CN-370000-HW560-CSS26A-3.pdf
PDF 577 KB Posted
- Contract number
- HW560
- Issued by
- Florida
About this file
This document is a Task Assignment Notification Change Order Form (TACO #3) issued by the Florida Department of Environmental Protection (FDEP) for Contract HW560, managed by contractor Tetra Tech, Inc. The change order pertains to Task Assignment CSS-26A for the Fosgate Road Dump/Montverde Geophysics Site (COM_367006) located in Lake County, Florida. The contract is administered by DEP Contract Manager Kelly Crain, with Gerald Walker, P.G., serving as the contractor representative.
The task involves private well sampling field work and associated documentation at the site. TACO #3 corrects miscalculations from the previous change order (TACO #2) by accounting for a previously invoiced and paid partial amount of $875.50 for Subtask 2. The final task amount is $8,760.76, representing a net increase of $875.50 from the prior task amount of $7,885.26. The original task amount was $9,672.33. This change order does not alter the task completion date of June 30, 2020, or the 60-day task period. Deliverables include the Site Inspection Workplan/Quality Assurance Project Plan (QAPP), Site Health and Safety Plan (HASP), and field notes, lab shipment receipts, chain of custody documentation, and photographic logs from private well sampling activities. The invoice schedule specifies three payment milestones: $644.57 for FDEP approval of the site HASP, $875.50 for previously invoiced amounts, and $7,240.69 for FDEP approval of field documentation and sampling activities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Change Order No.:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW560
03CSS-26A
Tetra Tech, Inc.
Gerald Walker, P.G.
8502458953Kelly Crain
Fosgate Road Dump/Montverde Geophysics Site
COM_367006
The Department approves this Task Assignment Change Order (TACO) in accordance with the attached revised Cost Proposal and Level of Effort (CP/LOE) submitted by Tetra Tech, Inc. on May 26, 2020, revised on June 1, 2020. This TACO will correct the change in costs and final Task Assignment amount that were miscalculated in the previous TACO #2 (attached for reference). The net increase of this TACO accounts for a previously invoiced and paid amount of $875.50.
Private Well Sampling Field Notes 06/12/2020
$ 9,672.33
$ 7,885.26 $ 7,885.26
$ 875.50 $ 875.50
$ 8,760.76
04/30/2020
06/30/2020
60 days
06/30/2020
Ginger Shirah Digitally signed by Ginger Shirah Date: 2020.06.12 09:28:56 -04'00'
Kelly Crain Digitally signed by Kelly Crain Date: 2020.06.12 09:36:52 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.06.12 10:36:58 -04'00'
Gerald Walker Digitally signed by Gerald Walker Date: 2020.06.12 16:13:59 -04'00'
$ 8,760.76 $ 0.00 $ 0.00 $ 0.00
$ 9,672.33
Shirah_GK Cross-Out
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW560
CSS-26A
$ 8,760.76
Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Site Health and Safety Plan (HASP)
Field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities
Final FDEP Approval of the Site HASP (Outstanding balance for Subtask 2)
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities (Subtask 1 and 3)
Previously Invoiced & Paid (Partial Amount of Subtask 2)
03/30/2020
06/12/2020
$ 875.50
$ 644.57
$ 7,240.69
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
TO:
FROM:
DATE:
SUBJECT:
Tetra Tech, Inc., HW560 Contract File CERCLA Site Screening
Kelly Crain, Contract Manager
June 11, 2020
Negotiation Summary – Task Assignment (TA) CSS-26A_CO3 Fosgate Road Dump, COM_367006, Montverde, Lake County Supplemental Site Inspection (SSI)
This change order is requested to correct the overall Task Assignment amount that was miscalculated in the previous change order. The previous change order (TACO #2) did not include the amount that was previously invoiced and paid, a partial payment of $875.50 for Subtask 2. This led to the overall task assignment amount being reduced by that amount ($875.50). The correct (final) Task Assignment amount should be $8,760.76, which accounts for the overall/net reduction of $911.57 in actual costs, that was documented in TACO #2.
This TACO #3 will correct the overall Task Assignment amount by including the previously invoiced/paid amount of $875.50. The remaining balance due to the contractor is $7,885.26 and will include all of Subtasks 1 and 3 and the remaining amount due for Subtask 2.
The final overall cost for this TA is $8,760.76 and is reasonable for the scope of services.
www.floridadep.gov http://www.floridadep.gov/
DEP CONTRACT NO.
Task Assignment #: Change Order No.:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
Site Name:
Site ID / Facility ID::
Description of Change [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverable:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
Cost Reimbursement Fixed Fee
Original Task Amount
Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00
Original Task Completion Date:
Completion Date Prior to this Change:
Net Increase/Decrease in Task Period:
Completion Date with all Change Orders:
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
FIXED PRICE
TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM
ITEM
$0.00
$0.00
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
Final Deliverable Due Date:
$0.00
$0.00
CHANGE IN TASK TIME
FEE SCHEDULE
COST PLUS FIXED FEE
TOTAL
WCP TAFORM 01_18
HW560
02CSS-26A
Tetra Tech, Inc.
Gerald Walker, P.G.
8502458953Kelly Crain
Fosgate Road Dump/Montverde Geophysics Site
COM_367006
The Department approves this Task Assignment Change Order (TACO) in accordance with the attached revised Cost Proposal and Level of Effort (CP/LOE) submitted by Tetra Tech, Inc. on May 26, 2020, revised on June 1, 2020. This TACO will add/remove labor hours due to staffing changes and decrease travel, shipping and equipment costs associated with the private well sampling event (subtask 3). This TACO also accounts for a previously paid partial invoice for Subtask 2. This results in an overall decrease of the total Task Assignment amount.
Private Well Sampling Field Notes 06/12/2020
$ 9,672.33
$ 9,672.33 $ 9,672.33
($ 1,787.07) ($ 1,787.07)
$ 7,885.26
04/30/2020
06/30/2020
60 days
06/30/2020
Ginger Shirah Digitally signed by Ginger Shirah Date: 2020.06.03 10:25:19 -04'00'
Kelly Crain Digitally signed by Kelly Crain Date: 2020.06.03 10:50:41 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.06.04 14:34:09 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = US O = Tetra Tech OU = 112-NUS Date: 2020.06.05 08:09:43 -04'00'
Gerald Walker
$ 7,885.26 $ 0.00 $ 0.00 $ 0.00
$ 9,672.33
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW560
CSS-26A
$ 7,885.26
Site Inspection Workplan/Quality Assurance Project Plan (QAPP) and Site Health and Safety Plan (HASP)
Field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities
Final FDEP Approval of the Site HASP (Subtask 2) - partial
FDEP Approval of field notes, lab shipment receipts, chain of custody, and photographic log from private well sampling activities (Subtask 1 and 3)
Partial Payment of Subtask 2 -PREVIOUSLY INVOICED
03/30/2020
06/12/2020
$ 875.50
$ 644.57
$ 6,365.19
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
TetraTech/TAL-20-46-IC9178
June 1, 2020
Department of Environmental Protection Waste Cleanup Programs ATTN: Ms. Ginger Shirah MS #4535 Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Reference: Florida Department of Environmental Protection (DEP) Waste Cleanup Programs Consolidated Contract HW560-26A-TACO2
Subject: Revised Task Assignment Change Order 2 Request– Fosgate Dump Private Well Sampling, Monteverde, Lake County, Florida
Dear Ms. Shirah:
Tetra Tech is providing the Florida Department of Environmental Protection (FDEP) this request for a change order to reduce cost for private well sampling in the vicinity of the Fosgate Dump Site in Monteverde, Lake County, Florida. The change is mostly due to travel restrictions created by the COVID-19 event. To complete the work, Tetra Tech used staff from a nearby office instead of Tallahassee-based staff to conduct the field work. Use of staff from Tetra Tech’s Cocoa, Florida office resulted in a change in labor cost and reduced travel and equipment costs. The breakdown in labor and cost changes can be found in attached Delta and Revised Amount spreadsheets.
These are described below:
Subtask 1 - Project Management: Project Management includes managing the project scope, schedule, and budget; and project communication. There was no change in Project Management cost.
Subtask 2 – Work Plan and HASP: This task includes completion of a work plan and brief HASP (short form) for the residential well sampling event. In reviewing the LOE for the change order, Tetra Tech discovered that a Project Assistant (LC) included in the original cost proposal was no longer employed by the company and wasn’t included under the FDEP Contract HW560 labor rates. Since this subtask has already been invoiced, these hours were removed from Subtask 3 as part of the change order.
Subtask 3 – Private Well Sampling: This subtask includes making contact with homeowners, mobilization to and from the site area and collecting samples from private wells for pesticides, shipment of the samples to the USEPA laboratory, and field documentation. Instead of staffing the field effort from Tallahassee, Tetra Tech used staff from our Cocoa, Florida office. Hours for
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
Scientist V (RH) and Scientist I (DH) based in Tallahassee were reduced to cover actual hours for coordination and compilation of the field deliverable, and actual hours expended by Scientist IV (CA) and Scientist I (MB) were included for homeowner contact and the field activities. Supporting the field effort from the Cocoa office also reduced the equipment cost, vehicle rental and per diem/hotel costs (day trip travel). Also, one fewer cooler was shipped, resulting in a reduction in shipping cost. One additional change in cost is that rental of a Trimble GPS was removed, because it was not needed. Homeowner addresses were used as the point of reference. The level of effort, equipment, and supplies for this subtask are described in the cost estimate worksheets.
These changes result in a cost reduction of $911.57 for this task assignment. The revised fixed price cost is $8,760.76.
If you have any questions, please call myself or Richard Hicks (850) 385-9899.
Sincerely yours, Gerald Walker, P.G.
Brownfields Program Manager rh/GAW
Attachments c: Kelly Crain, FDEP Jay McGovern, Tetra Tech Tallahassee File FDEP Contract HW560
Attachment A
Contract HW560 Cost Estimate Spreadsheets and Backup Documentation
FDEP COST ESTIMATE
Contractor: Tetra Tech, Inc.
Date: February 22, 2020
Task #: HW560 TA CSS- SubTask 1 Project Management
Site: Fosgate Dump SubTask 2 HASP
Activity/Phase: Private Well Sampling SubTask 3 Fieldwork - Private Well Sampling
Project Manager: Ginger Shirah SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$60.14 Project Manager (GW) 5 4.8
$55.00 Scientist V (RH) 23 1 22 0 0
$24.52 Scientist I (DH) 36 12 24 0 0
$32.26 Scientist II (QK) 0 0 0 0 0
$25.83 Engineer I (MQ) 2 2 0 0 0
$36.48 Staff GIS Specialist (JM) 2 2 0 0 0
$24.67 Project Assistant (LC) 1 1 0 0 0
Total Hours 69 5 18 46 0 0
Direct Labor $2,584.14 $287.13 $498.53 $1,798.48 $0.00 $0.00
Overhead 143.00% $3,695.33 $410.60 $712.90 $2,571.83 $0.00 $0.00
Gen & Admin 12.20% $766.09 $85.12 $147.79 $533.18 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $7,045.56 $782.85 $1,359.22 $4,903.49 $0.00 $0.00
Other Direct Costs $129.21 $14.36 $24.93 $89.92 $0.00 $0.00
Travel
Vehicle Rental $194.00 $0.00 $194.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $384.00 $0.00 $384.00 $0.00 $0.00
Total Travel $578.00 $0.00 $578.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Sample Containers $150.00 $0.00 $150.00 $0.00 $0.00
Sample Shipping $416.00 $0.00 $416.00 $0.00 $0.00
Total Laboratory $566.00 $0.00 $566.00 $0.00 $0.00
Field Expenses
Personal Protection (Level D) $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $65.00 $0.00 $65.00 $0.00 $0.00
Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $584.00 $0.00 $584.00 $0.00 $0.00
Total Field Expenses $649.00 $0.00 $649.00 $0.00 $0.00
Subtotal $8,967.77 $797.21 $1,384.15 $6,786.41 $0.00 $0.00
Completion Fee $704.56 $78.29 $135.92 $490.35 $0.00 $0.00
Total Estimated Cost $9,672.33 $875.50 $1,520.07 $7,276.76 $0.00 $0.00
REV: 03/23/17 Page 1
SITE :
SUBTASK 2: HASP
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review work plan and HASP [1] 1
Scientist I (DH) Tallahassee Office; Prepare work plan [12] 12
Scientist II (QK) 0
Engineer I (MQ) Tallahassee Office; Prepare short form HASP [2] 2
Staff GIS Specialist (JM) Jacksonville Office; Prepare site location and targeted sampling area maps [2] 2
Project Assistant (LC) Jacksonville Office; Document editing and production [1] 1
TOTAL LABOR 18
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
Fosgate Dump
SUBTASK 3: Fieldwork - Private Well Sampling
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Field work (prep for field[1], mobe/demobe[10], private well sampling [10] 22
Scientist I (DH) Tallahassee Office; Field work (prep for field[1], mobe/demobe[10], private well sampling, packing, shipping [12] 24
Scientist II (QK) 0
Engineer I (MQ) 0
Staff GIS Specialist (JM) 0
Project Assistant (LC) 0
TOTAL LABOR 46
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Turbidity Meter $24.25 Each 2 Lamotte $48.50
YSI Series 6 $126.10 Day 2 Incl flow cell $252.20
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 2 $65.00
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 0 $0.00
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each 0 $0.00
MiniRae 3000 PID $87.30 Each 0 $0.00
Total GPS Station $141.65 Each 2 Trimble GeoXH $283.30
TOTAL EQUIPMENT $649.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 2 $194.00
Car $68.00 day 0 $0.00
Subtotal $194.00
Mileage Miles 0
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 2 $72.00
Scientist (DH) $36.00 Day 2 $72.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist V (RH) $120.00 Day 1 $120.00
Scientist (DH) $120.00 Day 1 $120.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $384.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals Liquid 6010 $80.50 $0.00
Volatile Organics Liquid 8260 $109.00 $0.00
TRPH Liquid Florida PRO $84.00 $0.00
SVOC Liquid 8270 $100.00 $0.00
Mercury Liquid 7470 $23.00 $0.00
Pesticides Liquid 8081 $90.00 $0.00
Metals Soil 6010 $80.50 $0.00
Volatile Organics Soil 8260 $109.00 $0.00
TRPH Soil Florida PRO $84.00 $0.00
SVOC Soil 8270 $100.00 $0.00
Mercury Soil 7471 $25.00 $0.00
Pesticides Soil 8081 $90.00 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $150.00 1 1 L amber bottles, coolers, packing $150.00
Sample Shipping Coolers $104.00 4 priority overnight shipping FedEx $416.00
Subtotal $566.00
TOTAL LAB $566.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Date: June 1, 2020
Task #: HW560 TA CSS-26A SubTask 1 Project Management
Site: Fosgate Dump SubTask 2 HASP
Activity/Phase: Private Well Sampling TACO2 Delta SubTask 3 Fieldwork - Private Well Sampling
Project Manager: Ginger Shirah SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$60.14 Project Manager (GW) 0 0.1 $0.00 Staff CADD Specialist 0 0 0 0 0
$55.00 Scientist V (RH) -20 0 -20 0 0
$24.52 Scientist I (DH) -20 0 -20 0 0
$43.27 Scientist V (CA) 31 0 31 0 0
$26.20 Engineer I (MB) 12 0 12 0 0
$25.83 Engineer I (MQ) 0 0 0 0 0
$36.48 Staff GIS Specialist (JM) 0 0 0 0 0
$24.67 Project Assistant (LC) -1 0 -1 0 0
Total Hours 2 0 0 2 0 0
Direct Labor $45.78 $5.08 $0.00 $40.70 $0.00 $0.00
Overhead 143.00% $65.46 $7.26 $0.00 $58.20 $0.00 $0.00
Gen & Admin 12.20% $13.58 $1.51 $0.00 $12.07 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $124.82 $13.85 $0.00 $110.97 $0.00 $0.00
Other Direct Costs $2.29 $0.25 $0.00 $2.04 $0.00 $0.00
Travel
Vehicle Rental ($97.00) $0.00 ($97.00) $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel ($384.00) $0.00 ($384.00) $0.00 $0.00
Total Travel ($481.00) $0.00 ($481.00) $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Sample Containers $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping ($104.00) $0.00 ($104.00) $0.00 $0.00
Total Laboratory ($104.00) $0.00 ($104.00) $0.00 $0.00
Field Expenses
Personal Protection (Level D) $0.00 $0.00 $0.00 $0.00 $0.00
Expendables ($32.50) $0.00 ($32.50) $0.00 $0.00
Equipment (Drilling Related) $0.00 $0.00
Equipment (Analytical Related) $0.00 $0.00
Equipment (IDW Related) $0.00 $0.00
Equipment (Other) ($433.65) ($433.65)
Total Field Expenses ($466.15) $0.00 ($466.15) $0.00 $0.00
Subtotal ($924.04) $14.10 $0.00 ($938.14) $0.00 $0.00
Completion Fee $12.47 $1.37 $0.00 $11.10 $0.00 $0.00
Total Estimated Cost ($911.57) $15.47 $0.00 ($927.04) $0.00 $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review work plan and HASP [1] 1
Scientist I (DH) Tallahassee Office; Prepare work plan [12] 12
Scientist IV (CA) 0
Engineer I (MQ) Tallahassee Office; Prepare short form HASP [2] 2
Staff GIS Specialist (JM) Jacksonville Office; Prepare site location and targeted sampling area maps [2] 2
Project Assistant (LC) Jacksonville Office; Document editing and production [0] 0
TOTAL LABOR 17
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Field work (prep for field[1], mobe/demobe[10], private well sampling [10], coordination [2] -20
Scientist I (DH) Tallahassee Office; Field work (prep for field[1], mobe/demobe[10], private well sampling, packing, shipping [12], field deliverable [4] -20
Scientist V (CA) Cocoa Office; site access calls, field work [31] 31
Engineer I (MB) Cocoa Office; field work [12] 12
Engineer I (MQ) 0
Staff GIS Specialist (JM) 0
Project Assistant (LC) 0
TOTAL LABOR 3
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day -1 only 1 day ($32.50)
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 0 $0.00
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each 0 $0.00
MiniRae 3000 PID $87.30 Each 0 $0.00
Equipment (Other) $141.65 Each -2 ($433.65)
TOTAL EQUIPMENT ($466.15)
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day -1 only 1 day vehicle use ($97.00)
Car $68.00 day 0 $0.00 Subtotal ($97.00)
Mileage Miles 0
TOTAL VEHICLE ($97.00)
Scientist V (RH) $36.00 Day -2 no per diem ($72.00)
Scientist (DH) $36.00 Day -2 no per diem ($72.00)
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist V (RH) $120.00 Day -1 no hotel ($120.00)
Scientist (DH) $120.00 Day -1 no hotel ($120.00)
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM ($384.00)
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals Liquid 6010 $80.50 $0.00
Volatile Organics Liquid 8260 $109.00 $0.00
TRPH Liquid Florida PRO $84.00 $0.00
SVOC Liquid 8270 $100.00 $0.00
Mercury Liquid 7470 $23.00 $0.00
Pesticides Liquid 8081 $90.00 $0.00
Metals Soil 6010 $80.50 $0.00
Volatile Organics Soil 8260 $109.00 $0.00
TRPH Soil Florida PRO $84.00 $0.00
SVOC Soil 8270 $100.00 $0.00
Mercury Soil 7471 $25.00 $0.00
Pesticides Soil 8081 $90.00 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $150.00 1 1 L amber bottles, coolers, packing $0.00
Sample Shipping Coolers $104.00 -1 priority overnight shipping FedEx (3 coolers) ($104.00)
Subtotal ($104.00)
TOTAL LAB ($104.00)
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
Date: June 1, 2020
Task #: HW560 TA CSS- SubTask 1 Project Management
Site: Fosgate Dump SubTask 2 HASP
Activity/Phase: Private Well Sampling TACO2 Rev Amt SubTask 3 Fieldwork - Private Well Sampling
Project Manager: Ginger Shirah SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$60.14 Project Manager (GW) 5 4.9
$55.00 Scientist V (RH) 3 1 2 0 0
$24.52 Scientist I (DH) 16 12 4 0 0
$43.27 Scientist IV (CA) 31 0 31 0 0
$26.20 Scientist I (MB) 12 0 12 0 0
$25.83 Engineer I (MQ) 2 2 0 0 0
$36.48 Staff GIS Specialist (JM) 2 2 0 0 0
$24.67 Project Assistant (LC) 0 1 -1 0 0
Total Hours 71 5 18 48 0 0
Direct Labor $2,629.92 $292.21 $498.53 $1,839.18 $0.00 $0.00
Overhead 143.00% $3,760.79 $417.86 $712.90 $2,630.03 $0.00 $0.00
Gen & Admin 12.20% $779.66 $86.63 $147.79 $545.24 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $7,170.37 $796.70 $1,359.22 $5,014.45 $0.00 $0.00
Other Direct Costs $131.50 $14.61 $24.93 $91.96 $0.00 $0.00
Travel
Vehicle Rental $97.00 $0.00 $97.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $97.00 $0.00 $97.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Sample Containers $150.00 $0.00 $150.00 $0.00 $0.00
Sample Shipping $312.00 $0.00 $312.00 $0.00 $0.00
Total Laboratory $462.00 $0.00 $462.00 $0.00 $0.00
Field Expenses
Personal Protection (Level D) $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $32.50 $0.00 $32.50 $0.00 $0.00
Equipment (Drilling Related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical Related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW Related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $150.35 $0.00 $150.35 $0.00 $0.00
Total Field Expenses $182.85 $0.00 $182.85 $0.00 $0.00
Subtotal $8,043.72 $811.31 $1,384.15 $5,848.26 $0.00 $0.00
Completion Fee $717.04 $79.67 $135.92 $501.45 $0.00 $0.00
Total Estimated Cost $8,760.76 $890.98 $1,520.07 $6,349.71 $0.00 $0.00
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review work plan and HASP [1] 1
Scientist I (DH) Tallahassee Office; Prepare work plan [12] 12
Scientist IV (CA) 0
Engineer I (MQ) Tallahassee Office; Prepare short form HASP [2] 2
Staff GIS Specialist (JM) Jacksonville Office; Prepare site location and targeted sampling area maps [2] 2
Project Assistant (LC) Jacksonville Office; Document editing and production [0] 0
TOTAL LABOR 17
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00 Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Field work coordination [2] 2
Scientist I (DH) Tallahassee Office; Field deliverable [4] 4
Scientist IV (CA) Cocoa Office; site access calls, field work [31] 31
Scientist I (MB) Cocoa Office; field work [12] 12
Engineer I (MQ) 0
Staff GIS Specialist (JM) 0
Project Assistant (LC) 0
TOTAL LABOR 49
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 1 $32.50
Personal Protection (Level D) $28.00 Per Person x Day 0 $0.00
Teflon Tubing (1/4-inch diameter) $1.95 Foot 0 $0.00
Total Survey Station $41.75 Each 0 $0.00
Peristaltic Pump $29.10 Each 0 $0.00
Hammer Drill $50.95 Each 0 $0.00
MiniRae 3000 PID $87.30 Each 0 $0.00
Equipment (Other) $141.65 Each 0 $150.35
TOTAL EQUIPMENT $182.85
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 1 $97.00
Car $68.00 day 0 $0.00 Subtotal $97.00
Mileage Miles 0
TOTAL VEHICLE $97.00
Scientist (DH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist V (RH) $120.00 Day 0 $0.00
Scientist (DH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals Liquid 6010 $80.50 $0.00
Volatile Organics Liquid 8260 $109.00 $0.00
TRPH Liquid Florida PRO $84.00 $0.00
SVOC Liquid 8270 $100.00 $0.00
Mercury Liquid 7470 $23.00 $0.00
Pesticides Liquid 8081 $90.00 $0.00
Metals Soil 6010 $80.50 $0.00
Volatile Organics Soil 8260 $109.00 $0.00
TRPH Soil Florida PRO $84.00 $0.00
SVOC Soil 8270 $100.00 $0.00
Mercury Soil 7471 $25.00 $0.00
Pesticides Soil 8081 $90.00 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $150.00 1 1 L amber bottles, coolers, packing $150.00
Sample Shipping Coolers $104.00 3 priority overnight shipping FedEx $312.00
Subtotal $462.00
TOTAL LAB $462.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
| Task Assignment CHANGE ORDER |
| BWC Task Assignment Change Order Form (Rev 02-17).pdf |
| Task Assignment CHANGE ORDER |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |