

Printed Name and Title of Person Signing:

Date:

Company Address:

Telephone Number:

Email Address:

Appendix B

COST PROPOSAL / BID SCHEDULE

Offeror's Name: ___________________________________________________________

This project is being bid by individual roof section, with alternates; the Owner may award the project in whole or by individual section at its discretion. Offeror must complete pricing for each section below. Enter all costs in U.S. Dollars.

Roof Section Scope Warranty Offered Offeror's Price 2 Roof Replacement 3 Roof Replacement 4 Roof Replacement 5 Roof Replacement ALL (if awarded together) Roof Replacement

Authorized Signature: ___________________________________________________________

Print/Type Name: ___________________________________________________________

Print/Type Company Name: ___________________________________________________________

Date: ___________________________________________________________

Appendix C

REQUIRED CONTENT OF PROPOSAL

This appendix identifies what information should be submitted within your proposal and the order in which it desired to appear. Offeror should indicate required documents are included within the proposal by placing “Yes” by each requirement and specifying the page or reference number where that document is located.

This checklist is provided for the convenience of the Offeror, but it is the Offeror's responsibility to review the entire RFP and ensure a response is made to all requirements.

Yes/No Page/Ref. No. Requirement

1. Cover letter (company name, address, authorized contact)

2. Signed Proposal Certification (Appendix A)

3. Agreement to Project Requirements / Contract (Appendix D), with any exceptions in Appendix E

4. Evidence of current Georgia contractor license

5. Company background, organization chart, and key personnel biographies

6. Disclosure of conflicts of interest

7. Disclosure of business litigation within past five years

8. Description of similar roof replacement project experience (past five years)

9. Description of experience on occupied K-12 school campuses

10. Evidence of manufacturer certification (TPO system)

11. Evidence of bonding capacity

12. Evidence of current insurance coverage

13. Three to five (3–5) project references with contact information

14. Safety program description, EMR (past 3 years), and OSHA citation history

15. Proposed project schedule

16. Responses to Additional Requirements (Additional Scored)

17. Cost Proposal (Appendix B) – submitted as a separate, sealed package

Appendix D

CONTRACT

STATE OF GEORGIA

Coastal Empire Montessori Charter School

Roof Replacement – Roof Sections 2, 3, 4, and 5 20261028

AGREEMENT made by and between ___________________________ hereinafter referred to as “Contractor,” and Coastal Empire Montessori Charter School, hereinafter referred to as the “Owner.”

WHEREAS, the Owner has caused Request for Proposals Number [TBD], the “RFP,” to be issued; and WHEREAS, the Owner has received from Contractor a proposal in response to the RFP, “Contractor's Proposal”; and WHEREAS, Contractor's Proposal was deemed to be the proposal most advantageous to the Owner; NOW, THEREFORE, in consideration of the mutual covenants and agreements contained herein, the parties agree as follows:

1. Incorporation of Documents

The RFP (and any documents referenced therein) and Contractor's Proposal (including any best and final offer) are incorporated into this Contract by reference and form an integral part of this Contract. In the event of a conflict between the language of the RFP and the Contractor's Proposal, the language in the RFP shall govern.

2. Scope of Work

Contractor agrees to furnish all labor, materials, equipment, and supervision necessary to perform the work described in Appendix F – Project Specifications (the “Work”), plus any additional deliverables described in Contractor's Proposal.

3. Contract Price

The total Contract price for the Work is $_____________, as set forth in Contractor's accepted Cost Proposal (Appendix B).

4. Payment Terms

$50,000 due at contract signing / down payment, with the remainder due net 45 days as invoiced, consistent with Appendix F, Section 7 (Payment Terms). The Owner should confirm final payment terms with the awarded Contractor and its auditor before execution.

5. Contract Time / Schedule

Contractor shall commence Work on the date of Notice to Proceed and achieve Substantial Completion by January 6, 2026, consistent with Contractor's proposed schedule.

6. Inspection of Work

The Owner or its authorized representative shall have the right to enter the premises at all reasonable times to inspect, monitor, or otherwise evaluate Contractor's performance under this Contract.

7. Contractor's Personnel and Staffing

Contractor warrants that all persons assigned by it to perform Work under this Contract shall be employees or authorized subcontractors of Contractor and shall be fully qualified, as required in the RFP and specified in Contractor's Proposal.

8. Warranty

Contractor shall provide the manufacturer's and labor warranties described in Appendix F, Section 6 (Warranty), including a full, transferable 20-year manufacturer's warranty and a full 2-year Contractor labor warranty.

9. Insurance

Contractor shall procure and maintain insurance protecting Contractor and the Owner from claims for bodily injury, property damage, or personal injury arising out of operations under this Contract, in the types and amounts specified in the RFP, Offeror Information section.

10. Bonding

Whether payment and/or performance bonds are required for this Contract depends on resolution of the procurement threshold question described in Appendix F, Procurement Compliance Disclosures, Item b.

11. Indemnification

Contractor hereby agrees to indemnify, protect, and save harmless the Owner and its officers, employees, and board members from and against any and all claims, demands, liabilities, losses, costs, or expenses, including attorneys' fees, for bodily injury or property damage caused by, growing out of, or otherwise happening in connection with this Contract, due to any act or omission of Contractor, its agents, employees, or subcontractors.

12. Independent Contractor Relationship

In its relationship with the Owner, Contractor warrants that Contractor is an independent contractor.

Contractor is responsible for compliance with all laws, rules, and regulations involving employment of labor, including workers' compensation insurance and payment of wages.

13. Ownership of Documents

Any documents or other materials prepared by Contractor in connection with the Work shall be the property of the Owner upon completion of the Work.

14. Termination for Cause

The occurrence of any of the following shall constitute cause for the Owner to declare Contractor in default:

Contractor fails to deliver or has delivered nonconforming work or fails to perform any material requirement of this Contract; Contractor fails to make substantial and timely progress toward performance; Contractor becomes subject to bankruptcy or insolvency proceedings; or Contractor fails to comply with applicable federal, state, or local laws, rules, or regulations.

15. Termination for Convenience

Following thirty (30) days' written notice, the Owner may terminate this Contract in whole or in part without the payment of any penalty. Following such termination, Contractor shall be entitled to compensation for Work properly performed up to and including the date of termination.

16. Records Retention

Contractor agrees to maintain books, records, documents, and other evidence pertaining to the costs and expenses of this Contract and to make such records available for inspection or audit for a period of five (5) years from the date of final payment.

17. Compliance with Laws

Contractor shall perform its obligations under this Contract in accordance with all applicable federal, state, and local laws and regulations, including OSHA, applicable building codes, and the Georgia Public Works Construction Act (O.C.G.A. § 36-91-20 et seq.), to the extent applicable as described in Appendix F.

18. Drug-Free Workplace

Contractor certifies that it will provide a drug-free workplace as defined under O.C.G.A. §§ 50-24-2(5) and 50-24-3(b), throughout the duration of this Contract.

19. Governing Law / Venue

This Contract shall be construed in every respect according to the laws of the State of Georgia. Any lawsuit or other action based on a claim arising from this Contract shall be brought in a court of competent jurisdiction within Chatham County, Georgia.

20. Notices

All notices provided for herein shall be deemed duly given upon delivery if delivered by hand, or three days after mailing, to the addresses stated by the parties.

21. Amendments in Writing

Except as otherwise provided in this Contract, no amendment to this Contract shall be effective unless it is in writing and signed by duly authorized representatives of all parties.

22. Entire Contract

This Contract instrument, including all incorporated documents, contains the entire Contract between the parties with regard to the subject matter hereof, and supersedes any and all other prior and contemporaneous agreements and understandings between the parties, whether oral or written.

23. Severability

Any section, subsection, paragraph, term, condition, or provision of this Contract judged to be void, invalid, or otherwise unenforceable shall not affect any other part of this Contract, and the remainder shall continue in full force and effect.

EACH PERSON SIGNING BELOW ON BEHALF OF A PARTY REPRESENTS THAT SHE/HE IS DULY AUTHORIZED AND FULLY EMPOWERED TO BIND SUCH PARTY TO THIS CONTRACT. THE PARTIES HERETO ACKNOWLEDGE THAT THEY HAVE READ AND UNDERSTAND THIS CONTRACT, AND AGREE TO BE BOUND BY ALL TERMS AND CONDITIONS OF THIS CONTRACT, AS INDICATED BY THEIR SIGNING OF THIS CONTRACT DOCUMENT ON

THE DATES SET OUT BELOW.

CONTRACTOR:

By: ___________________________________________ Date: _______________

Printed Name and Title: ___________________________________________

OWNER – COASTAL EMPIRE MONTESSORI CHARTER SCHOOL:

By: ___________________________________________ Date: _______________

Printed Name and Title: ___________________________________________

Appendix E

CONTRACT EXCEPTIONS

(Offeror to list any exceptions to Appendix D – Contract, with proposed alternative language, here. Leave blank if no exceptions are taken.)

Appendix F

PROJECT SPECIFICATIONS

The full “Coastal Empire Montessori Roof Specifications” document is incorporated into this RFP by reference in its entirety, including its Scope of Work, Project Summary, General requirements, Procurement Compliance Disclosures, and Bid Schedule. That document is reproduced below.

Figure 1: Aerial view of roof sections at 2001 Cynthia St, Savannah, Georgia. Sections 2, 3, 4, and 5 (outlined) are included in this project; Sections 1 and 6 are not included.

Scope of Work

The intent of this project is to furnish and install all materials, labor, and services necessary to remove and replace the existing roofing systems on Roof Sections 2, 3, 4, and 5 at Coastal Empire Montessori Charter School. The existing roofing systems have reached or are nearing the end of their expected service life and are exhibiting active leaks. Work includes, but is not limited to, tear-off of existing roofing materials, deck and insulation preparation, installation of new insulation and membrane roofing, flashing, drainage, skylights, and all related components.

Project Summary – Key Items

a. Existing Roof Conditions: Sections 3 and 4 – fully-adhered membrane over 1.5" ISO insulation over tectum deck (~2005). Sections 2 and 5 – membrane over existing BUR with fanfold cover board (~2014–2015).

b. Project Preparation: pre-job meeting, lay-down yard/dumpster/portable toilet coordination, permits.

c. Safety Measures: OSHA compliance, daily site cleanliness, no risk to building occupants, secured equipment.

d. Roof Tear-Off and Surface Preparation: cut/relax membrane (Sections 3 & 4); remove TPO and cover board in entirety (Sections 2 & 5); proper off-site disposal.

e. Insulation Attachment: new 1.5" ISO, mechanically fastened.

f. New Roofing System Installation: fully adhered 60 mil TPO; 1.5" minimum robotic field welds; 2" minimum hand-welded details; new pipe boots, retrofit drains, drip edge, and skylights with safety cages.

g. Clean-Up and Debris Disposal: daily and final clean-up, proper disposal.

h. General Project Requirements: verification of existing conditions, daily tie-ins, protection of all surfaces, material matching.

Warranty

Full, transferable 20-year manufacturer's warranty (Versico Roofing Systems, or Owner-approved equal), plus a full 2-year Contractor labor warranty.

Payment Terms

$50,000 due at contract signing / down payment, due in December 2026, with the remainder due net 45 days as invoiced.

Procurement Compliance Disclosures – Pending Confirmation

a. [Will be Updated after FSU reviews] GaDOE Facilities Services Unit (FSU) Plan and Specification Approval: As of this draft, plans and specifications for this project have not been submitted to or approved by GaDOE FSU. Per GaDOE guidance for charter schools, FSU approval of plans and specifications is required before a construction project may be advertised for bid, and this requirement cannot be waived regardless of funding source.

b. Delivery Method Selection: This is a Design/Bid/Build delivery method as approved by the school’s Board of Trustees.

c. Rights-of-Way and Easements: This project is anticipated to require no new rights-of-way or easements.

d. Bonding and Insurance: Payment and performance bond requirements for Georgia public works contracts apply at or above the statutory threshold referenced above; whether bonding is required depends on resolution of that threshold question. Contractor insurance requirements will be specified once confirmed with the Owner's risk management or insurance advisor.

e. Asbestos / Environmental Compliance: The Owner has conducted an asbestos survey and all remediation related to asbestos has been completed.

Note: For the complete, currently governing version of the Project Specifications — including any updates made after this RFP was drafted — refer to the standalone “Coastal Empire Montessori Roof Specifications” document.

End of RFP

INTRODUCTION
OVERVIEW OF RFP PROCESS
OFFEROR RESPONSIBILITIES, QUALIFICATIONS AND REQUIREMENTS
Scope of Service – Roof Replacement
Mandatory Responsibilities
Technical Qualifications (Mandatory Scored)
Additional Requirements (Additional Scored)
RFP RULES AND RESPONSIBILITIES
OFFEROR INFORMATION
COST PROPOSAL
PROPOSAL EVALUATION, NEGOTIATIONS AND AWARD
CONTRACT TERMS AND CONDITIONS
LIST OF RFP ATTACHMENTS

File details come from the government source that posted it. Updated .