CN-370000-HW561-DC016M.pdf
PDF 3 MB Posted
- Contract number
- HW561
- Issued by
- Florida
About this file
This Task Assignment Notification Form is issued by the Florida Department of Environmental Protection (FDEP) under Contract HW561 to authorize Golder Associates Inc. to conduct well abandonment activities at the Harbour Place Cleaners facility (ERIC_4538) located at 13170 Atlantic Boulevard, Jacksonville, Duval County, Florida. The task assignment DC016M is managed by FDEP Contract Manager Ben Grubbs and Contractor Representative Jesse Brown, with the work performed during the Deletion phase at the site.
The scope of work, authorized under the October 15, 2020 Scope of Work and Cost Estimate, comprises two subtasks: Project Management (Subtask 1) and Well Abandonment and Letter Report (Subtask 2). Golder will abandon thirteen existing monitoring wells (MW001 through MW013) in accordance with FDEP and St. Johns River Water Management District regulations, remove steel manholes, restore ground surfaces, and submit a Well Abandonment Letter Report documenting all activities. The total fixed-price contract value is $5,767.19, consisting of $465.48 for project management and $5,301.71 for well abandonment activities, with 45 total labor hours allocated. The final deliverable—the Well Abandonment Letter Report—is due December 31, 2020, with the entire task completion and final invoice submission required by February 26, 2021. No retainage is applied, and payment is due upon submittal and FDEP approval of the Well Abandonment Letter Report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW561
D000 N/ADC016M
Golder Associates
Matt Crews
(850) 245-8992Ben Grubbs
ERIC_4538
Harbour Place Cleaners
13170 Atlantic Blvd, Jacksonville, Duval
Deletion
This Task Assignment authorizes Golder to conduct well abandonment activities in accordance with the October 15, 2020, Scope of Work and Cost Estimate.
Well Abandonment Letter Report
12/31/2020
02/26/2021
$ 5,767.19 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2020.10.19 12:36:41 -04'00'
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2020.10.19 12:36:53 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.10.19 14:14:35 -04'00'
Jesse Brown Digitally signed by Jesse Brown Date: 2020.10.19 14:55:36 -04'00'
$ 5,767.19
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Well Abandonment Letter Report 12/31/2020
Subtask 2: Submittal and FDEP approval of Well Abandonment Letter Report $ 5,767.19
$ 5,767.19
HW561
DC016M
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW561 Contract Negotiation File Harbour Place Cleaners Jacksonville, Duval County
ERIC_ 4538
From: Ben Grubbs, Project Manager Date: October 19, 2020 Subject: Negotiation Summary
HW561 DC016M
This Task Assignment authorizes Golder to conduct well abandonment activities in accordance with the October 15, 2020, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Well Abandonment and Letter Report Golder will abandon the thirteen existing monitoring wells. The steel manholes will be removed, and the ground surface will be restored to near its original condition. Golder will submit a Well Abandonment Letter Report to FDEP, documenting the well abandonment activities. The total cost associated with this subtask is $5,301.71.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $5,767.19 with 45 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Golder Associates Inc.
Date: 10/15/2020
Task #: DC016M SubTask 1 Project Management SubTask 6
Site: Harbour Place Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Well Abandonment SubTask 3 SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$42.96 Project Manager (RFM) 4 3.6 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0
$57.70 Senior Consultant - LV6 (JB) 1 1 0 0 0 0 0 0 0 0 $0.00 Senior Sci/Eng.- LV5 0 0 0 0 0 0 0 0 0 0
$42.96 Senior Sci/Eng.- LV4 (RFM) 8 8.0 0 0 0 0 0 0 0 0 $0.00 Project Sci/Eng - LV3 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Sci/Eng - LV2 0 0.0 0 0 0 0 0 0 0 0
$26.32 Staff Sci/Eng - LV2 (JS) 15 15.0 0 0 0 0 0 0 0 0 $0.00 Project Sci/Eng - LV3 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Draftsperson - LD2 0 0 0 0 0 0 0 0 0 0 $0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0
$29.98 Senior Technician - LT3 (H Brooks) 0 0.0 0 0 0 0 0 0 0 0 $25.10 Staff Technician - LT2 (D. Burton) 16 16 0 0 0 0 0 0 0 0
$0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0
$24.10 Staff Admin - LA2 (AS) 1 1 0 0 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 45 4 41.0 0.0 0.0 0 0 0 0 0 0
Direct Labor $1,374.62 $152.74 $1,221.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $2,371.22 $263.48 $2,107.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,745.84 $416.22 $3,329.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $68.73 $7.64 $61.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTI MATEContractor: Golder Associates Inc.
Date: 10/15/2020
Task #: DC016M SubTask 1 Project Management SubTask 6
Site: Harbour Place Cleaners SubTask 2 Well Abandonment SubTask 7
Activity/Phase: Well Abandonment SubTask 3 SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lowe's $113.40 $113.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $113.40 $113.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.34 $11.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $124.74 $124.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,000.30 $1,000.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,065.30 $1,065.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $5,392.61 $423.86 $4,968.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $374.58 $41.62 $332.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $5,767.19 $465.48 $5,301.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Harbour Place Cleaners SUBTASK 2: Well Abandonment
DATE: 10/15/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Consultant (J. Brown) Senior review of Well Abandonment Report 1
Senior Sci/Eng (R. Mongillo) 8
Staff Technician (D. Burton) 16
Sr. Technician (J. Spengler) 15
Staff Admin (A. Shportun) Report formatting, document production, binding, and shipping. Create pdf for OCULUS. 1
TOTAL LABOR 41.0
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $32.50 Per Day 2 $65.00 Construction/O&M/Pilot Test Kit $291.00 Per Day 2 $582.00 Jack Hammer $46.60 Per Day 2 $93.20 Concrete/Asphalt Saw $50.00 Per Day 2 $100.00 Portable Generator 25 kW $112.55 Per Day 2 $225.10
TOTAL EQUIPMENT $1,065.30
VEHICLE TYPE RATE UNIT USAGE
Truck $97.00 Per Day 2 $194.00 Truck Covid-19 $97.00 Per Day 2 $194.00
TOTAL VEHICLE $388.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COSTING UNIT USAGE TOTALS
Home Depot Concrete, Portland Cement, Grass seed/fert, Aspha $105.98 LS 1 $105.98 Home Depot Tax 7% LS 1 $7.42
TOTAL $113.40
Field event preparation (1 hour). Travel round trip 1 hour a day - two days (2 hours). Abandon 13 monitoring wells including manhole and pad removal, and surface restoration (13 hours).
Travel round trip 1 hour a day - two days (2 hours). Abandon 13 monitoring wells including manhole and pad removal, and surface restoration (13 hours).
Obtain site access for property access (1 hour). Obtain permits and well completion reports & prepare Well Abandonment Letter Report (10 hours).
FINAL --7/24/96
Golder Associates Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida USA 32256 T: +1 904 363-3430 | F: +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
VIA EMAIL
October 15, 2020 P13-82530
Mr. Ben Grubbs Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR WELL ABANDONMENT
HARBOUR PLACE CLEANERS
13170 ATLANTIC BOULEVARD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_4538
PROPOSED TASK ASSIGNMENT: DC016M
Dear Mr. Grubbs:
Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (FDEP) with this cost proposal for well abandonment at the above-referenced site. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.
SUBTASK 2 – WELL ABANDONMENT AND LETTER REPORT
On July 16, 2020, the FDEP approved Golder’s recommendation that a Site Rehabilitation Completion Order (SRCO) be issued for the site. Once the SRCO is issued, Golder will abandon the thirteen existing monitoring wells (MW001 through MW013) in accordance with FDEP and St. Johns River Water Management District (SJRWMD) regulations. Seven Modified Active Gas Sampling (MAGS) wells (MAGS001 through MAGS007) were abandoned during the SVE system decommissioning completed in January 2012. Golder will use an in-house, Florida-licensed driller to abandon the monitoring wells.
The monitoring wells will have the steel manholes removed after abandonment activities are completed, and the ground surface will be restored to near its original condition. For the six wells (MW003, MW004, MW005, MW006, Mr. Ben Grubbs P13-82530
Florida Department of Environmental Protection October 15, 2020
MW007, and MW012) located in the asphalt drive area, the property owner recently repaved the parking and drive areas with asphalt and the concrete well pads were covered just leaving the steel manhole exposed slightly below the new asphalt surface grade (See attached photos). Golder believes the best way to address these well finishes, after grout is pumped into the well and returns to the surface, is to fill in the top of the well with concrete to the top of the existing grade, break off the metal ring, and use asphalt seal to cover the concrete surface blending it in with the surrounding asphalt. Well details and locations are included in the attached table and figure. After the field work is completed, the driller will prepare the appropriate well completion reports for submittal to the SJRWMD, updating the status of the wells at the site. The well abandonment field activities will be completed in two days and documented with photographs.
Golder will submit a letter report to FDEP documenting the well abandonment activities, which will include copies of the well completion reports and the photographs.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the scope of work is $5,767.19. Golder will schedule the well abandonment activities for late November 2020 or early December 2020. The LOE/CEF cost sheets are included in Attachment A. Material quotes are included in Attachment B. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $465.48 February 26, 2021
Subtask 2 – Well Abandonment and Report $5,301.71 December 31, 2020
(Well Abandonment and Letter Report)
Total/Completion Date $5,767.19 February 26, 2021
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Golder Associates Inc.
Ralph F. Mongillo Jr., PG Jesse C. Brown, PE Senior Project Geologist Senior Engineer and Associate
RFM/JCB/as
Mr. Ben Grubbs P13-82530
Florida Department of Environmental Protection October 15, 2020
Attachments: Table
Figure Attachment A LOECEF Cost Sheets Attachment B Material Quotes and Photographs
G:\Projects\DEP-Drycleaning\Projects\Jax\Harbour Place\Proposals & Task Assignments\DC016M Well Abandonment\Well Abandonment Proposal - ERIC_4538.docx
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .