Task Assignment Notification Summary
This document is a Task Assignment Notification Form (DC003K) issued under Contract HW561 by the Florida Department of Environmental Protection (FDEP) to Golder Associates Inc. for environmental remediation services at the Former Coin Laundry Equipment facility located at 1692 Hammond Boulevard, Jacksonville, Duval County, Florida (ERIC 4627). The contract is administered by the FDEP with Ben Grubbs serving as the project manager and Matt Crews as the contractor representative.
The task assignment authorizes Golder to conduct groundwater sampling and investigation-derived waste (IDW) treatment activities comprising three subtasks: Project Management ($426.62), Additional Groundwater Sampling and IDW Treatment ($2,648.67), and Reporting ($1,787.45), for a total fixed-price contract value of $4,862.74 with 36 labor hours. Deliverables include field documentation and laboratory reports due November 15, 2019, and an Annual Groundwater Monitoring Report with GIS updates due December 20, 2019. Work scope includes sampling five monitoring wells for chlorinated volatile organic compounds (CVOCs), collecting depth-to-water measurements from thirteen wells, treating generated investigation-derived waste on-site, and submitting updated FDEP GIS tables and Automated Data Processing Tool (ADaPT) data. The contract is structured with no retainage, no fee schedule, and zero cost reimbursement, with execution through February 28, 2020.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number: HW561 Task Assignment #: DC003K
Deliverables:
Deliverable Deliverable Due Date Subtask 2: Groundwater Sampling Field Documentation and Lab Report, and IDW Treatment Documentation 15-Nov-19
Subtask 3: Annual Groundwater Monitoring Report and ADaPT/GIS Update 20-Dec-19
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced Subtask 2: Submittal and FDEP approval of Groundwater Sampling Field Documentation and Lab Report, and IDW Treatment Documentation
$2,648.67
Subtasks 1 & 3: Submittal and FDEP approval of Annual Groundwater Monitoring Report and ADaPT/GIS Update
$2,214.07
TOTAL COST $4,862.74
BWC TAFORM 01/18
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: HW561 Contract Negotiation File Former Coin Laundry Equipment of Jacksonville Jacksonville, Duval County
ERIC_ 4627
From: Ben Grubbs, Project Manager Date: October 1, 2019 Subject: Negotiation Summary
HW561 DC003K
This Task Assignment authorizes Golder to conduct groundwater sampling activities in accordance with the September 27, 2019, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Groundwater Sampling and IDW Treatment Golder will record field parameters and collect groundwater samples from five monitoring wells (MW006I, MW007I, and MW014I – MW016I). Prior to sampling, depth-to-water will be measured from the same five wells, as well as MW001I, MW002I, MW008I, MW009I, MW012I, and MW013I. The groundwater samples will be analyzed for chlorinated volatile organic compounds (VOCs). Investigation-derived waste (IDW) will be temporarily stored in 55-gallon drums before being treated with Golder’s IDW treatment system and disposed of on site.
Subtask 3: Reporting Golder will submit the Annual Groundwater Monitoring Report, updated FDEP GIS tables, and Automated Data Processing Tool (ADaPT) data deliverables. The report will include recommendations regarding the location of a new Temporary Point of Compliance (TPOC) well.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $4,862.74 with 36 labor hours.
Golder may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
Golder Associates Inc.
9428 Baymeadows Road, Suite 400 Jacksonville, Florida, USA 32256
T: +1 904 363-3430 +1 904 363-3445
Golder and the G logo are trademarks of Golder Associates Corporation golder.com
September 27, 2019 FDEPDC003 P13-82530
Mr. Ben Grubbs
Florida Department of Environmental Protection
2600 Blair Stone Road, MS4520
Tallahassee, FL 32399-2400
PROPOSAL FOR ADDITIONAL GROUNDWATER SAMPLING
FORMER COIN LAUNDRY EQUIPMENT OF JACKSONVILLE
1692 HAMMOND BOULEVARD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FACILITY IDENTIFICATION NUMBER: ERIC_4627
PROPOSE TASK ASSIGNMENT: DC003K
Dear Mr. Grubbs:
Golder Associates Inc. (Golder) is pleased to provide the Florida Department of Environmental Protection (FDEP) with this cost proposal for groundwater monitoring at the former Coin Laundry Equipment of Jacksonville (Coin
Laundry) site, located in Jacksonville, Duval County, Florida. This proposal includes a description of the proposed scope of services, level of effort (LOE) sheets for each subtask, and a Cost Estimate Form (CEF) that summarizes the costs of the proposed services. This scope of work is subdivided into three separate subtasks, as described below.
SUBTASK 1: PROJECT MANAGEMENT
To facilitate project quality and satisfactory completion of the proposed scope of work, the project will be overseen by an experienced project manager. The project manager will be responsible for the schedule, budget, invoicing, project activities, and communications with FDEP and the field team. Project management will include coordination of field activities; resource allocation such that the work is conducted by qualified professionals in accordance with the project schedule; cost control and tracking of the budget status; and submittal of project invoices in accordance with FDEP Drycleaning Solvent Cleanup Program requirements. The project manager will be responsible for the work being conducted in a manner that is consistent with the requirements of the FDEP-approved task assignment.
SUBTASK 2: GROUNDWATER SAMPLING AND IDW TREATMENT
Golder will collect groundwater samples from five monitoring wells (MW006I, MW007I, MW014I, MW015I, and
MW016I). Representatives from Golder and the FDEP participated in a conference telephone call on July 25, 2019 discussing the results from the 2019 Annual Groundwater Monitoring Report dated April 15, 2019. Golder and the
FDEP decided that groundwater from several existing perimeter monitoring wells needed to be sampled for analysis of chlorinated volatile organic compounds (VOCs), so that the need for a new temporary point of compliance (TPOC) monitoring well could be evaluated prior to the 2020 annual groundwater monitoring event. Figures 2 and 3 from
Mr. Ben Grubbs FDEPDC003 P13-82530
Florida Department of Environmental Protection September 27, 2019 the 2019 annual monitoring report are attached showing the potentiometric contours for the intermediate zone of the surficial aquifer and the VOC results for the intermediate zone.
Prior to groundwater sampling, depth-to-water measurements will be collected at the five previously mentioned monitoring wells and existing monitoring wells MW001I, MW002I, MW008I, MW009I, MW012I, and MW013I using an electronic water level indicator to determine groundwater depth. During the sampling event, the locks and well caps will be inspected for damage or degradation and repaired or replaced as necessary.
Groundwater samples will be collected from the wells in accordance with FDEP Standard Operating Procedures
(SOPs) for Field Activities (DEP-SOP-001/01), dated January 2017 (effective April 16, 2018). Prior to collecting the groundwater sample, each well will be purged and field parameters including temperature, pH, specific conductance, dissolved oxygen, turbidity, and oxidation-reduction potential (ORP) will be monitored. Purge volumes and field parameters will be recorded on field data sheets, and the field monitoring equipment will be calibrated in accordance with the manufacturer’s recommended procedures.
Groundwater samples will be collected using low flow sampling methods. The groundwater samples will be placed in laboratory-supplied containers, labeled with a unique identification number attached to the outside of the sample container, preserved on ice in a laboratory-provided cooler at a maximum temperature of four degrees Celsius, and delivered to a Florida Department of Health and National Environmental Laboratory Accreditation Program certified fixed-base laboratory along with the completed chain-of-custody documentation to be analyzed for chlorinated
VOCs using EPA Method 8260B. For quality assurance purposes, one trip blank will accompany each sample cooler for laboratory analysis of chlorinated VOCs using EPA Method 8260B. Upon receipt of the laboratory analytical results, Golder will evaluate the constituent concentrations to determine if additional off-site notification is required.
Golder will temporarily store purge water and development water generated from the monitoring well installation and groundwater sampling event in 55-gallon steel drums and treat the IDW on site using Golder’s IDW treatment system. Based on the historical IDW characterization data, the treated aqueous IDW will be assumed to be below the regulatory standards. Golder will spread the treated aqueous IDW on an impervious surface in locations sufficiently distant from any storm water drains to prevent runoff into the drains. The remaining 55-gallon drum will be removed from the site following treatment.
SUBTASK 3: REPORTING
The additional groundwater sampling letter report will include a description of the sampling procedures, evaluation of the analytical results, tabulated summary of the current and historical analytical data, a site map showing the groundwater analytical results, water level elevation information in tables and figures, laboratory analytical data, conclusions, and recommendations regarding the TPOC well identification. Golder will also update the FDEP GIS tables with the new water level data, field parameter measurements, and VOC data; run the FDEP data checker on the completed tables; and submit the updated tables and error reports under this subtask. Additionally, Golder will forward the Automated Data Processing Tool (ADaPT) data deliverables for the groundwater sampling event provided by the laboratory.
HEALTH AND SAFETY
Golder will update the existing site-specific Health and Safety Plan for the field work. The work will be completed in accordance with Golder’s safety policies and procedures. At a minimum, Golder will wear safety glasses, high
Mr. Ben Grubbs FDEPDC003 P13-82530
Florida Department of Environmental Protection September 27, 2019 visibility safety vests, and steel-toed boots. A safety job briefing will be conducted prior to the start of work activities, and anytime the scope of work or site conditions change.
COST AND SCHEDULE
The estimated cost to complete the proposed work is $4,862.74. Golder will tentatively schedule the sampling event to be conducted in early October 2019. The groundwater sampling event is estimated to require one day on site with two field personnel. The LOE/CEF cost sheets are included in Attachment A. The following table summarizes the proposed costs and deliverable schedule:
Table 1: Proposed Costs and Deliverable Schedule
Task Proposed Cost Proposed Schedule
Subtask 1: Project Management $426.62 January 31, 2020
Subtask 2: Annual Groundwater Sampling and IDW Treatment
$2,648.67 November 15, 2019 (Field Documentation and Laboratory Report)
Subtask 3: Reporting $1,787.45 December 20, 2019 (annual Monitoring report, GIS Tables, ADaPT Deliverables)
Total/Completion Date $4,862.74 February 28, 2020
Golder appreciates the opportunity to provide services under the Dry Cleaning Solvent Cleanup Program. Should you require additional information or clarifications, please contact us at 904 363-3430.
Sincerely, Golder Associates Inc.
Ralph F. Mongillo, Jr. PG Jesse C. Brown, PE
Senior Project Geologist Senior Engineer and Associate
RFM/JCB/as
Attachments:
Figures Figure 2 – Potentiometric Map of the Intermediate Surficial Aquifer (3/12/2019)
Figure 3 – CVOC Contaminants Detected in the Intermediate Surficial Aquifer
Attachment A LOE/CEF Cost Sheets
G:\Projects\DEP-Drycleaning\Projects\Jax\Coin Laundry\FDEPDC003-Coin Laundry\003K\Proposal and Contract\Proposal\DC003K Coin 2019 GW Sampling Proposal.docx
Figures
(68.05)
(68.20)
(68.33)
(NM)
(68.48)
(68.51)
(68.77)
(68.87)
(NM)
(NM)
(68.52)
BURIED GAS LINE
PROPERTY BOUNDARY
OVER HEAD ELECTRICAL LINES
INTERMEDIATE SURFICIAL AQUIFER
MONITORING WELL LOCATION
(SCREEN INTERVAL 20-25 FT BGS)
BURIED SEWER AND WATER LINES
UPPER SURFICIAL GROUNDWATER
ELEVATION (FT - NGVD)
GROUNDWATER CONTOUR INTERVAL
ESTIMATED GROUNDWATER FLOW DIRECTION
(DASHED WHERE INFERRED)
1. UST = UNDERGROUND STORAGE TANK
2. NM = NOT MEASURED
3. LIL CHAMP MONITORING WELLS WERE ABANDONED PRIOR TO
AUGUST 2005.
4. MW009I WAS DESTROYED WHEN USTs/DISPENSERS WERE
REMOVED FROM THE PROPERTY SOMETIME BETWEEN APRIL
2009 AND APRIL 2010.
5. GROUNDWATER MEASUREMENT FROM MW013I IS ANOMALOUS;
THEREFORE, WAS NOT USED ON THE POTENTIOMETRIC MAP.
i n
FDEP-DC003
Control No.
FDEP-DC003-G002
FIGURE
2019-03-26
BCL
RFM
RFM
JCB
COIN LAUNDRY
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMETAL PROTECTION
POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE OF THE
SURFICIAL AQUIFER
(SCREENED INTERVAL 20-25 FEET BGS) - MARCH 12, 2019
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
I F
T
H
S
M
E A
S U
R E
M E
N
D
O E
S
N
A T
C
W
A
T
O
W N
T
E
Z
E
H
B
E
N
M
O D
I F
I E
D
F
R O
M
A
N S
I
B
P a t h j a c k s o n v i l l e d r a f t i n g F i l e F
D E
P F
D E
P D
C d c n o c o i n l a u n d r y f n a m r p t a c t i v e d r a w i n g s i l e
N a m e
F
D E
P D
C G d w g
SCALE
0 20 40
FEET
LEGEND
NOTE(S)
(68.52)
AutoCAD SHX Text
DUMPSTERS
AutoCAD SHX Text
OVERHEAD ELECTRICAL LINES
AutoCAD SHX Text
UNDERGROUND ELECTRICAL LINES
AutoCAD SHX Text
SINK
AutoCAD SHX Text
WASHERS
AutoCAD SHX Text
WASHERS
AutoCAD SHX Text
LOCATION OF FORMER DRYCLEANING UNIT
AutoCAD SHX Text
SURFACE WATER DRAINAGE CULVERT
AutoCAD SHX Text
DOUBLE DOORS
AutoCAD SHX Text
NORMANDY BOULEVARD
AutoCAD SHX Text
HAMMOND BOULEVARD
AutoCAD SHX Text
UST
AutoCAD SHX Text
AREA
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
LIL CHAMP FOOD STORE
AutoCAD SHX Text
DRYERS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
OFFICES
AutoCAD SHX Text
HOT WATER HEATER
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SHRUBS
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
FILL FLOOR DRAIN
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
WATER
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FORMER LOCATION OF REMEDIAL SYSTEM EQUIPMENT
AutoCAD SHX Text
MW009II
AutoCAD SHX Text
MW002II
AutoCAD SHX Text
MW006II
AutoCAD SHX Text
MW013II
AutoCAD SHX Text
MW012II
AutoCAD SHX Text
MW014II
AutoCAD SHX Text
MW007II
AutoCAD SHX Text
MW001II
AutoCAD SHX Text
MW015II
AutoCAD SHX Text
MW008II
AutoCAD SHX Text
MW016II
AutoCAD SHX Text
SUMP
AutoCAD SHX Text
MW004S
C
D i n
FDEP-DC003
Control No.
FDEP-DC003-G003
FIGURE
2019-03-26
BCL
RFM
RFM
JCB
TITLE
PROJECT NO. REV.
PROJECT
CLIENT
CONSULTANT
PREPARED
DESIGNED
REVIEWED
APPROVED
YYYY-MM-DD
A
S U
R E
M E
N
D
E
S
N
T
C
W
A
T
O
W N
T
E
Z
E
H
E
N
M
O D
I F
I E
D
F
R O
M
A
N S
I
B
P a t h j a c k s o n v i l l e d r a f t i n g F i l e F
D E
P F
D E
P D
C d c n o c o i n l a u n d r y f n a m r p t a c t i v e d r a w i n g s i l e
N a m e
F
D E
P D
C G d w g
OVER HEAD ELECTRICAL LINES
PROPERTY BOUNDARY
ASPHALT CUTS
BURIED GAS LINE
BURIED SEWER AND WATER LINE
GROUNDWATER SAMPLE LOCATION
INTERMEDIATE SURFICIAL AQUIFER DPT
MONITORING WELL LOCATION
INTERMEDIATE SURFICIAL AQUIFER
PCE 3.0 ug/L ISOCONCENTRATION
CONTOUR
(SCREENED INTERVAL 20-25 FT. BGS)
A
B
ROSA JENKINS PROPERTY
M&T TRUST
8832 BRIER WAY SOUTH
8831 NORMANDY BLVD
C
FLORIDA DEPARTMENT OF
TRANSPORTATION PROPERTY
D
JUSTIN MICHAEL SHAW PROPERTY
8840 BRIER WAY SOUTH
MW014I
DATE PCE TCE
3/24/2011 2.8 0.36 U
3/22/2012
5.9
0.36 U
3/19/2013 1.7 0.66 U
3/13/2014
3.5
0.36 U
10/29/2015
5.2
0.58 U
10/26/2016
0.89 I
10/18/2017
1.2
3/12/2019
1.3 I
MW007I
DATE PCE TCE
3/24/2011
2.2
3/22/2012
1.1
3/19/2013
0.66 U
3/13/2014
0.54 I
10/29/2015
0.85 I
10/26/2016
1.8
10/18/2017
2.1
3/12/2019
1.3 I
DP014
DATE PCE TCE
9/2/2004 2.0 <1.0
8/29/2005 1.17 1.0 U
DP018
DATE PCE TCE
9/2/2004 2.0 U 2.0 U
DP015
DATE PCE TCE
9/1/2004
56.3
1.0
MW006I
DATE PCE TCE
6/5/2006 1.0 U 1.0 U
3/10/2008 1.61 0.324 U
3/20/2013
1.1
3/13/2014
0.73 I
5/17/2018
0.29 U
3/12/2019
0.29 U
DP019
DATE PCE TCE
9/2/2004 <1.0 <1.0
DP004
DATE PCE TCE
8/24/2004
59.8
2.9
DP016
DATE PCE TCE
9/1/2004 <1.0 <1.0
DP010
DATE PCE TCE
8/24/2004 <1.0 <1.0
DP020
DATE PCE TCE
9/2/2004 <1.0 <1.0
DP017
DATE PCE TCE
9/1/2004 <1.0 <1.0
DP012
DATE PCE TCE
9/1/2004 <1.0 <1.0
DP001
DATE PCE TCE
8/23/2004 <1.0 <1.0
DP011
DATE PCE TCE
8/24/2004 <1.0 <1.0
MW002I
DATE PCE TCE
9/28/2004 2.0 U 2.0 U
8/29/2005 1.0 U 1.0 U
6/5/2006 1.0 U 1.0 U
3/10/2008 0.187 U 0.324 U
DP002
DATE PCE TCE
8/24/2004
16.5
<1.0
DP021
DATE PCE TCE
9/3/2004 <1.0 <1.0
DP009
DATE PCE TCE
8/25/2004 <1.0 <1.0
DP005
DATE PCE TCE
8/25/2004 <1.0 <1.0
MW001I
DATE PCE TCE
3/24/2011
0.76 I
3/22/2012
0.69 I
3/19/2013
0.86 I
3/13/2014
2.7
10/29/2015
3.4*
10/26/2016
25 6.2
10/18/2017
36 8.6
3/12/2019
18 12
MW009I
DATE PCE TCE
9/28/2004 2.0 U 2.0 U
8/30/2005 1.42 1.0 U
6/5/2006 1.0 U 1.0 U
3/11/2008 0.187 U 0.324 U
MW012I
DATE PCE TCE
3/24/2011
6.1
0.36 U
3/22/2012
1.6
3/19/2013
0.66 U
3/13/2014
0.36 U
10/29/2015
6.1
0.29 U
10/26/2016
9.4
0.29 U
10/18/2017
7.8
0.29 U
3/12/2019
1.1 I
LCIW001
DATE PCE TCE
8/25/2004 1.3 <1.0
8/25/2004 1.13 1.0 U
MW008I
DATE PCE TCE
8/30/2005 1.0 U 1.0 U
6/5/2006 1.0 U 1.0 U
3/11/2008 0.187 U 0.324 U
3/19/2013 0.52 U 0.66 U
MW013I
DATE PCE TCE
3/24/2011 0.94 I 0.36 U
3/22/2012
6.6
0.36 U
3/19/2013 0.67 I 0.66 U
3/13/2014 0.36 U 0.36 U
10/29/2015 2.9 0.58 U
10/26/2016 2.6 0.29 U
10/18/2017 2.3 0.29 U
3/12/2019 0.36 U 0.29 U
DP008
DATE PCE TCE
9/24/2004 <1.0 <1.0
DP007
DATE PCE TCE
8/24/2004
23.3
2.1
MW015I
DATE PCE TCE
3/11/2008 0.187 U 0.324 U
3/19/2013 0.52 U 0.66 U
DP013
DATE PCE TCE
9/3/2004 <1.0 <1.0
WELL ID
DATE SAMPLED
DP002
DATE PCE TCE
10/26/2016 3 3
GCTLs
DP006
DATE PCE TCE
9/24/2004
52.7
<1.0
MW016I
DATE PCE TCE
10/29/2015 0.72 U 0.58 U
10/26/2016 0.36 U 0.29 U
10/18/2017 0.36 U 0.29 U
3/12/2019 0.36 U 0.29 U
1. DATE OF OFFSITE NOTIFICATION 8/29/2006.
2. CVOC - CHLORINATED VOLATILE ORGANIC COMPOUND
3.
* RESULT DETERMINED NOT TO EXCEED THE GCTL BASED ON
THE FDEP MEMORANDUM, DATED NOVEMBER 17, 2011.
4. MW009I WAS DESTROYED WHEN USTs/DISPENSERS WERE
REMOVED FROM THE PROPERTY SOMETIME BETWEEN APRIL
2009 AND APRIL 2010.
5. I = THE REPORTED VALUE IS BETWEEN THE LABORATORY
METHOD DETECTION LIMIT AND THE LABORATORY PRACTICAL
QUANTITATION LIMIT.
COIN LAUNDRY
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FL. DEPT. OF ENVIRONMETAL PROTECTION
CVOC CONTAMINANTS DETECTED IN THE INTERMEDIATE
ZONE OF THE SURFICIAL AQUIFER
(SCREENED INTERVAL 20 - 25 FEET BGS)
SCALE
0 20 40
FEET
LEGEND
NOTE(S)
AutoCAD SHX Text
DUMPSTERS
AutoCAD SHX Text
OVERHEAD ELECTRICAL LINES
AutoCAD SHX Text
UNDERGROUND ELECTRICAL LINES
AutoCAD SHX Text
SINK
AutoCAD SHX Text
SUMP
AutoCAD SHX Text
WASHERS
AutoCAD SHX Text
WASHERS
AutoCAD SHX Text
LOCATION OF FORMER DRYCLEANING UNIT
AutoCAD SHX Text
SURFACE WATER DRAINAGE CULVERT
AutoCAD SHX Text
DOUBLE DOORS
AutoCAD SHX Text
NORMANDY BOULEVARD
AutoCAD SHX Text
HAMMOND BOULEVARD
AutoCAD SHX Text
UST
AutoCAD SHX Text
AREA
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
LIL CHAMP FOOD STORE
AutoCAD SHX Text
DRYERS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
OFFICES
AutoCAD SHX Text
HOT WATER HEATER
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SHRUBS
AutoCAD SHX Text
BATHROOM
AutoCAD SHX Text
FILL FLOOR DRAIN
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
WATER
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FORMER LOCATION OF REMEDIAL SYSTEM EQUIPMENT
AutoCAD SHX Text
DP002
AutoCAD SHX Text
DP003
AutoCAD SHX Text
DP005
AutoCAD SHX Text
DP001
AutoCAD SHX Text
DP008
AutoCAD SHX Text
DP010
AutoCAD SHX Text
DP011
AutoCAD SHX Text
DP012
AutoCAD SHX Text
DP009
AutoCAD SHX Text
DP021
AutoCAD SHX Text
DP006
AutoCAD SHX Text
DP014
AutoCAD SHX Text
DP013
AutoCAD SHX Text
DP015
AutoCAD SHX Text
DP016
AutoCAD SHX Text
DP017
AutoCAD SHX Text
DP020
AutoCAD SHX Text
DP004
AutoCAD SHX Text
DP007
AutoCAD SHX Text
DP018
AutoCAD SHX Text
DP019
AutoCAD SHX Text
LCIW001
AutoCAD SHX Text
MW009II
AutoCAD SHX Text
MW008II
AutoCAD SHX Text
MW002II
AutoCAD SHX Text
MW001II
AutoCAD SHX Text
MW006II
AutoCAD SHX Text
MW007II
AutoCAD SHX Text
MW013II
AutoCAD SHX Text
MW012II
AutoCAD SHX Text
MW014II
AutoCAD SHX Text
MW015II
AutoCAD SHX Text
MW016II
AutoCAD SHX Text
DP001
AutoCAD SHX Text
DP015
AutoCAD SHX Text
MW002II
AutoCAD SHX Text I
AutoCAD SHX Text
APPENDIX A
Level of Effort Sheets and
Cost Estimate Form
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Coin Laundry Laundry Equipment of Jacksonville SUBTASK 2: Additional GW Sampling and IDW Treatment
DATE: 9/27/2019
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Project Sci/Eng (R Mongillo) 2
Staff Sci/Eng (J. Spengler) 9
Staff Sci/Eng (H. Huang) 8
TOTAL LABOR 19
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Miscellaneous Expendables $32.50 Per Day 1 $32.50 Shallow Groundwater Sampling Kit $208.55 Per Day 1 $208.55 Tubing, poly/HDPE $0.25 Per Foot 175 $43.75 Tubing, silicon 3/16 x 3/8 $1.95 Per Foot 5 $9.75 Drum, 55-gallon $58.20 Each 1 $58.20 Portable Compressor $48.50 Per Day 1 $48.50 Generator, 5 kW $66.00 Per Day 1 $66.00
TOTAL EQUIPMENT $467.25
VEHICLE TYPE RATE UNIT USAGE
Truck $97.00 Per Day 1 $97.00
TOTAL VEHICLE $97.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOC halocarbons (5 MWs, 1 TB) EPA Method 8260B $66.00 5 1 $396.00
Sample Shipping small $63.00 1 $63.00
TOTAL LAB $459.00
SUBCONTRACTOR COSTS
NAME PURPOSE RATE COSTING UNIT USAGE
TOTAL $0.00
Groundwater sampling for identification of TPOC well identification. Mobilize and collect samples from 5 wells. Round trip travel (1 hour), water levels from intermediate wells, instrument calibration, and sampling (6 hours), IDW treatment (1 hour).
Groundwater sampling for identification of TPOC well identification. Mobilize and collect samples from 5 wells. Field event preparation (1 hour), round trip travel (1 hour), water levels from intermediate wells, instrument calibration, and sampling (6 hours), IDW treatment (1 hour).
Arrange site access with RPO and adjacent offsite property owners.
Groundwater sampling scope: Sample 5 wells (Intermediate zone wells MW006I, MW007I, MW014I, MW015I, and MW016I) with field parameters and water levels. Depth to water measurements will be collected from the five intermediate zone wells that will be sampled and additional intermediate zone wells MW001I, MW002I, MW008I, MW009I, MW012I, and MW013I. IDW will be treated with Golder's aqueous treatment system and discharged on a paved surface. Groundwater will be analyzed for chlorinated VOCs by EPA Method 8260B.
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Coin Laundry Laundry Equipment of Jacksonville SUBTASK 3: Reporting
DATE: 9/27/2019
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Sci/Eng (J. Brown) 2
Senior Project Sci/Eng (R. Mongillo) 8
Project Sci/Eng (K. Godfrey) 1
Project Sci/Eng (B. Lucero) CADD figures 2
Staff Admin (A. Shportun) 1
TOTAL EQUIPMENT 14.0
VEHICLE TYPE RATE UNIT USAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
Report formatting, document production, binding, and shipping. Create pdf for OCULUS.
Additional assessment letter report senior review, conclusions and recommendations.
Reporting, data entry, report tables, prepare figures, author annual monitoring report
Update FDEP GIS tables, run data checker, create and edit error report, review and annotate error report (5 data points x 8 min/point = 40 minutes), and submit FDEP GIS tables; submit ADaPT deliverables.
FINAL --7/24/96
FDEP COST ESTIMATEContractor: Golder Associates Inc.
Date: 9/27/2019
Task #: DC003K SubTask 1 Project Management SubTask 6
Site: SubTask 2 Additional GW Sampling and IDW Treatment SubTask 7
Activity/Phase: SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$42.96 Project Manager (RFM) 3 3.3 $0.00 Practice Leader - LV7 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Consultant - LV6 0 0 0 0 0 0 0 0 0 0
$56.57 Senior Sci/Eng.- LV6 (JCB) 2 0 2 0 0 0 0 0 0 0 $42.96 Sr. Project Sci/Eng - LV4 (RFM) 10 2 8 0 0 0 0 0 0 0
$0.00 Project Sci/Eng - LV3 0 0 0 0 0 0 0 0 0 0 $29.91 Project Sci/Eng - LV3 (KG) 1 0 1.0 0 0 0 0 0 0 0 $37.85 Project Sci/Eng - LV3 (BL) 2 0 2 0 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (JS) 9 9 0 0 0 0 0 0 0 0 $26.32 Staff Sci/Eng - LV2 (HH) 8 8 0 0 0 0 0 0 0 0
$0.00 Draftsperson - LD1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Technician - LT3 0 0 0 0 0 0 0 0 0 0 $0.00 Staff Technician - LT2 0 0 0 0 0 0 0 0 0 0 $0.00 Technician - LT1 0 0 0 0 0 0 0 0 0 0 $0.00 Senior Admin. - LA3 0 0 0 0 0 0 0 0 0 0
$24.10 Staff Admin - LA2 (AS) 1 0 1 0 0 0 0 0 0 0 $0.00 Admin. Support - LA1 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 36 3 19 14.0 0 0 0 0 0 0 0
Direct Labor $1,259.88 $139.99 $533.36 $586.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.50% $2,173.29 $241.48 $920.05 $1,011.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,433.17 $381.47 $1,453.41 $1,598.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $63.00 $7.00 $26.67 $29.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Additional GW Sampling
Coin Laundry Laundry Equipment of Jacksonville
REV: 02/03 CEF GOLDER Page 1
FDEP COST ESTIMATEContractor: Golder Associates Inc.
Date: 9/27/2019
Task #: DC003K SubTask 1 Project Management SubTask 6
Site: SubTask 2 Additional GW Sampling and IDW Treatment SubTask 7
Activity/Phase: SubTask 3 Reporting SubTask 8
Project Manager: Ben Grubbs SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Additional GW Sampling
Coin Laundry Laundry Equipment of Jacksonville
Travel Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $396.00 $396.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $459.00 $459.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $262.05 $262.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $172.70 $172.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $467.25 $467.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,519.42 $388.47 $2,503.33 $1,627.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $343.32 $38.15 $145.34 $159.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,862.74 $426.62 $2,648.67 $1,787.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00