This is a Task Assignment Notification Form and supporting documentation for a state and local contract indefinite delivery vehicle under Florida Department of Environmental Protection (DEP) Contract No. HW560. The contract involves Tetra Tech, Inc. as the contractor, with Gerald Walker, P.G. as the contractor representative and Kelly Crain as the DEP Contract Manager. The task assignment pertains to the Former 3D Oil Distribution Facility located at 1744 Seagrave Street, South Daytona, Volusia County, Florida (DEP Site #ERIC_5549). The work is being conducted under the State & Tribal Response Program (SRP) cooperative agreement administered by DEP on behalf of the U.S. Environmental Protection Agency (EPA).
The task assignment covers Supplemental Site Assessment (SSA) groundwater monitoring activities consisting of six subtasks: Project Management ($1,326.13), Quality Assurance Project Plan/Work Plan and Health and Safety Plan ($806.27), First Biannual Monitoring Event ($8,733.21), First SSA Report ($1,436.85), Second Biannual Monitoring Event ($8,507.78), and Second SSA Report ($1,436.85), for a total task assignment value of $22,247.09 on a fixed price basis. The work includes groundwater sampling from nine existing monitoring wells, measurement of groundwater levels in seventeen wells, repair of damaged monitoring well MW-1, installation of tamper-evident seals, laboratory analysis through TestAmerica Laboratories, and preparation of letter reports documenting findings. The period of performance extends from task assignment execution through January 22, 2021, with the final deliverable (Second Supplemental Site Assessment Letter Report) due no later than December 18, 2020. Invoicing is based on Department approval of deliverables according to the attached schedule.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW560
SRPPM SRP18BF601B
Tetra Tech
Gerry Walker, P.G. Phone #: (850) 536-8126
(850) 245-8953Kelly Crain
ERIC_5549
Former 3D Oil Distribution Facility
1744 Seagrave Street, South Daytona, Volusia County
Supplemental Site Assessment (SSA) Groundwater Sampling
The Department approves this Task Assignment (TA) based upon the Cost Proposal and Level of Effort (CP/LOE) for supplemental groundwater assessment activities, submitted to the Department on March 10, 2020 (revised March 21, 2020) by Tetra Tech. The final deliverable will be a Supplemental Site Assessment (SSA) Letter Report following the second biannual groundwater monitoring event, received by the Department no later than 12/18/2020.
Supplemental Site Assessment (SSA) Letter Report
12/18/2020
01/22/2021
$ 22,247.09 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Megan R. Johnson Digitally signed by Megan R. Johnson Date: 2020.03.25 14:27:39 -04'00'
Kelly Crain Digitally signed by Kelly Crain Date: 2020.03.26 11:14:23 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.03.26 16:50:22 -04'00'
Digitally signed by: Gerald Walker DN: CN = Gerald Walker email = gerry.walker@tetratech.com C = AD O = Tetra tech OU = Tetra Tech Date: 2020.03.27 09:37:24 -04'00'
Gerald Walker
$ 22,247.09
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
QAPP/Work Plan and HASP 04/09/2020
Field notes, photographic log, chain of custody, groundwater sampling logs 05/11/2020
First Supplemental Site Assessment Report 06/08/2020
Field notes, photographic log, chain of custody, groundwater sampling logs 11/13/2020
Second Supplemental Site Assessment Report 12/18/2020
Department approval of QAPP/Work Plan and HASP (Subtask 2) $ 806.27
Department approval of field notes, photographic log, chain of custody, and groundwater sampling logs (Subtask 3) $ 8,733.21
Department approval of first Supplemental Site Assessment Letter Report (Subtask
4) $ 1,436.85
Department approval of field notes, photographic log, chain of custody, and groundwater sampling logs (Subtask 5) $ 8,507.78
Department approval of second Supplemental Site Assessment Letter Report (Subtasks 1 & 6) $ 2,762.98
$ 22,247.09
HW560
BF601B
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein
Secretary
Memorandum
TO: Tetra Tech, HW560 Contract File
FROM: Kelly Crain, Contract Manager
DATE: March 25, 2020
SUBJECT: Negotiation Summary – SRP 18 Task Assignment (TA) BF601B
Former 3D Oil Distribution Facility Facility ID # ERIC_5549 Supplemental Site Assessment (SSA) Groundwater Monitoring
This TA is intended for conducting Supplemental Site Assessment (SSA) groundwater monitoring at the Former 3D Oil Distribution Facility site, located at 1744 Seagrave Street, South Daytona, Volusia County, Florida. The services are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).
Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, fringe and other direct costs. The agreed upon cost of this subtask is $1,326.13.
Subtask 2: QAPP/Work Plan, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Quality Assurance Project Plan (QAPP)/Work Plan, a Health and Safety Plan (HASP). The QAPP/Work Plan will provide a brief summary of the scope of work, tables and figures showing the proposed sample locations, and laboratory and field quality assurance measures and procedures. The agreed upon cost of this subtask is $806.27.
Subtask 3: First Biannual Monitoring Event Under this subtask, Tetra Tech will collect groundwater samples from nine existing monitoring wells at select locations that had exceedances of the Department’s Groundwater Cleanup Target Level (GCTL) concentrations of VOCs and/or PAHs or are downgradient of the plume.
Groundwater samples will be collected with a peristaltic pump and polyethylene tubing using low-flow sampling procedures for laboratory analysis. The groundwater samples will be analyzed by TestAmerica Laboratories. Measurement of groundwater levels in all 17 available monitoring wells will be taken. Tetra Tech will also repair the surface completion of monitoring well MW1 that has been damaged and install tamper-evident seals on all monitoring wells. The agreed upon cost of this subtask is $8,733.21.
http://www.floridadep.gov/
Negotiation Summary – Task Assignment (TA) BF601B Former 3D Oil Distribution Facility Volusia County Supplemental Site Assessment Activities March 25, 2020 www.FloridaDEP.gov
Subtask 4: First Supplemental Site Assessment Report A Supplemental Site Assessment Report will be prepared detailing the field and laboratory results.
This report will also include figures, maps, tables, and conclusions and recommendations for any future work. The agreed upon cost of this subtask is $1,436.85.
Subtask 5: Second Biannual Monitoring Event Under this subtask, Tetra Tech will collect groundwater samples from nine existing monitoring wells at select locations that had exceedances of the Department’s Groundwater Cleanup Target Level (GCTL) concentrations of VOCs and/or PAHs or are downgradient of the plume.
Groundwater samples will be collected with a peristaltic pump and polyethylene tubing using low-flow sampling procedures for laboratory analysis. The groundwater samples will be analyzed by TestAmerica Laboratories. Measurement of groundwater levels in all 17 available monitoring wells will be taken. The agreed upon cost of this subtask is $8,507.78.
Subtask 6: Second Supplemental Site Assessment Report A final Supplemental Site Assessment Report will be prepared detailing the field and laboratory results. This report will also include figures, maps, tables, and conclusions and recommendations for any future work. The agreed upon cost of this subtask is $1,436.85.
Summary The Department’s SRP Contract Manager and Tetra Tech’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $22,247.09. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE letter provided by Tetra Tech on March 10, 2020 (revised March 21, 2020), as well as the Task Assignment Form for BF601B prepared by the Department. The final deliverable must be received by the Department no later than December 18, 2020.
Tetra Tech, Inc.
1558 Village Square Blvd., Ste. 2, Tallahassee, FL 32309-2478
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
TetraTech/TAL-20-21-HW560-08
March 19, 2020
Department of Environmental Protection Waste Cleanup Programs ATTN: Ms. Megan Johnson MS #4535 Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Reference: Florida Department of Environmental Protection (DEP) Waste Cleanup Programs Consolidated Contract HW560
Subject: Proposed Cost Estimate Revised – Supplemental Groundwater Monitoring, Former 3D Oil Distribution Site, South Daytona, Volusia County, Florida
Dear Ms. Johnson:
Tetra Tech is pleased to submit to the Florida Department of Environmental Protection (FDEP) this revised proposed Scope of Work and cost estimate to conduct biannual monitoring (2 events) of key monitoring wells at the former 3D Oil Distribution site in South Daytona, Volusia County, Florida.
Services provided in this proposal will be completed as six subtasks including: Subtask 1, Project Management; Subtask 2, Work Plan and Health and Safety Plan (HASP); Subtask 3, First Biannual Monitoring Event; Subtask 4, Report for First Monitoring Event; Subtask 5, Second Biannual Monitoring Event, and Subtask 6, Report for Second Biannual Monitoring Event. These subtasks will include the following activities:
Subtask 1 - Project Management: Project Management includes managing the project scope, schedule, and budget; and procurement of subcontractors. The level of effort is based on the HW560 Contract requirements and assumes 8 hours for Task 1.
Subtask 2 – Work Plan and HASP: The Work Plan will provide a summary of the scope of work and tables and figures showing the proposed groundwater sampling locations and proposed analysis. The level of effort assumes 1 hour for a Scientist V review; 6 hours for a Scientist I to complete document preparation; 1 hour for an Engineer I (the office Safety/Quality Assurance Manager) to review and update the HASP that was submitted for the previous sampling event at the site; and 1 hour for figure preparation.
Subtask 3 – First Biannual Monitoring Event: This subtask includes collecting groundwater samples from nine (9) existing monitoring wells at the site to provide an update on the groundwater contaminant plume configuration, measurement of groundwater levels in all 17 available monitoring wells, repair of the surface completion of one of the wells that had been damaged, and installation of tamper-evident seals on all 17 wells. Field activities will be conducted by a Staff Scientist and a Staff Engineer. The field activities and level of effort summary are described below as are the subcontracted services. The level of effort, subcontractor, equipment, travel, and supplies needed
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com for this subtask are detailed in the cost estimate worksheets. Monitoring well locations are shown in Figure 1.
Groundwater sampling. Tetra Tech will collect groundwater samples from nine monitoring wells that had exceedances of FDEP’s Groundwater Cleanup Target Level (GCTL) concentrations of VOCs and/or PAHs or are downgradient of the plume. The sampled monitoring wells will include one vertical extent monitoring well (DMW-2) within the plume.
Monitoring wells proposed for sampling include MW-1, MW-2, MW-8, MW-9, MW-10R, MW-11, MW-12, MW-15, and DMW-2. Samples will be collected with a peristaltic pump and tubing using low-flow sampling techniques to reduce sample turbidity, with the goal of attaining 20 NTU and stable field parameter readings in accordance with FDEP SOP for low flow sampling. Following sample collection, the samples will be properly packaged and shipped to TestAmerica Laboratories for analysis.
Depth to groundwater measurement. A synoptic set of groundwater levels will be collected from all onsite monitoring wells to document depth to groundwater and groundwater flow direction during the sampling event.
Sample Analysis. TestAmerica Laboratories will provide sample kits and analysis of the samples. Laboratory analyses will include aromatic Volatile Organic Compounds (VOC) per Method 8260, Polynuclear Aromatic Hydrocarbons (PAH) per Method 8270 and Total Recoverable Petroleum Hydrocarbons (TRPH) per the Florida PRO method. Quality assurance samples included in the proposal include one field duplicate, one equipment rinsate blank, and one trip blank (for VOCs only).
Repair of damaged well. The broken pad on monitoring well MW1 will be replaced with a new concrete pad and manhole. If the top of the well casing is be modified, it will be resurveyed and referenced to the other onsite monitoring wells based on a local datum location.
Field deliverable. A field subtask deliverable will be prepared and submitted to FDEP. It will include field notes, groundwater sampling field sheets, calibration logs, and copies of chain of custody and shipping forms. It will also include pertinent photographs of the site.
The field personnel will mobilize from the Tetra Tech Tallahassee office, and the work will be completed in two days. Two field staff (Scientist I and Engineer I) will conduct the work.
Hours proposed for the Scientist I and the Engineer I, including equipment staging, field work and mobilization are 21 hours apiece. Two additional hours by the Scientist I and one hour for a Scientist V are proposed for the field deliverable. The field operations staff in Tetra Tech’s Tallahassee office assigned to this project have extensive experience with the FDEP Brownfields program, working specifically with the FDEP Team. Proposed staff members for this project are thoroughly trained and experienced in the EPA Brownfields program’s standard field procedures and groundwater sampling.
Subtask 4 – Report for First Biannual Monitoring Event: This subtask includes preparation, review and submission of a letter report that summarizes the findings of the monitoring event conducted under Subtask 3. It will include a summary of the activities conducted and findings, tables documenting the depths to groundwater and groundwater elevations; field parameter measurements; and laboratory results; figures showing groundwater flow direction and chemical concentrations in wells, and chemical historical concentration plots for key analytes in groundwater samples. Appendices will include laboratory analytical data sheets, quality assurance documentation; and field documentation. Proposed labor includes 1 hour for a Scientist V for document review; 14 hours for a Scientist I for document production, table preparation, draft figures and trend plots; and 2 hours for graphics.
Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
Subtask 5 – Second Biannual Monitoring Event: This subtask includes a second biannual monitoring event, to be conducted six months after the first event. It will include the same activities described above for Subtask 3, except for the well repair work. As before, the same field staff members will mobilize from the Tetra Tech Tallahassee office, and the work will be completed in two days. Two field staff (Scientist I and Engineer I) will conduct the work. Hours proposed for the Scientist I and the Engineer I, including equipment staging, field work and mobilization are 20 hours apiece. Two additional hours by the Scientist I and 1 hour for a Scientist V are proposed for the field deliverable.
Subtask 6 – Report for Second Biannual Monitoring Event: This subtask includes preparation, review and submission of a letter report that summarizes the findings of the monitoring event conducted under Subtask 5. It will include a summary of the activities conducted and findings, tables documenting the depths to groundwater and groundwater elevations; field parameter measurements; and laboratory results; figures showing groundwater flow direction and chemical concentrations in wells, and chemical historical concentration plots for key analytes in groundwater samples. Appendices will include laboratory analytical data sheets, quality assurance documentation; and field documentation. Proposed labor includes 1 hour for a Scientist V for document review; 14 hours for a Scientist I for document production, table preparation, draft figures and trend plots; and 2 hours for graphics.
Tetra Tech’s cost proposal is based on the following assumptions:
Site access to enter the property for sampling and surveying will be obtained by FDEP.
The field activities will be scheduled once the cost proposal is approved by FDEP and a task assignment is received.
Investigation derived waste (IDW) will not be drummed but will be properly disposed of onsite.
Tetra Tech is prepared to begin work on this project following receipt of a signed FDEP task assignment. A signed task assignment will reflect the approval of this proposal and authorize use of associated funding required to commence project activities. The total fixed price cost to complete the activities described above is $22,247.09. Labor rates are based on Tetra Tech’s January 2020 rate sheet approved by FDEP. Please find a cost summary attached that provides details concerning this cost proposal. Tetra Tech anticipates completion of this project on a fixed price basis and will invoice costs incurred at 100% completion based on approval of deliverables and in accordance with deliverable due dates.
Period of Performance Tetra Tech will begin development of the Work Plan and set up the subcontract with TestAmerica upon receipt of the signed task assignment. The Work Plan and updated HASP will be submitted to FDEP within 14 days of task assignment and the site work will be scheduled. The letter reports for the first and second monitoring events will be prepared as soon as laboratory results from the monitoring events are provided.
If you have any questions, please call myself or Richard Hicks (850) 385-9899.
Sincerely yours, Tel 850.385.9899 Fax 850.385.9860 www.tetratech.com
Gerald Walker, P.G.
Brownfields Program Manager rh/GAW
Attachments c: Kelly Crain, FDEP Richard Hicks, Tetra Tech Jay McGovern, Tetra Tech Tallahassee File FDEP Contract HW560
FIGURES
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A
@A @A
@A@A
@A
MW-13
MW-14
MW-15
MW-8
MW-7
MW-6
MW-5
MW-4 MW-3
MW-2MW-1
DMW-2
MW-12
MW-11
DMW-1R
MW-10R
MW-9
³
JAX C:\GIS\PROPOSALS\MXD\3D OIL\MXD\0_MW_LOCATIONS_BASE.MXD 07/30/19
SITE MAP AND MONITORNG WELL LOCATIONS
FORMER 3D OIL DISTRIBUTION FACILITY
SOUTH DAYTONA, FLORIDA
112IC08907
FIGURE NUMBER
DATEDRAWN BY
J.MADDEN 07/30/19
DATECHECKED BY
R.HICKS 07/30/19
50 500 Feet
Legend @A Monitoring Well
RICHARD.HICKS
Rectangle @ A M
RICHARD.HICKS
Rectangle @ A
RICHARD.HICKS
Rectangle @ A
RICHARD.HICKS
Rectangle @ A M
RICHARD.HICKS
Rectangle @ A @ A D
RICHARD.HICKS
Rectangle @ A M
RICHARD.HICKS
Rectangle @ A M
RICHARD.HICKS
Rectangle @ A M
RICHARD.HICKS
Rectangle
RICHARD.HICKS
Text Box Well proposed for annual monitoring
Attachment A
Contract HW560 Cost Estimate Spreadsheets and Backup Documentation
FDEP COST ESTIMATE
Contractor: Tetra Tech, Inc.
Date: March 19, 2020
Task #: HW560 TA CSS- SubTask 1 Project Management SubTask 6 Report - 2nd Sampling Event
Site: 3D Oil Distribution SubTask 2 Work Plan and HASP SubTask 7
Activity/Phase: Biannual Monitoring SubTask 3 Fieldwork - 1st Sampling Event SubTask 8
Project Manager: Megan Johnson SubTask 4 Report - 1st Sampling Event SubTask 9
SubTask 5 Fieldwork - 2nd Sampling Event SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$60.14 Project Manager (GW) 7 7.2
$55.00 Scientist V (RH) 5 1 1 1 1 1 0 0 0 0
$24.52 Scientist I (DH) 79 6 23 14 22 14 0 0 0 0
$32.26 Scientist II (QK) 0 0 0 0 0 0 0 0 0 0
$25.83 Engineer I (MQ) 42 1 21 0 20 0 0 0 0 0
$36.48 Staff GIS Specialist (JM) 5 1 0 2 0 2 0 0 0 0
$24.67 Project Assistant (LC) 0 0 0 0 0 0 0 0 0 0
Total Hours 138 7 9 45 17 43 17 0 0 0 0
Direct Labor $3,914.26 $434.92 $264.43 $1,161.39 $471.24 $1,111.04 $471.24 $0.00 $0.00 $0.00 $0.00
Overhead 143.00% $5,597.39 $621.94 $378.13 $1,660.79 $673.87 $1,588.79 $673.87 $0.00 $0.00 $0.00 $0.00
Gen & Admin 12.20% $1,160.42 $128.94 $78.39 $344.31 $139.70 $329.38 $139.70 $0.00 $0.00 $0.00 $0.00
Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $10,672.07 $1,185.80 $720.95 $3,166.49 $1,284.81 $3,029.21 $1,284.81 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $195.71 $21.75 $13.22 $58.07 $23.56 $55.55 $23.56 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $388.00 $0.00 $194.00 $0.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $768.00 $0.00 $384.00 $0.00 $384.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $1,156.00 $0.00 $578.00 $0.00 $578.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Transportation & Disposal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling and Well Installation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Laboratory $7,288.00 $0.00 $3,644.00 $0.00 $3,644.00 $0.00 $0.00 $0.00 $0.00 $0.00
Encore Samplers $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $832.00 $0.00 $416.00 $0.00 $416.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $8,120.00 $0.00 $4,060.00 $0.00 $4,060.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $130.00 $0.00 $65.00 $0.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $834.20 $0.00 $417.10 $0.00 $417.10 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $71.90 $0.00 $71.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $1,036.10 $0.00 $554.00 $0.00 $482.10 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 03/23/17 Page 1
FDEP COST ESTIMATE
Contractor: Tetra Tech, Inc.
Date: March 19, 2020
Task #: HW560 TA CSS- SubTask 1 Project Management SubTask 6 Report - 2nd Sampling Event
Site: 3D Oil Distribution SubTask 2 Work Plan and HASP SubTask 7
Activity/Phase: Biannual Monitoring SubTask 3 Fieldwork - 1st Sampling Event SubTask 8
Project Manager: Megan Johnson SubTask 4 Report - 1st Sampling Event SubTask 9
SubTask 5 Fieldwork - 2nd Sampling Event SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Subtotal $21,179.88 $1,207.55 $734.17 $8,416.56 $1,308.37 $8,204.86 $1,308.37 $0.00 $0.00 $0.00 $0.00
Completion Fee $1,067.21 $118.58 $72.10 $316.65 $128.48 $302.92 $128.48 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,247.09 $1,326.13 $806.27 $8,733.21 $1,436.85 $8,507.78 $1,436.85 $0.00 $0.00 $0.00 $0.00
REV: 03/23/17 Page 2
SITE :
SUBTASK 2: Work Plan and HASP
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Review Work Plan and HASP[1] 1
Scientist I (DH) Tallahassee Office; Prepare Work Plan[6] 6
Scientist II (QK)
Engineer I (MQ) Update HASP 1
Staff GIS Specialist (JM) Jacksonville Office; Figures [1] 1
TOTAL LABOR 9
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL 0
Scientist V (RH) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
3D Oil Distribution
SUBTASK 3: Fieldwork - 1st Sampling Event
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Review field deliverable [1] 1
Scientist I (DH) Tallahassee, Office; Field work (prep for field[2], mobe/demobe[10], wls in 17 wells [2], spl 9 wells [5]; repair MW1 [1]; cooler prep and ship [1]; 23 field task deliverable [2])
Scientist II (QK)
Engineer I (MQ) Tallahassee, Office; Field work (prep for field[2], mobe/demobe[10], wls in 17 wells [2], spl 9 wells [5]; repair MW1 [1]; cooler prep and ship [1]) 21
Staff GIS Specialist (JM)
TOTAL LABOR 45
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Monitoring Well Installation Kit $184.30 Day $0.00
Shallow Groundwater Sampling Kit $208.55 Day 2 $417.10
Expendables $32.50 Day 2 $65.00
Monitoring Well Cover $42.80 Each 1 8 inch bolt down (cost info attached) $42.80
Teflon Tubing (1/4-inch diameter) $1.95 Foot $0.00
Total Survey Station $41.75 Each $0.00
Peristaltic Pump $29.10 Each 1 Extra pump for well purging $29.10
Total GPS Station $141.65 Each Trimble GeoXH $0.00
TOTAL EQUIPMENT $554.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $230.00 Each 0 $0.00
Van/Truck $97.00 day 2 $194.00
Car $68.00 day 0 $0.00
Subtotal $194.00
Mileage Miles 0
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist V (RH) $36.00 Day $0.00
Scientist (DH) $36.00 Day 2 $72.00
Engineer I (MQ) $36.00 Day 2 $72.00
HOTEL
Scientist III (RH) $120.00 Day $0.00
Scientist (DH) $120.00 Day 1 $120.00
Engineer I (MQ) $120.00 Day 1 $120.00
TOTAL PER DIEM $384.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Metals Liquid 6010 $80.50
Volatile Organics Liquid 8260 $135.00 9 3 QA includes 1 dup, 1 eq b, 1 tb $1,620.00
TRPH Liquid Florida PRO $84.00 9 2 QA includes 1 dup, 1 eq b $924.00
PAH Liquid 8270sim $100.00 9 2 QA includes 1 dup, 1 eq b $1,100.00
Mercury Liquid 7470 $23.00
Pesticides Liquid 8081 $90.00
Metals Soil 6010 $80.50
Volatile Organics Soil 8260 $66.00
TRPH Soil Florida PRO $84.00
SVOC Soil 8270 $100.00
Mercury Soil 7471 $25.00
Pesticides Soil 8081 $90.00
Subtotal $3,644.00
Unit Cost Quantity
Sample Containers Lot $0.00
Encore Samplers Each $8.75
Sample Shipping Coolers $104.00 4 $416.00
Subtotal $416.00
TOTAL LAB $4,060.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SUBTASK 4: Report - 1st Sampling Event
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Document review by a PG [1] 1
Scientist I (DH) Tallahassee Office; Document preparation; trend graphs [3]; tables [3]; text [6]; draft figures [2] 14
Scientist II (QK) 0
Engineer I (MQ) 0
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation [2] 2
TOTAL LABOR 17
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
$0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist III (WO) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
$0.00 $0.00
TOTAL $0.00
3D Oil Distribution
$0.00
REV: 03/23/17 Page 4
SUBTASK 5: Fieldwork - 2nd Sampling Event
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Review field deliverable [1] 1
Scientist I (DH) 22
Scientist II (QK)
Engineer I (MQ) 20
Staff GIS Specialist (JM)
TOTAL LABOR 43
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 2 $417.10
Expendables $32.50 Day 2 $65.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $482.10
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 2 $194.00
Car $68.00 day 0 $0.00
Subtotal $194.00
Mileage Miles 0
TOTAL VEHICLE $194.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist (DH) $36.00 Day 2 $72.00
Engineer I (MQ) $36.00 Day 2 $72.00
HOTEL
Scientist (DH) $120.00 Day 1 $120.00
Engineer I (MQ) $120.00 Day 1 $120.00
TOTAL PER DIEM $384.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Volatiles Liquid 8260 $135.00 9 3 QA includes 1 dup, 1 eq b, 1 tb $1,620.00
PAH Liquid 8270 $100.00 9 2 QA includes 1 dup, 1 eq b $1,100.00
Pesticides Liquid 8081 $90.00 $0.00
Herbicides Liquid 8151 $150.00 $0.00
TRPH Liquid Florida PRO $84.00 9 2 QA includes 1 dup, 1 eq b $924.00
Lead Liquid 6010 $11.50 $0.00
Total Dissolved Fe and Mn Liquid 6010 $23.00 $0.00
COD Liquid SM5220 $25.00 $0.00
BOD (5 day) Liquid SM5210 $25.00 $0.00
Methane/CO2/02 Liquid 3810 $110.00 $0.00
In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $3,644.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 4 $416.00
Subtotal $416.00
TOTAL LAB $4,060.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
3D Oil Distribution
Tallahassee, Office; Field work (prep for field[2], mobe/demobe[10], wls in 17 wells [2], spl 9 wells [5]; cooler prep and ship [1])
Tallahassee, Office; Field work (prep for field[2], mobe/demobe[10], wls in 17 wells [2], spl 9 wells [5]; cooler prep and ship [1];
field task deliverable [2]
REV: 03/23/17 Page 2
SUBTASK 6: Report - 2nd Sampling Event
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Scientist V (RH) Tallahassee Office; Document review by a PG [1] 1
Scientist I (DH) Tallahassee Office; Document preparation; trend graphs [3]; tables [3]; text [6]; draft figures [2] 14
Scientist II (QK)
Engineer I (MQ)
Staff GIS Specialist (JM) Jacksonville Office; Figure preparation [2] 2
TOTAL LABOR 17
FIELD EXPENSES ITEM RATE COSTING UNIT USAGE TOTALS
Equipment
Hand Auger $8.25 Each 0 $0.00
Monitoring Well Installation Kit $184.30 Day 0 $0.00
Shallow Groundwater Sampling Kit $208.55 Day 0 $0.00
Expendables $32.50 Day 0 $0.00
Personal Protection (Level D) $28.00 Day 0 $0.00
Site Reconnaissance Kit $81.48 Each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USAGE
Air Fare $0.00 Each 0 $0.00
Van/Truck $97.00 day 0 $0.00
Car $68.00 day 0 $0.00
Subtotal $0.00
Mileage Miles 0
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USAGE
MEALS
Scientist III (WO) $36.00 Day 0 $0.00
Engineer I (MQ) $36.00 Day 0 $0.00
HOTEL
Scientist III (WO) $120.00 Day 0 $0.00
Engineer I (MQ) $120.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER Media Method RATE # SAMPLES #QAQC Analysis
Volatiles Liquid 8260 $135.00 Standard Turn Around $0.00
Semivolatiles Liquid 8270 $100.00 Standard Turn Around $0.00
Pesticides Liquid 8081 $90.00 Standard Turn Around $0.00
Herbicides Liquid 8151 $150.00 Standard Turn Around $0.00
TRPH Liquid Florida PRO $84.00 Standard Turn Around $0.00
Lead Liquid 6010 $11.50 Standard Turn Around $0.00
Total Dissolved Fe and Mn Liquid 6010 $23.00 Standard Turn Around $0.00
COD Liquid SM5220 $25.00 Standard Turn Around $0.00
BOD (5 day) Liquid SM5210 $25.00 Standard Turn Around $0.00
Methane/CO2/02 Liquid 3810 $110.00 Standard Turn Around $0.00
In-line Filter (0.45 Micron) Each $17.50 $0.00
Subtotal $0.00
Unit Cost Quantity
Sample Containers Lot $0.00 0 $0.00
Encore Samplers Each $8.75 0 $0.00
Sample Shipping Coolers $104.00 0 $0.00
Subtotal $0.00
TOTAL LAB $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST Units
TOTAL $0.00
REV: 03/23/17 Page 3
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .