CO FLAP PUW16(1) For AD Plans.pdf
PDF 38 MB Posted
- Attached to
- CO FLAP PUW 16(1), Nichols Road
- Solicitation number
- 6982AF22B000027
About this file
This federal contract opportunity solicitation seeks construction services for road and trail reconstruction projects in Pueblo West, Colorado. The solicitation was issued by the Department of Transportation Federal Highway Administration as number 6982AF22B000027. Services required include reconstructing approximately 8,220 linear feet of Nichols Road and 725 linear feet of McColluch Road to add turn lanes at their intersection, and building an 8-foot asphalt trail spanning 8,220 feet, an 8-foot concrete trail spanning 725 feet, and a 160-foot pedestrian bridge over the Union Pacific Railroad. The project aims to improve access to Lake Pueblo State Park.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D E P
A R T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
PROJECT MANAGER
DENVER, COLORADO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
FOR
PLANS PREPARED BY
DATE:
APPROVED:
DATE:
Slopes are expressed as RISE:RUN
U.S. CUSTOMARY DIMENSIONS:
Know what'sbelow.
before you dig.Call
R www.call811.com
Denver, CO 80202-4824
Suite 3400
1670 Broadway
HDR Engineering, Inc.
PROJECTS, FP-14"
OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
"STANDARD SPECIFICATIONS FOR CONSTRUCTION
SPECIFICATIONS:
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
CHIEF OF ENGINEERING
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION A1
Greeley
Sterling
Limon
Pueblo
Walsenburg
Cortez Durango
DENVER
COLORADO
SPRINGS
Steamboat
Springs
GRAND
WYOMING NEBRASKA
OKLAHOMA
NEW MEXICO
UTAH KANSAS
Trinidad
KEY MAP OF COLORADO
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
JUNCTION
Gunnison Montrose
PLANS FOR PROPOSED
CO FLAP PUW16(1)
NICHOLS ROAD
improvements, and pedestrian bridge construction.
reconstruction, concrete sidewalk, fencing, minor drainage
Roadway rehabilitation, trail construction, intersection widening and
TYPE OF CONSTRUCTION:
e(max) ---------------
V --------------------
T --------------------
D --------------------
DHV ------------------
ADT (2042) -----------
ADT (2022) -----------
DESIGN DESIGNATIONS: MCCULLOCH BLVD
e(max) ---------------
V --------------------
T --------------------
D --------------------
DHV ------------------
ADT (2042) -----------
ADT (2022) -----------
DESIGN DESIGNATIONS: NICHOLS RD
PUEBLO WEST METRO DISTRICT
KNOWLES
CO FLAP PUW16(1)
PROJECT LOCATION
4%
50 MPH
Not Available
Not Available
Not Available
4%
35 MPH
Not Available
Not Available
Not Available
INTERSTATE
INTERSTATE
Pueblo
NO SCALE
NICHOLS RD
PROJECT CO FLAP PUW16(1)
By Letter Dated 11/14/2020
OPTION X TOTAL LENGTH 0.93 MILES
OPTION X TRAIL LENGTH 0.93 MILES
SCHEDULE A TOTAL LENGTH 1.77 MILES
SCHEDULE A BRIDGE LENGTH 0.03 MILES
SCHEDULE A TRAIL LENGTH 0.77 MILES
SCHEDULE A ROADWAY LENGTH 0.97 MILES
PUEBLO COUNTY
PUEBLO WEST METRO DISTRICT
STATE PROJECT
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
T L C
O F L
A P P
U W
.d g n
CO FLAP PUW16(1)
01/31/2022
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
U.S. CUSTOMARY STANDARD
A2
DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D
EROSION & SEDIMENT CONTROL SYMBOLS
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
S/W
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic sidewalk south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
ABBREVIATIONS
jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
HCL
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CSP
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A joint interior increment inclusive,including inside diameter highway high water horizontal horizontal control line hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers corrugated steel pipe point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d S
Y M C
O F L
A P P
U W
.d g n
01/14/2022
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
U.S. CUSTOMARY STANDARD
A3
WATER WATER
UTILITY
PEDESTAL
UTILITY
PEDESTAL
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Fire Hydrant
Water Valve
Underground Utility (Existing, Proposed)
PROJECT SPECIFIC ABBREVIATIONS
MCBL
NIRO
TRNO
TRSO
McCulloch Blvd
Nichols Road
Trail North
Trail South
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
PROJECT SPECIFIC SYMBOLS
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d S
Y M C
O F L
A P P
U W
.d g n
02/08/2022
SURVEY CONTROL
A4
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d C
O F L
A P P
U W
P r o jC o o r d s .d g n
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d S
T E C
O F L
A P P
U W
.d g n
CO FLAP PUW16(1)
0+
310+00
320+
330+00
340+00
400+00
410+00
420+00
430+00
440+00
130+00
120+00
110+
100+00
0+
2000'1000'0
Scale in Feet Begin Pedestrian Bridge
307+76
End Pedestrian Bridge
309+38
SITE MAP
Nichols Road Schedule A
Route 016
Station 100+67.00
CO FLAP PUW 16(1)
Begin Nichols Road
Trail South Schedule A
Station 300+50.00
CO FLAP PUW 16(1)
Begin Trail South
NOTE:
1.
District right-of-way.
Stay within the existing Pueblo West Metro area/storage of materials/stockpiles/ etc.
the northernmost trail connection for a staging trail alignment between McCulloch Blvd and
District property located along the pedestrian
The Contractor may use the Pueblo West Metro
See Note 1
Staging Area
Potential
Begin
See Note 1
Staging Area
End Potential A5
Trail North Option X
Station 449+16
CO FLAP PUW 16(1)
End Trail North
Trail North Option X
Station 400+28
CO FLAP PUW 16(1)
Begin Trail North
McCulloch Blvd Schedule A
Station 217+26
CO FLAP PUW 16(1)
End McCulloch Blvd
McCulloch Blvd Schedule A
Station 200+20
CO FLAP PUW 16(1)
Begin McCulloch Blvd
Trail South Schedule A
Station 342+84
CO FLAP PUW 16(1)
End Trail South
Nichols Road Schedule A
Route 016
Station 134+66
CO FLAP PUW 16(1)
End Nichols Road
A6
Average 24'
Existing width varies from 24' to 29'
C RoadwayL varies
Shldr.
varies
Shldr.
placed on native soils.
No aggregate base. Asphalt
3" existing asphalt pavement.
Fog sealPrime coat
2.0% 2.0%
(top of pavement)
Profile grade
5'
24' tack coat between lifts pavement placed in two lifts, 4" Asphalt concrete
1.
limit stake Slope limit stake Slope
LC Roadway
Varied excavation
NO SCALE
NOTE:
1.
100+67 to 134+66
200+20 to 217+26
0.97
Nichols Road
McCulloch Blvd.
Station to Station
LENGTH OF PROJECT
Alignment
400+28 to 449+16
Trail South
Trail North
8" Aggregate base
2.
3.
300+50 to 307+76
Varies guardrail and reset
Remove guardrail and reset
Remove
1:10 1:10
Traveled way
12'
Traveled way
12'
TOTAL (ft)
TOTAL (mi)
Trail South
Trail South
307+76 to 309+38
309+38 to 342+84
2' 2'
1.
support
Lateral
Variable fill slope grade
Finished tr a v e le d w a y
E d g e o f
2'
Hinge point
8" block
GUARDRAIL DETAIL
4" Asphalt curb4" Asphalt curb
8"
2"
See detail
Curb, 4" depth structural section Section for pavement
See Mainline Typical
2"4"2"
1/2" R
4-INCH DEPTH
ASPHALT CURB,
structural section Section for pavement
See Mainline Typical
2"
Tack coat
Traveled way
~11'
Traveled way
~11' and mulching
Topsoil, seeding, and mulching
Topsoil, seeding, 4.
3. 3.
4. 4.
Install per manufacturer's recommendations
Topsoil shall be placed at a 4" depth.
See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
100+67 to 103+00
NICHOLS ROAD
EXISTING TYPICAL SECTION
100+67 to 103+00
SCHEDULE A
NICHOLS ROAD
TYPICAL SECTION
SCHEDULE A
NICHOLS ROAD
TYPICAL SECTIONS
Bridge (ft)
Schedule A Option X
TOTAL (mi) 1.77
0.77 0.03
0.93
0.93
(4" depth) Strip topsoil grubbing limits Clearing and grubbing limits Clearing and
(4" depth) Strip topsoil
Construction limits
Roadway (ft) Trail (ft) Trail (ft)
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
Y P C
O F L
A P P
U W
.d g n
A7
Average 24'
Existing width varies from 23' to 25'
C RoadwayL
Shldr.
1'
Shldr.
1' placed on native soils.
No aggregate base. Asphalt
3" existing asphalt pavement.
NOTE:
1.
2.
3.
Fog seal Prime coat
2' Paved shoulder 2' Paved shoulder
5'
See Detail A
8'
1.8%
HCL TRSO
(top of pavement)
Profile grade tack coat between lifts pavement placed in two lifts, 4" asphalt concrete
28' limit stake Slope limit stake Slope
2.0% 2.0%
Varied excavation
C RoadwayL
ROW
8" Aggregate base
Clearzone
12'
Clearzone
12'
1:12
6'
1:6
DETAIL A
30° base
Aggregate
Asphalt concrete pavement
0.72'
1:6
Construct 30° pavement edge (safety edge)
NO SCALESee plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for
3.
2% Max. superele vation
Min. superelevation 0.5% width clear Min.
Max
2'
3" Asphalt sidewalk
(not measured for payment)
6" Aggregate base
1.
Traveled way
~11'
Traveled way
~11'
12' Traveled way
14'
12' Traveled way
14' and mulching
Topsoil, seeding, and mulching
Topsoil, seeding and mulching
Topsoil, seeding
Topsoil shall be placed at a 4" depth.
Swale back slope may vary. See cross sections for additional information.
See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
4.
4. 4.
SCHEDULE A
NICHOLS ROAD
TYPICAL SECTIONS
CL
Varies 8' Swale
Strip topsoil (4" depth) Strip topsoil (4" depth) grubbing limits Clearing and
Construction limits grubbing limits Clearing and
311+31 to 340+16
SCHEDULE A
SOUTH TRAIL
103+00 to 131+93
SCHEDULE A
NICHOLS ROAD
TYPICAL SECTION
311+31 to 340+16
SOUTH TRAIL
103+00 to 131+93
NICHOLS ROAD
EXISTING TYPICAL SECTION
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
Y P C
O F L
A P P
U W
.d g n
A8
C RoadwayL placed on native soils.
No aggregate base. Asphalt
3" existing asphalt pavement.
Shldr.
Varied
Left turn lane
~11'
Right turn lane
~10'
Average 40'
Existing width varies from 37' to 44'
Shldr.
Varied
Fog seal limit stake Slope
Varied excavation tack coat between lifts pavement placed in two lifts, 4" asphalt concrete
39'
2.0
NO SCALE
1' Paved shoulder
C RoadwayL
8" Aggregate base
Clearzone
12'
Left turn lane
12'
12' Right turn lane
13'
NOTE:
1.
2.
3.
4.
DETAIL A
30° base
Aggregate
Asphalt concrete pavement
0.72'
1:6
Construct 30° pavement edge (safety edge)
1:6
See Detail A
Prime coat
2' Paved shoulder
8'
1.8%
HCL TRSO
(top of pavement)
Profile grade limit stake Slope
2.0%
L
ROW
Clearzone
12'
1:12
6" Aggregate base (not measured for payment)
1.
3.
width clear Min.
2'
C Swale
Varies
L C Swale
8'
L
Traveled way
~11'
12' Traveled way
14'
3" Asphalt sidewalk and mulching
Topsoil, seeding, and mulching
Topsoil, seeding and mulching
Topsoil, seeding, 4.4.
Topsoil shall be placed at a 4" depth.
for additional information.
From 133+78 to 134+57 lane width varies within intersection. See intersection detail
Swale back slope may vary. See cross sections for additional information.
See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
5.
5. 5.
SCHEDULE A
NICHOLS ROAD
TYPICAL SECTIONS
Strip topsoil (4" depth) Strip topsoil (4" depth)
Clearing and grubbing limits Clearing and grubbing limits
340+16 to 342+84
SCHEDULE A
SOUTH TRAIL
132+73 to 134+66
INTERSECTION WIDENING 131+93 to 132+73
SCHEDULE A
NICHOLS ROAD
TYPICAL SECTION
340+16 to 342+84
SOUTH TRAIL
132+73 to 134+66
INTERSECTION WIDENING 131+93 to 132+73
NICHOLS ROAD
EXISTING TYPICAL SECTION
Max
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
Y P C
O F L
A P P
U W
.d g n
A9
NO SCALE
Average 30'
Existing width varies from 30' to 31'
Traveled way
~12' placed on native soils.
No aggregate base. Asphalt
3" existing asphalt pavement.
Shldr.
C RoadwayL
Shldr.
Traveled way
~12'
3' - 4'
Varies
3' - 5'
Shldr.
stake Slope
Clearzone
16'
Varies
1.
tack coat between lifts pavement placed in two lifts, 4" asphalt concrete
Varied excavation
See Detail A
(top of pavement)
Profile grade
Fog seal
2.0%
Prime coat traveled way
Westbound
12'
Eastbound
12' traveled way
C RoadwayL Clearzone
16'
Paved
4' stake Slope
Paved
4'
2.0%
Shldr.
8" Aggregate base
NOTE:
2.
0' - 12'
/ Turn lane Painted median
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for
1:61:6
Varies
DETAIL A
30° base
Aggregate
Asphalt concrete pavement
0.72'
1:6
Construct 30° pavement edge (safety edge)
4% Max. superele vation
Varies
Min. superelevation 4% and mulching
Topsoil, seeding, and mulching
Topsoil, seeding, Topsoil shall be placed at a 4" depth.
See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
3.
3. 3.
200+20 to 217+26
MCCULLOCH BLVD
EXISTING TYPICAL SECTION
200+20 to 217+26
SCHEDULE A
MCCULLOCH BLVD
TYPICAL SECTION
SCHEDULE A
MCCULLOCH BLVD.
TYPICAL SECTIONS
Strip topsoil (4" depth) Strip topsoil (4" depth) grubbing limits Clearing and grubbing limits Clearing and
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
Y P C
O F L
A P P
U W
.d g n
A10 stake
Slope
Varies
(top of pavement)
Profile grade
8' limit stake Slope
NO SCALE
Existing roadway
8' Shldr.
3' Graded
1.8%
1:4
Profile grade
Varies Varies
3' Graded
1:4
400+28 to 449+16
NORTH TRAIL
EXISTING TYPICAL SECTION
309+38 to 311+31
300+50 to 307+76
SOUTH TRAIL
EXISTING TYPICAL SECTION
limit stake Slope limit stake Slope
NOTE:
1.
2.
3.
6" Aggregate base (not measured for payment)
3" Asphalt sidewalk
4'
4" Sidewalk aggregate
1:61:6
1:6
Varies
3.
Average 10'
Existing maintenance access and mulching
Topsoil, seeding, and mulching
Topsoil, seeding, and mulching
Topsoil, seeding, and mulching
Topsoil, seeding, Clearing and construction limits
Clearing and construction limits
1:6 1:6
3' Varies
2.
2.
1. 1.
Strip topsoil (4" depth)
Strip topsoil (4" depth)
4.
5.
5. 5.
5. 5.
8' Shldr.
3' Graded
Profile grade
Varies Varies
3' Graded limit stake Slope limit stake Slope
1:61:6
3.
and mulching
Topsoil, seeding, and mulching
Topsoil, seeding, Clearing and construction limits
Strip topsoil (4" depth)
5. 5.
(not measured for payment)
6" Aggregate Base
3" Asphalt Sidewalk
300+50 to 307+76
SCHEDULE A
SOUTH TRAIL
TYPICAL SECTION
309+38 to 311+31
SCHEDULE A
SOUTH TRAIL
TYPICAL SECTION
400+28 to 449+16
OPTION X
NORTH TRAIL
TYPICAL SECTION
OPTION X
NORTH TRAIL
SCHEDULE A
SOUTH TRAIL
TYPICAL SECTIONS
(not measured for payment)
4" Aggregate base concrete sidewalk 4" Colored
TRSO
HCL
TRSO
HCL
TRSO
HCL
Topsoil shall be placed at a 4" depth.
in the plans.
Place contraction joints at intervals equal to the width of the sidewalk as shown side of the proposed pedestrian bridge.
Colored concrete sidewalk required for the sidewalk section located on the south
See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
Y P C
O F L
A P P
U W
.d g n
STATION
CLASS
TYPE1.
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach
(ft)
R
(ft)
R
(ft)
W 1 2
Variable
W
Variable3' minimum
16'x
20' desired
15' min.
1.3' W
1.3' d
CLASSTYPE
APPLICATION
SAMPLE
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
N/A
6' (typ.)
U
S E
R
A11
CLASS
TYPE
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
6' (typ.)
6' (typ.)
Paved driveway
ADT = 200
100 = ADT < 199
25 = ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
127+74.37 Lt.
117+19.52 Rt.
112+53.82 Lt.
108+40.51 Rt.
105+30.47 Lt.
2D
2D
2D
2D
2D
215+99.56 Lt.
211+06.34 Lt.
210+65.91 Rt.
210+35.23 Lt.
205+49.42 Lt.
202+46.98 Lt.
133+82.48 Lt.
133+11.51 Lt.
132+54.11 Lt.
131+24.63 Lt.
130+36.16 Lt.
121+29.86 Lt.
116+20.56 Lt.
115+59.01 Lt.
113+94.42 Lt.
110+02.62 Rt.
106+93.49 Lt.
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
3A
See Sheet D2
See Sheet D3
See Sheet D4
See Sheet D5
See Sheet D6
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
Drainage Swale Section C-C Applies
& DRIVEWAYS
APPROACH ROADS
TYPICAL SECTIONS
STATION
1.
9.
4.
Variable
V a ria b le
A s
B
A
B
M a in li e
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li grade (optional)
Typical maximum design
A
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k e d NOTE:Paved length
NO SCALE
(1:6 desirable)
1:4 or flatter base edge
Aggregate
Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
TYPICAL PLAN
TYPE 3
APPROACH ROAD
REMARKS
APPROACH ROAD SUMMARY
base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach
4.
3.
2.
3.
1.
2.
2.
Subgrade edge
Aggregate base edge
End Section A-A End Section A-A
Total length
Paved length
90° W
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
90°
Total length
WW
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
REMARKS
DRIVEWAY SUMMARY
7" Minor Concrete Pavement
6" Aggregate Base
1:12 1:12
8'
5.
R
R
Aggregate base edge
8'
SECTION C-C
edge subgrade
Normal
C C
5.
4. 4.
5.
5.5.
6.
7.
7.
4.
PAVEMENT SECTION
MINOR CONCRETE
6-inch depth Aggregate base, 7-inch depth pavement, plain, Minor concrete
8.
8.
8.
8.
9.
8.
7.
6.
5.
4.
3.
2.
1.
9.
Width may vary. See plan and profiles for additional information.
of Nichols Road as part of drainage swale.
Section C-C applies to approach roads and driveways located on the west side
R is on the left side of the approach road centerline.
Vary radii to fit unusual field conditions. Do not reduce existing radii or widths.
6% maximum.
snowy regions restrict this to a 0% to -2% grade. Under special conditions, use
Construct approach roads with landing areas having grades within ±2%. In foreslopes.
Refer to mainline typical sections for structural section thicknesses and
Cross slope may vary. See plan and profiles for additional information.
Under special conditions, the approach road angle shown may be varied ±30°.
roadway construction.
Construct cut and fill slopes for approach roads to match with mainline
Stations shown are approximate locations. Actual locations to be field verified.
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
Y P C
O F L
A P P
U W
.d g n
Sheet and Description
B5 B6 B8-B9 B10-B11 B12 B13 B14 S2
Removals
Summary
Grading
Summary
Surfacing
Summary
Permanent Sign and Pavement
Marking
Summary
Miscellaneous
Summary
Survey and
Staking
Summary
Sidewalk
Summary
Bridge
Summary Allowance Bid Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 7 7
A0030 15215-2000 SURVEY AND STAKING, BRIDGE EACH 1 1
A0040 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 1 1
A0050 15225-0000 SLOPE, REFERENCE, AND CLEARING AND
GRUBBING CONTROL MILE 1.18 1.18
A0060 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 2.37 2.37
A0070 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0090 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 5,009 291 5,300
A0110 15720-0000 STORM WATER POLLUTION PREVENTION
PLAN LPSM ALL
A0120 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0130 20101-0000 CLEARING AND GRUBBING ACRE 6.01 0.29 6.30
A0140 20301-0100 REMOVAL OF BOLLARD EACH 3 3
A0150 20301-1100 REMOVAL OF GATE EACH 1 1
A0160 20301-2400 REMOVAL OF SIGN EACH 12 12
A0170 20302-0400 REMOVAL OF CURB, ASPHALT LNFT 287 23 310
A0180 20302-0700 REMOVAL OF FENCE LNFT 207 13 220
A0190 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 15,929 871 16,800
A0200 20303-2300 REMOVAL OF PAVEMENT, CONCRETE SQYD 603 37 640
A0210 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 161 9 170
A0220 20402-0000 SUBEXCAVATION CUYD 250 250 As directed by CO
A0230 20420-0000 EMBANKMENT CONSTRUCTION CUYD 6,671 329 7,000
A0240 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 3,230 170 3,400
A0250 20703-2000 GEOGRID, STABILIZATION SQYD 150 150 As directed by CO
A0260 20801-0000 STRUCTURE EXCAVATION CUYD 150 150 Contract Quantity
A0270 20803-0000 STRUCTURAL BACKFILL CUYD 290 290 Contract Quantity
A0280 30101-0000 AGGREGATE BASE TON 9,619 481 10,100
A0300 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 4,216 234 4,450
A0310 40601-0000 FOG SEAL TON 8.00 1.00 9.00
A0320 41101-1000 PRIME COAT, METHOD 1 TON 27 3 30
A0330 41105-0000 BLOTTER TON 28.00 2.00 30.00
A0340 41201-0000 TACK COAT TON 8.00 1.00 9.00
A0350 50101-2700 MINOR CONCRETE PAVEMENT, PLAIN,
7-INCH DEPTH SQYD 1,014 86 1,100
A0360 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 126 126 Contract Quantity
MileStone: For AD
Date Completed: 06/03/22
Report Date: 06/03/22
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -J u n -2
:3
A
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities c p w w o rk in g \c e n tr a l0
\d
C O
F L A P P
U W
(1
F o r
A D
S O
Q .x ls m
]S h e e t
STATE PROJECT
B1CO FLAP PUW 16(1)CO
SHEET
NUMBER
06/03/2022
Removals
Summary
Grading
Summary
Surfacing
Summary
Permanent Sign and Pavement
Marking
Summary
Miscellaneous
Summary
Survey and
Staking
Summary
Sidewalk
Summary
Bridge
Summary Allowance Bid Schedule
A0370 55235-0000 EXPANSION JOINTS LNFT 26 26 Contract Quantity
A0380 55401-1000 REINFORCING STEEL LB 17,700 17,700 Contract Quantity
A0390 55504-0000 PRE-FABRICATED STEEL BRIDGE LPSM All ALL Contract Quantity
A0400 55601-0900 BRIDGE RAILING, STEEL LNFT 80 80 Contract Quantity
A0410 60201-0600 18-INCH PIPE CULVERT LNFT 32 32
A0420 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 2 2
A0430 60901-2100 CURB, ASPHALT, 4-INCH DEPTH LNFT 287 23 310
A0440 61501-0100 SIDEWALK, CONCRETE SQYD 55 5 60
A0450 61501-0200 SIDEWALK, COLORED CONCRETE SQYD 645 55 700
A0460 61501-1100 SIDEWALK, ASPHALT SQYD 2,684 166 2,850
A0470 61509-0000 DETECTABLE WARNING PANELS SQYD 16 16
A0480 61708-1000 REMOVE AND RESET, GUARDRAIL LNFT 287 38 325
A0490 61709-4000 REMOVE AND RESET, TERMINAL SECTION EACH 4 4
A0500 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM
CAPACITY HOUR 60
A0510 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 30
A0520 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 30
A0530 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 30
A0540 62301-0000 GENERAL LABOR HOUR 60
A0550 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 30
A0560 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 60
A0570 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH
DEPTH SQYD 21,710 1,090 22,800
A0580 62510-1000 SEEDING, DRY METHOD ACRE 4.49 0.51 5.00
A0590 62515-1000 MULCHING, DRY METHOD ACRE 4.49 0.51 5.00
A0600 63301-0000 SIGN SYSTEM EACH 21 21
A0610 63316-1000 REMOVE AND RESET SIGN EACH 6 6
A0620 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN LNFT 292 28 320
A0630 63402-0700 PAVEMENT MARKINGS, TYPE D, SOLID MILE 5.15 0.15 5.30
A0640 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 26 26
A0650 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN
ARROW EACH 8 8
A0660 63405-1350 PAVEMENT MARKINGS, TYPE D, STRAIGHT
ARROW EACH 8 8
A0670 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
-J u n -2
:3
A
M
MileStone: For AD
Date Completed: 06/03/22
Report Date: 06/03/22 c p w w o rk in g \c e n tr a l0
\d
C O
F L A P P
U W
(1
F o r
A D
S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
STATE PROJECT
B2CO FLAP PUW 16(1)CO
SHEET
Removals
Summary
Grading
Summary
Surfacing
Summary
Permanent Sign and Pavement
Marking
Summary
Miscellaneous
Summary
Survey and
Staking
Summary
Sidewalk
Summary
Bridge
Summary Allowance Bid Schedule
A0680 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC
CONTROL SUPERVISOR LPSM All ALL
A0690 63602-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL
(RRFB) EACH 1 1
A0700 63701-0000 FIELD OFFICE EACH 1
A0710 64620-0400 REMOVE AND RESET MAILBOX EACH 6 6
-J u n -2
:3
A
M
MileStone: For AD
Date Completed: 06/03/22
Report Date: 06/03/22 c p w w o rk in g \c e n tr a l0
\d
C O
F L A P P
U W
(1
F o r
A D
S O
Q .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
STATE PROJECT
B3CO FLAP PUW 16(1)CO
SHEET
B7 B14 B15
Grading Summary Sidewalk
Summary
Permanent Sign and Pavement
Marking Summary
Allowance Bid Schedule
X0010 15101-0000 MOBILIZATION LPSM ALL
X0020 15225-0000 SLOPE, REFERENCE, AND CLEARING AND
GRUBBING CONTROL MILE 0.93 0.93
X0030 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.85 1.85
X0040 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0050 15401-0000 CONTRACTOR TESTING LPSM ALL
X0060 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 4,825 275 5,100
X0080 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
X0090 20101-0000 CLEARING AND GRUBBING ACRE 3.51 0.19 3.70
X0100 20301-2400 REMOVAL OF SIGN EACH 1 1
X0110 20420-0000 EMBANKMENT CONSTRUCTION CUYD 235 15 250
X0120 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 1,887 113 2,000
X0130 61501-0800 SIDEWALK, AGGREGATE SQYD 132 2,250
X0140 61501-1100 SIDEWALK, ASPHALT SQYD 4,329 221 4,550
X0150 61509-0000 DETECTABLE WARNING PANELS SQYD 15 15
X0160 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM
CAPACITY HOUR 30 30
X0170 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 10
X0180 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 10
X0190 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
X0200 62301-0000 GENERAL LABOR HOUR 20
X0210 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 20
X0220 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
X0230 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH
DEPTH SQYD 10,534 466 11,000
X0240 62510-1000 SEEDING, DRY METHOD ACRE 2.18 2.30
X0250 62515-1000 MULCHING, DRY METHOD ACRE 2.18 0.12 2.30
X0260 63301-0000 SIGN SYSTEM EACH 11 11
X0270 63402-0700 PAVEMENT MARKINGS, TYPE D, SOLID MILE 0.05 0.05
X0280 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 14 14
X0290 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
X0300 63602-1000 SYSTEM INSTALLATION, TRAFFIC SIGNAL
(RRFB) EACH 3 3
-J u n -2
:3
A
M
MileStone: For AD
Date Completed: 06/03/22
Report Date: 06/03/22 c p w w o rk in g \c e n tr a l0
\d
C O
F L A P P
U W
(1
F o r
A D
S O
Q .x ls m
]S h e e t
(4
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B4CO FLAP PUW 16(1)CO
SHEET
SCHEDULE A
REMOVAL SUMMARY
B5
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
SUMMARY
GRADING
B6
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
OPTION X
GRADING
B7
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
A
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
08/03/2022
SUMMARY
SURFACING
B8
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
01/28/2022
Sheet 2 of 2
SUMMARY
SURFACING
B9
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
PERMANENT SIGN
B10
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
SUMMARY
PAVEMENT MARKINGS
B11
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
Sheet 2 of 2
SUMMARY
PAVEMENT MARKINGS
B12
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
MISCELLANEOUS
B13
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
SIDEWALK
B14
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
MARKINGS SUMMARY
PERMANENT PAVEMENT
PERMANENT SIGN SUMMARY
B15
U.S. DEPARTMENT OF TRANSPORTATION
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d T
A B C
O F
L A
P P
U W
.d g n
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P N I R
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.6
-0.933% -5.564%
V P I
E L
,9
.1
-5.564% +0.400%
300' VC
K = 50
,9
.4
135' VC
K = 29
SSD = 250'
,9
.9
W A
T E
R
U P
R R
Nichols Rd.
W B e ll a C a s a D r
P O
T
.0
P C
.8
P T
.7
100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00
Existing ground
100'50'0
Scale in Feet
HCL NIRO
PI 105+61.19
D
L = 225.92'
R = 600.00'
T = 114.31'
Existing R/W
Existing R/W
Existing R/W
Curve = NIRO-1
C1
HCL TRSO
NOTE:
information regarding trail construction.
See trail plan and profiles for additional 1.
24'
Curve = NIRO-1
W Bella Casa Dr.
Railroad
0%
-5.0%
5.0%
0%
5.0%
-5.0%
104+51
103+90
106+69
LT & RT EOP
Profile grade and axis of rotation
RT EOP
LT EOP
-2.0%
0.5%
100+86 to 102+54 Lt.
reset guardrail
Remove and
100+62 to 101+81 Rt.
reset guardrail
Remove and
102+54 to 102+91 Lt.
terminal section
Remove and reset
100+81 to 102+18 Rt.
terminal section
Remove and reset
Driveway with end sections
18" pipe culvert
Removal of fence
Removal of gate
Profile grade
.4
.4
A
D
Sta. 102+83.84, 14.00' Rt.
Sta. 102+53.91, 12.00' Rt.
Sta. 102+53.91, 12.00' Lt.
Sta. 102+83.84, 14.00' Lt.
NICHOLS ROAD - SCHEDULE A
Match Existing
Schedule A
Nichols Road
Station 100+67
CO FLAP PUW 16(1)
Begin Project
Schedule A
Nichols Road
Station 100+67
CO FLAP PUW 16(1)
Begin Project
08/03/2022
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P N I R
O P
U W
.d g n
CO FLAP PUW16(1)
T
W A T E R
S T
O P
T
S T
O P
W A T E R
W C a m b r ia D r
Nichols Rd.
W Y e r b a B u e n a D r
P T
.7
P C
.2
107+00 107+50 108+00 108+50 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 113+00 113+50 114+00
Existing ground
100'50'0
Scale in Feet
Existing R/W
HCL NIRO
Existing R/W
PI 115+42.59
D
L = 359.49'
R = 600.00'
T = 185.32'
HCL TRSO
Curve = NIRO-2
C2 information regarding trail construction.
See trail plan and profiles for additional
NOTE:
1.
31'
Curve = NIRO-2
W Cambria Dr. W Yerba Buena Dr.
26'
LT & RT EOP
Profile grade and axis of rotation
-2.0%
2.0%
LT EOP
RT EOP
-5.0%
0%
5.0%
-5.0%
0%
5.0%
107+20 112+85
113+75.32
Driveway Driveway reset mailbox
Remove and
Profile grade
.4
A
D
.8
.4
A
.5
A
110+02.62
D
NICHOLS ROAD - SCHEDULE A
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P N I R
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.1
+0.400% +1.168%
100' VC
K = 130
T
T
W A
T E
R
T
Nichol s Rd.
W G a r c ia C t.
P T
.7
114+00 114+50 115+00 115+50 116+00 116+50 117+00 117+50 118+00 118+50 119+00 119+50 120+00 120+50 121+00
Existing ground
100'50'0
Scale in Feet
PI 115+42.59
D
L = 359.49'
R = 600.00'
T = 185.32'
Existing R/WHCL NIRO
Existing R/W
HCL TRSO
C3
Curve = NIRO-2 information regarding trail construction.
See trail plan and profiles for additional 1.
NOTE:
24'
Curve = NIRO-2
W Garcia Ct.
LT EOP
RT EOP
2.0%
5.0%
0%
-5.0%
-2.0%
LT & RT EOP
Profile grade and axis of rotation
-5.0%
0%
5.0%
116+98.69
117+89.01
Driveway Driveway Driveway
' 8
Profile grade
A
.4
D
.5
.5
A
.8
A
A
.0
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P N I R
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.1
+1.168% +1.629%
70' VC
K = 152
V P I
E L
,9
.3
+1.629% +1.928%
180' VC
K = 603
W A
T E
R
Nichols Rd.
W M o n te b e ll o D r
121+00 121+50 122+00 122+50 123+00 123+50 124+00 124+50 125+00 125+50 126+00 126+50 127+00 127+50 128+00
Existing ground
100'50'0
Scale in Feet
Existing R/W
HCL NIRO
Existing R/W
HCL TRSO
C4
NOTE:
1.
information regarding trail construction.
See trail plan and profiles for additional
30'
W Montebello Dr.
5.0%
0%
-5.0%
Profile grade and axis of rotation
-2.0%
LT & RT EOP
-5.0%
0%
5.0%
Driveway
Profile grade
A
.8
.3
D
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P N I R
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.7
+1.928% +0.850%
160' VC
K = 148
SSD = 696'
V P I
E L
,9
.6
+0.850% +0.595%
200' VC
K = 785
SSD = 2707'
V P I
E L
,9
.3
4+0.595%
70' VC
K = 21
V P I
E L
,9
.3
+3.92 3%
-2.000%
30' VC
K = 5
SSD = 127'
V P I
E L
,9
.9
W A
T E
R
T T
W A
T E
R
W A
T E
R
S T
O P
W M o n te b e ll o D r
Nichols Rd.
P O
T
.1
208+00
209+00
128+00 128+50 129+00 129+50 130+00 130+50 131+00 131+50 132+00 132+50 133+00 133+50 134+00 134+50 135+00
Existing ground
100'50'0
Scale in Feet
HCL NIRO
Existing R/W
Existing R/W
HCL MCBL
HCL TRSO
C5 information regarding trail construction.
See trail plan and profiles for additional
NOTE:
1.
30'
W Montebello Dr.
M c C u llo c h B lv d be removed
Driveway to
TRNO
HCL
5.0%
0%
-5.0%
Profile grade and axis of rotation
-2.0%
LT & RT EOP
-5.0%
0%
5.0% reset mailbox
Remove and reset mailbox
Remove and
DrivewayDrivewayDriveway
Driveway
Driveway
Sta. 131+99.32, 14.00' Rt.
Sta. 132+72.65, 25.00' Rt.
Profile grade
.3
D
A
.1
.6
A
A
.1
.5
A
.4
A
NICHOLS ROAD - SCHEDULE A
Schedule A
McCulloch Blvd.
Station 207+94, 16.00' RT
Nichols Road =
Station 134+66
CO FLAP PUW 16(1)
End Project
Schedule A
Station 207+94 McCulloch Blvd.
Station 134+66 Nichols Road =
CO FLAP PUW 16(1)
End Project
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P
M C
B L P
U W
.d g n
CO FLAP PUW16(1)
,9
.0
V P I
E L
,9
.4
-0.299% -0.150%
100' VC
K = 671
V P I
E L
,9
.7
-0.150%
100' VC
K = 365
SSD = 2478'
W A
TE
R
T
S
TO
P T
W C a li e n te D r
McCulloch Blvd
343+00
342+
401+
P O
T
.0
P C
.5
0 2
200+00 200+50 201+00 201+50 202+50202+00 203+00 203+50 204+00 204+50 205+00 205+50 206+00 206+50 207+00
Existing ground
100'50'0
Scale in Feet
Existing R/W
HCL MCBL
PI 206+18.46
D
L = 1020.80'
R = 1000.00'
T = 559.89'
Existing R/W
HCL TRNO
HCL TRSO
C6
W Caliente Dr.
Curve = MCBL-1
Curve = MCBL-1
Profile grade and axis of rotation
0%
5.0%
-5.0%
LT EOP
RT EOP
5.0%
0%
-5.0%
201+20.00
201+20.00
4.0 %
-4.0 %
200+19.67 reset mailbox
Remove and
Driveway Driveway
16.00' RT
Sta 201+43.34, 16.00' LT
Sta 201+43.59, 16.00' RT
Sta 203+92.53, 16.00' LT
Sta 201+77.70, 29.00' RT
Sta 205+30.93, 28.00' LT
Sta 207+15.53, Profile grade
0.9%
200+19.67
-0.9%
.9
A
.4
A
Curve = MCBL_REOP-4
D
PI 14+49.33
R = 629.47'
L = 142.30'
Curve = MCBL_REOP-4
T = 71.45'
MCCULLOCH BLVD - SCHEDULE A
Schedule A
McCulloch Blvd.
Station 200+20
CO FLAP PUW 16(1)
Begin Project
Match Existing
Schedule A
McCulloch Blvd.
Station 200+20
CO FLAP PUW 16(1)
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P
M C
B L P
U W
.d g n
CO FLAP PUW16(1)
-0.424%
V P I
E L
,9
.3
-0.424% -0.150%
100' VC
K = 365
V P I
E L
,9
.8
-0.150% -0.318%
100' VC
K = 597
SSD = 4017'
V P I
E L
,9
.3
-0.318% -0.412%
100' VC
K = 1054
SSD = 7052'
V P I
E L
,9
.7
SSD = 2478'
K = 365
100' VC
STOP
WATER
T
WATER
STOP
V iv a ld i
D r
McCulloch Bl vd.
+00
342+00
401+00
134+00
P T
.3
207+00 207+50 208+00 208+50 209+50209+00 210+00 210+50 211+00 211+50 212+00 212+50 213+00 213+50 214+00
Existing ground
100'50'0
Scale in Feet
Existing R/W
HCL MCBL
Existing R/W
HCL TRSO
PI 206+18.46
D
L = 1020.80'
R = 1000.00'
T = 559.89'
HCL NIRO
C7
N ic h o ls R d
Vivaldi Dr.Nichols Rd.
Curve = MCBL-1
Curve = MCBL-1
210+29.37Profile grade and axis of rotation
RT EOP
LT EOP -4.0 %
4.0 %
-5.0%
0%
5.0%
-5.0%
0%
5.0%
212+54.37
210+29.37 -2.0 %
LT & RT EOP
5005 5005 reset mailbox
Remove and
Driveway DrivewayDriveway
28.00' RT
Sta. 211+06.34, Profile grade
211+79.37
.2
A
.3
A
.9
A
HCL TRNO
MCCULLOCH BLVD - SCHEDULE A
Schedule A
McCulloch Blvd.
Station 207+90
Nichols Road =
Station 134+82
CO FLAP PUW 16(1)
U
S E
R
NUMBER
SHEET
Superelevation Diagram
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P
M C
B L P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.8
-0.412% -1.367%
120' VC
K = 126
SSD = 756'
,9
.4
UTILITY
PEDESTAL
WATERSTOP
UTILITY
PEDESTAL
WATER
WATERWATER
McCulloch Blvd.
P O
T
.6
214+00 214+50 215+00 215+50 216+50216+00 217+00 217+50 218+00 218+50 219+00 219+50 220+00 220+50 221+00
Existing ground
100'50'0
Scale in Feet
Existing R/W
HCL MCBL
Existing R/W
C8
.6
Vivaldi Dr.
-2.0 %
LT & RT EOP
Profile grade and axis of rotation
-5.0%
0%
5.0%
-5.0%
0%
5.0% reset mailbox
Remove and
Driveway
Profile grade
A
.5
MCCULLOCH BLVD - SCHEDULE A
Schedule A
McCulloch Blvd.
Station 217+26
CO FLAP PUW 16(1)
End Project
Match Existing
Schedule A
McCulloch Blvd.
Station 217+26
CO FLAP PUW 16(1)
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
,9
.3
V P I
E L
,9
.8
-0.545% -2.361%
100' VC
V P I
E L
,9
.5
-2.361% +5.00 0%
200' VC
S T
O P
54955
49604960
Nichols Rd.
P O
T
.0
P C
.7
300+00 300+50 301+00 301+50 302+50302+00 303+00 303+50 304+00 304+50 305+00 305+50 306+00 306+50 307+00
Existing ground
100'50'0
Scale in Feet
HCL TRSO
PI 305+21.73
D
L = 505.78'
R = 600.00'
T = 269.01'
C9
Colored concrete sidewalk
Curve = TRSO_3-1
Curve = TRSO_3-1
Profile grade
300+50.00 concrete sidewalk
Begin colored sidewalk
Remove concrete
TRAIL SOUTH - SCHEDULE A
4935 4935
Remove bollards
Match Existing
Schedule A
Trail South
Station 300+50
CO FLAP PUW 16(1)
Begin Project
Schedule A
Trail South
Station 300+50
CO FLAP PUW 16(1)
Begin Project 01/31/2022
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
-5.000%
V P I
E L
,9
.1
20' VC
V P I
E L
,9
.9
V P I
E L
,9
.0
+0.500%
V P I
E L
,9
.9
V
P I
-1.500%
-1.500%
-5.000%
V P I
E L
,9
.2
+5.00 0%
V P I
E L
,9
.2
-5.000%
V P I
E L
,9
.0
-5.000% +0.992%
150' VC V
P I
E L
,9
.5
+0.992%
50' VC
49654965
W A
T E
R
U P
R R
Nichols Rd.
W B e ll a C a s a D r
P T
.4
P C
.7
P R
C
.3
P T
.0
P C
.1
P C
C
.0
P R
C
.8
P
R C
.9
307+00 307+50 308+50308+00 309+00 309+50 310+00 310+50 311+00 311+50 312+00 312+50 313+00
Existing ground
100'50'0
Scale in Feet
313+50 314+00
HCL TRSO
Existing R/W
Existing R/W
Existing R/W
Existing R/W
PI 305+21.73
D
L = 505.78'
R = 600.00'
T = 269.01'
PI 310+25.64
D
R = 208.00'
T = 24.91'
L = 49.59'
PI 310+74.27
D
R = 200.00'
T = 23.96'
L = 47.69'
PI 313+35.77
D
R = 638.00'
L = 108.90'
HCL NIRO
C10
' 1
' 8
Curve = TRSO_3-1
Curve = TRSO_3-1
Curve = TRSO_3-2
Curve = TRSO_3-2
Curve = TRSO_3-3
Curve = TRSO_3-3
Curve = TRSO_3-4
Curve = TRSO_3-4
Proposed pedestrian bridge
Proposed pedestrian bridge W Bella Casa Dr.
Curve = TRSO_3-5
T = 54.58'
Curve = TRSO_3-6
PI 313+99.49
D
R = 111.97'
Curve = TRSO_3-5
T = 9.40'
PI 314+13.90
D
Curve = TRSO_3-6
T = 5.05'
L = 18.76'
R = 83.39'
L = 10.08'
20' VC
E L
,9
.4
Profile grade
(See Sheets S1 - S10)
(See Sheets S1 - S10)
307+58.55 to 307+75.85 slope from 1.8% to 1.0% Transition sidewalk cross
307+75.85 concrete sidewalk
End colored
309+37.85 to 309+53.55 slope from 1.0% to 1.8% Transition sidewalk cross
309+37.85 sidewalk
Begin asphalt
Asphalt sidewalk with end sections
18" pipe culvert
TRAIL SOUTH - SCHEDULE A
See Special 615-A
Concrete sidewalk
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
20' VC
V P I
E L
,9
.7
+4.74 3%
-3.191%
30' VC
V P I
E L
,9
.8
30' VC V
P I
E L
,9
.8
+2.581% -2.117%
V P I
E L
,9
.4
V P I
E L
,9
.3
20' VC V
P I
E L
,9
.5
+0.386% -1.501%
50' VC
V P I
E L
,9
.8
-0.297%
50' VC
V P I
E L
,9
.4
-0.297%
50' VC
V P I
E L
,9
.0
+1.150% -0.069%
50' VC
V P I
E L
,9
.9
-0.069% +0.609%
50' VC
V P I
E L
,9
.4
20' VC
V P I
E L
,9
.9
V P I
E L
,9
.0
+0.504%
-1.890% -5.000%
+1.500% -5.000%
+1.500%
T W A T E R
S T
O P
T
S T
O P
W A T E R
W A T E R
W B e ll a C a s a D r
W C a m b r ia D r
Nichols Rd.
W Y e r b a B u e n a D r
P C
C
.0
P R
C
.8
P R
C
.9
P T
.1
P C
.7
P R
C
.7
P T
.7
P C
.1
P R
C
.5
P T
.8
314+00 314+50 315+50315+00 316+00 316+50 317+00 317+50 318+00 318+50 319+00 319+50 320+00
Existing ground
320+50 321+00
Existing R/W HCL TRSO
Existing R/W
100'50'0
Scale in Feet
HCL NIRO
C11
PI 314+70.65
D
L = 103.22'
Curve = TRSO_3-7
Curve = TRSO_3-7
W Yerba Buena Dr.
W B e ll a C a s a D r
Curve = TRSO_3-8
R = 648.61'
T = 51.72'
Curve = TRSO_3-8
PI 315+40.74
R = 100.00'
T = 5.01'
D
L = 10.00'
Curve = TRSO_3-9
Curve = TRSO_3-9
PI 315+50.75
R = 100.00'
T = 5.01'
D
L = 10.00'
PI 317+96.86
R = 100.00'
T = 8.69'
D
L = 17.34'
PI 318+14.20
R = 100.00'
T = 8.69'
D
L = 17.34'
Curve = TRSO_3-10 Curve = TRSO_3-11
Curve = TRSO_3-10
Curve = TRSO_3-11
20' VC
Driveway
+0.504%
Profile grade sidewalk
Asphalt
TRAIL SOUTH - SCHEDULE A
See Special 615-A
Concrete sidewalk See Special 615-A
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.1
+0.504%
V P I
E L
,9
.1
V P I
E L
,9
.6
20' VC
V P I
E L
,9
.4
+1.378% -1.316%
40' VC
V P I
E L
,9
.8
+1.208%
V P I
E L
,9
.1
V P I
E L
,9
.7
+2.770% -0.149%
40' VC V
P I
E L
,9
.6
+1.323%
50' VC
V
P I
E L
,9
.0
V P I
E L
,9
.0
+0.078%
V P I
E L
,9
.7
30' VC
V P I
E L
,9
.9
V P I
E L
,9
.9
+0.033% -0.020%
V P I
E L
,9
.9
40' VC V
P I
E L
,9
.4
+1.381% +0.452%
30' VC
V P I
E L
,9
.5
30' VC
V P I
E L
,9
.4
+2.928
+0.390%
30' VC
V P I
E L
,9
.7
+1.608%
50' VC
V P I
E L
,9
.5
+1.608%
50' VC
-5.000%
-1.675% +1.255% +1.500%
T
S T
O P
W A
T E
R
T
W A
T E
R
T
W Y e rb a B u e n a D r.
Nich ols R d.
W G a r c ia C t.
P C
.8
P T
.5
P C
.2
P R
C
.3
P R
C
.5
P T
.5
0 3
0 3
0 1
0 1
0 1
321+00 321+50 322+50322+00 323+00 323+50 324+00 324+50 325+00 325+50 326+00 326+50 327+00
Existing ground
327+50 328+00
Existing R/W
HCL TRSO
Existing R/W
100'50'0
Scale in Feet
PI 323+79.41
D
R = 562.00'
T = 173.58'
L = 336.72'
HCL NIRO
C12
W Yerba Buena Dr.
Curve = TRSO_3-12
Curve = TRSO_3-12
Curve = TRSO_3-13
Curve = TRSO_3-14
Curve = TRSO_3-15
R = 100.00'
D
PI 325+51.29
Curve = TRSO_3-13
D
PI 325+70.49
Curve = TRSO_3-14
R = 100.16'
D
PI 325+87.52
Curve = TRSO_3-15
T = 7.09'
L = 14.16'
R = 99.94'
T = 12.13'
L = 24.15'
T = 5.01'
L = 10.02'
+0.504%
Driveway Driveway
Driveway
Profile grade
+1.500%+1.500%
-5.000% sidewalk
Asphalt
TRAIL SOUTH - SCHEDULE A
See Special 615-A
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
+0.670%
V P I
E L
,9
.9
50' VC
V P I
E L
,9
.9
+1.431% +0.332%
50' VC
V P I
E L
,9
.0
V P I
E L
,9
.0
+1.366%
V P I
E L
,9
.1
100' VC
V P I
E L
,9
.2
4+0.744%
110' VC
V P I
E L
,9
.4
+2.452% +0.698%
70' VC
V P I
E L
,9
.3
+1.814%
150' VC
-0.004%
Nichols Rd.
P C
.4
P R
C
.4
P T
.4
328+00 328+50 329+50329+00 330+00 330+50 331+00 331+50 332+00 332+50 333+00 333+50 334+00
Existing ground
334+50 335+00
Existing R/W
HCL TRSO
Existing R/W
100'50'0
Scale in Feet
HCL NIRO
C13
Curve = TRSO_3-17
Curve = TRSO_3-17
PI 333+06.41
D
R = 100.00'
T = 5.01'
L = 10.00'
Curve = TRSO_3-16
Curve = TRSO_3-16
PI 332+96.40
D
R = 100.00'
T = 5.01'
L = 10.00'
Profile grade sidewalk
Asphalt
TRAIL SOUTH - SCHEDULE A
335+00 335+50 336+50336+00 337+00 337+50 338+00 338+50 339+00 339+50 340+00 340+50 341+00
Existing ground
341+50 342+00
Existing R/W
HCL TRSO
Existing R/W
100'50'0
Scale in Feet
HCL NIRO
C14
W Montebello Dr.
Curve = TRSO_3-18
PI 336+32.22
D
T = 8.72'
L = 17.36'
Curve = TRSO_3-18
Curve = TRSO_3-19
Curve = TRSO_3-20
Curve = TRSO_3-19
PI 336+58.54
D
T = 17.68'
L = 34.73'
Curve = TRSO_3-20
PI 336+84.30
D
T = 8.71'
L = 17.34'
R = 75.00' R = 75.04' R = 74.93'
Curve = TRSO_3-21
Curve = TRSO_3-22
Curve = TRSO_3-23
Curve = TRSO_3-24
Curve = TRSO_3-26
Curve = TRSO_3-25
Curve = TRSO_3-21
PI 338+22.55
D
T = 7.08'
L = 14.15'
Curve = TRSO_3-22
PI 338+36.68
D
T = 7.06'
L = 14.12'
Curve = TRSO_3-23
PI 340+09.72
D
T = 8.67'
L = 17.33'
Curve = TRSO_3-24
PI 340+27.04
D
T = 8.67'
L = 17.33'
Curve = TRSO_3-25
PI 341+67.55
D
T = 6.13'
L = 12.25'
Curve = TRSO_3-26
PI 341+79.81
D
T = 6.14'
L = 12.26'
R = 200.00' R = 199.49' R = 200.00' R = 200.00' R = 100.00' R = 100.09'
Driveway Driveway Driveway Driveway
Driveway
Profile grade sidewalk
Asphalt
TRAIL SOUTH - SCHEDULE A
See Special 615-A
Concrete sidewalk
W A
T E
R
W A
T E
R
T T
W A
T E
R
W A
T E
R
W M o n te b e ll o D r
Nichols Rd.
P C
.5
P R
C
.8
P R
C
.5
P T
.9
P C
.4
P R
C
.6
P T
.7
P C
.0
P R
C
.3
P T
.7
P C
.4
P R
C
.6
P T
.9
P C
.1
STATE PROJECT
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.2
20' VC
V P I
E L
,9
.7
V
P I
E L
,9
.7
V P I
E L
,9
.3
+1.878%
V P I
E L
,9
.2
V P I
E L
,9
.7
20' VC
V P I
E L
,9
.9
+1.041%
150' VC
V P I
E L
,9
.0
2+1.829%
V P I
E L
,9
.4
+2.544%
V P I
E L
,9
.9
-1.602% +2.321%
60' VC
V P I
E L
,9
.8
V P I
E L
,9
.0
V P I
E L
,9
.8
+0.196%
40' VC
V P I
E L
,9
.0
30' VC
V P I
E L
,9
.3
V P I
E L
,9
.1
V P I
E L
,9
.2
30' VC V
P I
E L
,9
.7
V P I
E L
,9
.9
+0.969%
V P I
E L
,9
.0
40' VC
V P I
E L
,9
.1
+5.000%
-1.500%
+5.000%
-0.718%
+1.344%
+1.577% +3.053%
+0.335%
+0.152%
+0.754%
+1.814% -1.500%
342+00 342+50 343+50343+00 344+00 344+50 345+00 345+50 346+00 346+50 347+00 347+50 348+00
Existing ground
348+50 349+00
Existing R/W
HCL TRSO
Existing R/W
100'50'0
Scale in Feet
HCL NIRO
HCL MCBL
HCL TRNO
C15
Nichols Rd.
M c C u llo c h B lv d
Curve = TRSO_3-27
Curve = TSRO_3-27
PI 342+34.19
R = 100.00'
T = 5.01'
L = 10.00'
D
Curve = TRSO_3-28
Curve = TRSO_3-29
Curve = TSRO_3-28
PI 342+44.20
R = 100.00'
T = 5.01'
L = 10.00'
D
Curve = TSRO_3-29
PI 342+70.85
T = 1.48'
L = 2.95'
D
R = 10.00'
Driveway
Profile grade sidewalk
Asphalt
TRAIL SOUTH - SCHEDULE A
See Special 615-A
Concrete sidewalk
Schedule A
Trail South
Station 342+84
CO FLAP PUW 16(1)
End Project
Schedule A
Trail South
Station 342+84
CO FLAP PUW 16(1)
End Project
T T
W A
T E
R
W A
T E
R
S T
O P
P C
.4
P R
C
.6
P T
.9
P C
.1
P R
C
.1
P T
.2
P C
.3
P T
.3
P O
T
.3
207+00
208+00
209+00
STATE PROJECT
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R S
O P
U W
.d g n
CO FLAP PUW16(1)
+1.523%
50' VC
+1.165%
V P I
E L
,9
.4
,9
.4
V P I
E L
,9
.8
+7.5
,9
.7
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R N
O P
U W
.d g n
CO FLAP PUW16(1)
,9
.3
+0.459%
P O
T
.0
P C
.6
P T
.1
P C
.0
P T
.8
206+00
207+00
208+00
400+00 400+50 401+00 401+50 402+50402+00 403+00 403+50 404+00 404+50 405+00 405+50 406+50 407+00
Existing ground
100'50'0
Scale in Feet
406+00
PI 400+86.00
D
R = 300.00'
Existing R/W
HCL TRNO
T = 67.36'
PI 403+76.57
D
R = 1000.00'
L = 134.78'
Existing R/W
HCL MCBL
HCL NIRO
HCL TRSO
C16
Curve = TRNO_2-1
Curve = TRNO_2-1
Curve = TRNO_2-2
Curve = TRNO_2-2
M c C u llo c h B lv d
L = 132.53'
T = 67.49'
Profile grade aggregate
Sidewalk sidewalk
Asphalt
TRAIL NORTH - OPTION X
See Special 615-A with drainage swale
Concrete sidewalk
Option X
Trail North
Station 400+28
CO FLAP PUW 16(1)
Begin Project
Option X
Trail North
Station 400+28
CO FLAP PUW 16(1)
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R N
O P
U W
.d g n
CO FLAP PUW16(1)
+0.707%
+0.707%
+0.459%
V P I
E L
,9
.8
100' VC
P C
.2
P T
.1
P C
.4
407+00 407+50 408+00 408+50 409+50409+00 410+00 410+50 411+00 411+50 412+00 412+50 413+50 414+00
Existing ground
100'50'0
Scale in Feet
413+00
Existing R/W
HCL TRNO
Existing R/W
PI 412+72.02
D
R = 1000.00'
L = 198.82'
C17
Curve = TRNO_2-3
Curve = TRNO_2-3
T = 99.74'
Profile grade aggregate
Sidewalk sidewalk
Asphalt
TRAIL NORTH - OPTION X
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R N
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,9
.0
+0.707% +0.840%
1,000' VC
+0.840%
T
50003
P T
.1
P C
.4
P T
.7
P C
.5
P T
.4
P C
.3
P T
.6
414+00 414+50 415+00 415+50 416+50416+00 417+00 417+50 418+00 418+50 419+00 419+50 420+50 421+00
Existing ground
100'50'0
Scale in Feet
420+00
Existing R/W
HCL TRNO
Existing R/W
PI 414+42.41
D
R = 125.00'
PI 417+45.95
D
R = 1000.00'
C18
Curve = TRNO_2-4
Curve = TRNO_2-4
Curve = TRNO_2-6
T = 24.94'
L = 49.23'
Curve = TRNO_2-5
PI 415+08.63
D
R = 200.00'
T = 22.03'
L = 43.89'
Curve = TRNO_2-5 Curve = TRNO_2-6
T = 5.64'
L = 11.28' aggregate
Sidewalk
Profile grade sidewalk
Asphalt
U
S E
R
NUMBER
SHEET
CO
P
M c p w w o r k in g c e n tr a l0 d P
N P T
R N
O P
U W
.d g n
CO FLAP PUW16(1)
V P I
E L
,0
.2
+0.840% +1.522%
100' VC
V P I
E L
,0
.5
V P I
E L
,0
.2
-0.500% +1.073%
100' VC
V P I
E L
,0
.2
T
T
T
T
T
W C a p is tr a n o A v e
P C
.4
P T
.8
P C
.6
P R
C
.0
P T
.4
P C
.7
P T
.4
421+00 421+50 422+00 422+50 423+50423+00 424+00 424+50 425+00 425+50 426+00 426+50 427+50 428+00
Existing ground
100'50'0
Scale in Feet
427+00
Existing R/W
Existing R/W
HCL TRNO
PI 422+17.64
D
R = 1000.00'
PI 424+56.94
D
R = 200.00'
T = 22.33'
L = 44.48'
PI 425+22.45
D
R = 200.00'
T = 43.36'
L = 85.39'
C19
Curve = TRNO_2-7 Curve = TRNO_2-8
W Capistrano Ave.
T = 11.16'
L = 22.33'
Curve = TRNO_2-8
Curve = TRNO_2-9
Curve = TRNO_2-9
Curve = TRNO_2-7 Curve = TRNO_2-10
PI 426+08.14
D
R = 200.00'
T = 16.38'
L = 32.68'
Curve = TRNO_2-10…