This document is a Task Assignment Notification Form and supporting proposal from the Florida Department of Environmental Protection (FDEP) dated November 6, 2020. The task assignment authorizes professional engineering services from Ayres Associates Inc. for the Lovers Key State Park Municipal Sewer Connection project located in Fort Myers Beach, Florida. The project is managed by FDEP's Bureau of Design and Construction under Contract No. CN205, Task Assignment No. 10, with Andy Carrier serving as the FDEP Project Manager and Chris Martin as the Consultant Representative.

The consultant shall provide permitting, onsite construction administration, permit closeout, and engineering services related to lift station capacity for the Lovers Key Sewer Main. The scope encompasses sixteen subtasks including federal, state, and local permitting; contractor submittal review; responses to requests for information during bidding and construction phases; preconstruction and progress meetings; construction observation and site inspections; lift station start-up documentation; substantial completion assessment; final warranty inspection; regulatory permit completion notification; as-needed engineering services; and visitor center coordination with lift station capacity verification. The fixed price cost is $70,689.92 with cost reimbursement not to exceed $1,325.70, for a total task amount of $72,015.62. Payment is due upon arrival of deliverables. The project completion date is July 30, 2021, with work to commence upon receipt of a Notice to Proceed.

View the file

Other files

File Type Posted
CN-370000-CN205-T12.pdf PDF
CN-370000-CN205-T6CO2.pdf PDF
CN-370000-CN205-T7.pdf PDF
CN-370000-CN205-T9.pdf PDF
CN-370000-CN205-T10CO1.pdf PDF
CN-370000-CN205-T2.pdf PDF
CN-370000-CN205-T3.pdf PDF
CN-370000-CN205-T5.pdf PDF
CN-370000-CN205-T8.pdf PDF
CN-370000-CN205-TA11.pdf PDF
CN-370000-CN205-CMC1.pdf PDF
CN-370000-CN205-CMC3.pdf PDF
CN-370000-CN205-T2CO2.pdf PDF
CN-370000-CN205-T6.pdf PDF
CN-370000-CN205-T7CO1.pdf PDF
CN-370000-CN205-T7CO3.pdf PDF
PC-370000-CN205.pdf PDF
CN-370000-CN205-A1.pdf PDF
CN-370000-CN205-CMC2.pdf PDF
CN-370000-CN205-T2CO1.pdf PDF
CN-370000-CN205-T3CO1.pdf PDF
CN-370000-CN205-T4.pdf PDF
CN-370000-CN205-T5CO1.pdf PDF
CN-370000-CN205-T6CO1.pdf PDF
CN-370000-CN205-T7CO2.pdf PDF
CN-370000-CN205-T7CO4.pdf PDF
CN-370000-CN205-TA1.pdf PDF
CN-370000-CN205.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN205 10 FDEP 60889C

Lovers Key State Park Municipal Sewer Connection

Ayres Associates Inc.

Chris Martin 813-558-3357 MartinC@AyresAssociates.com

Alyssa Skehan or successor 850-245-2781 Alyssa.Skehan@FloridaDEP.gov

Consultant shall provide permitting, onsite construction administration, permit closeout, and engineering services related to the lift station capacity for the Lovers Key Sewer Main. See attached proposal dated November 6, 2020.

Andy Carrier or successor

Upon execution $ 70,689.92 7/30/2021 $ 1,325.70

$ 72,015.62

Greg Turral

Andy Carrier Andrew J Carrier Digitally signed by Andrew J Carrier Date: 2020.11.10 11:47:11 -05'00'

Alyssa Skehan Alyssa Skehan Digitally signed by Alyssa Skehan Date: 2020.11.10 13:59:01 -05'00'

Hisham N. Sunna Digitally signed by Hisham N Sunna Date: 2020.11.11 07:59:56 -05'00'

Michael W. Foster Jr. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2020.11.12 15:23:43 -05'00'

60889C 37504000193 080039/20 423001 U3200 131500 QK $ 72,015.62

$ 72,015.62

Gregory Turral Digitally signed by Gregory Turral Date: 2020.11.10 11:29:06 -05'00'