CN-370000-CN205-T7CO4.pdf
PDF 5 MB Posted
- Contract number
- CN205
- Issued by
- Florida
About this file
This document is a Task Assignment Change Order Form (Change Order No. 04) issued by the Florida Department of Environmental Protection (FDEP) to Ayres Associates, Inc. for engineering inspection services at Weeki Wachee Springs State Park. The contract is identified as CN205, Task Assignment Number TA07, Project Number 61253. The FDEP Contract Manager is Ralph Perkins, and the consultant representative is Hisham Sunna, PhD, PE. The change order was approved on July 7, 2023, and includes signatures from the Budget Representative, Project Manager, Contract Manager, and Contract Authority of FDEP, as well as the consultant.
The scope of work requires Ayres Associates to provide yearly engineering reports on the condition of waterslides at Weeki Wachee Springs State Park, consisting of two inspection tasks. Task 1 involves a field inspection of the water slide tower, Pirates Revenge slide, and Cannonball slide between October 2-13, 2023, with a report due by October 27, 2023. Task 2 involves a post-repair inspection between January 29 and February 9, 2024, with deliverables including a signed and sealed Affidavit of Compliance due by February 16, 2024. The fixed price cost is $3,634.70 (comprising labor hours for a Project Manager at $375.85, Sr. Structural Engineer at $432.60, and Structural Inspector at $1,008.90 per task), with reimbursable costs of $85.44 for mileage, bringing the overall total cost to $3,720.14. The original task execution date was August 14, 2019, with an original end date of July 31, 2020, extended by this change order to July 31, 2024.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN205 TA07 04 61253
Weeki Wachee Springs State Park Waterslide Engineering Inspections
Ayres Associates, Inc.
Hisham Sunna, PhD, PE 813-978-8688 sunnah@ayresassociates.com
Ralph Perkins 850-245-2460 Ralph.Perkins@FloridaDEP.gov
Provide yearly engineering report on the condition of the waterslides at Weeki Wachee Springs per proposal dated May 2, 2023.
$ 42.72 $ 1,220.14 $ 1,262.86 $ 341.76 $ 13,354.84 $ 13,696.60 $ 85.44 $ 3,634.70 $ 3,720.14 $ 427.20 $ 16,989.54 $ 17,416.74
08/14/2019
07/31/2020
07/31/2023
07/31/2024
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.06.28 15:26:10 -04'00'
Richard Rowe for Stephen Pindel Richard J. Rowe Digitally signed by Richard J.
Rowe Date: 2023.06.30 13:38:34 -04'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.07.05 10:41:30 -04'00'
Hisham Sunna, PhD, PE Hisham N Sunna Digitally signed by Hisham N Sunna Date: 2023.07.05 12:23:50 -04'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.07.07 16:20:18 -04'00'
61253 37504000281 080039/22 423001 U3200 131500 QK $ 3,720.14
$ 3,720.14
May 02, 2023
Stephen Pindel Construction Project Consultant II Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399
RE: CN205, Task Assignment Number 07, Change Order 04
Weeki Wachee Springs State Park Water Slide Inspection
Dear Mr. Pindel;
For your review, Ayres Associates, has provided a proposal summary and man-hour documentation for the services tasks identified below:
Schedule:
1. Ayres Associates will provide an inspection of the slide tower, Pirates Revenge slide and the Cannonball slide between October 2, 2023, and October 13, 2023. The report will be due by October 27, 2023 and used as the bidding scope of work.
2. Ayres Associates will provide inspection of slide structure between January 29, 2024, and February 9, 2024, to confirm completion of the repairs. The Affidavit of Compliance and will be completed and forwarded to the Department of Agriculture by February 16, 2024. Department of Agriculture inspection will be completed in the last (2) weeks of February 2024.
The Scope includes:
1. Provide complete inspection of Tower, Pirates Revenge slide, Cannonball slide and structure and provide an inspection report in a pdf and excel format.
2. Provide a signed and sealed Affidavit of Compliance to the Department of Agriculture and DEP.
Please review the attached Proposal Summary and deliverables.
Sincerely, Rick Maslyn, CBI Supervisor- Structural Inspection 813.318.1577 8875 Hidden River Parkway, Suite 200 Tampa, FL 33637
Project Description Weeki Wachee Springs State Park
CN205, Task Assignment Number 07, Change Order 04
Task 1: Slide Inspection and Report Deliverable Description: Perform field inspection of Weeki Wachee Springs State Park Water Slide Tower, Pirate’s Revenge Slide and Cannonball Slide and provide inspection report to be used as basis for contractor bid repairs.
Deliverable:
• 1 – Inspect structure and provide one pdf, 8 ½ x 11, report deliverable to include list of defects, corrective actions taken since the prior inspection, and repair recommendations with photos and slide layout sketches. Report will also include an Excel Spreadsheet of repair recommendations, submitted by October 27, 2023.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 1 Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost Ayres Associates Project Manager 150.34 2.5 375.85 Ayres Associates Sr. Structural Engineer (PE) 144.20 3 432.60 Ayres Associates Structural Inspector (CBI) 100.89 10 1,008.90
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Postage $0 Printing $0 Overnight Travel (if applicable)
$0
Mileage (@ $0.445 per mile) Provide the calculation and number for trips and provide total estimated cost 48 mile trip from office to park and back (96 miles)
Reimbursable Total Cost $42.72 Total for Subtask 1: (Fixed Price Cost + Reimbursable)
Project Schedule:
Activity Duration (Calendar Days) Subtask 1 12 days. Between October 2, 2023, and October 13, 2023. The report will be due by October 27, 2023.
Task 2: Slide Inspection and Report Deliverable Description: Perform field inspection of Weeki Wachee Springs State Park Water Slide Tower, Pirate’s Revenge Slide and Cannonball Slide and provide inspection report to be used as basis for documentation/confirmation of contractor repairs.
Deliverable:
• 2 – Inspect structure and provide one pdf, 8 ½ x 11, report deliverable to include list of defects, corrective actions taken since the prior inspection, and repair recommendations with photos and slide layout sketches. Report will also include a signed and sealed Affidavit of Compliance and an Excel Spreadsheet of repair recommendations, submitted by February 17, 2023.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely. (Please do not alter this language)
Fixed Price Cost:
Subtask 2 Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost Ayres Associates Project Manager 150.34 2.5 375.85 Ayres Associates Sr. Structural Engineer (PE) 144.20 3 432.60 Ayres Associates Structural Inspector (CBI) 100.89 10 1,008.90
Reimbursable Cost: (if applicable – provide for each task in which reimbursables are required)
Postage $0 Printing $0 Overnight Travel (if applicable)
$0
Mileage (@ $0.445 per mile) Provide the calculation and number for trips and provide total estimated cost 48 mile trip from office to park and back (96 miles)
Reimbursable Total Cost $42.72 Total for Subtask 2: (Fixed Price Cost + Reimbursable)
Project Schedule:
Activity Duration (Calendar Days) Subtask 2 12 days. Between January 29, 2024, and February 9, 2024, to confirm completion of the repairs. The Affidavit of Compliance and will be completed and forwarded to the Department of Agriculture by February 16, 2024.
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1 $1,817.35 $42.72 Subtask 2 $1,817.35 $42.72
Total Fixed Price Cost: $3,634.70 Total Reimbursable Cost: $85.44
Overall Total Cost: $3,720.14 Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.
(Please do not alter this language)
| CN205 TA7 CO4 Weeki Wachee Springs - Waterslide Inspections.pdf |
| Ayres Associates_Task 07 Assignment_ Change Order 04_4.25.23_Rev050223.pdf |
| May 02, 2023 |