DI-SESS-81785 Systems Engineering Management Plan

View the file

Other versions and copies of DI-SESS-81785

Who attaches DI-SESS-81785

Other files

File Type Posted
A020_DID_DI-IPSC-81427A_Software_Development_Plan_(SDP).pdf PDF
A076_DID_DI-SAFT-80102B_Safety_Assessment_Report_(SAR).pdf PDF
A025_DID_DI-IPSC-81433A_Software_Requirements_Specification_(SRD).pdf PDF
A092_DID_DI-MGMT-81861_IPMR.pdf PDF
A088_DID_DI-ISPC-81436A_IDD.pdf PDF
A089_DID_DI-SESS-81766_Airworthiness_Specification.pdf PDF
A029_DID_DI-IPSC-81440A_Software_Test_Report_(STR).pdf PDF
A050_DID_DI-NDTI-81284_Test_and_Evaluation_Program_Plan.pdf PDF
A045_DID_DI-MISC-80508B_Technical_Report-Study_Services.pdf PDF
A023_DID_DI-IPSC-81431A_System_Susbsystem_Specification_(SSS).pdf PDF
A096_DID_DI-MISC-81283_Spec_Rqmt_Ver_Matrix.pdf PDF
A099_DID_DI-ADMN-80239_Information_Sys_Accreditation_Doc.pdf PDF
A106_DID_DI-MISC-81454C_ACPIN_Data_and_Control_Record.pdf PDF
A101_DID_Open_Skies_Digital_Visual_Imaging_System_(DVIS)_TM-86-01P_Rev.1.pdf PDF
A037_DID_DI-MGMT-80033A_Site_Preparation_Requirements_and_Installation_Plan.pdf PDF
A094_DID_DI-MGMT-81334D_CWBS.pdf PDF
A080_DID_DI-SESS-81000E_Product_Drawings_Models_and_Associated_Lists.pdf PDF
A083_DID_DI-NDTI-80603A_Test_Procedure.pdf PDF
A097_DID_DI-DRPR-81961_Engineering_Drawing_Tree.pdf PDF
A024_DID_DI-IPSC-81432A_SystemSubsystem_Design_Description_(SSDD).pdf PDF
A090_DID_DI-NDTI-80566A_Test_Plan.pdf PDF
A087_DID_DI-CMAN-81248A_ICD.pdf PDF
A028_DID_DI-IPSC-81439A_Software_Test_Description_(STD).pdf PDF
A040_DID_DI-MGMT-80368A_Status_Report.pdf PDF
A002_DID_DI-ADMN-81250A_Conference_Minutes.pdf PDF
A049_DID_DI-NDTI-80809B_Test_Inspection_Report.pdf PDF
A091_DID_DI-MGMT-81468_Contract_Funds_Status_Report.pdf PDF
A084_DID_DI-IPSC-81434A_Interface_Requirements_Specification_(IRS).pdf PDF
A103_DID_DI-ILSS-80872_Training_Materials.pdf PDF
A011_DID_DI-CMAN-81022C_Configuration_Audit_Summary_Report.pdf PDF
A095_DID_DI-MGMT-81808_Contractor's_Risk_Management_Plan.pdf PDF
A001_DID_DI-ADMN-81249A_Conference_Agenda.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Systems Engineering Management Plan (SEMP)

Number: DI-SESS-81785 Approval Date: 20091014 AMSC Number: D9101 Limitation: None DTIC Applicable: No GIDEP Applicable: No Preparing Activity: SE Applicable Forms: N/A

Use/relationship: The SEMP describes the contractor's technical approach and proposed plan for the conduct, management, and control of the integrated systems engineering effort. It shall be consistent with the government Systems Engineering Plan (SEP), if available.

The SEMP content may be tailored depending on the scope, purpose, and the acquisition phase of the program. The contractor’s SEMP shall contain the annotated mapping between contractor and government SE processes. The government SE processes may be noted in the SEP. The SEMP shall also show alignment of contractor and subcontractor SE processes.

This Data Item Description (DID) contains content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.

This DID supersedes DI-MGMT-81024.

Requirements:

1. Reference documents. OSD’s SEP Preparation Guide.

2. Format. The SEMP format shall be selected by the contractor.

3. Content. The SEMP shall describe the contractor’s planned systems engineering approach to meeting the program’s contract, objectives, and overall technical and management approach.

The SEMP shall describe the contractor’s detailed operational plan for executing systems engineering. It shall be consistent with the content of the government SEP.

4. In the absence of a government SEP, the SEMP topics should address, at a minimum, those in the Office of the Secretary of Defense Systems Engineering Plan Preparation Guide active at the time of the Request for Proposal. The SEMP shall also include:

a. Technical solution activities:

1) Development, documentation, maintenance, and communication of detailed system architectures (functional and physical) and detailed interfaces – both internal and external

2) Performance of trade studies for critical design decisions

Source: https://assist.dla.mil -- Downloaded: 2014-05-20T12:33Z Check the source to verify that this is the current version before use.

http://www.acq.osd.mil/sse/docs/SEP-Prep-Guide.pdf

DI-SESS-81785

3) Integration, verification, and validation

b. Related planning associated with application of the contractor’s systems engineering processes as tailored to meet the needs of the program and at a level of detail necessary for the contractor to manage and execute the technical effort. Details of process integration and communication with subcontractors and suppliers shall be provided.

c. Referenced lower-level and subcontractor technical plans, e.g., risk management, requirements management, data management, and configuration management, as determined necessary by the contractor to plan and execute a total systems engineering effort.

d. Other areas deemed necessary to execute systems engineering to meet the program’s contract, objectives, and overall technical and management approach.

END OF DI-SESS-81785