This is a Task Assignment Notification Form (DC014P) executed under Florida Department of Environmental Protection (FDEP) Contract HW561, an indefinite delivery vehicle for environmental remediation services. The task assignment is issued to Golder Associates Inc., a consulting firm, with FDEP serving as the contracting agency. The project site is Lakeshore Plaza - Dixie Cleaners, located at 1931 Blanding Boulevard in Jacksonville, Duval County, Florida (FDEP Facility ID: ERIC_4531). Benjamin Grubbs serves as the FDEP Contract Manager, and the work is authorized under the monitoring phase of the contract.
The task assignment authorizes Golder to conduct well redevelopment and annual groundwater monitoring activities from April 21, 2021, through December 15, 2021, in accordance with the April 21, 2021 Scope of Work, Cost Estimate, and Bid Documentation. The deliverables include well redevelopment documentation (due 06/30/2021), groundwater monitoring lab reports with field and investigation-derived waste (IDW) treatment documentation (due 07/30/2021), COVID-19 safety precaution documentation (due 07/30/2021), and an Annual Groundwater Monitoring Report with ADaPT/GIS update (due 09/15/2021). The total task assignment value is $22,819.32 with 145 labor hours, structured as a fixed price contract with retainage of $0.00. Payment is contingent upon FDEP approval of each deliverable and is invoiced in four milestones: $3,100.34 for well redevelopment, $13,573.57 for groundwater monitoring and IDW treatment, $388.00 for COVID-19 costs, and $5,757.41 for reporting and GIS updates. Erwin Remediation was selected as the lowest responsive and responsible bidder for IDW disposal at $100 per drum.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW561
D000 N/ADC014P
Golder Associates
Matt Crews
(850) 245-8992Ben Grubbs
ERIC_4531
Lakeshore Plaza - Dixie Cleaners
1931 Blanding Blvd, Jacksonville, Duval
Monitoring
This Task Assignment authorizes Golder to conduct well redevelopment and groundwater monitoring activities in accordance with the April 21, 2021, Scope of Work, Cost Estimate, and Bid Documentation.
Annual Groundwater Monitoring Report and ADaPT/GIS update
09/15/2021
12/15/2021
$ 22,819.32 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.04.28 13:41:15 -04'00'
Benjamin Grubbs Digitally signed by Benjamin Grubbs Date: 2021.04.28 13:41:26 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.04.28 14:46:33 -04'00'
Donald Miller Digitally signed by Donald Miller Date: 2021.04.28 15:34:44 -04'00'
$ 22,819.32
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Well Redevelopment Documentation 06/30/2021
Subtask 3: Groundwater monitoring lab report and field and IDW treatment documentation 07/30/2021
Subtask 4: Field documentation of COVID-19 safety precautions via E-mail Deliverable 07/30/2021
Subtask 5: Annual Groundwater Monitoring Report and ADaPT/GIS update 09/15/2021
Subtask 2: Submittal and FDEP approval of Well Redevelopment Documentation $ 3,100.34
Subtask 3: Submittal and FDEP approval of groundwater monitoring lab report and field and IDW treatment documentation $ 13,573.57
Subtask 4: Submittal and FDEP approval of field documentation of COVID-19 safety precautions via E-mail Deliverable $ 388.00
Subtasks 1 & 5: Submittal and FDEP approval of the Annual Groundwater Monitoring Report and ADaPT/GIS update $ 5,757.41
$ 22,819.32
HW561
DC014P
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW561 Contract Negotiation File Lakeshore Plaza - Dixie Cleaners Jacksonville, Duval County
ERIC_4531
From: Ben Grubbs, Project Manager Date: April 28, 2021 Subject: Negotiation Summary
HW561 DC014P
This Task Assignment authorizes Golder to conduct well redevelopment and groundwater monitoring activities in accordance with the April 21, 2021, Scope of Work, Cost Estimate, and Bid Documentation.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Monitoring and Injection Well Redevelopment Golder will redevelop monitoring wells MW034-MW036 and MW038-MW041 and injection wells IW002-IW008. Investigation-derived waste (IDW) will be temporarily stored in 55-gallon drums until waste characterization is completed. IDW disposal will be covered under Subtask 3.
Subtask 3: Annual Groundwater Monitoring and IDW Treatment Golder will collect groundwater samples from five shallow zone monitoring wells (MW001, MW16, MW034, MW038, and MW040); nine intermediate zone monitoring wells (MW011, MW023, MW029, MW018, MW035, MW037, MW039, MW041, and MW019); seventeen injection wells (IW002, IW003, IW004, IW007, IW008, IW011, IW012, IW013, IW005, IW006, IW015, IW017, IW018, IW019, IW021, IW022, and IW023), and five deep zone monitoring wells (MW015, MW024, MW-27, MW030, and MW036). Prior to sampling, depth-to-water will be measured. The wells will then be purged, and field parameters will be recorded. The groundwater samples will be collected using low flow sampling methods and analyzed for chlorinated volatile organic compounds (VOCs). Groundwater samples from MW029, MW034, MW035, IW021, IW022, and IW023 will also be analyzed for total organic carbon. Groundwater samples from MW029, MW034, and MW035 will also be analyzed for total dissolved solids, color, and odor.
IDW will be temporarily stored in 55-gallon drums until waste characterization is completed. An IDW sample will be collected and analyzed for VOCs. Golder requested bids for IDW transport
MEMORANDUM
Lakeshore Plaza - Dixie Cleaners April 28, 2021 Page Two and disposal from Clark Environmental, Erwin Remediation, and Capitol Environmental. Erwin Remediation was selected as the lowest responsive and responsible bidder.
Subtask 4: COVID-19 Costs Costs related to the use of extra vehicles so that Golder can maintain social distancing during the COVID-19 pandemic are covered under this subtask for invoicing purposes.
Subtask 5: Reporting Golder will submit the Annual Groundwater Monitoring Report and ADaPT and GIS deliverables to FDEP.
The original Task Assignment totaled $22,885.32 with 145 labor hours but after negotiations and corrections with contractor costs are reflected as below:
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $22,819.32 with 145 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Golder Associates Inc.
Date: 4/21/2021
Task #: DC014P SubTask 1 Project Management SubTask 6
Site: Dixie Cleaners SubTask 2 Well Development SubTask 7
Activity/Phase: Monitoring SubTask 3 Ann GW Monitoring and IDW Treatment SubTask 8
Project Manager: Benjamin Grubbs SubTask 4 Covid-19 Costs SubTask 9
SubTask 5 Reporting SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$48.81 Project Manager (RFM) 12 11.5 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0
$59.43 Senior Consultant - LV7 (JCB) 5 1.0 1.0 0 3 0 0 0 0 0 $0.00 Senior Sci/Eng.- LV5 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Sci/Eng-LV5 0 0.0 0.0 0 0 0 0 0 0 0
$48.81 Sr Sci/Eng - LV5 (RFM) 24 2.0 6.0 0 16 0 0 0 0 0 $34.17 Staff Sci/Eng - LV3 (HH) 0 0.0 0 0 0 0 0 0 0 0 $41.54 Sr Project Sci/Eng - LV4 (JT) 5 0 0.0 0.0 5.0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 3 0 0 0 3 0 0 0 0 0
$0.00 Staff Draftsperson - LD2 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Sci/Eng - LV1 0 0 0 0 0 0 0 0 0 0
$29.98 Senior Technician - LT3 (HB) 47 11.0 36.0 0 0 0 0 0 0 0 $25.10 Staff Technician - LT2 0 0 0 0 0 0 0 0 0 0
$0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0
$24.10 Staff Admin - LA2 (AS) 2 0 0 0 2 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0
$26.32 Staff Sci/Eng - LV2 (KF) 47 12.0 35.0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 145 12 26.0 78.0 0.0 29.0 0 0 0 0 0
Direct Labor $5,044.66 $560.52 $802.67 $2,352.77 $0.00 $1,328.70 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $8,702.05 $966.90 $1,384.61 $4,058.53 $0.00 $2,292.01 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $13,746.71 $1,527.42 $2,187.28 $6,411.30 $0.00 $3,620.71 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $252.24 $28.03 $40.13 $117.64 $0.00 $66.44 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
Task #: DC014P SubTask 1 Project Management SubTask 6
Site: Dixie Cleaners SubTask 2 Well Development SubTask 7
Activity/Phase: Monitoring SubTask 3 Ann GW Monitoring and IDW Treatment SubTask 8
Project Manager: Benjamin Grubbs SubTask 4 Covid-19 Costs SubTask 9
SubTask 5 Reporting SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $873.00 $97.00 $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $873.00 $97.00 $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $900.00 $0.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
AEL $51.00 $0.00 $51.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
25 gram Encore sampler $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Locator $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $951.00 $0.00 $951.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $95.10 $0.00 $95.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,046.10 $0.00 $1,046.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,828.50 $0.00 $2,828.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $208.00 $0.00 $208.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,036.50 $0.00 $3,036.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $130.00 $32.50 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $50.50 $50.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,785.80 $125.00 $1,660.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $523.80 $349.20 $174.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,490.10 $557.20 $1,932.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $21,444.65 $1,555.45 $2,881.61 $12,932.44 $388.00 $3,687.15 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,374.67 $152.74 $218.73 $641.13 $0.00 $362.07 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,819.32 $1,708.19 $3,100.34 $13,573.57 $388.00 $4,049.22 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dixie Cleaners SUBTASK 2: Well Development
DATE: 4/21/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J. Brown) 1
Senior Proj Sci/Eng (R. Mongillo) 2
Project Sci/Eng (K. Fraley) 12
Sr Tech (H. Brooks) 11
TOTAL LABOR 26.0
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $32.50 Per Day 1 $32.50 Centrifugal Pump (2 pumps) $25.25 Per Day 2 $50.50 Tubing, poly/HDPE $0.25 Per Foot 500 $125.00 Drum, 55-gallon (Water) $58.20 Each 6 $349.20
TOTAL EQUIPMENT $557.20
VEHICLE TYPE RATE UNIT USAGE
Truck $97.00 Per Day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
Mobilize to redevelop seven monitoring wells and seven injection wells that were compromised during the building demolition. Round trip travel (1 hour per day). monitoring well redevelopment activities (10 hours).
Mobilize to redevelop seven monitoring wells and seven injection wells that were compromised during the building demolition. Field event preparation (1 hour). Round trip travel (1 hour per day). monitoring well redevelopment activities (10 hours).
Correspondence with RPO for site access for monitoring well development (1 hour). Organizing and review of monitoring well development data for submittal to the FDEP (1 hour).
Review soil boring locations and analytical data (2 hours).
FINAL --7/24/96
SUBTASK 3: Ann GW Monitoring and IDW Treatment
DATE: 4/21/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J. Brown) 1
Senior Proj Sci/Eng (R. Mongillo) 6
Project Sci/Eng (K. Fraley) 35
Sen Tech (H. Brooks) 34
Sen Tech (H. Brooks) 2
TOTAL LABOR 78.0
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $32.50 Per Day 3 $97.50
2 kits per day Shallow Groundwater Sampling Kit $208.55 Per Day 6 $1,251.30 Tubing, poly/HDPE $0.25 Per Foot 1,350 $337.50 Tubing, silicon 3/16 x 3/8 $2.00 Per Foot 36 $72.00 Drum, 55-gallon $58.20 Each 3 $174.60
TOTAL EQUIPMENT $1,932.90
VEHICLE TYPE RATE UNIT USAGE
Truck $97.00 Per Day 3 $291.00 Truck (IDW disposal) $97.00 Per Day 1 $97.00
TOTAL VEHICLE $388.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOC halocarbons (36 MW, 2 TB) EPA Method 8260B $66.00 36 2 $2,508.00
TOC (MW-029, MW-034, MW-
035, IW-021, IW-022, and IW- 023)
EPA Method 5310B $26.00 6 $156.00
TDS (MW-029, 034, 035) EPA Method 160.1 $11.50 3 $34.50 Color (MW-029, 034, 035) $10.00 3 $30.00 Volatile Organics PID/Hall Series(GW) (IDW) 8260 $100 1 $100.00 Sample Shipping Large $104.00 2 $208.00
TOTAL LAB $3,036.50
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Odor (MW-029, 034, 035) SM2150B $17.00 3 $51.00 ER IDW water (sampling) $100.00 3 $300.00 ER IDW water (develop) $100.00 6 $600.00
TOTAL $951.00
Mobilize and collect samples from a portion of 36 wells: five shallow zone monitoring wells (MW001, MW16, MW034, MW038, and MW040); nine intermediate zone monitoring wells (MW011, MW023, MW029, MW018, MW035, MW037, MW039, MW041, and MW019); seventeen injection wells (IW002, IW003, IW004, IW007, IW008, IW011, IW012, IW013, IW005, IW006, IW015, IW016, IW017, IW018, IW019, IW021, IW022, and IW023), and five deep zone monitoring wells (MW015, MW024, MW027, MW030, and MW036). Field event preparation (1 hour). Round trip travel (1 hour per day x 3 days = 3 hours). Water levels, instrument pre and post calibration, and sampling (31 hours).
Mobilize and collect samples from a portion of 36 wells: five shallow zone monitoring wells (MW001, MW16, MW034, MW038, and MW040); nine intermediate zone monitoring wells (MW011, MW023, MW029, MW018, MW035, MW037, MW039, MW041, and MW019); seventeen injection wells (IW002, IW003, IW004, IW007, IW008, IW011, IW012, IW013, IW005, IW006, IW015, IW017, IW018, IW019, IW021, IW022, and IW023), and five deep zone monitoring wells (MW015, MW024, MW027, MW030, and MW036). Round trip travel (1 hour per day x 3 days = 3 hours). Water levels, instrument pre and post calibration, and sampling (31 hours).
Review of final groundwater sampling results and submit e-mail deliverable to FDEP (6 hrs).
Review groundwater sampling results analytical data (1 hour).
Return trip to site for IDW disposal
SUBTASK 4: Covid-19 Costs
DATE: 4/21/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Subtask 2 Covid Truck $97.00 Per Day 1 $97.00 Subtask 3 Covid Truck $97.00 Per Day 3 $291.00
TOTAL VEHICLE $388.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 5: Reporting
DATE: 4/21/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J. Brown) 3
Senior Sci/Eng (R. Mongillo) 16
Proj. Sci/Eng (J Thomas) 5
Proj. Sci/Eng (B. Lucero) CADD for Report - VOC and potentiometric contours for 3 intervals 3 Staff Admin (AS) Reporting: document production, binding, and shipping 2
TOTAL LABOR 29
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
Reporting: Monitoring Report review, conclusions and recommendations; review and submit FDEP GIS tables; submit ADaPT deliverables.
FDEP GIS data entries for sampling event, including QA sample (36 gw data points x 8 min/point = 288 min. EDD Uploads. Run FDEP data checker and annotate error report.
Reporting, data entry, report tables, develop potentiometric maps and VOC figures for three separate intervals, author monitoring report
FINAL --7/24/96
Task #: DC014P SubTask 1 Project Management SubTask 6
Site: Dixie Cleaners SubTask 2 Well Development SubTask 7
Activity/Phase: Monitoring SubTask 3 Ann GW Monitoring and IDW Treatment SubTask 8
Project Manager: Benjamin Grubbs SubTask 4 Covid-19 Costs SubTask 9
SubTask 5 Reporting SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$48.81 Project Manager (RFM) 12 11.5 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0
$59.43 Senior Consultant - LV7 (JCB) 5 1.0 1.0 0 3 0 0 0 0 0 $0.00 Senior Sci/Eng.- LV5 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Sci/Eng-LV5 0 0.0 0.0 0 0 0 0 0 0 0
$48.81 Sr Sci/Eng - LV5 (RFM) 24 2.0 6.0 0 16 0 0 0 0 0 $34.17 Staff Sci/Eng - LV3 (HH) 0 0.0 0 0 0 0 0 0 0 0 $41.54 Sr Project Sci/Eng - LV4 (JT) 5 0 0.0 0.0 5.0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 3 0 0 0 3 0 0 0 0 0
$0.00 Staff Draftsperson - LD2 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Sci/Eng - LV1 0 0 0 0 0 0 0 0 0 0
$29.98 Senior Technician - LT3 (HB) 47 11.0 36.0 0 0 0 0 0 0 0 $25.10 Staff Technician - LT2 0 0 0 0 0 0 0 0 0 0
$0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0
$24.10 Staff Admin - LA2 (AS) 2 0 0 0 2 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0
$26.32 Staff Sci/Eng - LV2 (KF) 47 12.0 35.0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 145 12 26.0 78.0 0.0 29.0 0 0 0 0 0
Direct Labor $5,044.66 $560.52 $802.67 $2,352.77 $0.00 $1,328.70 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $8,702.05 $966.90 $1,384.61 $4,058.53 $0.00 $2,292.01 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $13,746.71 $1,527.42 $2,187.28 $6,411.30 $0.00 $3,620.71 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $252.24 $28.03 $40.13 $117.64 $0.00 $66.44 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 1
Task #: DC014P SubTask 1 Project Management SubTask 6
Site: Dixie Cleaners SubTask 2 Well Development SubTask 7
Activity/Phase: Monitoring SubTask 3 Ann GW Monitoring and IDW Treatment SubTask 8
Project Manager: Benjamin Grubbs SubTask 4 Covid-19 Costs SubTask 9
SubTask 5 Reporting SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $873.00 $97.00 $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $873.00 $97.00 $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $900.00 $0.00 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
AEL $51.00 $0.00 $51.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
25 gram Encore sampler $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Locator $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $951.00 $0.00 $951.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $95.10 $0.00 $95.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,046.10 $0.00 $1,046.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,894.50 $0.00 $2,894.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $208.00 $0.00 $208.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,102.50 $0.00 $3,102.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $130.00 $32.50 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $50.50 $50.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,785.80 $125.00 $1,660.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $523.80 $349.20 $174.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $2,490.10 $557.20 $1,932.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $21,510.65 $1,555.45 $2,881.61 $12,998.44 $388.00 $3,687.15 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,374.67 $152.74 $218.73 $641.13 $0.00 $362.07 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,885.32 $1,708.19 $3,100.34 $13,639.57 $388.00 $4,049.22 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GOLDER Page 2
Golder Associates Inc.
9428 Baymeadows Road, Suite 400, Jacksonville, Florida, USA 32256
T: +1 904 363-3430 F: +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
VIA EMAIL
April 21, 2021 Proposal No. CX21-460854
Mr. Benjamin Grubbs Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
RE: COST PROPOSAL FOR DIXIE CLEANERS
WELL DEVELOPMENT AND ANNUAL GROUNDWATER MONITORING
1931 BLANDING BOULEARD, JACKSONVILLE, FLORIDA
DEP FACILITY ID NUMBER: ERIC_4531
PROPOSED TASK ASSIGNMENT: DC014P
Dear Mr. Grubbs:
Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (FDEP) with this cost proposal for redevelopment of selected monitoring wells impacted from the building demolition and completing the annual groundwater monitoring event at the Dixie Cleaners site located at 1931 Blanding Boulevard in Jacksonville, Duval County, Florida. This proposal includes a description of the proposed scope of services, level of effort sheets for each subtask, and a cost estimate form that summarizes the costs of the proposed services.
The general scope of work was previously discussed during the January site summary meeting with the FDEP. The proposed scope of services is described below.
SUBTASK 1 – PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, all aspects of this project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation to confirm the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP Drycleaning Solvent Cleanup Program requirements. The project manager will oversee the work so that it is conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.
SUBTASK 2 – MONITORING AND INJECTION WELL DEVELOPMENT
Golder proposes to mobilize a two-person sampling crew to the site to redevelop seven monitoring wells MW034, MW035, MW036, MW038, MW039, MW040, and MW041 and seven injection wells IW002, IW003, IW004, IW005, IW006, IW007, and IW008, (Figures 7 and 8) that were impacted by the building demolition activities will be redeveloped before completing the annual groundwater sampling activities. Well construction information for the
Mr. Benjamin Grubbs Proposal No. CX21-460854
Florida Department of Environmental Protection April 21, 2021 affected monitoring wells is presented on Table 1. The property owner has not informed Golder on the locations of proposed features on the property during the redevelopment phase; therefore, Golder has not included the surface completions for the above-referenced monitoring/injection wells during this phase of work.
The development water will be containerized in a 55-gallon steel drums and stored at the site pending waste characterization and disposal. A sample of the investigative derived waste (IDW) development water will be collected and analyzed for chlorinated volatile organic compounds (VOCs) using EPA Method 8260B. For cost estimating purposes, Golder assumes characterization and disposal of six drums of non-hazardous IDW waste water.
SUBTASK 3 – ANNUAL GROUNDWATER MONITORING AND IDW TREATMENT
Golder will collect groundwater samples from the following 36 wells: five shallow zone monitoring wells (MW001, MW16, MW034, MW038, and MW040); nine intermediate zone monitoring wells (MW011, MW023, MW029, MW018, MW035, MW037, MW039, MW041, and MW019); seventeen injection wells (IW002, IW003, IW004, IW007, IW008, IW011, IW012, IW013, IW005, IW006, IW015, IW017, IW018, IW019, IW021, IW022, and IW023), and five deep zone monitoring wells (MW015, MW024, MW-27, MW030, and MW036). Figures 12 through 14 from the most recent groundwater monitoring report, which show the well locations and most recent VOC results for the shallow, intermediate, and deep zones of the surficial aquifer, are attached for reference.
Prior to groundwater sampling, the water level depth will be measured at the wells to be sampled to determine groundwater elevations. Groundwater samples will be collected from the wells in accordance with FDEP Standard Operating Procedures (SOPs) for Field Activities (DEP-SOP-001/01) dated January 2017 approved April 16, 2018.
Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures. During the sampling event, the locks and well caps will be inspected for damage or degradation and replaced, as necessary.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated VOCs using EPA Method No. 8260B. For quality assurance purposes, one trip blank will accompany each sample container for laboratory analysis of chlorinated VOCs using EPA Method 8260B. In addition, groundwater samples from six wells (MW029, MW034, MW035, IW021, IW022, and IW023) will be analyzed for total organic carbon using EPA Method SM 5310B. Groundwater samples from three of the monitoring wells (MW029, MW034, and MW035) will also be analyzed for CHITOREM® Underground Injection Control parameters including total dissolved solids using EPA Method 160.1, color, and odor. Upon receipt of the laboratory analytical results, Golder will evaluate the groundwater concentrations to determine if off site notification is required.
The purge water will be containerized in a 55-gallon steel drums and stored at the site pending waste characterization and disposal. A sample of the IDW purge water will be collected and analyzed for total VOCs using EPA Method 8260. For cost estimating purposes, Golder assumes characterization and disposal of three drums of non-hazardous IDW waste water. The six drums of IDW from well development activities during Subtask 2, will also be picked up for disposal by the subcontractor.
SUBTASK 4 – COVID-19 COSTS
Providing a second truck for use by a two-person field crew during a one day mobilization associated with Subtask 2 and three days of mobilization associated with Subtask 3 to provide protection from Covid-19.
SUBTASK 5 – REPORTING
The annual groundwater monitoring report will include a description of sampling procedures, evaluation of analytical results, comparison of current to historical data, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations. Golder will update the FDEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the FDEP data checker on the completed tables; and submit the updated tables and error report under this subtask. Additionally, Golder will forward Automated Data Processing Tool (ADaPT) data deliverables provided by the laboratory for the groundwater sampling event.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the monitoring is $22,885.32. Golder will tentatively schedule the well development work for May 2021 and the groundwater sampling one to two weeks later. Golder anticipates that development of monitoring/injection wells will take one day and the water level gauging and groundwater sample collection will take three days to complete. The LOE/CEF cost sheets and subcontractor bids are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule.
Task Proposed Cost Proposed Schedule/Deliverables
Subtask 1 – Project Management $1,708.19 September 15, 2021
Subtask 2 – Monitoring and Injection Well Development $3,100.34 June 30, 2021
(Well Development Documentation)
Subtask 3 – Annual Groundwater Monitoring $13,639.57
July 31, 2021 (Groundwater Sampling Documentation and Laboratory Report)
Subtask 4 – Covid-19 Costs $388.00 July 31, 2021
Subtask 5 – Reporting $4,049.22 September 15, 2021 (Semi-Annual Report, GIS Tables, ADaPT Deliverables)
Total/Completion Date $22,885.32 December 15, 2021
Subtask 2: $13,573.57 Total: $22,819.32
-BG
Grubbs_B Cross-Out
Grubbs_B Cross-Out
Please be aware that Golder has been acquired by and is now a Member of the WSP family of companies. Golder remains as a legal entity and is the proposed contracting entity for this proposal. We are in the process of integrating the resources of our companies. Correspondence for this proposal should continue to be addressed to the undersigned.
Golder appreciates the opportunity to provide services under the Drycleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at (904) 363-3430.
Sincerely, Golder Associates Inc.
Ralph F. Mongillo, Jr., PG Jesse C. Brown, PE Senior Project Geologist Senior Consultant and Associate
RFM/JCB/as
Attachments: Table 1 - Monitoring Well Completion and Groundwater Elevation Summary
Figure 7 – EOS® and AquaBupH™ Injection Well Locations Figure 8 – LDA Boring and Injection Well Locations Figure 12 - Groundwater Analytical Results Shallow Zone (5-15 ft.)
Figure 13 - Groundwater Analytical Results Intermediate Zone (15-25 ft.)
Figure 14 - Groundwater Analytical Results Deep Zone (25-30 ft.)
Attachment A - LOE/CEF Cost Sheets and Subcontractor Quotes
G:\Projects\DEP-Drycleaning\Projects\Jax\Dixie\Proposals & Task Assignments\DC014P - 2021 Annual Monitoring\DC014P - Dixie Cleaners Soil Sampling and Semi-Annual GW Mon Proposal 4.21.21.docx
Client PM: Quote Date:
Company: Project Name:
Address: Project Number:
PO Number:
Phone:
FAX: Quoted by:
Matrix Quantity Unit Cost Total
GW 1 17.00$ 17.00$
Total = 17.00$
Project Specific Details:
Required Turnaround Time:
Client Comments:
Standard 5 Day
9428 Baymeadows Rd.
Suite 400
( 904 ) - 363 - 3445
Jacksonville, FL 32256 ( 904 ) - 363 - 3430
Odor by SM2150B (24 hr hold time)
PROJECT
QUOTE
6601 Southpoint Parkway, Jacksonville, FL 32216, 904-363-9350, FAX: 904-363-9354
Testing Method/Parameter
5/12/2016 Former Dixie Drycleaners
Shane Poston
Matt Crews Golder and Associates, Inc.
TERMS AND CONDITIONS
The following terms and conditions apply to all work performed by Advanced Environmental Laboratories, Inc. (AEL), unless specifically exempted in writing by an officer of AEL.
1. CONTRACT AGREEMENT/TERMS AND CONDITIONS:
The Client, when placing an order with AEL, agrees that AEL’s quotation, Terms and Conditions, the Client’s purchase order, and AEL’s agreement to perform testing shall constitute the entire contract between the Client and AEL. A purchase order issued to AEL shall not constitute a binding contract until it is accepted and acknowledged by AEL. It is assumed the Client accepts AEL’s Terms and Conditions in lieu of the Client’s Terms and Conditions on any orders placed with AEL.
2. GOVERNING LAW:
All contracts between AEL and the Client shall be deemed to be made and governed by the Laws of the State of Florida. Any legal action brought by either the Client or AEL shall be brought in a court of competent jurisdiction in Duval County, Florida, or if the action is to be in federal court, in the U.S. District Court for the Middle District of Florida – Jacksonville District.
3. QUOTATION PERIOD AND PRICING:
Prices quoted by AEL remain in effect for thirty (30) days and are subject to change after that period. The prices contained in a quotation supplied by AEL apply specifically to the test or project named on the quote in accordance with stated specifications and documentation provided to AEL at the time of quotation. AEL shall not be bound to this pricing for any subsequent testing, repeat testing, additions, and omissions to the test program or parts thereof.
4. PRICING REVISION:
The Client representative requesting any testing quotation by AEL shall be considered an agent of the client and authorized to make technical and/or cost changes of any nature to the test procedures, specifications, or other Client documents.
If AEL is required to submit a quotation without first receiving and reviewing applicable test specifications, any pricing submitted shall be subject to change when such specifications are made available to AEL.
5. CREDIT TERMS AND PAYMENT:
The acceptance of any purchase order by AEL shall be contingent upon approval of the Client’s credit. Unless otherwise determined, terms of AEL’s invoices shall be Net 30 days and payable in U.S. funds. Payment for the services rendered is the obligation of the Client issuing the purchase order or accepting the proposal. This obligation is not contingent upon payment to the Client by any third party or on any specific result from AEL's services and may not be assigned without the written permission of AEL. If the Client fails to make payment within the agreed terms, AEL shall have the right to cease work, withhold data/reports, and make all invoices immediately due and payable. In addition, AEL shall have the right to charge interest on all amounts not paid by the due date at the rate of 1.5% interest per month, compounded monthly, from the due date of payment.
Client agrees to pay all cost of collections including attorney’s fees.
6. STANDARD PROCEDURES AND ACCREDITATION:
AEL represents to the client that testing is done in accordance with standard procedures as applicable and that reported test results are accurate within generally acceptable commercial ranges of accuracy, unless another measure of accuracy has been agreed to in writing by AEL and the client. AEL’s testing laboratories are accredited by NELAP by the Florida Department of Health. It is the client’s responsibility to ensure AEL is aware of any testing requiring accreditation. AEL makes no claims or guarantees that reported MDLs, PQLs, and/or MRLs will meet a Client’s requirements, be they regulatory, commercial, industrial, or otherwise. It is the complete and full responsibility of the Client to determine if AEL MDLs, PQLs, and/or MRLs will satisfy a Clients needs.
7. WARRANTIES:
AEL performs services and hence its work and reports are not governed by the Uniform Commercial Code. Except as stated in paragraph 6, AEL disclaims all warranties, express or implied, including any warranties of merchantability or fitness for a particular purpose. AEL shall have no liability for incidental or consequential damages of any nature whatsoever.
8. Cancellation of Testing:
AEL begins testing upon receipt of samples from the Client. If for any reason the testing is interrupted by the Client, the completed portion of the work, including (but not limited to) supplies, materials, labor, and equipment utilization shall be billed to the Client and be payable within the agreed upon payment terms. In such circumstances where AEL agrees to place samples on hold, AEL may bill the Client stand-by charges, up to the full cost of established testing rates, until the testing resumes or is terminated by the client. If the testing is terminated by the client, AEL may impose a cancellation fee of no less than 10% of the unbilled portion of the project.
9. PROGRAM DELAYS:
AEL shall not be liable for any failure or delay in performance which is caused in whole or in part by acts of God (fire, flood, earthquakes, etc.), strikes or other labor disturbances, shut-downs, equipment breakdowns, unforeseen engineering problems, fuel shortages, Government priorities, or any other cause beyond the control of AEL.
10. ACCEPTANCE OF TEST REPORTS:
AEL reports apply only to the specific samples tested under stated test conditions and test results are not necessarily indicative of the qualities of apparently identical or similar test or operating conditions. AEL shall have no liability for any deductions, inferences or generalizations drawn by the client or others from AEL reports. If the Client requests verification of any part of the test report, AEL shall be notified within thirty (30) days of submission of the report to the Client. Failure to notify within this thirty
(30) day period acknowledges acceptance of the report. Should additional work be required for verification purposes, AEL shall be entitled to the reasonable value of the additional work involved providing the original findings are verified.
Payment for any test report or other AEL invoice shall not be contingent upon acceptance and/or approval of a third party.
11. SAMPLE/DATA RETENTION
Samples will be destroyed thirty (30) days after the date of the final report, unless the client indicates otherwise in writing and prepays before the expiration of said thirty (30) day period the entire cost of any storing, packaging and shipping the sample(s) by AEL. AEL shall have no obligation to retain its test reports or related data and documents beyond its normal retention periods.
12. SHIPPING/TRANSPORTATION
The Client shall be responsible for the transportation and any associated shipping costs of Client’s property to and from AEL’s laboratories.
April 2021 CX21-460854
Well Designation MW-034 MW-35 MW-36 Diameter (in) in. in. in. 1.0 in. 1.0 in. 1.0 in. in.
Well Depth (ft) feet feet feet 15.6 feet 25.6 feet 30 feet feet Screen Interval feet feet feet 10.6-15.6 feet 20.6-25.6 feet 25-30 feet feet TOC Elevation feet feet feet 15.75 feet 15.79 feet 15.94 feet feet
DATE ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP
7/6/1999 NI NI NI NI NI NI
4/13/2000 NI NI NI NI NI NI
7/18/2000 NI NI NI NI NI NI
10/18/2000 NI NI NI NI NI NI
2/5/2001 NI NI NI NI NI NI
7/24/2001 NI NI NI NI NI NI
6/24/2003 NI NI NI NI NI NI
11/4/2003 NI NI NI NI NI NI
3/10/2004 11.97 3.78 0.00 11.47 4.32 0.00 NI NI
8/26/2004 14.20 1.55 0.00 12.89 2.90 0.00 13.21 2.73 0.00
11/29/2004 13.85 1.90 0.00 13.07 2.72 0.00 13.02 2.92 0.00
8/29/2005 NM 13.07 2.72 0.00 13.03 2.91 0.00
1/9/2006 13.76 1.99 0.00 13.27 2.52 0.00 13.17 2.77 0.00
4/21/2006 NM 12.09 3.70 0.00 NM
7/17/2006 13.39 2.36 0.00 12.09 3.70 0.00 8.54 7.40 0.00 10/9/2006 12.90 2.85 0.00 11.74 4.05 0.00 11.56 4.38 0.00 11/6/2007 13.78 1.97 0.00 13.17 2.62 0.00 13.02 2.92 0.00 3/19/2009 12.29 3.46 0.00 12.57 3.22 0.00 12.55 3.39 0.00 12/1/2009 12.70 3.05 0.00 12.30 3.49 0.00 12.33 3.61 0.00
4/19/2010 13.00 2.75 0.00 12.43 3.36 0.00 NM
5/24/2011 12.29 3.46 0.00 11.64 4.15 0.00 NM
4/9/2012 12.82 2.93 0.00 11.56 4.23 0.00 11.89 4.05 0.00
3/27/2013 14.15 1.60 0.00 13.07 2.72 0.00 NM
4/9/2014 13.78 1.97 0.00 13.46 2.33 0.00 NM
7/9/2015 12.93 2.82 0.00 12.44 3.35 0.00 NM
6/22/2016 13.53 2.22 0.00 13.10 2.69 0.00 NM
2/13/2017 13.31 2.44 0.00 12.79 3.00 0.00 NM
7/7/2017 13.56 2.19 0.00 13.17 2.62 0.00 NM
1/2/2018 13.41 2.34 0.00 13.14 2.65 0.00 13.10 2.84 0.00 9/11/2018 13.60 2.15 0.00 13.37 2.42 0.00 13.35 2.59 0.00
11/11/2019 12.66 3.09 0.00 12.53 3.26 0.00 12.52 3.42 0.00
MONITORING WELL COMPLETION AND GROUNDWATER ELEVATION SUMMARY
TABLE 1
Dixie Cleaners Jacksonville, Duval County, Florida
FN: G:\Projects\DEP-Drycleaning\Projects\Jax\Dixie\Proposals & Task Assignments\DC014P - 2021 Annual Monitoring\ Table 1 Page 1 of 2
April 2021 CX21-460854
MONITORING WELL COMPLETION AND GROUNDWATER ELEVATION SUMMARY
TABLE 1
Dixie Cleaners Jacksonville, Duval County, Florida
Well Designation MW-038 MW-039 MW-040 MW-041 IW-002 IW-003 Diameter (in) 1.0 in. 1.0 in. 1.0 in. 1.0 in. in. 2.0 in. 2.0 in.
Well Depth (ft) 15 feet 25 feet 15 feet 25 feet feet 28 feet 28 feet Screen Interval 10-15 feet 20-25 feet 10-15 feet 20-25 feet feet 3-28 feet 3-28 feet TOC Elevation 16.04 feet 16.1 feet 15.99 feet 15.93 feet feet NM feet NM feet
DATE ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP
11/29/2004 NI NI NI NI NI NI NI NI NI NI NI NI
8/29/2005 12.94 3.1 0.00 13.44 2.66 0.00 12.63 3.36 0.00 13.88 2.05 0.00 1.90 0.00 2.20 0.00
1/9/2006 13.83 2.21 0.00 14.10 2.00 0.00 14.08 1.91 0.00 13.39 2.54 0.00 NM NM
4/21/2006 NM 10.55 5.55 0.00 NM 12.32 3.61 0.00 NM NM
7/17/2006 13.44 2.6 0.00 10.43 5.67 0.00 13.58 2.41 0.00 12.03 3.90 0.00 NM NM
10/9/2006 12.84 3.2 0.00 9.85 6.25 0.00 13.16 2.83 0.00 11.73 4.20 0.00 NM NM
11/6/2007 13.85 2.19 0.00 11.43 4.67 0.00 13.95 2.04 0.00 13.16 2.77 0.00 NM NM
3/19/2009 13.42 2.62 0.00 13.62 2.48 0.00 13.61 2.38 0.00 NM NM NM
12/1/2009 13.06 2.98 0.00 11.04 5.06 0.00 13.40 2.59 0.00 12.35 3.58 0.00 1.24 0.00 2.84 0.00
4/19/2010 12.99 3.05 0.00 12.83 3.27 0.00 NM NM NM NM
5/23/2011 11.68 4.36 0.00 12.80 3.30 0.00 NM 11.77 4.16 0.00 NM NM
4/9/2012 13.06 2.98 0.00 11.78 4.32 0.00 NM NM NM NM
3/27/2013 14.04 2 0.00 13.05 3.05 0.00 NM NM NM NM
4/9/2014 14.26 1.78 0.00 13.58 2.52 0.00 NM NM NM NM
7/9/2015 12.50 3.54 0.00 NM 12.20 3.79 0.00 NM NM NM
6/22/2016 NM NM 13.86 2.13 0.00 NM NM NM
2/13/2017 13.43 2.61 0.00 NM NM NM NM NM
1/2/2018 13.82 2.22 0.00 13.42 2.68 0.00 NM NM NM NM
11/11/2019 13.12 2.92 0.00 12.61 3.49 0.00 13.39 2.6 0.00 12.62 3.31 0.00 NM 3.11
Well Designation IW-004 IW-005 IW-006 IW-007 IW-008 Diameter (in) 2.0 in. 2.0 in. 2.0 in. 2.0 in. 2.0 in. in. in.
Well Depth (ft) 28 feet 28 feet 28 feet 28 feet 28 feet feet feet Screen Interval 3-28 feet 3-28 feet 3-28 feet 3-28 feet 3-28 feet feet feet TOC Elevation NM feet NM feet NM feet NM feet NM feet feet feet
DATE ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP ELEV DTW FP
11/29/2004 NI NI NI NI NI NI NI NI NI NI
8/29/2005 2.3 0.00 2.30 0.00 2.30 0.00 1.60 0.00 2.3 0.00
1/9/2006 NM NM NM NM NM
10/9/2006 NM NM NM NM NM
11/8/2007 NM NM NM NM NM
3/19/2009 2.33 0.00 NM NM NM NM
12/1/2009 2.33 0.00 NM NM NM NM
4/9/2012 NM NM NM NM NM
3/27/2013 NM NM NM NM NM
6/22/2016 NM NM NM NM NM
9/11/2018 NM NM NM NM NM
11/11/2019 3.02 FP 2.39 0.00 0.71 0.00 NM NM
Notes:
ft - feet TOC Elev. - Top of casing elevation. 1) Elevations based on an assumed datum NI - Not Installed FP - Free Product (feet) DTW - Depth to Water (feet) NM - Not Measured
FN: G:\Projects\DEP-Drycleaning\Projects\Jax\Dixie\Proposals & Task Assignments\DC014P - 2021 Annual Monitoring\ Table 1 Page 2 of 2
JANUARY 2010 INJECTION
MONITORING WELL LOCATION (DESTROYED)
MONITORING WELL LOCATION
EOS
& AquaBupH
TM
INJECTION WELL LOCATIONS
1.) SITE MAP BY HARDING ESE, MACTEC COMPANY, DATED DECEMBER 2002.
2.) APPROXIMATE PROPERTY LINE TAKEN FROM THE CITY OF JACKSONVILLE GIS
WEBSITE.
APPROXIMATE PROPERTY LINE
SANITARY MANHOLE AND LINE
BUILDING
i n
FDEP-DC014
Control No.
FDEPDC014-N007
FIGURE
2019-11-27
BCL
KDC
KDC
JCB
(FORMER) DIXIE CLEANERS
1931 BLANDING BOULEVARD, JACKSONVILLE, FL
FL. DEPT. OF ENVIRONMENTAL PROTECTION
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
I F
T
H
S
M
E A
S U
R E
M E
N
D
O E
S
N
A T
C
W
A
T
O
W N
T
E
Z
E
H
B
E
N
M
O D
I F
I E
D
F
R O
M
A
N S
I
B
P a t h j a c k s o n v i l l e d r a f t i n g F i l e F
D E
P F
D E
P D
C D
C
N o
D i x i e
C l e a n e r s o v
S a m p l i n g A c t i v e
D r a w i n g s i l e
N a m e
F
D E
P D
C N d w g
LEGEND
SCALE
0 10 20
FEET
REFERENCE(S)
INJECTION WELLS USED FOR 2010 EOS
& AquaBupH
TM
INJECTION
AutoCAD SHX Text
ST
AutoCAD SHX Text
MW-006
AutoCAD SHX Text
MW-001
AutoCAD SHX Text
MW-008
AutoCAD SHX Text
LIFT STATION
AutoCAD SHX Text
MW-007
AutoCAD SHX Text
MW-011
AutoCAD SHX Text
MW-010
AutoCAD SHX Text
MW-004
AutoCAD SHX Text
MW-027
AutoCAD SHX Text
MW-026
AutoCAD SHX Text
MW-025
AutoCAD SHX Text
MW-031
AutoCAD SHX Text
MW-032
AutoCAD SHX Text
MW-033
AutoCAD SHX Text
MW-030
AutoCAD SHX Text
MW-029
AutoCAD SHX Text
MW-028
AutoCAD SHX Text
MW-019
AutoCAD SHX Text
MW-018
AutoCAD SHX Text
MW-017
AutoCAD SHX Text
MW-016
AutoCAD SHX Text
MW-024
AutoCAD SHX Text
MW-023
AutoCAD SHX Text
MW-022
AutoCAD SHX Text
MW-015
AutoCAD SHX Text
MW-014
AutoCAD SHX Text
MW-036
AutoCAD SHX Text
MW-037
AutoCAD SHX Text
MW-041
AutoCAD SHX Text
MW-040
AutoCAD SHX Text
MW-039
AutoCAD SHX Text
MW-038
AutoCAD SHX Text
IW-19
AutoCAD SHX Text
IW-18
AutoCAD SHX Text
IW-17
AutoCAD SHX Text
IW-16
AutoCAD SHX Text
IW-15
AutoCAD SHX Text
IW-14
AutoCAD SHX Text
MW-034
AutoCAD SHX Text
MW-035
AutoCAD SHX Text
IW-20
AutoCAD SHX Text
IW005
AutoCAD SHX Text
IW006
AutoCAD SHX Text
IW007
AutoCAD SHX Text
IW002
AutoCAD SHX Text
IW003
AutoCAD SHX Text
IW004
AutoCAD SHX Text
IW010
AutoCAD SHX Text
IW011
AutoCAD SHX Text
IW012
AutoCAD SHX Text
IW013
AutoCAD SHX Text
IW009
AutoCAD SHX Text
MW-006
AutoCAD SHX Text
MW-001
AT&T BURIED LINE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
4' WIDE x 5' TO 6' DEEP FLOWABLE
FILL FOUNDATION STABILIZATION
LOCATION OF DRAINAGE CULVERT
REMOVED & REPLACED
B4
A3
B2
B1
C1/IW-22
B3
D3
C2
C3
C4
C5
D1
D2
D4
E1/IW-23
E2
A2
A1/IW-21
LDA INJECTION WELL LOCATION
SANITARY MANHOLE AND LINE
MONITORING WELL LOCATION (DESTROYED)
BUILDING
MONITORING WELL LOCATION
INJECTION WELL LOCATION
DIRECT PUSH TECHNOLOGY LOCATION
EXISTING GAS LINE
EXISTING WATER LINE
GAS
W W
LDA LOCATION
A1
LDA DEPTH TABLE
LDA ID
PROPOSED
DEPTH (FT)
ACTUAL
DEPTH (FT)
A1 20 22
A2 30 30
A3 30 23
B1 25 22
B2 30 22
B3 30 22
B4 30 20
C1 25 21
C2 25 17
C3 30 23
C4 30 22
C5 30 24
D1 20 20
D2 25 20
D3 20 28
D4 20-25 25
E1 20-25 23
E2 20-25 17 i n
FDEP-DC014
Control No.
FDEPDC014-N008
FIGURE
2019-11-27
BCL
KDC
KDC
JCB
(FORMER) DIXIE CLEANERS
1931 BLANDING BOULEVARD, JACKSONVILLE, FL
FL. DEPT. OF ENVIRONMENTAL PROTECTION
LDA BORINGS AND INJECTION WELL LOCATIONS
PROJECTCLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
A
S U
R E
M E
D
E
S
N
T
C
A
T
O
W N
T
E
Z
E
H
B
E
N
M
O D
I F
I E
D
F
R O
M
A
N S
I
B
P a t h j a c k s o n v i l l e d r a f t i n g F i l e F
D E
P F
D E
P D
C D
C
N o
D i x i e
C l e a n e r s o v
S a m p l i n g A c t i v e
D r a w i n g s i l e
N a m e
F
D…