CO805_26051401_JP1767142_SampleProposal.pdf
PDF 5 MB Posted
- Attached to
- Grade, Drain & Surface, US-270
- Solicitation number
- 260129 CO 805
- Issued by
- Beaver County, Oklahoma
About this file
This is a Sample Proposal document from the Oklahoma Department of Transportation (ODOT) for a federal aid highway construction project in Blaine and Dewey Counties. The project involves grading, draining, and surfacing US-270 from 3.09 miles northwest of the SH-58 intersection, extending southeast near Watonga, for a total project length of 3.849 miles. The proposal (NHPP-017N(311)FP, JP No. 17671(42), Proposal 260129, Call Order 805) will be let on Thursday, May 14, 2026, at 10:30 a.m. with a contract time estimated at 365 calendar days with flexible start provisions allowing work to commence any time after notice to proceed but no later than October 5, 2026. Bidding documents will be available April 16, 2026, at a cost of $50.00 plus tax, with no proposals issued after May 13, 2026, at 10:30 a.m. The work includes extensive roadway construction items such as clearing and grubbing, excavation (203,399 cubic yards of unclassified excavation and 16,878 cubic yards of unclassified borrow), grading, sodding (425,160.240 square yards), superpave asphalt paving (approximately 106,225 tons across multiple types and grades), drainage structures (various reinforced concrete pipes, culverts, and inlets), traffic control measures, and permanent traffic striping and signage. Bids must be submitted electronically via Bid Express using AASHTOware Project Bids or by sealed written proposal, with all proposals requiring a 5% proposal guaranty and an unsworn statement under penalty of perjury.
The project is subject to Buy America and Build America, Buy America requirements with various material compliance provisions detailed in Special Provision 106-5. A Disadvantaged Business Enterprise (DBE) goal of zero percent applies to this project. Railroad involvement with Grainbelt Corporation (Farmrail Corporation) requires contractor compliance with railroad flagging provisions at $1,300 per eight-hour day (100% reimbursement), railroad protective liability insurance of $2,000,000 per occurrence and $6,000,000 aggregate, and execution of a contractor release and indemnification form. Prevailing wage requirements apply per Oklahoma General Decision Number OK20260021, with wage rates varying by county and classification for various labor categories including carpenters, cement masons, laborers, power equipment operators, and truck drivers. Liquidated damages are assessed daily based on contract amount, ranging from $300 to $1,800 per day depending on the contract value. The project includes provisions for fuel price adjustments for diesel fuel used in earthwork items, payment to subcontractors monitored through AASHTOWare Project Civil Rights & Labor software, and a requirement that the contractor perform at least 30% of the contract work using its own organization. Questions regarding the bid opening are accepted until April 24, 2026, through ODOT-Prebid.Question@odot.org, with responses posted to the ODOT Contracts & Proposals webpage.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID RIGGING IS A SERIOUS CRIME. IF YOU HAVE ANY INFORMATION CONCERNING COLLUSIVE BIDDING, EVEN A REQUEST TO SUBMIT A COMPLIMENTARY BID, PLEASE CALL THE OKLAHOMA ATTORNEY GENERAL'S OFFICE AT TELEPHONE NO. 405-521-3921.
PROPOSAL 260129
CALL ORDER 805
TO BE LET ON
THURSDAY, MAY 14, 2026 AT 10:30 A.M.
STANDARD PROPOSAL
BIDX WILL BE ACCEPTED.
BLAINE AND DEWEY COUNTIES
FEDERAL AID PROJECT
GRADE, DRAIN, AND SURFACE
US-270: FROM 3.09 MILES NW OF THE SH-58 INTERSECTION,
EXTEND SE NEAR WATONGA.
PROJECT LENGTH = 3.849 MILES
NHPP-017N(311)FP, 17671(42)
BUY AMERICA AND BUILD AMERICA, BUY AMERICA REQUIREMENTS APPLY, HOWEVER,
FOR ANY APPLICABLE WAIVERS PLEASE REVIEW SPECIAL PROVISION 106-5 (8-20-25)
CONTRACT TIME ESTIMATED FOR PROPOSAL IS 365 CALENDAR DAYS
FLEX START - SEE SPECIAL PROVISION 108-23
THE DBE GOAL IS ZERO FOR THIS PROPOSAL.
CREATION OF THIS DOCUMENT WAS ON THURSDAY, APRIL 9, 2026 AT 3:49 PM.
CREATED: 4/9/2026 3:49 PM
S T A T E O F O K L A H O M A D E P A R T M E N T O F T R A N S P O R T A T I O N
Advertisement to Contractors – May 14, 2026 10:30 A.M. Bid Opening
SHEET 1 OF 1
Plans and proposals for this bid opening will be available on April 16, 2026. No bidding proposals will be issued to any Contractor after May 13, 2026 10:30 A.M.. The cost for each bidding proposal is $ 50.00 + tax. State Standard Specifications may be purchased by contacting ODOT Business Services Center Branch (405) 521-4509. No refunds will be made for bidding documents or specification books purchased.
Sample proposals, preliminary plans, long form and short form notices, order forms, bid tabs and awards, can be accessed on ODOT's Web site: https://oklahoma.gov/odot/business-center/contracts-and-proposals.html
Bids must be prepared in accordance with the State Standard Specifications. Unless otherwise specified, bids for all projects must be submitted over the internet to Bid Express(https://www.bidx.com) using AASHTOware Project Bids.
Instructions for using Bid Express, Project Bids, and the electronicbidding process are available from the Office Engineer Division. When written bids are allowed, sealed proposals may be delivered directly to the Office Engineer Division prior to the scheduled bid opening. For written bids, do not disassemble the bidding proposal in any way.
Any firm bidding a project as a joint venture, that has not been previously approved by the department, must complete the ‘Request for Joint Venture’ form, which is posted on the ODOT website, prior to bidding.
Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total.
Questions and comments regarding the May 14, 2026 bid opening will be accepted until April 24, 2026. Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. Responses will be posted to the “Pre-bid Questions and Answers” section of the ODOT Contracts & Proposals webpage as they are received. It is recommended that interested contractors visit the “Pre-Bid Questions and Answers” link regularly in order to stay informed of the latest information: https://oklahoma.gov/odot/business-center/contracts-and-proposals.html.
Unless otherwise noted in the proposal, upon award of the contract to the successful bidder, the contract will be completely and correctly executed by the contractor and returned to the Department within ten(10) working days from the date of award. The Department will have fourteen(14) working days from the date of award to complete it's execution of the contract.
The Oklahoma Department of Transportation(ODOT) and the Oklahoma Turnpike Authority(OTA) ensures that no person or groups of persons shall, on the grounds of race, color, sex, religion, national origin,age, disability, retaliation or genetic information, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination underany and all programs, services, or activities administered by ODOT or OTA, their recipients, sub -recipients, and contractors. To request an accommodation please contact the ADA Coordinator at (405)521-4140 or the Oklahoma Relay Service at 1-800-722-0353. If you have any ADA or Title VI questions email ODOT-ada-titlevi@odot.org
Description of work and location of project: Call Order: 805 NHPP-017N(311)FP US-270 BLAINE AND DEWEY JP No.17671(42)
GRADE, DRAIN, AND SURFACE
US-270: FROM 3.09 MILES NW OF THE SH-58 INTERSECTION, EXTEND SE NEAR
WATONGA.
STATE OF OKLAHOMA, OKLAHOMA DEPARTMENT OF TRANSPORTATION - By: TIM J. GATZ, Director.
PAGE 1 OF 157PROPOSAL ID : 260129
https://oklahoma.gov/odot/business-center/contracts-and-proposals.html https://www.bidx.com mailto:ODOT-Prebid.Question@odot.org https://oklahoma.gov/odot/business-center/contracts-and-proposals.html mailto:ODOT-ada-titlevi@odot.org mailto:ODOT-ada-titlevi@odot.org
S U M M A R Y O F T I M E
SHEET 1 OF 1
CONTRACT TIME
CONTRACT TIME ESTIMATED FOR PROPOSAL IS 365 CALENDAR DAYS
NOTICE
THE DEPARTMENT WILL CONSIDER A PROPOSAL NONRESPONSIVE AND REJECT IT IN ACCORDANCE
WITH SUBSECTIONS 102.08 AND/OR 102.14 OF THE CURRENT OKLAHOMA DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS.
PAGE 2 OF 157PROPOSAL ID : 260129
S U M M A R Y O F I T E M S
SHEET 1 OF 7
LINE ITEM DESCRIPTION APPROX. QTY UNIT PRICE BID AMOUNT
UNITS DOLLARS CTS DOLLARS CTS
SECTION 0001 ROADWAY
0010 201(A)1200
CLEARING AND GRUBBING
1.000 LSUM
0020 202(A)2200
UNCLASSIFIED EXCAVATION
203,399.000 CY
0030 202(D)2500
UNCLASSIFIED BORROW
16,878.000 CY
0040 205(A)6200
TYPE A-SALVAGED TOPSOIL
1.000 LSUM
0050 221(B)2300
TEMPORARY SILT FENCE
19,194.780 LF
0060 221(E)2600
TEMPORARY SILT DIKE
882.000 LF
0070 230(A)7200
SOLID SLAB SODDING
425,160.240 SY
0080 233(A)0200
VEGETATIVE MULCHING
192.660 AC
0090 241 3100
MOWING
175.690 AC
0100 307(K)4200
STABILIZED SUBGRADE
200,718.660 SY
0110 402(E)2600
TRAFFIC BOUND SURFACE COURSE
TYPE E
1,989.260 TON
0120 407(B)7300
TACK COAT
51,053.290 GAL
0130 408 8100
PRIME COAT
73,046.100 GAL
0140 411 1100
(PL)CRACK SEALING ASPHALT
PAVEMENT
2,820.000 LF
0150 411(B)1300
SUPERPAVE, TYPE S3(PG 76-28 OK)
26,987.550 TON
0160 411(B)1330
SUPERPAVE, TYPE S3(PG 64-22 OK)
79,238.160 TON
PAGE 3 OF 157PROPOSAL ID : 260129
SHEET 2 OF 7
UNITS DOLLARS CTS DOLLARS CTS
0170 411(C)1400
SUPERPAVE, TYPE S4(PG 76-28 OK)
18,122.690 TON
0180 411(C)1430
SUPERPAVE, TYPE S4(PG 64-22 OK)
7,833.900 TON
0190 411(J)2100
(SP) RICH INTERMEDIATE LAYER
3,529.770 TON
0200 412 3100
COLD MILLING PAVEMENT
45,127.550 SY
0210 414(E)5600
FULL DEPTH P.C.C. PATCH
(PLACEMENT)
9,400.000 SY
0220 414(G)5800
P.C. CONCRETE FOR PAVEMENT
3,133.000 CY
0230 509(C)0400
CLASS A CONCRETE, SMALL
STRUCTURES
8.980 CY
0240 509(D)0500
CLASS C CONCRETE
65.220 CY
0250 611(G)0354
INLET (SMD-TYPE 2)
3.000 EA
0260 611(G)0358
INLET (SMD-TYPE 2A)
1.000 EA
0270 611(G)7966
INLET GPI TYPE 2 (DES. 10)
1.000 EA
0280 611(L)1600
JUNCTION BOXES
180.100 CF
0290 613(A)5208
18" R.C.PIPE CLASS III
1,551.000 LF
0300 613(A)5216
24" R.C.PIPE CLASS III
310.000 LF
0310 613(A)5310
18" R.C.PIPE CLASS V
82.000 LF
0320 613(A)5350
22" X 13" R.C.PIPE ARCH CLASS A-III
964.000 LF
0330 613(A)5358
28" X 18" R.C.PIPE ARCH CLASS A-III
458.000 LF
PAGE 4 OF 157PROPOSAL ID : 260129
SHEET 3 OF 7
UNITS DOLLARS CTS DOLLARS CTS
0340 613(A)5370
43" X 26" R.C.PIPE ARCH CLASS A-III
320.000 LF
0350 613(B)5508
18" CORR. GALV. STEEL PIPE
886.000 LF
0360 613(L)6708
18" PREFAB. CULVERT END SEC.,
ROUND
1.000 EA
0370 613(M)6960
TYPE A4 CULVERT END TREATMENT
34.000 EA
0380 613(M)6964
TYPE B4 CULVERT END TREATMENT
8.000 EA
0390 613(M)6968
TYPE C4 CULVERT END TREATMENT
1.000 EA
0400 613(M)7004
TYPE A6 CULVERT END TREATMENT
19.000 EA
0410 613(M)7008
TYPE B6 CULVERT END TREATMENT
10.000 EA
0420 613(M)7012
TYPE C6 CULVERT END TREATMENT
3.000 EA
0430 613(N)7148
TYPE A6 SLOPED CONCRETE END
SECTION
6.000 EA
0440 613(N)7152
TYPE B6 SLOPED CONCRETE END
SECTION
1.000 EA
0450 613(W)8115
18" JACKED CONDUIT
82.000 LF
0460 619(A)6200
REMOVAL OF STRUCTURES &
OBSTRUCTIONS
1.000 LSUM
0470 619(B)6364
REMOVAL OF ASPHALT PAVEMENT
61,499.200 SY
0480 619(B)6376
REMOVAL OF
CONC.PAV.W/ASPH.OVERLAY
23,549.200 SY
0490 619(B)6384
REMOVAL OF ASPHALT DRIVEWAY
886.170 SY
PAGE 5 OF 157PROPOSAL ID : 260129
SHEET 4 OF 7
UNITS DOLLARS CTS DOLLARS CTS
0500 624(C)3405
FENCE-STYLE SWF (5 BARBED WIRE)
19,192.470 LF
SECTION 0001 SUB TOTAL
SECTION 0002 TRAFFIC TEMPORARY
0510 104 3250
(SP) RAILROAD FLAGGING(NON-
BIDDABLE)
225.000 DAY $ 1,300.00 $ 292,500.00
0520 857(A)9205
CONSTRUCTION TRAFFIC
STR.(PAINT)(6" WIDE)
114,798.000 LF
0530 857(B)9320
CONSTRUCTION TRAFFIC
STR.(PAINT)(SYMBOL)
10.000 EA
0540 857(E)9620
(PL)CONST.ZONE PAV.MKRS(FLEX
TAB)TYP.2-1
3,000.000 EA
0550 857(F)9700
PAVEMENT
MRKNG.REMOVAL(TRAF.STRP)
42,979.000 LF
0560 857(F)9730
PAVEMENT MARKING
REMOVAL(SYMBOLS)
12.000 EA
0570 858(A)0224
PAVE.MARKERS CLASS A TYPE 2-C
270.000 EA
0580 858(A)0228
PAVE.MARKERS CLASS A TYPE 2-D
203.000 EA
0590 880(A)6220
ARROW DISPLAY(TYPE C)
465.000 SD
0600 880(B)6300
CONSTRUCTION SIGNS 0 TO 6.25 SF
20,100.000 SD
0610 880(B)6310
CONSTRUCTION SIGNS 6.26 SF TO 15.99
SF
19,350.000 SD
0620 880(B)6320
CONSTRUCTION SIGNS 16.0 SF TO 32.99
SF
16,300.000 SD
PAGE 6 OF 157PROPOSAL ID : 260129
SHEET 5 OF 7
UNITS DOLLARS CTS DOLLARS CTS
0630 880(C)6410
CONSTRUCTION BARRICADES(TYPE III)
17,895.000 SD
0640 880(E)6607
WARNING LIGHTS(TYPE B)
34,890.000 SD
0650 880(F)6700
DRUMS
61,635.000 SD
0660 880(G)6805
CHANNELIZER CONES
67,875.000 SD
0670 880(I)7000
FLAGGER
60.000 SD
0680 882(A)8210
PORT.CHANGEABLE MESSAGE SIGN
1,516.000 SD
SECTION 0002 SUB TOTAL
SECTION 0003 TRAFFIC PERMANENT
0690 413(A)4210
RUMBLE STRIP-CENTERLINE HMA-CON
40,417.000 LF
0700 413(B)4300
RUMBLE STRIP-METHOD HMA-CYC
GROUP
6.000 EAGP
0710 413(B)4310
RUMBLE STRIP-METHOD HMA-CYC
44,466.000 LF
0720 804(A)2200
STRUCTURAL CONCRETE
7.760 CY
0730 804(B)2300
REINFORCING STEEL
1,098.840 LB
0740 805(A)3252
(PL)REMOVAL OF EXISTING SIGNS
55.000 EA
0750 805(D)3528
(PL)REMOVE & RESET EXISTING SIGNS
6.000 EA
0760 850(A)1200
SHEET ALUMINUM SIGNS
1,217.460 SF
0770 850(B)1310
EXTRUDED ALUMINUM PANEL SIGNS
138.000 SF
PAGE 7 OF 157PROPOSAL ID : 260129
SHEET 6 OF 7
UNITS DOLLARS CTS DOLLARS CTS
0780 851(A)2200
4"@13 GALV.STL.WD.FLANGE BM.POST
100.000 LF
0790 851(B)2315
3"@7.58 GALV.STL.PIPE POST
199.150 LF
0800 851(B)2320
3 1/2"@9.11 GALV.STL.PIPE POST
69.850 LF
0810 851(B)2325
4"@10.79 GALV.STL.PIPE POST
112.110 LF
0820 851(C)2415
2" SQUARE TUBE POST
1,393.880 LF
0830 856(A)8203
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(4" WIDE)
16,185.630 LF
0840 856(A)8207
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(6" WIDE)
130,876.750 LF
0850 856(A)8211
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(8" WIDE)
4,645.870 LF
0860 856(A)8215
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(12" WIDE)
4,791.460 LF
0870 856(A)8219
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(24" WIDE)
282.000 LF
0880 856(B)8303
(SP) TRAF.STR.(PLURAL-
COMPONENT)(SYM,WRD,ETC)
4.000 EA
0890 856(B)8307
(SP) TRAFFIC STRIPE(PLURAL-
COMP)(ARROWS)
64.000 EA
SECTION 0003 SUB TOTAL
SECTION 0004 STAKING
0900 642(B)3300
CONSTRUCTION STAKING LEVEL II
1.000 LSUM
PAGE 8 OF 157PROPOSAL ID : 260129
SHEET 7 OF 7
UNITS DOLLARS CTS DOLLARS CTS
SECTION 0004 SUB TOTAL
SECTION 0005 CONSTRUCTION
0910 220 1100
SWPPP DOCUMENTATION AND
MANAGEMENT
1.000 LSUM
0920 641 2110
MOBILIZATION
1.000 LSUM
SECTION 0005 SUB TOTAL
TOTAL
PAGE 9 OF 157PROPOSAL ID : 260129
D E P A R T M E N T O F T R A N S P O R T A T I O N
I N D E X O F P R O V I S I O N S FOR JPN(s) : NHPP-017N(311)FP, 17671(42)
BLAINE AND DEWEY COUNTIES
SHEET 1 OF 2
PROPOSAL DOCUMENTS
GNBC CONTRACTOR REQUIREMENTS
GNBC RAILROAD INFORMATION
OK20260021 WAGE DECISION
PROPOSAL PROVISIONS
102-013(a-b)19 BIDDING PROCEDURES 103-003(a)19 SUBCONTRACTS 104-006(a-b)19 RAILROAD FLAGGING (100% REIMBURSEMENT) 106-005(a-e)19 BUY AMERICA AND BUILD AMERICA, BUY AMERICA 107-008(a)19 LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC (RAILROAD
INSURANCE)
108-023(a)19 FLEXIBLE NOTICE TO PROCEED 108-080(a)19 LIQUIDATED DAMAGES 108-081(a)19 DISINCENTIVE FOR EXPOSED COLD-MILLED PAVEMENT 108-182(a)19 SUBLETTING OF CONTRACT (70%) 109-003(a-c)19 PRICE ADJUSTMENT FOR FUEL 109-014(a)19 MATERIAL ON HAND 109-015(a-c)19 PROMPT PAYMENT FOR SUBCONTRACTORS 411-015(a-f)19 RICH INTERMEDIATE LAYER (RIL) 411-025(a)19 HOT MIX ASPHALT/WARM MIX ASPHALT 414-017(a)19 LONGITUDINAL FINISH
414-018(a)19 OPTIMIZED GRADATION FOR PORTLAND CEMENT CONCRETE
PAVEMENT
415-001(a-c)19 BITUMINOUS (FIBER FILL) CRACK SEALING 430-2QA(a-j)19 PAVEMENT AND BRIDGE DECK SMOOTHNESS 430-4QA(a-j)19 PAVEMENT AND BRIDGE DECK SMOOTHNESS USING IRI 441-001(a-c)19 ELECTRONIC TICKETING FOR BITUMINOUS MATERIALS
701-014(a-d)19 OPTIMIZED GRADATION FOR PORTLAND CEMENT CONCRETE
PAVEMENT
703-001(a-b)19 RECYCLED CONCRETE AGGREGATE 708-024(a-b)19 PERFORMANCE-GRADED ASPHALT BINDER USING MULTIPLE STRESS
CREEP RECOVERY (MSCR) TEST
711-003(a-h)19 TRAFFIC STRIPE 856-003(a-j)19 TRAFFIC STRIPE (PLURAL-COMPONENT)
CF000050 REPORTING OF BID RIGGING
CF000101 TITLE VI - NON-DISCRIMINATION CLAUSE
CF000200 RESIDENCE REQUIREMENTS FOR LABOR ON FEDERAL AID PROJECTS
PROJECTS
CF000501 CERTIFICATION FOR FEDERAL-AID CONTRACTS
CF000800 NOTICE OF REQUIREMENTS FOR AFFIRMATIVE ACTION
CF000900 STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY
SPECIFICATIONS
CF001000 ON-THE-JOB TRAINING (OJT) PROGRAM
CF001700 CONTRACTORS AFFIDAVIT
CX00210B DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
CZ002300 CONTRACT DISPUTE RESOLUTION PROCEDURE
CZ002850 NO.2 PROPOSAL SHEET
CZ002975 * BIDDER'S AFFIDAVIT - STATEMENT UNDER PENALTY OF PERJURY
PAGE 10 OF 157PROPOSAL ID : 260129
D E P A R T M E N T O F T R A N S P O R T A T I O N
I N D E X O F P R O V I S I O N S FOR JPN(s) : NHPP-017N(311)FP, 17671(42)
BLAINE AND DEWEY COUNTIES
SHEET 2 OF 2
PROPOSAL PROVISIONS
FHWA1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION
CONTRACTS
PAGE 11 OF 157PROPOSAL ID : 260129
Exhibit A
• Railroad Protective Liability Insurance o Limit of $2 Million per occurrence and $6 Million Aggregate o The Railroad must be the named insured o Amended definition of “Physical Damage to Property” o Pollution Exclusion Amendment
• Commercial General Liability Insurance o Limit - $ 1 Million o The Railroad should be added as an additional insured o Delete exclusion of work within 50 feet of ROW o Waiver of Subrogation in favor of the Railroad o Coverage should be primary and non-contributory in regard to the Railroad o Per Project Aggregate Limit
• Commercial Auto Insurance o Limit - $ 1 Million o The Railroad should be added as an additional insured o Waiver of Subrogation in favor of the Railroad
• Umbrella o Limit - $ 1 Million (Minimum) The combined CGL Occurrence Limits and Umbrella
Occurrence Limits should match the Occurrence Limits on the Railroad Protective Liability Policy
• Workers Compensation o Workers Compensation Limit - Statutory o Employers Liability Limit - $ 1 Million o Waiver of Subrogation (if allowable in State)
• Contractors Pollution Liability Insurance o Limit - $ 1 Million (Minimum)
• Miscellaneous o Make sure the insurance carriers are A rated on the certificate of Insurance.
Acknowledgment of Insurance Requirements: _________________________________ Print Name:
PAGE 12 OF 157PROPOSAL ID : 260129
{P0168431}
FARMRAIL CORPORATION
GRAINBELT CORPORATION
RELEASE AND INDEMNIFICATION
FOR VALUE RECEIVED, and in consideration of being authorized by Grainbelt Corporation and/ or Grainbelt Corporation (collectively "RAILROAD") to enter upon RAILROAD's property, undersigned contractor (the "CONTRACTOR"), intending to be legally bound, agrees as follows:
1 PURPOSE:
(a) [Describe purpose for entry/work contractor will be doing/if there is a contract for the work, you can reference or attach the contract]
(b) CONTRACTOR shall not perform any work other than as specifically authorized pursuant to paragraph 1(a) hereof.
2 CONTRACTOR acknowledges and appreciates the risks and danger assumed and attendant upon the exercise of the permission granted hereunder, and assumes all risk of injury (including death) to itself, its officers, employees and agents, or to its property, occurring or arising while or resulting from being upon or about the property of RAILROAD, regardless of RAILROAD's fault or negligence.
3 CONTRACTOR, for itself and for its successors and assigns, agrees to release, indemnify, and save harmless RAILROAD, the State of Oklahoma (if applicable), and their respective officers, employees, successors and assigns, from and against all damages, losses, claims, costs or expenses, including reasonable counsel fees, which RAILROAD may suffer or sustain, or be subject to, directly or indirectly, for personal injury, death or property damage suffered by anyone whomsoever (including RAILROAD and CONTRACTOR) and to the extent arising out of or caused either wholly or in part by the work performed on RAILROAD's property by the undersigned, regardless of the fault, failure or negligence of RAILROAD. CONTRACTOR agrees to acquire and maintain insurance as set forth on “Exhibit A”. The acquisition of insurance shall not limit Contractor's liability hereunder.
IN WITNESS WHEREOF, the undersigned has caused these presents to be executed this _____ day of _______________________, 202__.
WITNESS: CONTRACTOR:
By:
Name:
Title:
PAGE 13 OF 157PROPOSAL ID : 260129
ATTENTION CONTRACTORS
Grainbelt Corporation Railroad Information
Project No. NHPP-017N(311)FP, J/P No. 17671(42) Blaine and Dewey Counties
Please reference the following Grainbelt railroad information on all correspondence with the railroad:
DOT No. 671371L RR MilePost 645.24
Any contract let by the state for construction of the roadway or bridge involving Railroad property shall require the contractor to abide by the two special provisions attached, Railroad Flagging 104-6(a-b)19 and Railroad Insurance 107-8(a)19. The Contractor will be required to have Railroad Protective Liability and Property Damage Insurance and a flagman will be required by the Railroad when working within 25 feet of track.
Any contract let by the State for construction of the roadway or bridge involving Railroad property shall require the contractor to enter into the Railroad’s standard Contractor’s Release Form in substantially the same form as attached. Upon receipt of the executed Contractor’s Release Form the Contractor shall notify the Railroad ten (10) working days prior to entering onto the Railroads Right-of-Way. The Grainbelt Contractor’s Release Form must be filled out by the Contractor and the Railroad prior to entering onto the railroad’s right-of-way
Prior to issuance of the Work Order, the Contractor must submit an original and one copy of the insurance policy to the Construction Division, Oklahoma Department of Transportation, 200 N.E. 21st Street, Oklahoma City, Oklahoma 73105-3204.
The Contractor shall notify:
Mr. Kelly Rippetoe Roadway Supt.
Farmrail Corporation P.O. Box 1750 Clinton, Oklahoma 73601 Phone: 580-214-0388 Email:Kellyrippetoe@farmrail.com
Mr. Devin Martin President and General Manager Farmrail Corporation P.O. Box 1750 Clinton, Oklahoma 73601 Phone: 580-323-1234 Email:
Devinmartin@farmrail.com
PAGE 14 OF 157PROPOSAL ID : 260129
mailto:kellyrippetoe@farmrail.com
"General Decision Number: OK20260021 01/02/2026
Superseded General Decision Number: OK20250021
State: Oklahoma
Construction Type: Highway
Counties: Alfalfa, Beaver, Blaine, Cimarron, Dewey, Ellis, Garfield, Grant, Harper, Kay, Kingfisher, Major, Noble, Payne, Texas, Woods and Woodward Counties in Oklahoma.
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Modification Number Publication Date 0 01/02/2026
SUOK2011‐008 04/18/2011
Rates Fringes
CARPENTER (Excludes Form Work)...$ 13.32
CEMENT MASON/CONCRETE FINISHER
Garfield County.............$ 13.14 Kay County..................$ 14.59 Payne County................$ 13.18 Remaining Counties..........$ 14.09
FORM WORKER......................$ 12.55
GUARDRAIL INSTALLER (Includes Guardrail/Post Driver Work)......$ 9.70
IRONWORKER, REINFORCING..........$ 13.63
LABORER
Air/Power Tool Operator (Includes Handheld Concrete Saws and Chipping Guns).......................$ 12.79 Asphalt Raker and Shoveler..$ 11.18 0.64 Common or General Alfalfa and Kay Counties...$ 10.50
PAGE 15 OF 157PROPOSAL ID : 260129
Dewey County...............$ 10.42 Ellis County...............$ 10.87 Garfield County............$ 11.05 Grant County...............$ 10.65 Harper County..............$ 10.09 Major County...............$ 10.56 Noble County...............$ 10.77 Payne County...............$ 10.49 Remaining Counties.........$ 10.57 Texas County...............$ 10.83 Woods County...............$ 10.30 Pipelayer...................$ 11.83 Traffic Control (Includes Flagger, Setting Up and Moving Cones/Barrels).......$ 10.12 Vibrating Plate.............$ 12.70
POWER EQUIPMENT OPERATOR:
Asphalt Paver Screed........$ 13.38 Asphalt Paving Machine......$ 12.71 Asphalt Plant...............$ 14.70 Backhoe/Trackhoe Kay County.................$ 13.43 Remaining Counties.........$ 13.61 Bobcat/Skid Loader..........$ 12.87 Broom.......................$ 11.72 Bulldozer...................$ 13.95 Concrete Paving Machine.....$ 14.42 Concrete Saw................$ 12.46 Crane.......................$ 16.88 Distributor Truck...........$ 14.98 Excavator...................$ 16.19 Grader/Blade Remaining Counties.........$ 14.82 Woods County...............$ 16.45 Loader (Front End)..........$ 12.82 Mechanic....................$ 15.79 Milling Machine.............$ 13.51 Mixer.......................$ 14.56 Oiler.......................$ 13.84 Roller (Asphalt)............$ 11.76 Roller (Dirt Compaction)....$ 12.12 Rotomill....................$ 17.33 Scraper.....................$ 12.00 Striping Machine............$ 12.11 Tractor/Box Blade...........$ 12.61 Transfer Material Machine...$ 12.38 0.75 Trencher....................$ 14.66
TRUCK DRIVER
PAGE 16 OF 157PROPOSAL ID : 260129
Concrete Truck..............$ 14.22 Dump Truck..................$ 13.17 Flatbed Truck...............$ 14.68 Lowboy/Float................$ 16.00 Off the Road Truck..........$ 12.55 Single Axle Truck (Includes Pilot Car)........$ 12.32 Straight Truck..............$ 15.92 Tandem Axle/Semi Trailer Grant County...............$ 15.16 Kay County.................$ 13.36 Remaining Counties.........$ 13.57 Texas County...............$ 13.26 Woods County...............$ 13.05 Water Truck Remaining Counties.........$ 12.00 Woods County...............$ 15.88
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government‐contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis‐Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis‐Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the
PAGE 17 OF 157PROPOSAL ID : 260129
contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four‐letter identifier beginning with characters other than ""SU"", ""UAVG"", "SA", or "SC" denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for
PAGE 18 OF 157PROPOSAL ID : 260129
the classifications reflected union rates. EXAMPLE:
UAVG‐OH‐0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non‐union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SUFL2022‐007 6/27/2024. SU indicates the rate is a single non‐union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
"SU" wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)‐(h). Example: SAME2023‐007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the "SA" identifier took effect under state law in the state from which the rates were adopted.
PAGE 19 OF 157PROPOSAL ID : 260129
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD‐Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment
PAGE 20 OF 157PROPOSAL ID : 260129
data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
PAGE 21 OF 157PROPOSAL ID : 260129
102-13(a-b)19 11/20/2020
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
BIDDING PROCEDURES
These special provisions amend and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction, English and Metric.
102.07 PREPARATION OF PROPOSAL (Revise to amend as follows:)
Submit the Proposal in the format required by the Bid Notice. For each item on the Proposal Forms, type or write (in ink) the unit price and the product of the unit price and estimated quantity on the Proposal Forms in the space provided. Show the total Proposal amount by adding the products of the unit prices and the estimated quantities. Acknowledge any change to a unit price, the product of a unit price and quantity, or the total Proposal amount with the initials of the person signing the Proposal, adjacent to each change.
If a discrepancy occurs on the Proposal, between the unit price and the product of the unit price and quantity, the Department will use the unit price. If a unit price or the product of a unit price and quantity is omitted or is entered as zero ($0) for any item listed on the Proposal Forms, the Department will consider the Proposal non-responsive and will reject the Proposal. If there is a discrepancy between the submitted electronic media and written Proposal, the Department will use the written Proposal. If the Department requires a printout of electronic media and a discrepancy occurs between the printout and the electronic media, the Department will use the printout.
An individual, all members of a partnership, a duly authorized officer of a corporation, or all members of a joint venture shall sign the Proposal in black or blue ink. For Proposals submitted by a corporation, show the name of the corporation and business address. For Proposals submitted by the internet bidding process, the Department will require an electronic signature only. Include a Non-Collusive Bidding Certification with the Proposal in accordance with Subsection 102.16, “Non- Collusive Bidding Certification.”
102.08 NONRESPONSIVE PROPOSALS (Revise to amend as follows:)
The Department will consider a proposal nonresponsive and may reject it for any of the following reasons:
• The bidder submits a Proposal on an unapproved form (or format, if computer-generated), or the form is altered, incomplete, or disassembled.
• The bidder submits a Proposal using a form other than the latest approved Proposal Form.
• The Department determines that Proposal irregularities (such as unauthorized additions and
PAGE 22 OF 157PROPOSAL ID : 260129
102-13(b-b)19 11/20/2020 conditional or alternate bids) may tend to make the Proposal incomplete, indefinite, or ambiguous.
• The Proposal does not contain a unit price for each item listed, except for authorized alternate items.
• The Proposal is materially unbalanced in accordance with Subsection 101.05.CT.2
• The Proposal is not properly signed.
• The Proposal is not typed or completed in ink.
• The bidder fails to provide a properly executed Proposal Guaranty, or irrevocable Letter of
Credit.
• The bidder fails to sign the unsworn statement made under penalty of perjury.
• The Proposal fails to comply with any material requirement of the Bid Notice.
• The bidder fails to properly comply with Disadvantaged Business Enterprise Requirements or to properly list eligible disadvantaged businesses if participation in accordance with the Proposal Forms.
PAGE 23 OF 157PROPOSAL ID : 260129
103-3(a) 19
6-8-20
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
SUBCONTRACTS
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019
Standard Specifications for Highway Construction.
(Add the following:)
103.10 SUBCONTRACTS
Subcontracts and/or sub-agreements must be submitted for review and approval by the Department prior to the subcontractor performing contract work. Ensure all subcontracts conform to the requirements of
Subsection 108.01, “Subletting of Contract,” and are executed in accordance with the Contract requirements and the provisions specified herein.
As a minimum, the following information must be included in all subcontracts:
• Full description of the contract work to be performed by the subcontractor
• Contractor Equal Employment Opportunity (EEO) Policy Statement (see ODOT General Contractor
Requirements – Development and Dissemination of EEO Policy)
• Form FHWA-1273 (must be physically attached verbatim to subcontracts, excluding purchase orders, rental agreements and other agreements for supplies or services)
• ODOT Title VI Assurances Appendices A and E (must be physically attached verbatim)
• Prompt Payment/Return of Retainage provisions (from the ODOT DBE Program Manual)
• Signature(s) of the prime contractor and subcontractor
If the subcontract is with a subcontractor performing work as an ODOT certified DBE, then the following additional information must be included in the submitted subcontract:
• Full description of the contract work that the certified DBE will perform based upon their NAICS code
• DBE Termination/Substitution/Replacement Clause (from the ODOT DBE Program Manual)
The aforementioned subcontract documents can be downloaded from the ODOT website, and are available for the Contractors’ use: http://www.odot.org/subcontracts.
Purchase orders, rental agreements and other agreements for supplies or services related to a construction contract are excluded from this requirement only if the purchase order or other agreement is not with a DBE.
However, Prompt Payment/Return of Retainage provisions must still be included.
Submit executed subcontracts and/or sub-agreements in pdf format to the Department using the following email address: constructionsubcontracts@odot.org. Submit all additional and/or modified subcontracts or sub-agreements to the Department via the same email address. To prevent delays in the approval of the subcontract, include the following information in all correspondence: contract I.D., project number, prime contractor, and subcontractor.
Subcontracts and sub-agreements may be submitted prior to the receipt of the signed Contract by the
Department.
PAGE 24 OF 157PROPOSAL ID : 260129
https://www.ok.gov/odot/Doing_Business/Civil_Rights/Contractor_Compliance_-_Construction.html mailto:
104-6(a-b) 19 1-30-24
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
RAILROAD FLAGGING (100% REINBURSEMENT)
NHPP-017N(311)FP, JP NO. 17671(42), BLAINE AND DEWEY COUNTIES
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction.
104.18 RAILROAD FLAGGING (Add the following:)
Execute and return the right of entry agreement (if required by the railroad) with the contract to the Department within the time period provided for contract execution. Reimburse Grainbelt Corporation Railroad Company, hereinafter referred to as the Railway Company, directly for the cost of all railroad flagging required by the Railway Company due to construction on their property.
The Railway Company’s requirements for flagging and right of entry may vary significantly from those implied by other contract documents. Therefore, be informed of the individual Railway Company’s requirements for flagging and right of entry.
For the purpose of bidding, the following information is furnished by the Railway Company covering the estimated flagging schedule and the estimated cost thereof:
A. Flagging Services
Flagging services will be required:
(1) In the event it is necessary for the Contractor to operate his crane or other heavy machinery in the vicinity of the track, as defined by the Railway Company, which may endanger railroad operations.
(2) At any time the Contractor is within 25 feet of the track.
(3) As specified in the right of entry agreement (if required).
(4) At any other time deemed appropriate by the Railway Company.
(5) In the event it is necessary for the Contractor to operate his crane or other heavy machinery in the vicinity of the track, as defined by the Railroad Company, which may endanger railroad operations.
(6) When, upon inspection by Railroad Company’s Representative, other conditions warrant.
(7) When any excavation is performed below the bottom of the elevation, if, in the opinion of the
Railroad Company’s Representative, track or other railroad facilities may be subject to movement or settlement.
(8) When work in any way interferes with the safe operation of trains at timetable speeds.
(9) When any hazard is presented to Railroad Company’s track, communications, signal, electrical, or other facilities either due to persons, material, equipment or blasting in the vicinity.
(10) Special permission must be obtained from the Railroad Company before moving heavy or cumbersome objects or equipment which might result in making the track impassable.
B. Flaggers
The total cost for one flagger, supervisory personnel, vacation allowances, and retirement and unemployment insurance is $1,300 per eight hour day. This rate is based on current wage scales for an eight hour basic day, including any additional pay for overtime, rest days and holidays, and is subject to any increases which may result from railroad employees-railroad management negotiations, or which may be authorized by Federal authorities. No additional payment will be made for increases in the above rate if such increases should occur.
PAGE 25 OF 157PROPOSAL ID : 260129
104-6(b-b) 19 1-30-24
Furthermore, the Contractor's final estimate will not be paid until satisfactory evidence that the Railway Company has been fully reimbursed for their flagging services is provided.
C. Utilities
Fiber optic, communications, control systems, and other types of cables may be buried on Railway Company property. Contact Call Okie at 1-800-522-6544 to assist in determining if cable systems are buried on Railway Company property to be used before beginning work. Contact the appropriate personnel to have cables located, and make arrangements with the owner of the facility to ascertain the protective measures that must be adhered to prior to the commencement of any work on the Railway Company’s property.
D. Railroad Operations
Normal train operations over the crossing consists of four (4) trains daily. Details regarding train operations required or desired may be obtained by consulting the Railway Company’s office located at Kelly Rippetoe, Farmrail Corporation, PO 1750, Clinton, OK 73601, Phone 580-323-1234. Email:
Kellyrippetoe@farmrail.com.
E. Measurement of Railroad Flagging
The Engineer will measure Railroad Flagging (Non-Biddable) as billed by the Railway Company prorated to an eight hour day, as a single operation, regardless of the actual number of railroad personnel needed. For example, if the Contractor is billed by the Railway Company for twelve hours of flagging, this will constitute 1.5 days of Railroad Flagging.
For progressive payment to be made, the Contractor will present an original, notarized confirmation that the Railway Company has been reimbursed for the number of eight hour flagging days billed.
F. Payment for Railroad Flagging
Approved Railroad Flagging, as described above, will be paid for at the contract unit price as follows:
Pay Item: Pay Unit:
RAILROAD FLAGGING (NON-BIDDABLE) Day
Payment for Railroad Flagging (Non-Biddable) is considered full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified. Any additional costs incurred for railroad flagging will be included in other items bid in the Contract.
It is the intent of this provision that the Contractor be reimbursed by the Department at a rate of $1,300 per eight hour day (approximately 100% of the rate specified in Subsection 104.18.B above).
PAGE 26 OF 157PROPOSAL ID : 260129
106-5(a-e) 19 8-20-25
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
BUY AMERICA AND BUILD AMERICA, BUY AMERICA
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction.
106.01 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (Replace with the following :)
B. Buy America and Build America, Buy America
Buy America (BA) and Build America, Buy America (BABA) requirements are in effect only on projects with federal aid risk, as identified in the contract documents. The Contractor is responsible for submitting completed Material Data Testing (MDT-1) form in accordance with Section 106.01(B)(1) regardless of the BA/BABA requirements.
An article, material, or supply should only be classified into one of the following categories: (1) iron or steel products, (2) construction material, (3) manufactured products, or (4) excluded material. An article, material, or supply should not be considered to fall into multiple categories, except as otherwise provided in Subsection 106.01.B(4)(b)(2). A material is solely classified based on its status at the time it is brought to the worksite.
Except as otherwise provided in Subsection 106.01.B(4)(b)(2) of this special provision, an article, material, or supply shall not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the above-listed categories. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron or steel product or manufactured product will be incorporated.
(1) Iron and/or Steel Products
Comply with the Buy America provisions of 23 CFR 635.410 which states that all manufacturing processes, including the application of a coating, for all steel or iron products permanently incorporated into the project shall have occurred in the United States (U.S.).
“All manufacturing processes” are defined as any process required to change the raw ore or scrap metal into the finished steel or iron product (e.g. smelting, rolling, extruding, bending, etc.).
“Coating” is defined as any process which protects or enhances the value of the steel or iron product to which the coating is applied (e.g. epoxy, galvanizing, painting, etc.).
The Contractor is responsible for submitting completed Material Testing Data (MDT-1) for the iron and steel in following items for all projects, regardless of the BA/BABA requirements:
• Precast box culverts
• Reinforced concrete pipe and precast end sections
• Precast inlets and catch basins
• Precast manholes
• Structural steel (girders, diaphragms, anchor bolts, high-strength bolts, sealed expansion joints, etc.)
• Reinforcing steel (all types)
• Welded wire fabric
• Steel spiral wire (drilled shaft cages, bridge rail, etc.)
• Steel piling
PAGE 27 OF 157PROPOSAL ID : 260129
106-5(b-e) 19
• Drill shaft casing (permanent)
• Dowel bars and baskets for paving
• Steel sheet piling (permanent)
• Bridge bearing assemblies (fixed and expansion)
• Post-tensioning steel (strands, wedges, anchor plates, etc.)
• Steel monotube structures
• Galvanized steel supports for overhead and cantilevered sign structures
• Sign posts and bases (all sizes)
• Guardrail, guardrail posts, end sections, terminals, impact attenuators
• Intelligent transportation system or other electronic hardware system cabinets
(2) Waiver for Iron and Steel Raw Materials
The BA/BABA requirements for the following raw materials are waived in accordance with the FHWA nationwide waiver (dated March 24, 1995) for pig iron and processed, pelletized, and reduced iron ore, unless processed or refined to include substantial amounts of steel or iron material, and may be used regardless of source in the domestic manufacturing process for steel or iron material:
• Raw materials (iron ore or alloys)
• Scrap
• Pig iron
• Processed, pelletized, and reduced iron ore material
For recycled steel, only the manufacturing processes to produce steel products must occur domestically, beginning at the point where the recycled steel is melted.
(3) Minimal Use Request for Steel and Iron
Federal regulations allow a minimal use of foreign steel or iron if the cost of the steel and iron products as they are delivered to the project does not exceed 0.1 percent of the total Contract amount, or $2,500, whichever is greater. This threshold applies to the cumulative amount of all foreign steel and iron used on the project. The Contractor must track the amount of incorporated foreign steel and iron throughout the life of a project to ensure the minimal use threshold amount is not exceeded.
(4) Construction Materials
Comply with the Build America, Buy America (BABA) Act of 2 CFR 184. The following construction materials as defined in 2 CFR 184.3 must be manufactured in the United States of America. This means that all manufacturing processes for the construction material occurred in the United States of America.
• Non-ferrous metals
• Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables)
• Glass (including optic glass)
• Fiber optic cable (including drop cable)
• Optical fiber
• Lumber
• Engineered wood
• Drywall
For non-ferrous metals, certification requires all manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States.
PAGE 28 OF 157PROPOSAL ID : 260129
106-5(c-e) 19
For plastic and polymer-based products, certification requires all manufacturing processes, from initial combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States.
For glass, certification requires all manufacturing processes, from initial batching and melting of raw materials through annealing, cooling, and cutting, occurred in the United States.
For fiber optic cable (including drop cable), certification requires all manufacturing processes, from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others.
For optical fiber, certification requires all manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States.
For lumber, certification requires all manufacturing processes, from initial debarking through treatment and planning, occurred in the United States.
For engineered wood, certification requires all manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States.
For drywall, certification requires all manufacturing processes, from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States.
(5) Manufactured Products
Manufactured products used and permanently incorporated in this project must be produced in the United States. Manufactured products will comply with the Buy America requirements of 23 CFR 635.410 with the following modifications:
(a) Produced in the United States, in the case of manufactured products, means the product was manufactured in the United States.