CO800_26051401_JP3577504_SampleProposal.pdf
PDF 5 MB Posted
- Attached to
- Intersection Modification, US-83
- Solicitation number
- 260128 CO 800
- Issued by
- Alfalfa County, Hastings Town, Oklahoma
About this file
This is a sample proposal document issued by the Oklahoma Department of Transportation (ODOT) for a federal-aid highway construction project involving intersection modification on US-83 at the intersection of SH-3 near Hardesty in Beaver County, Oklahoma. The project, identified as Proposal 260128 Call Order 800, encompasses approximately 0.423 miles and includes comprehensive roadway work such as clearing and grubbing, excavation, pavement removal and replacement, concrete work, culvert installation, and associated site improvements. The scope consists of six major sections: roadway construction (items 0010-0290), traffic signing and striping (items 0300-0450), traffic lighting (items 0460-0550), traffic control (items 0560-0730), staking (item 0740), and construction support (items 0750-0760). The estimated contract time is 270 calendar days with flexible start provisions allowing contractors to begin work any time after Notice to Proceed but no later than October 5, 2026. Sealed proposals will be accepted via Bid Express internet bidding platform, with bidding documents available beginning April 16, 2026 and bids due by May 13, 2026 at 10:30 a.m. The bid opening is scheduled for May 14, 2026 at 10:30 a.m. Bidding documents cost $50.00 plus tax, and a 5 percent proposal guaranty is required unless otherwise specified.
Pricing is to be submitted on a unit-price basis for each line item specified in the proposal forms, with all prices subject to the applicable Oklahoma Department of Transportation Standard Specifications and numerous special provisions governing Buy America and Build America compliance, wage requirements, material standards, traffic control, and quality assurance. The project is subject to prevailing wage requirements per the General Decision OK20260021 dated January 2, 2026, with specific rates established for various labor classifications including carpenters, cement masons, laborers, equipment operators, and truck drivers varying by county. The Disadvantaged Business Enterprise (DBE) goal for this proposal is zero percent. Liquidated damages are assessed at rates between $300 and $1,800 daily depending on contract value, with additional disincentives for non-compliance including specific penalties for exposed cold-milled pavement. The project is funded through federal-aid (STP-204B(066)PM, 35775(04)) and subject to all applicable federal requirements including Title VI non-discrimination provisions, Davis-Bacon Act prevailing wage determinations, and executive orders regarding paid sick leave and minimum wage rates. Upon contract award, the successful contractor must execute the contract within ten working days, with the Department completing execution within fourteen working days thereafter.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID RIGGING IS A SERIOUS CRIME. IF YOU HAVE ANY INFORMATION CONCERNING COLLUSIVE BIDDING, EVEN A REQUEST TO SUBMIT A COMPLIMENTARY BID, PLEASE CALL THE OKLAHOMA ATTORNEY GENERAL'S OFFICE AT TELEPHONE NO. 405-521-3921.
PROPOSAL 260128
CALL ORDER 800
TO BE LET ON
THURSDAY, MAY 14, 2026 AT 10:30 A.M.
STANDARD PROPOSAL
BIDX WILL BE ACCEPTED.
BEAVER COUNTY
FEDERAL AID PROJECT
INTERSECTION MODIFICATION
US-83: AT THE INTERSECTION OF SH-3, NEAR HARDESTY.
PROJECT LENGTH = 0.423 MILES
STP-204B(066)PM, 35775(04)
BUY AMERICA AND BUILD AMERICA, BUY AMERICA REQUIREMENTS APPLY, HOWEVER,
FOR ANY APPLICABLE WAIVERS PLEASE REVIEW SPECIAL PROVISION 106-5 (8-20-25)
CONTRACT TIME ESTIMATED FOR PROPOSAL IS 270 CALENDAR DAYS
FLEX START - SEE SPECIAL PROVISION 108-23
THE DBE GOAL IS ZERO FOR THIS PROPOSAL.
CREATION OF THIS DOCUMENT WAS ON MONDAY, MARCH 30, 2026 AT 9:50 AM.
CREATED: 3/30/2026 9:50 AM
S T A T E O F O K L A H O M A D E P A R T M E N T O F T R A N S P O R T A T I O N
Advertisement to Contractors – May 14, 2026 10:30 A.M. Bid Opening
SHEET 1 OF 1
Plans and proposals for this bid opening will be available on April 16, 2026. No bidding proposals will be issued to any Contractor after May 13, 2026 10:30 A.M.. The cost for each bidding proposal is $ 50.00 + tax. State Standard Specifications may be purchased by contacting ODOT Business Services Center Branch (405) 521-4509. No refunds will be made for bidding documents or specification books purchased.
Sample proposals, preliminary plans, long form and short form notices, order forms, bid tabs and awards, can be accessed on ODOT's Web site: https://oklahoma.gov/odot/business-center/contracts-and-proposals.html
Bids must be prepared in accordance with the State Standard Specifications. Unless otherwise specified, bids for all projects must be submitted over the internet to Bid Express(https://www.bidx.com) using AASHTOware Project Bids.
Instructions for using Bid Express, Project Bids, and the electronicbidding process are available from the Office Engineer Division. When written bids are allowed, sealed proposals may be delivered directly to the Office Engineer Division prior to the scheduled bid opening. For written bids, do not disassemble the bidding proposal in any way.
Any firm bidding a project as a joint venture, that has not been previously approved by the department, must complete the ‘Request for Joint Venture’ form, which is posted on the ODOT website, prior to bidding.
Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total.
Questions and comments regarding the May 14, 2026 bid opening will be accepted until April 24, 2026. Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. Responses will be posted to the “Pre-bid Questions and Answers” section of the ODOT Contracts & Proposals webpage as they are received. It is recommended that interested contractors visit the “Pre-Bid Questions and Answers” link regularly in order to stay informed of the latest information: https://oklahoma.gov/odot/business-center/contracts-and-proposals.html.
Unless otherwise noted in the proposal, upon award of the contract to the successful bidder, the contract will be completely and correctly executed by the contractor and returned to the Department within ten(10) working days from the date of award. The Department will have fourteen(14) working days from the date of award to complete it's execution of the contract.
The Oklahoma Department of Transportation(ODOT) and the Oklahoma Turnpike Authority(OTA) ensures that no person or groups of persons shall, on the grounds of race, color, sex, religion, national origin,age, disability, retaliation or genetic information, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination underany and all programs, services, or activities administered by ODOT or OTA, their recipients, sub -recipients, and contractors. To request an accommodation please contact the ADA Coordinator at (405)521-4140 or the Oklahoma Relay Service at 1-800-722-0353. If you have any ADA or Title VI questions email ODOT-ada-titlevi@odot.org
Description of work and location of project: Call Order: 800 STP-204B(066)PM US-83 BEAVER JP No.35775(04)
INTERSECTION MODIFICATION
US-83: AT THE INTERSECTION OF SH-3, NEAR HARDESTY.
STATE OF OKLAHOMA, OKLAHOMA DEPARTMENT OF TRANSPORTATION - By: TIM J. GATZ, Director.
PAGE 1 OF 115PROPOSAL ID : 260128
https://oklahoma.gov/odot/business-center/contracts-and-proposals.html https://www.bidx.com mailto:ODOT-Prebid.Question@odot.org https://oklahoma.gov/odot/business-center/contracts-and-proposals.html mailto:ODOT-ada-titlevi@odot.org mailto:ODOT-ada-titlevi@odot.org
S U M M A R Y O F T I M E
CONTRACT TIME
CONTRACT TIME ESTIMATED FOR PROPOSAL IS 270 CALENDAR DAYS
NOTICE
THE DEPARTMENT WILL CONSIDER A PROPOSAL NONRESPONSIVE AND REJECT IT IN ACCORDANCE
WITH SUBSECTIONS 102.08 AND/OR 102.14 OF THE CURRENT OKLAHOMA DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS.
PAGE 2 OF 115PROPOSAL ID : 260128
S U M M A R Y O F I T E M S
SHEET 1 OF 6
LINE ITEM DESCRIPTION APPROX. QTY UNIT PRICE BID AMOUNT
UNITS DOLLARS CTS DOLLARS CTS
SECTION 0001 ROADWAY
0010 201(A)1200
CLEARING AND GRUBBING
1.000 LSUM
0020 202(A)2200
UNCLASSIFIED EXCAVATION
2,759.000 CY
0030 202(D)2500
UNCLASSIFIED BORROW
500.000 CY
0040 205(A)6200
TYPE A-SALVAGED TOPSOIL
1.000 LSUM
0050 221(B)2300
TEMPORARY SILT FENCE
2,268.000 LF
0060 221(E)2600
TEMPORARY SILT DIKE
588.000 LF
0070 230(A)7200
SOLID SLAB SODDING
6,681.000 SY
0080 233(A)0200
VEGETATIVE MULCHING
4.020 AC
0090 241 3100
MOWING
1.270 AC
0100 307(K)4200
STABILIZED SUBGRADE
18,963.240 SY
0110 325 0100
SEPARATOR FABRIC
16,973.430 SY
0120 407(B)7300
TACK COAT
915.940 GAL
0130 408 8100
PRIME COAT
8,399.130 GAL
0140 411(B)1330
SUPERPAVE, TYPE S3(PG 64-22 OK)
3,654.760 TON
0150 411(C)1400
SUPERPAVE, TYPE S4(PG 76-28 OK)
670.670 TON
0160 411(C)1430
SUPERPAVE, TYPE S4(PG 64-22 OK)
427.030 TON
0170 412 3100
COLD MILLING PAVEMENT
9,800.680 SY
PAGE 3 OF 115PROPOSAL ID : 260128
SHEET 2 OF 6
UNITS DOLLARS CTS DOLLARS CTS
0180 414(A)5200
P.C.CONCRETE
PAVEMENT(PLACEMENT)
4,401.190 SY
0190 414(B)5300
DOWEL JOINTED
P.C.C.PAVT.(PLACEMENT)
9,869.330 SY
0200 414(G)5800
P.C. CONCRETE FOR PAVEMENT
4,360.620 CY
0210 609(A)4250
CONC.CURB(6" MNTBLE-INTEGRAL)
142.000 LF
0220 610(B)5310
6" CONCRETE DRIVEWAY
2,875.000 SY
0230 610(C)5410
6" CONCRETE DIVIDING STRIP
56.040 SY
0240 613(B)5604
21" X 15" CORR. GALV. STEEL PIPE
ARCH
1,091.000 LF
0250 613(M)6960
TYPE A4 CULVERT END TREATMENT
22.000 EA
0260 619(B)6360
REMOVAL OF CONCRETE PAVEMENT
309.000 SY
0270 619(B)6364
REMOVAL OF ASPHALT PAVEMENT
16,817.000 SY
0280 619(B)6400
REMOVAL OF CURB
1,037.000 LF
0290 619(B)6440
REMOVAL OF EXISTING PIPE
693.000 LF
SECTION 0001 SUB TOTAL
SECTION 0002 TRAFFIC SIGNING AND STRIPING
0300 413(D)4500
RUMBLE STRIP METHOD PCC-CYC
GROUP
6.000 EAGP
0310 804(A)2200
STRUCTURAL CONCRETE
13.260 CY
PAGE 4 OF 115PROPOSAL ID : 260128
SHEET 3 OF 6
UNITS DOLLARS CTS DOLLARS CTS
0320 804(B)2300
REINFORCING STEEL
1,994.000 LB
0330 805(A)3252
(PL)REMOVAL OF EXISTING SIGNS
70.000 EA
0340 850(A)1200
SHEET ALUMINUM SIGNS
700.000 SF
0350 850(B)1310
EXTRUDED ALUMINUM PANEL SIGNS
230.500 SF
0360 851(A)2200
4"@13 GALV.STL.WD.FLANGE BM.POST
123.000 LF
0370 851(B)2315
3"@7.58 GALV.STL.PIPE POST
673.000 LF
0380 851(C)2415
2" SQUARE TUBE POST
252.500 LF
0390 851(C)2430
2 1/2" SQUARE TUBE POST
185.000 LF
0400 856(A)8207
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(6" WIDE)
17,037.000 LF
0410 856(A)8211
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(8" WIDE)
560.000 LF
0420 856(A)8215
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(12" WIDE)
2,685.000 LF
0430 856(A)8219
(SP) TRAFFIC STRIPE(PLURAL-
COMPONENT)(24" WIDE)
59.000 LF
0440 856(B)8303
(SP) TRAF.STR.(PLURAL-
COMPONENT)(SYM,WRD,ETC)
12.000 EA
0450 890 1110
(PL)TRAFFIC ITEMS
10.000 EA
SECTION 0002 SUB TOTAL
SECTION 0003 TRAFFIC LIGHTING
PAGE 5 OF 115PROPOSAL ID : 260128
SHEET 4 OF 6
UNITS DOLLARS CTS DOLLARS CTS
0460 802(B)0324
2" PVC SCH.40 PLASTIC CONDUIT
TRENCHED
645.000 LF
0470 803(A)1210
PULL BOX(SIZE I)
9.000 EA
0480 804(A)2200
STRUCTURAL CONCRETE
7.000 CY
0490 804(B)2300
REINFORCING STEEL
1,136.000 LB
0500 805(A)3256
(PL)REMOVAL OF TRAFFIC SIGNAL
EQUIPMENT
1.000 LSUM
0510 806(D)4616
40' MTG.HT.HL.PTP.(G.STL.)
4.000 EA
0520 807 5100
BREAKAWAY BASE
4.000 EA
0530 809(A)7200
ROADWAY LUMINAIRE
4.000 EA
0540 811 9115
1/C NO.4 ELECT.COND.
1,450.000 LF
0550 811 9130
1/C NO.10 ELECT.COND.
500.000 LF
SECTION 0003 SUB TOTAL
SECTION 0004 TRAFFIC CONTROL
0560 413(E)4600
(PL)RUMBLE STRIP-TEMPORARY
1,080.000 SD
0570 857(A)9200
CONSTRUCTION TRAFFIC
STR.(PAINT)(4" WIDE)
1,000.000 LF
0580 857(C)9400
REMOVABLE PAVEMENT MARKING
TAPE(4" WIDE)
79,648.000 LF
0590 857(E)9630
(PL)CONST.ZONE PAV.MKRS(FLEX
TAB)TYP.2-2
8,373.000 EA
PAGE 6 OF 115PROPOSAL ID : 260128
SHEET 5 OF 6
UNITS DOLLARS CTS DOLLARS CTS
0600 857(F)9700
PAVEMENT
MRKNG.REMOVAL(TRAF.STRP)
23,251.000 LF
0610 857(F)9710
PAVEMENT MARKING
REMOVAL(ARROWS)
8.000 EA
0620 876(A)3210
(PL)TRUCK MOUNTED ATTENUATOR
260.000 SD
0630 880(A)6220
ARROW DISPLAY(TYPE C)
390.000 SD
0640 880(B)6300
CONSTRUCTION SIGNS 0 TO 6.25 SF
16,236.000 SD
0650 880(B)6310
CONSTRUCTION SIGNS 6.26 SF TO 15.99
SF
17,490.000 SD
0660 880(B)6320
CONSTRUCTION SIGNS 16.0 SF TO 32.99
SF
21,252.000 SD
0670 880(C)6410
CONSTRUCTION BARRICADES(TYPE III)
5,643.000 SD
0680 880(E)6607
WARNING LIGHTS(TYPE B)
9,504.000 SD
0690 880(E)6610
WARNING LIGHTS(TYPE C)
43,395.000 SD
0700 880(F)6700
DRUMS
43,395.000 SD
0710 880(G)6805
CHANNELIZER CONES
29,667.000 SD
0720 880(L)7310
(SP) TRAFFIC SURVEILLANCE, OHP
(NON-BID)
320.000 HOUR $ 77.00 $ 24,640.00
0730 882(A)8210
PORT.CHANGEABLE MESSAGE SIGN
1,136.000 SD
SECTION 0004 SUB TOTAL
SECTION 0005 STAKING
PAGE 7 OF 115PROPOSAL ID : 260128
SHEET 6 OF 6
UNITS DOLLARS CTS DOLLARS CTS
0740 642(B)3300
CONSTRUCTION STAKING LEVEL II
1.000 LSUM
SECTION 0005 SUB TOTAL
SECTION 0006 CONSTRUCTION
0750 220 1100
SWPPP DOCUMENTATION AND
MANAGEMENT
1.000 LSUM
0760 641 2110
MOBILIZATION
1.000 LSUM
SECTION 0006 SUB TOTAL
TOTAL
PAGE 8 OF 115PROPOSAL ID : 260128
D E P A R T M E N T O F T R A N S P O R T A T I O N
I N D E X O F P R O V I S I O N S FOR JPN(s) : STP-204B(066)PM, 35775(04)
BEAVER COUNTY
PROPOSAL DOCUMENTS
OK20260021 WAGE DECISION
PROPOSAL PROVISIONS
102-013(a-b)19 BIDDING PROCEDURES 103-003(a)19 SUBCONTRACTS 106-005(a-e)19 BUY AMERICA AND BUILD AMERICA, BUY AMERICA 108-023(a)19 FLEXIBLE NOTICE TO PROCEED 108-080(a)19 LIQUIDATED DAMAGES 108-081(a)19 DISINCENTIVE FOR EXPOSED COLD-MILLED PAVEMENT 108-182(a)19 SUBLETTING OF CONTRACT (70%) 109-014(a)19 MATERIAL ON HAND 109-015(a-c)19 PROMPT PAYMENT FOR SUBCONTRACTORS 411-025(a)19 HOT MIX ASPHALT/WARM MIX ASPHALT 414-017(a)19 LONGITUDINAL FINISH
414-018(a)19 OPTIMIZED GRADATION FOR PORTLAND CEMENT CONCRETE
PAVEMENT
441-001(a-c)19 ELECTRONIC TICKETING FOR BITUMINOUS MATERIALS
701-014(a-d)19 OPTIMIZED GRADATION FOR PORTLAND CEMENT CONCRETE
PAVEMENT
711-003(a-h)19 TRAFFIC STRIPE 856-003(a-j)19 TRAFFIC STRIPE (PLURAL-COMPONENT) 880-010(a-b)19 TRAFFIC SURVEILLANCE
CF000050 REPORTING OF BID RIGGING
CF000101 TITLE VI - NON-DISCRIMINATION CLAUSE
CF000200 RESIDENCE REQUIREMENTS FOR LABOR ON FEDERAL AID PROJECTS
PROJECTS
CF000501 CERTIFICATION FOR FEDERAL-AID CONTRACTS
CF000800 NOTICE OF REQUIREMENTS FOR AFFIRMATIVE ACTION
CF000900 STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY
SPECIFICATIONS
CF001000 ON-THE-JOB TRAINING (OJT) PROGRAM
CF001700 CONTRACTORS AFFIDAVIT
CX00210B DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
CZ002300 CONTRACT DISPUTE RESOLUTION PROCEDURE
CZ002850 NO.2 PROPOSAL SHEET
CZ002975 * BIDDER'S AFFIDAVIT - STATEMENT UNDER PENALTY OF PERJURY
FHWA1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION
CONTRACTS
PAGE 9 OF 115PROPOSAL ID : 260128
"General Decision Number: OK20260021 01/02/2026
Superseded General Decision Number: OK20250021
State: Oklahoma
Construction Type: Highway
Counties: Alfalfa, Beaver, Blaine, Cimarron, Dewey, Ellis, Garfield, Grant, Harper, Kay, Kingfisher, Major, Noble, Payne, Texas, Woods and Woodward Counties in Oklahoma.
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Modification Number Publication Date 0 01/02/2026
SUOK2011‐008 04/18/2011
Rates Fringes
CARPENTER (Excludes Form Work)...$ 13.32
CEMENT MASON/CONCRETE FINISHER
Garfield County.............$ 13.14 Kay County..................$ 14.59 Payne County................$ 13.18 Remaining Counties..........$ 14.09
FORM WORKER......................$ 12.55
GUARDRAIL INSTALLER (Includes Guardrail/Post Driver Work)......$ 9.70
IRONWORKER, REINFORCING..........$ 13.63
LABORER
Air/Power Tool Operator (Includes Handheld Concrete Saws and Chipping Guns).......................$ 12.79 Asphalt Raker and Shoveler..$ 11.18 0.64 Common or General Alfalfa and Kay Counties...$ 10.50
PAGE 10 OF 115PROPOSAL ID : 260128
Dewey County...............$ 10.42 Ellis County...............$ 10.87 Garfield County............$ 11.05 Grant County...............$ 10.65 Harper County..............$ 10.09 Major County...............$ 10.56 Noble County...............$ 10.77 Payne County...............$ 10.49 Remaining Counties.........$ 10.57 Texas County...............$ 10.83 Woods County...............$ 10.30 Pipelayer...................$ 11.83 Traffic Control (Includes Flagger, Setting Up and Moving Cones/Barrels).......$ 10.12 Vibrating Plate.............$ 12.70
POWER EQUIPMENT OPERATOR:
Asphalt Paver Screed........$ 13.38 Asphalt Paving Machine......$ 12.71 Asphalt Plant...............$ 14.70 Backhoe/Trackhoe Kay County.................$ 13.43 Remaining Counties.........$ 13.61 Bobcat/Skid Loader..........$ 12.87 Broom.......................$ 11.72 Bulldozer...................$ 13.95 Concrete Paving Machine.....$ 14.42 Concrete Saw................$ 12.46 Crane.......................$ 16.88 Distributor Truck...........$ 14.98 Excavator...................$ 16.19 Grader/Blade Remaining Counties.........$ 14.82 Woods County...............$ 16.45 Loader (Front End)..........$ 12.82 Mechanic....................$ 15.79 Milling Machine.............$ 13.51 Mixer.......................$ 14.56 Oiler.......................$ 13.84 Roller (Asphalt)............$ 11.76 Roller (Dirt Compaction)....$ 12.12 Rotomill....................$ 17.33 Scraper.....................$ 12.00 Striping Machine............$ 12.11 Tractor/Box Blade...........$ 12.61 Transfer Material Machine...$ 12.38 0.75 Trencher....................$ 14.66
TRUCK DRIVER
PAGE 11 OF 115PROPOSAL ID : 260128
Concrete Truck..............$ 14.22 Dump Truck..................$ 13.17 Flatbed Truck...............$ 14.68 Lowboy/Float................$ 16.00 Off the Road Truck..........$ 12.55 Single Axle Truck (Includes Pilot Car)........$ 12.32 Straight Truck..............$ 15.92 Tandem Axle/Semi Trailer Grant County...............$ 15.16 Kay County.................$ 13.36 Remaining Counties.........$ 13.57 Texas County...............$ 13.26 Woods County...............$ 13.05 Water Truck Remaining Counties.........$ 12.00 Woods County...............$ 15.88
WELDERS ‐ Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis‐Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health‐related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health‐related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government‐contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis‐Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis‐Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the
PAGE 12 OF 115PROPOSAL ID : 260128
contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four‐letter identifier beginning with characters other than ""SU"", ""UAVG"", "SA", or "SC" denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198‐005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for
PAGE 13 OF 115PROPOSAL ID : 260128
the classifications reflected union rates. EXAMPLE:
UAVG‐OH‐0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non‐union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non‐union rates. Example: SUFL2022‐007 6/27/2024. SU indicates the rate is a single non‐union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
"SU" wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)‐(h). Example: SAME2023‐007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the "SA" identifier took effect under state law in the state from which the rates were adopted.
PAGE 14 OF 115PROPOSAL ID : 260128
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD‐Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment
PAGE 15 OF 115PROPOSAL ID : 260128
data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
PAGE 16 OF 115PROPOSAL ID : 260128
102-13(a-b)19 11/20/2020
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
BIDDING PROCEDURES
These special provisions amend and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction, English and Metric.
102.07 PREPARATION OF PROPOSAL (Revise to amend as follows:)
Submit the Proposal in the format required by the Bid Notice. For each item on the Proposal Forms, type or write (in ink) the unit price and the product of the unit price and estimated quantity on the Proposal Forms in the space provided. Show the total Proposal amount by adding the products of the unit prices and the estimated quantities. Acknowledge any change to a unit price, the product of a unit price and quantity, or the total Proposal amount with the initials of the person signing the Proposal, adjacent to each change.
If a discrepancy occurs on the Proposal, between the unit price and the product of the unit price and quantity, the Department will use the unit price. If a unit price or the product of a unit price and quantity is omitted or is entered as zero ($0) for any item listed on the Proposal Forms, the Department will consider the Proposal non-responsive and will reject the Proposal. If there is a discrepancy between the submitted electronic media and written Proposal, the Department will use the written Proposal. If the Department requires a printout of electronic media and a discrepancy occurs between the printout and the electronic media, the Department will use the printout.
An individual, all members of a partnership, a duly authorized officer of a corporation, or all members of a joint venture shall sign the Proposal in black or blue ink. For Proposals submitted by a corporation, show the name of the corporation and business address. For Proposals submitted by the internet bidding process, the Department will require an electronic signature only. Include a Non-Collusive Bidding Certification with the Proposal in accordance with Subsection 102.16, “Non- Collusive Bidding Certification.”
102.08 NONRESPONSIVE PROPOSALS (Revise to amend as follows:)
The Department will consider a proposal nonresponsive and may reject it for any of the following reasons:
• The bidder submits a Proposal on an unapproved form (or format, if computer-generated), or the form is altered, incomplete, or disassembled.
• The bidder submits a Proposal using a form other than the latest approved Proposal Form.
• The Department determines that Proposal irregularities (such as unauthorized additions and
PAGE 17 OF 115PROPOSAL ID : 260128
102-13(b-b)19 11/20/2020 conditional or alternate bids) may tend to make the Proposal incomplete, indefinite, or ambiguous.
• The Proposal does not contain a unit price for each item listed, except for authorized alternate items.
• The Proposal is materially unbalanced in accordance with Subsection 101.05.CT.2
• The Proposal is not properly signed.
• The Proposal is not typed or completed in ink.
• The bidder fails to provide a properly executed Proposal Guaranty, or irrevocable Letter of
Credit.
• The bidder fails to sign the unsworn statement made under penalty of perjury.
• The Proposal fails to comply with any material requirement of the Bid Notice.
• The bidder fails to properly comply with Disadvantaged Business Enterprise Requirements or to properly list eligible disadvantaged businesses if participation in accordance with the Proposal Forms.
PAGE 18 OF 115PROPOSAL ID : 260128
103-3(a) 19
6-8-20
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
SUBCONTRACTS
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019
Standard Specifications for Highway Construction.
(Add the following:)
103.10 SUBCONTRACTS
Subcontracts and/or sub-agreements must be submitted for review and approval by the Department prior to the subcontractor performing contract work. Ensure all subcontracts conform to the requirements of
Subsection 108.01, “Subletting of Contract,” and are executed in accordance with the Contract requirements and the provisions specified herein.
As a minimum, the following information must be included in all subcontracts:
• Full description of the contract work to be performed by the subcontractor
• Contractor Equal Employment Opportunity (EEO) Policy Statement (see ODOT General Contractor
Requirements – Development and Dissemination of EEO Policy)
• Form FHWA-1273 (must be physically attached verbatim to subcontracts, excluding purchase orders, rental agreements and other agreements for supplies or services)
• ODOT Title VI Assurances Appendices A and E (must be physically attached verbatim)
• Prompt Payment/Return of Retainage provisions (from the ODOT DBE Program Manual)
• Signature(s) of the prime contractor and subcontractor
If the subcontract is with a subcontractor performing work as an ODOT certified DBE, then the following additional information must be included in the submitted subcontract:
• Full description of the contract work that the certified DBE will perform based upon their NAICS code
• DBE Termination/Substitution/Replacement Clause (from the ODOT DBE Program Manual)
The aforementioned subcontract documents can be downloaded from the ODOT website, and are available for the Contractors’ use: http://www.odot.org/subcontracts.
Purchase orders, rental agreements and other agreements for supplies or services related to a construction contract are excluded from this requirement only if the purchase order or other agreement is not with a DBE.
However, Prompt Payment/Return of Retainage provisions must still be included.
Submit executed subcontracts and/or sub-agreements in pdf format to the Department using the following email address: constructionsubcontracts@odot.org. Submit all additional and/or modified subcontracts or sub-agreements to the Department via the same email address. To prevent delays in the approval of the subcontract, include the following information in all correspondence: contract I.D., project number, prime contractor, and subcontractor.
Subcontracts and sub-agreements may be submitted prior to the receipt of the signed Contract by the
Department.
PAGE 19 OF 115PROPOSAL ID : 260128
https://www.ok.gov/odot/Doing_Business/Civil_Rights/Contractor_Compliance_-_Construction.html mailto:
106-5(a-e) 19 8-20-25
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
BUY AMERICA AND BUILD AMERICA, BUY AMERICA
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction.
106.01 SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (Replace with the following :)
B. Buy America and Build America, Buy America
Buy America (BA) and Build America, Buy America (BABA) requirements are in effect only on projects with federal aid risk, as identified in the contract documents. The Contractor is responsible for submitting completed Material Data Testing (MDT-1) form in accordance with Section 106.01(B)(1) regardless of the BA/BABA requirements.
An article, material, or supply should only be classified into one of the following categories: (1) iron or steel products, (2) construction material, (3) manufactured products, or (4) excluded material. An article, material, or supply should not be considered to fall into multiple categories, except as otherwise provided in Subsection 106.01.B(4)(b)(2). A material is solely classified based on its status at the time it is brought to the worksite.
Except as otherwise provided in Subsection 106.01.B(4)(b)(2) of this special provision, an article, material, or supply shall not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the above-listed categories. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron or steel product or manufactured product will be incorporated.
(1) Iron and/or Steel Products
Comply with the Buy America provisions of 23 CFR 635.410 which states that all manufacturing processes, including the application of a coating, for all steel or iron products permanently incorporated into the project shall have occurred in the United States (U.S.).
“All manufacturing processes” are defined as any process required to change the raw ore or scrap metal into the finished steel or iron product (e.g. smelting, rolling, extruding, bending, etc.).
“Coating” is defined as any process which protects or enhances the value of the steel or iron product to which the coating is applied (e.g. epoxy, galvanizing, painting, etc.).
The Contractor is responsible for submitting completed Material Testing Data (MDT-1) for the iron and steel in following items for all projects, regardless of the BA/BABA requirements:
• Precast box culverts
• Reinforced concrete pipe and precast end sections
• Precast inlets and catch basins
• Precast manholes
• Structural steel (girders, diaphragms, anchor bolts, high-strength bolts, sealed expansion joints, etc.)
• Reinforcing steel (all types)
• Welded wire fabric
• Steel spiral wire (drilled shaft cages, bridge rail, etc.)
• Steel piling
PAGE 20 OF 115PROPOSAL ID : 260128
106-5(b-e) 19
• Drill shaft casing (permanent)
• Dowel bars and baskets for paving
• Steel sheet piling (permanent)
• Bridge bearing assemblies (fixed and expansion)
• Post-tensioning steel (strands, wedges, anchor plates, etc.)
• Steel monotube structures
• Galvanized steel supports for overhead and cantilevered sign structures
• Sign posts and bases (all sizes)
• Guardrail, guardrail posts, end sections, terminals, impact attenuators
• Intelligent transportation system or other electronic hardware system cabinets
(2) Waiver for Iron and Steel Raw Materials
The BA/BABA requirements for the following raw materials are waived in accordance with the FHWA nationwide waiver (dated March 24, 1995) for pig iron and processed, pelletized, and reduced iron ore, unless processed or refined to include substantial amounts of steel or iron material, and may be used regardless of source in the domestic manufacturing process for steel or iron material:
• Raw materials (iron ore or alloys)
• Scrap
• Pig iron
• Processed, pelletized, and reduced iron ore material
For recycled steel, only the manufacturing processes to produce steel products must occur domestically, beginning at the point where the recycled steel is melted.
(3) Minimal Use Request for Steel and Iron
Federal regulations allow a minimal use of foreign steel or iron if the cost of the steel and iron products as they are delivered to the project does not exceed 0.1 percent of the total Contract amount, or $2,500, whichever is greater. This threshold applies to the cumulative amount of all foreign steel and iron used on the project. The Contractor must track the amount of incorporated foreign steel and iron throughout the life of a project to ensure the minimal use threshold amount is not exceeded.
(4) Construction Materials
Comply with the Build America, Buy America (BABA) Act of 2 CFR 184. The following construction materials as defined in 2 CFR 184.3 must be manufactured in the United States of America. This means that all manufacturing processes for the construction material occurred in the United States of America.
• Non-ferrous metals
• Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables)
• Glass (including optic glass)
• Fiber optic cable (including drop cable)
• Optical fiber
• Lumber
• Engineered wood
• Drywall
For non-ferrous metals, certification requires all manufacturing processes, from initial smelting or melting through final shaping, coating, and assembly, occurred in the United States.
PAGE 21 OF 115PROPOSAL ID : 260128
106-5(c-e) 19
For plastic and polymer-based products, certification requires all manufacturing processes, from initial combination of constituent plastic or polymer-based inputs, or, where applicable, constituent composite materials, until the item is in its final form, occurred in the United States.
For glass, certification requires all manufacturing processes, from initial batching and melting of raw materials through annealing, cooling, and cutting, occurred in the United States.
For fiber optic cable (including drop cable), certification requires all manufacturing processes, from the initial ribboning (if applicable), through buffering, fiber stranding and jacketing, occurred in the United States. All manufacturing processes also include the standards for glass and optical fiber, but not for non-ferrous metals, plastic and polymer-based products, or any others.
For optical fiber, certification requires all manufacturing processes, from the initial preform fabrication stage through the completion of the draw, occurred in the United States.
For lumber, certification requires all manufacturing processes, from initial debarking through treatment and planning, occurred in the United States.
For engineered wood, certification requires all manufacturing processes from the initial combination of constituent materials until the wood product is in its final form, occurred in the United States.
For drywall, certification requires all manufacturing processes, from initial blending of mined or synthetic gypsum plaster and additives through cutting and drying of sandwiched panels, occurred in the United States.
(5) Manufactured Products
Manufactured products used and permanently incorporated in this project must be produced in the United States. Manufactured products will comply with the Buy America requirements of 23 CFR 635.410 with the following modifications:
(a) Produced in the United States, in the case of manufactured products, means the product was manufactured in the United States. FHWA further clarifies that this means the final assembly must occur in the United States.
(b) Classification of Precast Concrete Products and Electronics Cabinets
(1) With respect to precast concrete products that are classified as manufactured products, components of precast concrete products that consist wholly or predominantly of iron or steel, or a combination of both, shall also meet the requirements of Subsection 106.01.B(1), “Iron and/or Steel Products.” The cost of such components shall be included in the applicable calculation for purposes of determining whether the precast concrete product is produced in the United States.
(2) With respect to intelligent transportation systems and other electronic hardware systems that are installed in the highway right of way or other real property and classified as manufactured products, the cabinets or other enclosures of such systems that consist wholly or predominantly of iron or steel, or a combination of both, shall also meet the requirements of Subsection 106.01.B(1), “Iron and/or Steel Products.” The cost of cabinets or other enclosures shall be included in the applicable calculation for purposes of determining whether systems referred to in the preceding sentence are produced in the United States.
PAGE 22 OF 115PROPOSAL ID : 260128
106-5(d-e) 19
(6) Application of BA/BABA Requirements
BA/BABA requirements only apply to steel, iron, construction materials and manufactured products that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, removed at or before completion of the project. BA/BABA does not apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished project, but are not an integral part of or permanently affixed to the structure.
(7) USDOT de Minimis Costs and Small Grant Waiver for Construction Materials and Manufactured Products
If the total value of the non-compliant construction materials and manufactured products is no more than the lesser of $1,000,000 or 5% of total applicable project costs, BA/BABA does not apply for those products. Iron and steel are still subject to minimal use in accordance with 23 CFR 635.410(b)(4) and 106.01.B(3), “Minimal Use Request for Steel and Iron.” The total applicable project costs are defined as the cost of all materials, including iron, steel, manufactured products, and construction materials subject to BA/BABA requirements. The Contractor assumes the responsibility of tracking the costs of the materials and providing the certification for the waiver if applicable.
For projects identified by the Department as small grants with federal awards less than $500,000, BA/BABA requirement is waived for all materials.
(8) Compliance with BA/BABA Requirements
The Contractor assumes the risk of including any foreign materials including iron, steel, construction materials, and manufactured products that are not exempt in the Contractor's bid.
The Contractor has the obligation to remove and replace non-Buy America complaint material that exceeds minimal threshold, unless a waiver is granted for the use. No claims for contract adjustment (additional time, money, or both) will be made because of the non-complaint material.
After work is completed on the project, submit a list of items in compliance with the Buy America (BA) Act and the Build America, Buy America (BABA) Act. The list shall include all materials permanently incorporated into the project, with a designation indicating whether the item is an iron or steel product, a construction material, a manufactured product, or an excluded other product. In addition to the list, submit a notarized or electronically verified certification signed by the Contractor's authorized agent to the Engineer, with the following information:
“I hereby certify that all construction materials furnished to the Oklahoma Department of Transportation for the construction of the above referenced project that are required to be compliant with the the Build America, Buy America (BABA) Act provision of 2 CFR 184 have been manufactured in the United States of America. I further certify that all supporting documentation is on file and will be maintained for a period of three (3) years after project completion.”
“I also hereby certify that all manufacturing processes of all steel and iron products permanently incorporated into this Oklahoma Department of Transportation referenced project, including protective coating, occurred in the USA and are in accordance with 23 CFR 635.410.”
"I also hereby certify that all manufactured products permanently incorporated into this Oklahoma Department of Transportation reference project were produced in the United States of America, in accordance with 23 CFR Part 635.410( c). I further certify that all supporting documentation is on file and will be maintained for a period of three (3) years after project completion.”
PAGE 23 OF 115PROPOSAL ID : 260128
106-5(e-e) 19
The Contractor may maintain this documentation electronically or in paper format. Upon request, the Department, or FHWA, may review the Contractor's supporting documentation to verify compliance with the Buy America provisions at any time. The Contractor shall provide the supporting documentation within five (5) business days of the request. The burden of proof to meet the Buy America provisions rests on the Contractor. If the supporting documentation does not undeniably demonstrate to the Department, or FHWA, that the iron or steel, manufactured products, or construction materials identified in the Certificates of Compliance were produced in the United States of America, then such iron, steel, manufactured products, or construction materials will be considered unacceptable and must be replaced at no cost to the Department.
The Contractor shall not anticipate that any Buy America Preference provisions will be waived.
PAGE 24 OF 115PROPOSAL ID : 260128
108-23(a) 19 1-10-20
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
FLEXIBLE NOTICE TO PROCEED
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction, English and Metric.
108.03 PROSECUTION AND PROGRESS (Add the following:)
The Notice to Proceed for this project will be issued in the normal time period (approximately 30 days after the award). The Contractor may begin work any time after the issuance of the Notice to Proceed, but no later than October 5, 2026. Time charges will begin on the date the Contractor begins work, or at the date specified in the Notice to Proceed, and will continue until the project is completed.
Once the work begins, construction is expected to continue at an optimum rate until the work is done.
Notify the Resident Engineer, and when applicable the County Commissioner, at least 14 calendar days prior to beginning work.
There will be no additional compensation for any increased costs due to beginning work at or near the end of the flexible period.
PAGE 25 OF 115PROPOSAL ID : 260128
108-80(a) 19 1-19-23
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
LIQUIDATED DAMAGES
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction.
108.09 FAILURE TO COMPLETE ON TIME (Revise Table 108:1 as follows:)
Table 108:1 Schedule of Liquidated Damages
Contract Amount, $ Daily Assessment Rate, $
# $200,000 $300 >$200,000 and #$1,000,000 $800
>$1,000,000 and #$5,000,000 $1,000 > $5,000,000 and #$10,000,000 $1,300
> $10,000,000 $1,800
PAGE 26 OF 115PROPOSAL ID : 260128
108-81(a) 19
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
DISINCENTIVE FOR EXPOSED COLD-MILLED PAVEMENT
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019
Standard Specifications for Highway Construction.
(Add the following:)
108.14 DISINCENTIVE FOR EXPOSED COLD-MILLED PAVEMENT
The intent of this provision is to minimize the time of exposure of milled paving surfaces. The following items set forth the Contract requirements for this portion of work, and disincentive(s) for non-compliance with these specifications.
A disincentive of $0.02 per square yard per hour will be assessed for all cold-milled surfaces not overlayed within 48 hours of being exposed by cold-milling operations. The disincentive will be assessed each hour after the 48 hours, and continue until the cold-milled surfaces are no longer exposed to the elements as determined by the Engineer. (Fog sealing cold-milled surfaces will not exempt the Contractor from this disincentive.)
The Engineer may allow cold-milled surfaces to remain exposed for up to 96 hours if the Contractor, at no additional cost to the Department, covers the exposed cold-milled surfaces with an approved trackless tack coat meeting the requirements of Special Provision 708-25 within 48 hours of being exposed by cold-milling operations. The trackless tack coat layer must be maintained, ensuring that the trackless tack is of sufficient adhesion or tack coat must be reapplied prior to overlaying the cold-milled surface(s). In the event that trackless tack is used, the above disincentive will be assessed each hour after the 96 hours, and continue until the cold-milled surfaces are overlayed.
Extents of cold-milling required to provide a smooth transition to bridge approaches or to existing pavements will be exempt from this provision. However, if these extents are to be left exposed for more than
48 hours, they must be fog sealed or the disincentive set forth in this provision will apply for each hour in excess of the 48 hours until the fog seal or surfacing is placed.
PAGE 27 OF 115PROPOSAL ID : 260128
108-182(a) 19
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
70% SUBLETTING OF CONTRACT
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019
Standard Specifications for Highway Construction.
108.01 SUBLETTING OF CONTRACT (Replace paragraph one with the following:)
The Department will not allow the Contractor to sublet, sell, assign, or otherwise dispose of the Contract, or any portion thereof, or any of the Contractor's rights, title, or interest therein without the written or electronic consent of the State Construction Engineer or an authorized representative. The Contractor shall perform at least 30% of the Contract amount, based on the contract unit prices, using its own organization, unless the Contract allows a greater percentage.
PAGE 28 OF 115PROPOSAL ID : 260128
109-14(a) 19 6-6-23
OKLAHOMA DEPARTMENT OF
TRANSPORTATION SPECIAL PROVISIONS
FOR
MATERIAL ON HAND
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction.
109.07 PAYMENT FOR MATERIAL ON HAND (Add the following:)
By way of these provisions, the Department hereby suspends the storage requirements associated with payments for material on hand, as required per section 109.07 of the Standard Specifications, and superseded on some contracts by Special Provision 109-11(a)09. All other requirements for the payment of material on hand will be enforced as specified in the aforementioned specifications and provisions.
Requests for payment that are deemed unreasonable by the Engineer will not be considered.
PAGE 29 OF 115PROPOSAL ID : 260128
109-15(a-c) 19 9-18-23
OKLAHOMA DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR
PROMPT PAYMENT FOR SUBCONTRACTORS
These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the 2019 Standard Specifications for Highway Construction.
(Add the following:)
109.11 PAYMENT TO SUBCONTRACTORS
The Department will monitor payments made by Contractors and Subcontractors for compliance with 49 CFR 26.29. To facilitate this monitoring, the Department requires Contractors to report payments made to Subcontractors, and Subcontractors should report payments received from Contractors.
A. AASHTOWare Project Civil Rights & Labor (CRL)
(a) Data Reporting
Unless otherwise directed, submit payments made to subcontractors, suppliers, and manufacturers through AASHTOWare Project Civil Rights & Labor (CRL) software.
(b) System Requirements
The CRL system is web based and configured for Google Chrome. The Department does not ensure or support compatibility with other web browsers.
(c) System Accessibility and Security
Submit a "Vendor Access Form" for each Contractor designee and Subcontractor designee who requires access to the CRL system for the purpose of entering payment information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .