This is a Task Assignment Notification Form for Contract HW561 issued by the Florida Department of Environmental Protection (FDEP) Division of Waste Management, Drycleaning Solvent Cleanup Program. The contracting parties are Golder Associates Inc. (contractor) and FDEP. The task assignment authorizes work at Jay's Professional Dry Cleaners & Laundry, located at 10025 San Jose Boulevard, Jacksonville, Duval County, Florida (DEP Site ERIC_4521). The document includes a negotiation summary dated May 7, 2021, signed by FDEP Project Manager Ben Grubbs, and a cost proposal dated May 3, 2021, prepared by Golder Associates Inc.

The task assignment authorizes Golder to conduct annual groundwater monitoring activities consisting of four subtasks: project management, groundwater sampling and investigation-derived waste (IDW) treatment, COVID-19 related costs, and annual reporting. Golder will collect groundwater samples from ten monitoring wells using low-flow sampling methods and analyze them for chlorinated volatile organic compounds (VOCs) using EPA Method 8260B. IDW will be temporarily stored and disposed of by Erwin Remediation at a cost of $100 per 55-gallon drum. The contractor will submit an Annual Groundwater Monitoring Report, update FDEP GIS tables, and provide ADaPT deliverables. The total task assignment value is $7,592.59, comprised of $622.21 for project management, $3,977.58 for groundwater monitoring and IDW treatment, $97.00 for COVID-19 costs, and $2,895.80 for reporting. All work is on a fixed-price basis with a performance period extending through November 1, 2021, with intermediate deliverables due on August 31, 2021.

View the file

Other files

File Type Posted
CN-370000-HW561-A8.pdf PDF
CN-370000-HW561-CO2.pdf PDF
CN-370000-HW561-CO3.pdf PDF
CN-370000-HW561-DC004B.pdf PDF
CN-370000-HW561-DC004J.pdf PDF
CN-370000-HW561-DC004P.pdf PDF
CN-370000-HW561-DC004P.pdf.crdownload CRDOWNLOAD file
CN-370000-HW561-DC008E.pdf PDF
CN-370000-HW561-DC008K.pdf PDF
CN-370000-HW561-DC009A.pdf PDF
CN-370000-HW561-DC009G.pdf PDF
CN-370000-HW561-DC009H.pdf PDF
CN-370000-HW561-DC013D.pdf PDF
CN-370000-HW561-DC014P.pdf PDF
CN-370000-HW561-DC016G.pdf PDF
CN-370000-HW561-DC019A.pdf PDF
CN-370000-HW561-DC019G.pdf PDF
CN-370000-HW561-DC019H.pdf PDF
CN-370000-HW561-DC01E.pdf PDF
CN-370000-HW561-DC01GCO3.pdf PDF
CN-370000-HW561-DC01GCO5.pdf PDF
CN-370000-HW561-DC01GCO6.pdf PDF
CN-370000-HW561-DC020A.pdf PDF
CN-370000-HW561-DC020F.pdf PDF
CN-370000-HW561-DC023A.pdf PDF
CN-370000-HW561-DC024C.pdf PDF
CN-370000-HW561-DC025F.pdf PDF
CN-370000-HW561-DC028B.pdf PDF
CN-370000-HW561-DC02E.pdf PDF
CN-370000-HW561-DC03CCO1.pdf PDF
CN-370000-HW561-DC03GCO1.pdf PDF
CN-370000-HW561-DC040CO2.pdf PDF
CN-370000-HW561-DC04CCO1.pdf PDF
CN-370000-HW561-DC04GCO1.pdf PDF
CN-370000-HW561-DC04OCO1.pdf PDF
CN-370000-HW561-DC05D.pdf PDF
CN-370000-HW561-DC05G.pdf PDF
CN-370000-HW561-DC05JCO1.pdf PDF
CN-370000-HW561-DC08CO3.pdf PDF
CN-370000-HW561-DC08F.pdf PDF
CN-370000-HW561-DC08H.pdf PDF
CN-370000-HW561-DC08I.pdf PDF
CN-370000-HW561-DC08L.pdf PDF
CN-370000-HW561-DC08LCO3.pdf PDF
CN-370000-HW561-DC08NCO6.pdf PDF
CN-370000-HW561-DC08O.pdf PDF
CN-370000-HW561-DC08PCO2.pdf PDF
CN-370000-HW561-DC09D.pdf PDF
CN-370000-HW561-DC09DCO1.pdf PDF
CN-370000-HW561-DC09E.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW561

D000 N/ADC008P

Golder Associates

Matt Crews

(850) 245-8992Ben Grubbs

ERIC_4521

Jays Professional Dry Cleaners & Laundry

10025 San Jose Blvd, Jacksonville, Duval

Monitoring

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the May 3, 2021, Scope of Work, Cost Estimate, and Bid Documentation.

Annual Groundwater Monitoring Report and ADaPT/GIS update

08/31/2021

11/01/2021

$ 7,592.59 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.05.07 13:21:25 -04'00'

Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.05.07 13:21:36 -04'00'

Aaron Cohen Digitally signed by Aaron Cohen Date: 2021.05.07 14:36:38 -04'00'

Donald Miller Digitally signed by Donald Miller Date: 2021.05.07 15:27:21 -04'00'

$ 7,592.59

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Groundwater monitoring field and IDW treatment documentation and lab report 08/02/2021

Subtask 3: Field documentation of COVID-19 safety precautions via E-mail Deliverable 08/02/2021

Subtask 4: Annual Groundwater Monitoring Report and ADaPT/GIS update 08/31/2021

Subtask 2: Submittal and FDEP approval of groundwater monitoring field and IDW treatment documentation and lab report $ 3,977.58

Subtask 3: Submittal and FDEP approval of field documentation of COVID-19 safety precautions via E-mail Deliverable $ 97.00

Subtasks 1 & 4: Submittal and FDEP approval of Annual Groundwater Monitoring Report and ADaPT/GIS update $ 3,518.01

$ 7,592.59

HW561

DC008P

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

To: HW561 Contract Negotiation File Jays Professional Dry Cleaners & Laundry Jacksonville, Duval County

ERIC_4521

From: Ben Grubbs, Project Manager Date: May 7, 2021 Subject: Negotiation Summary

HW561 DC008P

This Task Assignment authorizes Golder to conduct groundwater monitoring activities in accordance with the May 3, 2021, Scope of Work, Cost Estimate, and Bid Documentation.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Annual Groundwater Monitoring and IDW Treatment Golder will collect groundwater samples from ten monitoring wells (MW001-MW004 and MW007-MW012). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in a 55-gallon drum until waste characterization is completed. An IDW sample will be collected and analyzed for VOCs. Golder requested bids for IDW transport and disposal from Clark Environmental, Erwin Remediation, and Capitol Environmental. Erwin Remediation was selected as the lowest responsive and responsible bidder.

Subtask 3: COVID-19 Costs Costs related to the use of an extra vehicle, so that Golder can maintain social distancing during the COVID-19 pandemic, are covered under this subtask for invoicing purposes.

Subtask 4: Reporting Golder will submit the Annual Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $7,592.59 with 47 labor hours.

MEMORANDUM

Jays Professional Dry Cleaners & Laundry May 7, 2021 Page Two

Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

Contractor: Golder Associates Inc.

Date: 5/3/2021

Task #: DC008P SubTask 1 Project Management SubTask 6 Site: SubTask 2 Annual Groundwater Monitoring SubTask 7

Activity/Phase: Annual Monitoring SubTask 3 Covid-19 Costs SubTask 8 Project Manager: Ben Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$48.81 Project Manager (RFM) 4 4.2 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - LV6 0 0 0 0 0 0 0 0 0 0

$59.43 Senior Sci/Eng.- LV6 (JB) 3 0 0.0 3.0 0 0 0 0 0 0 $48.81 Sr. Project Sci/Eng - LV5 (RFM) 15 3.0 0 12.0 0 0 0 0 0 0 $0.00 Project Sci/Eng - LV 0 0.0 0 0 0 0 0 0 0 0

$41.54 Project Sci/Eng - LV3 (JT) 2 0.0 0.0 1.5 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (JS) 9 9.0 0 0 0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 2 0 0.0 2.0 0 0 0 0 0 0 $0.00 Staff Draftsperson - LD2 0 0 0 0 0 0 0 0 0 0 $0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0

$29.98 Senior Technician - LT3 (DM) 10.0 10 0 0 0 0 0 0 0 0 $0.00 Staff Technician - LT2 0 0 0 0 0 0 0 0 0 0 $0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0

$24.10 Staff Admin - LA2 (AS) 2 0 0.0 2.0 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 47 4.2 22.0 0.0 20.5 0 0 0 0 0 0

Direct Labor $1,837.50 $204.17 $683.11 $0.00 $950.22 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.50% $3,169.68 $352.19 $1,178.36 $0.00 $1,639.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,007.18 $556.36 $1,861.47 $0.00 $2,589.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $91.88 $10.21 $34.16 $0.00 $47.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTIMATE

Jay's Professional Dry Cleaners

REV: 02/03

Contractor: Golder Associates Inc.

Date: 5/3/2021

Task #: DC008P SubTask 1 Project Management SubTask 6 Site: SubTask 2 Annual Groundwater Monitoring SubTask 7

Activity/Phase: Annual Monitoring SubTask 3 Covid-19 Costs SubTask 8 Project Manager: Ben Grubbs SubTask 4 Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

FDEP COST ESTIMATE

Jay's Professional Dry Cleaners

Travel Vehicle Rental $291.00 $194.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $291.00 $194.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $826.00 $826.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $889.00 $889.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $612.10 $612.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $58.20 $58.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $702.80 $702.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,091.86 $566.57 $3,791.43 $97.00 $2,636.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $500.73 $55.64 $186.15 $0.00 $258.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $7,592.59 $622.21 $3,977.58 $97.00 $2,895.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03

SITE : Jay's Professional Dry Cleaners SUBTASK: Annual Groundwater Monitoring

DATE: 5/3/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (R. Mongillo)

Project Sci/Eng (J. Spengler) 9

Senior Technician (D. McDaniels) 10

TOTAL LABOR 22

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Miscellaneous Expendables $32.50 Per Day 1 $32.50 Shallow Groundwater Sampling Kit $208.55 Per Day 2 $417.10 Tubing, poly/HDPE $0.25 Per Foot 700 $175.00 Tubing, silicon 3/16 x 3/8 $2.00 Per Foot 10 $20.00 Drum, 55-gallon $58.20 Each 1 $58.20

TOTAL EQUIPMENT $702.80

VEHICLE TYPE RATE UNIT USEAGE

Truck (1 day sampling) $97.00 Per Day 1 $97.00 Truck (IDW Disposal) $97.00 Per Day 1 $97.00

TOTAL VEHICLE $194.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOC halocarbons EPA Method 8260B $66 10 1 $726.00 VOC IDW Sample EPA Method 8260 $100 1 $100.00 Sample Shipping Small $63 1 $63.00

TOTAL LAB $889.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT RATE COSTING UNIT USEAGE

ER IDW Disposal per drum $100 1 $100.00

TOTAL $100.00

Round trip travel (1 hour). Water levels, instrument calibration, and sampling (7 hours). Meet with IDW subcontractor for drum pick up (2 hours).

Field event preparation (1 hour). Round trip travel (1 hour). Water levels, instrument calibration, and sampling (7 hours).

Sampling Scope: Sample 10 wells (MW001, MW002, MW003, MW004, MW007, MW008, MW009, MW010, MW011, and MW012) with 2 field staff and 2 shallow groundwater sampling kits. MW samples and trip blank samples analyzed for chlorinated VOCs by EPA Method 8260.

LEVEL OF EFFORT/EXPENSE WORKSHEET

Correspondence with RPO for site access (1 hour). Contact FDEP with initial results of the groundwater samples and prepare an email deliverable with sample field notes, forms, and laboratory reports (2 hours).

FINAL --7/24/96

SUBTASK: Covid-19 Costs

DATE: 5/3/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR 0

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

Truck (1 day sampling) $97.00 Per Day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LEVEL OF EFFORT/EXPENSE WORKSHEET

SUBTASK: Reporting

DATE: 5/3/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Senior Sci/Eng (J. Brown) 3

Senior Sci/Eng (R. Mongillo) 12

Sr. Project Sci/Eng (J. Thomas) 1.5

Senior Draftperson (B. Lucero) CADD figures 2

Staff Admin (A. Strayer) 2

TOTAL LABOR 20.5

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

Update FDEP GIS tables, run data checker, create and edit error report (10 samples x 8 min/sample = 80 min), review and annotate error report.

LEVEL OF EFFORT/EXPENSE WORKSHEET

Reporting, data entry, report tables, report figures, author annual monitoring report

Report formatting, document production, binding, and shipping. Create pdf for OCULUS.

Annual monitoring report senior review, conclusions and recommendations; review and submit FDEP GIS tables; submit ADaPT deliverables.

FINAL --7/24/96

Golder Associates Inc.

9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256

T: +1 904 363-3430 F: +1 904 363-3445

Golder and the G logo are trademarks of Golder Associates Corporation golder.com

May 3, 2021 Proposal No. CX21-465592

Mr. Ben Grubbs Florida Department of Environmental Protection Division of Waste Management Drycleaning Solvent Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

RE: COST PROPOSAL FOR JAY’S PROFESSIONAL DRY CLEANERS AND LAUNDRY

ANNUAL GROUNDWATER MONITORING

10025 SAN JOSE BOULEVARD

JACKSONVILLE, FLORIDA

DEP FACILITY ID NO.: ERIC_4521

PROPOSED TASK ASSIGNMENT: DC008P

Dear Mr. Grubbs:

Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (DEP) with this cost proposal for annual groundwater monitoring and reporting at the Jay’s Professional Dry Cleaners and

Laundry site located at 10025 San Jose Boulevard in Jacksonville, Duval County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate form (CEF) that summarizes the costs of the proposed services. The proposed scope of services is described below.

SUBTASK 1 – PROJECT MANAGEMENT

To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with DEP. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with DEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the DEP-approved task assignment.

SUBTASK 2 – ANNUAL GROUNDWATER MONITORING AND IDW TREATMENT

Golder will collect groundwater samples from the following ten monitoring wells: shallow zone monitoring wells MW001, MW002, MW003, MW007, and MW008; intermediate zone monitoring wells MW009, MW011, and MW012;

and deep zone monitoring wells MW004 and MW010. Figures 3 through 7 from the 2020 Annual Groundwater

Mr. Ben Grubbs Proposal No. CX21-465592

Florida Department of Environmental Protection May 3, 2021

Monitoring Report are attached, which show the potentiometric contours and chlorinated volatile organic compound (VOC) results for the shallow, intermediate, and deep zones of the surficial aquifer.

Prior to groundwater sampling, the depth to groundwater will be measured using an electronic water level indicator to determine groundwater elevations. During the sampling event, the locks and well caps will be inspected for damage or degradation and replaced as necessary. Groundwater samples will be collected from the wells in accordance with DEP Standard Operating Procedures (SOPs) for Field Activities (DEP SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.

Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program-certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method No. 8260B. For quality assurance purposes one trip blank will accompany the sample container for laboratory analysis of chlorinated VOCs using Environmental Protection Agency (EPA) Method 8260B.

Upon receipt of the laboratory analytical results, Golder will evaluate the groundwater concentrations to determine if off-site notification is required.

Golder will temporarily store the investigation derived waste (IDW) purge water generated from the groundwater sampling event in a 55-gallon steel drum(s). A waste characterization sample will be collected from the IDW drum(s) for analysis of total VOCs using EPA Method 8260. If the waste characterization sample is acceptable to the disposal subcontractor, the IDW drum(s) will be picked up and transported to a facility for proper disposal. A non-hazardous waste manifest will be provided by the disposal subcontractor upon delivery to the disposal facility.

Upon completion of Subtask 2, an e-mail deliverable will be submitted and include copies of the field data sheets, equipment calibration forms, field notes, laboratory analytical report, and laboratory chain-of-custody documentation.

SUBTASK 3 – COVID-19 COSTS

Providing a second truck for use by a two person field crew during a one day field effort associated with Subtask 2 to provide protection from Covid-19.

SUBTASK 4 – REPORTING

The annual groundwater monitoring report will include a description of sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will update the DEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the DEP data checker on the completed tables;

and submit the updated tables and error report under this subtask. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for the groundwater sampling event.

Mr. Ben Grubbs Proposal No. CX21-465592

Florida Department of Environmental Protection May 3, 2021

HEALTH AND SAFETY

Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.

COST AND SCHEDULE

The estimated cost to complete the annual monitoring is $7,592.59. Golder will tentatively schedule the annual sampling event for June 2021. The groundwater sampling event is estimated to require one day on site with two field personnel. The LOE/CEF cost sheets and Subcontractor Bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule:

Task Proposed Cost Proposed Schedule/Deliverables

Subtask 1 – Project Management $622.21 September 30, 2021

Subtask 2 – Annual Groundwater Monitoring $3,977.58

July 31, 2021 (Field documentation and Laboratory Report via email)

Subtask 3 – Covid-19 Costs $97.00 July 31, 2021

Subtask 4 – Reporting $2,895.80 August 31, 2021 (Annual Groundwater Monitoring Report, GIS Tables, ADaPT Deliverables)

Total/Completion Date $7,592.59 October 31, 2021

Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.

Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.

Sincerely, Golder Associates Inc.

Ralph F. Mongillo, Jr., PG Donald J. Miller Senior Geologist Principal

RFM/DJM/as

X

X

X X X X X

X

X

X

X

XXX

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

JAY'S

DRY CLEANERS

MW001

23.23

MW002

23.37

MW003

23.42

MW005

NM

MW006

NM

MW007

23.53

MW008

23.51

BUILDING

i n

FDEP-DC008

Control No.

FDEP-DC008-S003

FIGURE

2020-04-08

BCL

MAH

MAH

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

FACILITY ID#: ERIC-4521

FL. DEPT. OF ENVIRONMENTAL PROTECTION

POTENTIOMETRIC MAP - SHALLOW ZONE OF THE SURFICIAL

AQUIFER

(MARCH 13, 2020)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

I F

T

H

S

M

E A

S U

R E

M E

N

D

O E

S

N

A T

C

W

A

T

O

W N

T

E

Z

E

H

B

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h

E

G o l d e r P r o j e c t s F

D E

P D

C

N o

J a y s

C l e a n e r s p r

R p t A c t i v e

D r a w i n g s i l e

N a m e

F

D E

P D

C S d w g

SCALE

0 30 60

FEET

LEGEND

REFERENCE(S)

X X X

23.53

(DASHED WHERE INFERRED)

FENCE

TREELINE

DITCH

PROPERTY BOUNDARY

1.) SITE MAP BY HARDING ESE, MACTEC COMPANY DATED MARCH

2001.

GROUNDWATER ELEVATION

GROUNDWATER CONTOUR INTERVAL

ESTIMATED GROUNDWATER FLOW

DIRECTION

SHALLOW MONITORING WELL LOCATION

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

X

X X X X X

X

X

X

X

XXX

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

JAY'S

DRY CLEANERS

MW009

23.24

MW011

23.14

MW012

23.21

BUILDING

i n

FDEP-DC008

Control No.

FDEP-DC008-S004

MAH

MAH

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

POTENTIOMETRIC MAP - INTERMEDIATE ZONE OF THE

SURFICIAL AQUIFER

(MARCH 13, 2020)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

A

S U

R E

M E

E

S

N

T

A

T

O

W N

T

E

Z

E

H

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h

E

G o l d e r P r o j e c t s F

D E

P D

C

N o

J a y s

C l e a n e r s p r

R p t A c t i v e

D r a w i n g l e

N a m e

F

D E

P D

C S d

FEET

LEGEND

REFERENCE(S)

X X X

23.21

(DASHED WHERE INFERRED)

FENCE

TREELINE

DITCH

PROPERTY BOUNDARY

1.) SITE MAP BY HARDING ESE, MACTEC COMPANY DATED MARCH

2001.

GROUNDWATER ELEVATION

GROUNDWATER CONTOUR INTERVAL

ESTIMATED GROUNDWATER FLOW

DIRECTION

INTERMEDIATE MONITORING WELL LOCATION

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

X

X X X X X

X

X

X

X

XXX

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

JAY'S

DRY CLEANERS

MW001

MW002

MW003

MW005

MW006

MW007

MW008

BUILDING

i n

FDEP-DC008

Control No.

FDEP-DC008-S005

MAH

MAH

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

GROUNDWATER ANALYTICAL RESULTS

SHALLOW ZONE OF THE SURFICIAL AQUIFER

(MARCH 2020)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

A

S U

R E

M E

E

S

N

T

A

T

O

W N

T

E

Z

E

H

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h

E

G o l d e r P r o j e c t s F

D E

P D

C

N o

J a y s

C l e a n e r s p r

R p t A c t i v e

D r a w i n g l e

N a m e

F

D E

P D

C S d

FEET

LEGEND

X X X

FENCE

DITCH

PROPERTY BOUNDARY

SHALLOW MONITORING WELL LOCATION

ANALYTICAL DATA LEGEND

REFERENCE(S)

1.) SITE MAP BY HARDING ESE, MACTEC

COMPANY DATED MARCH 2001.

MW008

1/16/17 1/31/18 3/25/19 11/12/15 03/13/20

0.22 U 0.22 U 0.22 U 0.36 U 0.22 U

0.51 I 0.65 I 6.5 2.5 2.8

6 1.2 10 20 10

0.36 U 0.36 U 0.36 U 0.24 U 0.36 U

MW007

1/16/17 1/31/18 3/25/19 03/13/20

39 15 28 27

48 6.5 13 18

23 1.2 4.1 6.4

0.36 U 0.36 U 0.36 U 0.36

MW002

1/16/17 1/31/18 3/25/19 03/13/20

0.22 U 0.44 I 0.22 U 0.22 U

0.36 U 0.54 I 0.36 U 0.38 I

0.36 U 0.54 I 0.36 U 0.36 I

0.36 U 0.36 U 0.36 U 0.36 U

MW001

1/16/17 1/31/18 3/25/19 03/13/20

130 110 77 25

47 140 120 150

27 60 90 95

0.72 I 0.57 I 1.8 U 0.99 I

MW003

1/16/17 1/31/18 3/25/19 03/13/20

200 57 3.7 0.84 I

190 96 26 21

64 98 33 21

0.72 U 0.80 I 0.41 I 0.45 I

MW005

8/24/01 11/12/15

1.0 U 0.36 U

1.0 U 0.29 U

1.0 U 0.24 U

1.0 U 0.24 U

MW006

11/12/15

0.36 U

0.29 U

0.24 U

0.24 U

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER

(µg/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER

CHAPTER 62-777, TABLE I, OF THE FLORIDA ADMINISTRATIVE

CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF

THE APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT

NOT DETECTED.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

6.) CVOCs - CHLORINATED VOLATILE ORGANIC COMPOUNDS.

cis-1,2-DICHLOROETHENE (cis-1,2-DCE)

TRICHLOROETHENE (TCE)

TETRACHLOROETHENE (PCE)

MW-007

6/26/14

MONITORING WELL I.D.

SAMPLE DATE

VINYL CHLORIDE (VC)

GCTLs

ESTIMATED EXTENT OF

GROUNDWATER CONCENTRATIONS

OF CVOCs EXCEEDING THE GCTLs

NOTE(S)

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

X

X X X X X

X

X

X

X

XXX

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

JAY'S

DRY CLEANERS

MW009

MW011

MW012

BUILDING

i n

FDEP-DC008

Control No.

FDEP-DC008-S006

MAH

MAH

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

INTERMEDIATE ZONE OF THE SURFICIAL AQUIFER

(MARCH 2020)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

A

S U

R E

M E

E

S

N

T

A

T

O

W N

T

E

Z

E

H

E

N

M

O D

I F

I E

D

F

R O

M

A

N S

I

B

P a t h

E

G o l d e r P r o j e c t s F

D E

P D

C

N o

J a y s

C l e a n e r s p r

R p t A c t i v e

D r a w i n g l e

N a m e

F

D E

P D

C S d

FEET

LEGEND

X X X

FENCE

DITCH

PROPERTY BOUNDARY

ANALYTICAL DATA LEGEND

REFERENCE(S)

1.) SITE MAP BY HARDING ESE, MACTEC

COMPANY DATED MARCH 2001.

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER

(µg/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER

CHAPTER 62-777, TABLE I, OF THE FLORIDA ADMINISTRATIVE

CODE.

3.) SHADED CELL AND BOLD FONT INDICATE AN EXCEEDANCE OF

THE APPLICABLE GCTL.

4.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT

NOT DETECTED.

5.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

6.) CVOCs - CHLORINATED VOLATILE ORGANIC COMPOUNDS.

cis-1,2-DICHLOROETHENE (cis-1,2-DCE)

TRICHLOROETHENE (TCE)

TETRACHLOROETHENE (PCE)

MW-007

6/26/14

MONITORING WELL I.D.

SAMPLE DATE

VINYL CHLORIDE (VC)

GCTLs

ESTIMATED EXTENT OF

GROUNDWATER CONCENTRATIONS

OF CVOCs EXCEEDING THE GCTLs

NOTE(S)

INTERMEDIATE MONITORING WELL LOCATION

MW009

1/16/17 1/31/18 3/25/19 03/13/20

9.8 5.2 1.3 3.6

72 22 5.5 41

71 34 3.3 130

0.72 U 0.36 U 0.36 U 0.36 U

MW012

1/16/17 1/31/18 3/25/19 03/13/20

0.22 U 0.22 U 0.22 U 0.22 U

1.1 0.84 I 1.2 1.6

6.7 8.9 9.8 9.2

3.3 2.7 2.4 3.2

MW011

1/16/17 1/31/18 3/25/19 03/13/20

0.22 U 0.22 U 0.22 U 0.22

0.36 U 0.36 U 0.36 U 0.36

1.6 1.2 1.1 2.4

0.36 U 0.36 U 0.36 U 0.36 U

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

X

X X X X X X X

X X

XXX

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXXXXXXXXXXXXXX

X

X X

X X

X X

X X

X

JAY'S

DRY CLEANERS

MW004

MW010

BUILDING

in

FDEP-DC008

Control No.

FDEP-DC008-S007

FIGURE

2020-04-08

BCL

MAH

MAH

JCB

JAY'S CLEANERS

JACKSONVILLE, DUVAL COUNTY, FLORIDA

DEEP ZONE OF THE SURFICIAL AQUIFER

(MARCH 2020)

TITLE

PROJECT NO. REV.

PROJECTCLIENT

CONSULTANT

PREPARED

DESIGNED

REVIEWED

APPROVED

YYYY-MM-DD

IF

T

H

IS

M

EA

SU

R

EM

EN

T D

O

ES

N O

T M

AT

C

H W

H

AT

IS

S

H O

W N

, T H

E

SH

EE

T

SI

ZE

H

AS

B

EE

N M

O D

IF

IE

D F

R O

M : A

N

SI

B

Pa th

: E :\G ol de r_ Pr oj ec ts \F

D

EP

\D C

N o

Ja y' s C le an er s\

S

- A pr

R pt \A ct iv e D ra w in gs

Fi le

N am e:

F

D

EP

-D C

8-

S0

.d

FEET

LEGEND

X X X FENCE

DITCH

PROPERTY BOUNDARY

ANALYTICAL DATA LEGEND

REFERENCE(S)

1.) SITE MAP BY HARDING ESE, MACTEC

COMPANY DATED MARCH 2001.

1.) ALL RESULTS ARE REPORTED IN MICROGRAMS PER LITER

(µg/L).

2.) GCTL - GROUNDWATER CLEANUP TARGET LEVEL PER

CHAPTER 62-777, TABLE I, OF THE FLORIDA ADMINISTRATIVE

CODE.

3.) U - INDICATES THAT THE COMPOUND WAS ANALYZED FOR BUT

NOT DETECTED.

4.) I - THE REPORTED VALUE IS BETWEEN THE LABORATORY

METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL

QUANTITATION LIMIT.

cis-1,2-DICHLOROETHENE (cis-1,2-DCE)

TRICHLOROETHENE (TCE)

TETRACHLOROETHENE (PCE)

MW-007

6/26/14

MONITORING WELL I.D.

SAMPLE DATE

VINYL CHLORIDE (VC)

GCTLs

NOTE(S)

DEEP MONITORING WELL LOCATION

MW010

1/16/17 1/31/18 3/25/19 03/13/20

0.22 U 0.22 U 0.22 U 0.22 U

0.36 U 0.36 U 0.36 U 0.36 U

0.36 U 0.36 U 0.36 U 0.36 U

0.36 U 0.36 U 0.36 U 0.36 U

MW004

1/16/17 1/31/18 3/25/19 03/13/20

0.22 U 0.28 I 0.22 U 0.22 U

0.36 U 0.41 I 0.36 U 0.36 U

0.36 U 0.36 U 0.36 U 0.36 U

0.36 U 0.36 U 0.36 U 0.36 U

AutoCAD SHX Text

MALL

AutoCAD SHX Text

SAN JOSE BOULEVARD

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

LOT

AutoCAD SHX Text

CROWN POINT COURT

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

POND

AutoCAD SHX Text

MALL

AutoCAD SHX Text

POND

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

CROWN POINT ROAD

AutoCAD SHX Text

MERCHANT'S WALK

AutoCAD SHX Text

SHOPPING CENTER

AutoCAD SHX Text

CROWN POINT

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

ASPHALT

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MEDICAL

AutoCAD SHX Text

CENTER

AutoCAD SHX Text

DAY CARE

AutoCAD SHX Text

GRASS

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .