CO OMAD 300(71) 6982AF27B000010 IFB.pdf

PDF 2 MB Posted

Attached to
CO OMAD 300(71) Minuteman Missile Access
Solicitation number
6982AF27B000010
Issued by

About this file

This is an Invitation for Bid (IFB) for roadway construction and maintenance services on Minuteman Missile Access Roads located across Colorado, Nebraska, and Wyoming at Francis E. Warren Air Force Base. The Federal Highway Administration Central Federal Lands Highway Division is soliciting sealed bids for a Total Small Business Set-Aside project (solicitation number 6982AF27B000010, project CO OMAD 300(71)). The scope of work includes aggregate surface course reconditioning, drainage improvements, signage installation, and culvert replacement across three separate schedules totaling between 29.02 and 45.36 miles of roadway. Bids are due by 2:00 p.m. local time on December 2, 2026, at the Federal Highway Administration office in Lakewood, Colorado. The estimated project price range is between $5,000,000 and $10,000,000. Award will be made to the lowest responsive, responsible bidder based on Schedule C first, then Schedule B, then Schedule A, subject to available funding.

Bidders must submit original printed bids only (electronic bids are not accepted) with a 20 percent bid bond, SF-1442 form, completed bid schedules, authority to bind certificates, Buy American Act certifications, VETS-4212 declaration, and bidders' qualifications information. The contract will be a firm fixed-price agreement with performance and payment bonds required within 10 calendar days of award. The contractor must begin work within 10 calendar days of receiving the notice to proceed and comply with construction wage rate requirements, FP-24 Standard Specifications for Construction of Roads and Bridges, FAR, and applicable TAR provisions. Technical questions must be submitted by 4:00 p.m. on November 19, 2026. A non-mandatory virtual pre-bid meeting is scheduled for November 12, 2026, from 10:00 a.m. to 11:00 a.m. Mountain Time. The contractor will be required to use the Government's Masterworks web-based system for daily reports and measurement notes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER:

SOLICITATION TYPE:

PROJECT NUMBER:

PROJECT NAME:

6982AF27B000010

TOTAL SMALL BUSINESS SET ASIDE

CO OMAD 300(71)

MINUTEMAN MISSILE ACCESS ROADS

BID OPENING DATE:

See Page A-1, Item 13A

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-24 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov

PROJECT CO OMAD 300(71)

LOCATION FRANCIS E. WARREN AIR FORCE BASE

COUNTIES LOGAN (CO), WELD (CO),

KIMBALL (NE), LARAMIE (WY)

STATES COLORADO, NEBRASKA, WYOMING

LENGTH SCHEDULE A: 29.02 MILES

SCHEDULE B: 39.73 MILES

SCHEDULE C: 45.36 MILES

TYPE OF IMPROVEMENT AGGREGATE SURFACE COURSE,

AGGREGATE SURFACE

RECONDITIONING, DRAINAGE

IMPROVEMENTS, SIGNAGE

TABLE OF CONTENTS

Notice to Bidders ............................................................................................................. A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ............................................................................... A-5

Solicitation Provisions .....................................................................................................B-9

Contract Clauses ..............................................................................................................C-1

Construction Wage Rate Requirement ............................................................................ D-1

Division 100 ..................................................................................................................... E-2 Division 150 ................................................................................................................... E-18 Division 200 ................................................................................................................... E-30 Division 300 ................................................................................................................... E-31 Division 400 .......................................................................................................... See FP-24 Division 500 .......................................................................................................... See FP-24 Division 600 ................................................................................................................... E-37 Division 700 ................................................................................................................... E-39

PROJECT OVERVIEW

In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling existing gravel Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force.

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

NOTICE TO BIDDERS

A-i

I. PRE-BID INFORMATION

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).

Bids and bonds shall be submitted in sealed envelopes or packages:

(1) addressed to the office specified in the solicitation, and

(2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed above when delivered to the office specified in the solicitation.

Submit the following documents with your Bid Package–

• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2

• Bid Schedule Pages A-6 through A-13

• Completed an applicable Authority to Bind certificate, pages A-14 through A-18

• Buy American Act & Hazardous Materials, Pages A-19 through A-20

• Bid Guarantee (RFO Clause 52.228-1), Pages B-1 through B-4. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.

o Digital copies may be downloaded at https://www.gsa.gov/forms-library/bid-bond

• Completed the VETS-4212 declaration, Page A-iii; Bidders’ Information, Pages B-5 through B-8.

Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at https://sam.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.

This solicitation and subsequent contract are governed by the 48 CFR, Chapter 1, Federal Acquisition Regulation (FAR), Revolutionary FAR Overhaul (RFO), Department of Transportation Acquisition Regulation (TAR), and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.

A-ii

The FP-24 was utilized for the design of this project. Paper copies of the FP-24 will not be provided to bidders or the awarded Prime Contractor. The FP-24 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ and a copy is uploaded with this solicitation.

Applicable FAR, RFO and TAR provisions and clauses in this IFB are incorporated by reference or full text. FAR, RFO and TAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/content/regulations, https://www.acquisition.gov/far-overhaul/far-part-deviation-guide and https://www.acquisition.gov/tar.

Notice of SAM Registration – Offerors or quoters are required to have an active Federal Government contracts registration in the System for Award Management (SAM) when they submit an offer or quotation, and at the time of award. Failure to be fully registered prior to submission of a bid may require award to the next successful registered offeror. See RFO Subpart 4.203-1(b).

Register online at www.sam.gov.

“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in DOT solicitations.

Examples include:

• 52.222-25, Affirmative Action Compliance, and

• 52.212-3(d), Offeror Representations and Certifications—Commercial Products and Commercial Services.

• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals— Representation.

• 52.212-3(t), Offeror Representations and Certifications—Commercial Products and Commercial Services.

Contracting officers will not need to consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million. If your average annual gross receipts for the past 5 years are above $45 million, you are a large business for this solicitation. If they are below $45 million you are a small business. Before submitting bids, you must ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov. Include NAICS 237310 in your SAM profile.

A-iii

My firm had a qualifying Federal Contract in 2025 and has complied with the reporting requirements.

My firm did not have a qualifying Federal Contract in 2025 and is therefore exempt from the reporting requirements.

Bid Guarantee – Follow the requirements of RFO Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-24. Bid bonds must be original and have original signatures and corporate seals.

Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.

Accuracy and Completeness of Bid- The Contractor is fully responsible for verifying that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON NOVEMBER 19, 2026

Consolidate all questions on a single Microsoft Word document and submit NLT the deadline to submit technical questions.

Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov

Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email), if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email).

For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See RFO Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov

Revolutionary FAR Overhaul 36.101-4 requires a description of the Federal Highway

Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: https://www.dol.gov/agencies/vets/programs/vets4212

Eric.Grosskreuz Rectangle

Eric.Grosskreuz Rectangle

Eric.Grosskreuz Rectangle

Eric.Grosskreuz Rectangle

A-iv

Administration’s (FHWA) procedures that apply to definitization of equitable adjustments for change orders under construction contracts. It also requires that FHWA furnish data on the agency’s past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts.

Change orders as defined in RFO 2.101 are changes to the contract work pursuant to RFO 52.243-4, Changes.

There are no agency-specific additional policies and procedures that exist at this time.

The table below contains data regarding the definitization of equitable adjustments for change orders under construction contracts by fiscal year (FY).

Time to definitize after receipt of an adequate change order definitization proposal under construction contracts

Number of change order proposals definitized under construction contracts

FY 2023 FY 2024 FY 2025

0 to 30 days 0 0 1 31 to 60 days 0 1 0 61 to 90 days 0 0 0 91 to 180 days 1 4 2 181 to 365 days 1 2 1 366 or more days 0 0 0 After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance

0 0 0

II. POST AWARD INFORMATION

CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.

Subcontracting – RFO Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

Insurance requirements - See Subsection 107.05 of the FP-24.

A-v

Masterworks - Contractors shall use the Government’s web-based system Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).

The Contractor shall be required to attend a training session on the use of Masterworks. The virtual training sessions will be either a video presentation or live training as determined by the CO. The Contractor shall be responsible for training additional staff.

The Contractor shall be required to submit a user account form to gain access to the Masterworks.

See Subsection 104.04.

NOTICE: NON-MANDATORY VIRTUAL PRE-BID MEETING

This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will conduct a virtual meeting on Thursday, November 12th from 10:00 a.m. to approximately 11:00 a.m. Mountain Time.

To RSVP send e-mail to CFLcontracts@dot.gov by close of business November 10, 2026.

CO OMAD and ND OMAD pre-bid virtual meeting information:

Thursday, November 12 · 10:00 – 11:00 Time zone: Mountain Time Google Meet joining info Video call link: https://meet.google.com/unz-gkav-hmp Or dial: (US) +1 609-736-2860 PIN: 554 501 332# More phone numbers: https://tel.meet/unz-gkav-hmp?pin=1809875879359

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

6982AF27B000010

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

10/27/2026

PAGE OF

PAGES

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

HFLCEO260332PR

6. PROJECT NO.

CO OMAD 300(71)

7. ISSUED BY:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

Eric Grosskreuz, Acquisition Program Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:

1. 48 CFR, CHAPTER 1, FEDERAL ACQUISITION REGULATION (FAR), REVOLUTIONARY FAR OVERHAUL (RFO)

AND THE DEPARTMENT OF TRANSPORTATION ACQUISITION REGULATION (TAR)

2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES.

3. SPECIAL CONTRACT REQUIREMENTS.

4. PLANS.

5. BID SCHEDULE.

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-24, U.S. CUSTOMARY UNITS.

See Subsection 104.04 of the FP-24 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *See Page A-3

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 12/02/26 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

X

X

A-1

STANDARD FORM 1442 (REV. 12/2022) BACK

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

UEI.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

THE UNITED STATES CODE AT

□ 10 U.S.C. 3204(a)( ) □ 41 U.S.C. 3304(a)( )

26. ADMINISTERED BY CODE: 27. PAYMENT WILL BE MADE BY

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

A-2

Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.

Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.

FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov .

Item 11: COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than See SCR Section 108.01, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

Item 12A: PERFORMANCE AND PAYMENT BONDS: See RFO Clause 52.228-15 Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-24.

Item 13B: BID BOND AMOUNT: See RFO Provision 52.228-1 Bid Guarantee (Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-

24. All bid guarantees must have original signatures with original corporate seals.

Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO

ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE

DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY

RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov.

Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the

FP-24.

ESTIMATED

PRICE: The price range of the project work is between $5,000,000 and $10,000,000.

A-3

Bid Schedule Instructions

BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of three (3) schedules. Before preparing the bid, carefully read the Solicitation Provisions and the following:

• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government

• Multiply the unit price by the quantity for each pay item and show the amount bid.

When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.

• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.

• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.

NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern, and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.

A-4

Basis for Award

To be eligible for award of contract, the offeror shall submit prices for each item necessary to complete all contract work in Schedule A, Schedule B and Schedule C.

The Government will evaluate the total of Schedule C first. If funds are not available for Schedule C at the time of award, the Government will evaluate Schedule B. If funds are not available for Schedule B at the time of award, the Government will evaluate Schedule A.

Accordingly, award of contract, if made, will be made to the lowest responsive, responsible bidder, subject to funds availability.

A-5

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

BID SCHEDULE

A-6Bid Schedule Project: CO OMAD 300(71), MINUTEMAN MISSILE ACCESS ROAD

BID SCHEDULE

Project No : CO OMAD 300(71) Schedule : A

Project Name : MINUTEMAN MISSILE ACCESS

ROAD

Schedule Type : Base

Contract Quantity Pay Items

No Contract Quantity Pay Items

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15215-3000

SURVEY AND

STAKING, DRAINAGE

STRUCTURE

8.000 EACH

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

A0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0120 15701-0000 SOIL EROSION

CONTROL ALL LPSM

A0140 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

A0160 20301-2000 REMOVAL OF PIPE

END SECTION 1.000 EACH

A0180 20302-2100 REMOVAL OF PIPE

CULVERT 295.000 LNFT

A0200 20402-0000 SUBEXCAVATION 75.000 CUYD

A0220 20420-0000 EMBANKMENT

CONSTRUCTION 15.000 CUYD

A0240 30110-0000 AGGREGATE

SURFACE COURSE 96,200.000 TON

A0260 30110-0000 AGGREGATE

SURFACE COURSE

(HAUL ROADS) 500.000 TON

A0280 30301-5000

AGGREGATE

SURFACE

RECONDITIONING

29.250 MILE

A0300 60201-0600 18-INCH PIPE

CULVERT 10.000 LNFT

A0320 60201-0700 21-INCH PIPE

CULVERT 10.000 LNFT

A0340 60201-0800 24-INCH PIPE

CULVERT 20.000 LNFT

A0360 60202-0400

24-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

90.000 LNFT

A0380 60202-0500

30-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

125.000 LNFT

A0400 60210-0600 END SECTION FOR 18-

INCH PIPE CULVERT 4.000 EACH

A0420 60210-0700 END SECTION FOR 21-

INCH PIPE CULVERT 2.000 EACH

A0440 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT 4.000 EACH

A0460 60210-1200 END SECTION FOR 48-

INCH PIPE CULVERT 2.000 EACH

A-7Bid Schedule

A0480 60211-0800

END SECTION FOR 24-

INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

8.000 EACH

A0500 60211-0900

END SECTION FOR 30-

INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

8.000 EACH

A0520 60704-0000 CLEANING CULVERT

IN PLACE 11.000 EACH

A0540 62201-0200

DUMP TRUCK, 8

CUBIC YARD MINIMUM

CAPACITY

10.000 HOUR

A0560 62201-0950

WHEEL LOADER, 3

CUBIC YARD MINIMUM

RATED CAPACITY

10.000 HOUR

A0580 62201-2850

MOTOR GRADER, 12

FOOT MINIMUM

BLADE

20.000 HOUR

A0600 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

10.000 HOUR

A0620 62301-0000 GENERAL LABOR 15.000 HOUR

A0640 62302-1100

SPECIAL LABOR,

HIRED SURVEY

SERVICES

20.000 HOUR

A0660 63308-2000 OBJECT MARKER,

TYPE 2

(OM2-2V) 14.000 EACH

A0680 63309-0200 DELINEATOR, TYPE 2 14.000 EACH

A0700 63501-0000 TEMPORARY TRAFFIC

CONTROL ALL LPSM

Submitted By: Schedule Total:

A-8Bid Schedule

Project No : CO OMAD 300(71) Schedule : B

Project Name : MINUTEMAN MISSILE ACCESS

ROAD

Schedule Type : Base

Contract Quantity Pay Items

No Contract Quantity Pay Items

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

B0020 15101-0000 MOBILIZATION ALL LPSM

B0040 15215-3000

SURVEY AND

STAKING, DRAINAGE

STRUCTURE

12.000 EACH

B0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

B0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

B0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

B0120 15701-0000 SOIL EROSION

CONTROL ALL LPSM

B0140 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

B0160 20301-2000 REMOVAL OF PIPE

END SECTION 1.000 EACH

B0180 20302-2100 REMOVAL OF PIPE

CULVERT 390.000 LNFT

B0200 20402-0000 SUBEXCAVATION 75.000 CUYD

B0220 20420-0000 EMBANKMENT

CONSTRUCTION 19.000 CUYD

B0240 30110-0000 AGGREGATE

SURFACE COURSE 132,000.000 TON

B0260 30110-0000 AGGREGATE

SURFACE COURSE

(HAUL ROADS) 850.000 TON

B0280 30301-5000

AGGREGATE

SURFACE

RECONDITIONING

40.010 MILE

B0300 60201-0600 18-INCH PIPE

CULVERT 10.000 LNFT

B0320 60201-0700 21-INCH PIPE

CULVERT 10.000 LNFT

B0340 60201-0800 24-INCH PIPE

CULVERT 20.000 LNFT

B0360 60202-0400

24-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

210.000 LNFT

B0380 60202-0500

30-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

125.000 LNFT

B0400 60210-0600 END SECTION FOR 18-

INCH PIPE CULVERT 4.000 EACH

B0420 60210-0700 END SECTION FOR 21-

INCH PIPE CULVERT 2.000 EACH

B0440 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT 4.000 EACH

B0460 60210-1200 END SECTION FOR 48-

INCH PIPE CULVERT 2.000 EACH

A-9Bid Schedule

B0480 60211-0800

END SECTION FOR 24-

INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

16.000 EACH

B0500 60211-0900

END SECTION FOR 30-

INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

8.000 EACH

B0520 60704-0000 CLEANING CULVERT

IN PLACE 12.000 EACH

B0540 62201-0200

DUMP TRUCK, 8

CUBIC YARD MINIMUM

CAPACITY

15.000 HOUR

B0560 62201-0950

WHEEL LOADER, 3

CUBIC YARD MINIMUM

RATED CAPACITY

15.000 HOUR

B0580 62201-2850

MOTOR GRADER, 12

FOOT MINIMUM

BLADE

30.000 HOUR

B0600 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

15.000 HOUR

B0620 62301-0000 GENERAL LABOR 20.000 HOUR

B0640 62302-1100

SPECIAL LABOR,

HIRED SURVEY

SERVICES

30.000 HOUR

B0660 63308-2000 OBJECT MARKER,

TYPE 2

(OM2-2V) 22.000 EACH

B0680 63309-0200 DELINEATOR, TYPE 2 14.000 EACH

B0700 63501-0000 TEMPORARY TRAFFIC

CONTROL ALL LPSM

Submitted By: Schedule Total:

A-10Bid Schedule

Project No : CO OMAD 300(71) Schedule : C

Project Name : MINUTEMAN MISSILE ACCESS

ROAD

Schedule Type : Base

Contract Quantity Pay Items

No Contract Quantity Pay Items

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

C0020 15101-0000 MOBILIZATION ALL LPSM

C0040 15215-3000

SURVEY AND

STAKING, DRAINAGE

STRUCTURE

16.000 EACH

C0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

C0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

C0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

C0120 15701-0000 SOIL EROSION

CONTROL ALL LPSM

C0140 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

C0160 20301-2000 REMOVAL OF PIPE

END SECTION 1.000 EACH

C0180 20302-2100 REMOVAL OF PIPE

CULVERT 540.000 LNFT

C0200 20402-0000 SUBEXCAVATION 85.000 CUYD

C0220 20420-0000 EMBANKMENT

CONSTRUCTION 25.000 CUYD

C0240 30110-0000 AGGREGATE

SURFACE COURSE 150,300.000 TON

C0260 30110-0000 AGGREGATE

SURFACE COURSE

(HAUL ROADS) 1,000.000 TON

C0280 30301-5000

AGGREGATE

SURFACE

RECONDITIONING

45.670 MILE

C0300 60201-0600 18-INCH PIPE

CULVERT 10.000 LNFT

C0320 60201-0700 21-INCH PIPE

CULVERT 10.000 LNFT

C0340 60201-0800 24-INCH PIPE

CULVERT 20.000 LNFT

C0360 60202-0400

24-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

300.000 LNFT

C0380 60202-0500

30-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

180.000 LNFT

C0400 60202-1000

60-INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

8.000 LNFT

C0420 60210-0600 END SECTION FOR 18-

INCH PIPE CULVERT 4.000 EACH

C0440 60210-0700 END SECTION FOR 21-

INCH PIPE CULVERT 2.000 EACH

C0460 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT 4.000 EACH

A-11Bid Schedule

C0480 60210-1200 END SECTION FOR 48-

INCH PIPE CULVERT 2.000 EACH

C0500 60211-0800

END SECTION FOR 24-

INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

22.000 EACH

C0520 60211-0900

END SECTION FOR 30-

INCH EQUIVALENT

DIAMETER ARCH OR

ELLIPTICAL PIPE

CULVERT

10.000 EACH

C0540 60704-0000 CLEANING CULVERT

IN PLACE 14.000 EACH

C0560 60706-0000 CLEANING DRAINAGE

STRUCTURE 1.000 EACH

C0580 62201-0200

DUMP TRUCK, 8

CUBIC YARD MINIMUM

CAPACITY

20.000 HOUR

C0600 62201-0950

WHEEL LOADER, 3

CUBIC YARD MINIMUM

RATED CAPACITY

20.000 HOUR

C0620 62201-2850

MOTOR GRADER, 12

FOOT MINIMUM

BLADE

35.000 HOUR

C0640 62201-3150

HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

20.000 HOUR

C0660 62301-0000 GENERAL LABOR 25.000 HOUR

C0680 62302-1100

SPECIAL LABOR,

HIRED SURVEY

SERVICES

35.000 HOUR

C0700 63308-2000 OBJECT MARKER,

TYPE 2

(OM2-2V) 34.000 EACH

C0720 63309-0200 DELINEATOR, TYPE 2 14.000 EACH

C0740 63501-0000 TEMPORARY TRAFFIC

CONTROL ALL LPSM

Submitted By: Schedule Total:

A-12Bid Schedule

Total-Schedule(s) and Option(s) Bid Total

Schedule A, Schedule B, Schedule C $0.00

BID SCHEDULE SUMMARY

Schedule Bid Total

Schedule A - Base $0.00

Schedule Bid Total

Schedule B - Base $0.00

Schedule Bid Total

Schedule C - Base $0.00

A-13Bid Schedule Project: CO OMAD 300(71), MINUTEMAN MISSILE ACCESS ROAD

Rectangle

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, (name), certify that I am the

(title), of the corporation named as the

Offeror/Principal herein;

that (name), who signed this offer and/or bid bond on behalf of (company name) is

(title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

(signature) Affix Corporate Seal

(title)

A-14

INSTRUCTIONS: When the offeror/principal is a limited liability corporation, include this certification with your offer/bid.

Limited Liability Certificate

I, (name), certify that I am the

(title), of the limited liability company named as the Offeror/Principal herein;

that (name), who signed this offer and/or bid bond on behalf of (company name) is

(title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

(signature) Affix Company Seal (as applicable)

(title)

A-15

INSTRUCTIONS: When the offeror/principal is a partnership, include this certification with your offer/bid.

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting

Officer.

(Include names and signatures of all partners)

A-16

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification with your offer/bid.

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledged by the Contracting

Officer.

(Include names and signatures of all applicable individuals)

A-17

INSTRUCTIONS: When the offeror/principal is a sole proprietorship, include this certification with your offer/bid.

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor. If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

A-18

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the RFO are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under RFO Clause 52.225-9 Paragraph (c) & (d) and RFO Provision 52.225-10 Paragraph (b).

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

A-19

HAZARDOUS MATERIALS

As required by RFO Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the RFO clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material Identification Number

BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES

See RFO Provision 52.223-1 Biobased Product Certification and RFO 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts for usage, certification, and reporting requirements.

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

A-20

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0001 Expiration Date: 1/31/2027

Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture

Corporation Other (Specify)

State Of Incorporation

Surety(ies) (Name And Business Address)

Penal Sum Of Bond Bid Identification Percent Of Bid Price

Amount Not To Exceed Bid Date Invitation Number 6982AF27B000010 Million(s)

Thousand(s)

Hundred(s)

Cents

For (Construction , Supplies Or Services)

Construction

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Authorized For Local Reproduction STANDARD FORM 24 (REV. 10/2023) Previous Edition Is Not Usable Prescribed by GSA – FAR (48 CFR) 53.228(a)

B-1

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

Principal

Signature(s) 1.

(Seal)

2.

(Seal)

3.

(Seal)

Corporate Seal Name(s)

And Title(s) (Typed)

1. 2. 3.

Individual Surety(ies)

Signature(s) 1. (Seal) 2. (Seal)

Name(s) (Typed)

1. 2.

Corporate Surety(ies)

S u re ty

A

Name And Address

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

S u re

B

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

S u re

C

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

S u re

D

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

B-2

S u re

E

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

S u re

F

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

S u re

G

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

STANDARD FORM 24 (REV. 10/2023) PAGE 3

B-3

Eric.Grosskreuz Line

Line

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form

28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include

"proposal" and "offeror."

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F

Street, NW, Washington, DC 20405.

STANDARD FORM 24 (REV. 10/2023) PAGE 4

B-4

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LAND HIGHWAY DIVISION

BIDDER’S INFORMATION

INSTRUCTIONS: Answer all questions on this form by inserting "none" or "not applicable" where appropriate. If more space is required, attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.

1. Name and address of business

Name Unique Entity ID (See RFO Provision 52.204-91)

Street Employer ID Number (EIN)* *Necessary for Government reporting purposes only

City State Zip Code

County

Telephone Number (Include Area Code)

Fax Number (Include Area Code) E-mail Address

2. a. Type of organization (check appropriate box):

☐ Individual ☐ Non-Profit Organization ☐ Corporation ☐ Partnership ☐ Joint

Venture ☐ Incorporated in:

If a foreign entity:

☐ Individual ☐ Non-Profit Organization ☐ Corporation ☐ Partnership ☐ Joint

Venture ☐ Registered in

b. Size and Type of Business Concern (check appropriate boxes):

☐ Large Business Concern ☐ Small Disadvantaged Business Concern

☐ Emerging Small Business

☐ Small Business Concern ☐ Women-Owned Small Business

☐ SBA 8(a) Certified

☐ HUBZone Business Concern ☐ Veteran Owned Business Concern

☐ Service-Disabled Veteran-Owned Business Concern

B-5

3. If a Joint Venture or General Partnership:

a. Provide the name under which the project will be bid, the home office address, and the name of the principal who will represent the company with the regard to this project if different from “1” above.

Principal

Business Name

Street

City State Zip Code

b. Provide the name of the home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attache a separate sheet for additional partners.

Sponsoring Partner Other Partner

Street Street

City State Zip Code City State Zip Code

4. Date Organization Established

5. Name of succeeded business (if any):

6. How many years have you been in business at:

a. General Contractor years.

b. Subcontractor years.

7. a. Furnish the following information concerning the owner, partners, officers and directors:

Name Title Percent of Business

Owned

Years of Business Experience

Contracting Other

b. Attach resumes of key personnel as well as the on-site manager(s) and superintendent(s), and specifically identify the following

- Present position, responsibility, and length of employment

- Amount and type of construction

- Amount and type of highway construction experience, including position, responsibility, and a brief project description for each period of employment.

- Formal education and training, professional or technical registrations or licenses.

B-6

8. a. Contracts in force. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, and Contact Name, Email and

Telephone # Scope of Work Performed Contract Amount Estimated

Completion Date Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-7

9. a. List up to five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, Contact Name, Email and

Telephone # Scope of Work

Performed Original and Final Contract Amounts

Original and Final Completion Dates

Names of On-site Project Manager and Superintendent

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet

B-8

B-9

Solicitation Provisions

52.203-2 Certificate of Independent Price Determination (APR 1985)

(a) The offeror certifies that-

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to-

(i) Those prices;

(ii) The intention to submit an offer; or

(iii) The methods or factors used to calculate the prices offered.

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory-

(1) Is the person in the offeror’s…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .