CMAR RFQP TAX COMM BUILDING _ RFP_2026_1545_0.pdf

PDF 984 KB Posted

Attached to
Construction Management at Risk Services - New Tax Commissioner Building
Solicitation number
PE-77197-NONST-2026-000000017
Issued by
Peach County, Georgia

About this file

CMAR RFQ/P Summary

This is a Request for Qualifications and Price Proposal (RFQ/P) issued by Pickens County Government in Georgia for Construction Management at Risk (CMAR) Services related to the Tax Commissioner Building Construction Project (RFP #2026-1545-001). The project involves the construction of a new 6,889 square foot, single-story building to house the offices of the Pickens County Tax Commission. The scope of work encompasses both a Preconstruction Phase and a Construction Phase, during which the selected Construction Manager will conduct project planning, estimating, value engineering, proposal package arrangements, individual trade contract awards, construction management through occupancy, and implementation of a one-year warranty period with inspections. A mandatory Pre-Proposal Conference and Site Inspection is scheduled for August 26, 2026, at 9:00 AM at the Pickens County Administration Building (1266 East Church Street, Jasper, Georgia 30143). Sealed proposals are due by 4:30 p.m. ET on September 11, 2026, submitted to Miranda McDowell, Finance Director. Proposing Firms must submit six hardcopy copies (one original, five copies) and one digital/PDF copy, with the price proposal in a separate sealed envelope. Pickens County will evaluate proposals using a five-step selection process including preliminary evaluation, interviews, committee evaluations, recommendations to the Board of Commissioners, and final selection.

The evaluation criteria allocate 20 percent to experience and workload, 10 percent to references, 20 percent to firm personnel experience, 20 percent to project approach, and 30 percent to price proposal. The Construction Manager will be "at-risk" and responsible for completing the project at a Guaranteed Maximum Price (GMP) and Guaranteed Delivery Date, both to be proposed by the selected firm. Project costs below the GMP revert to Pickens County, and the project will operate on an open-book basis with all savings, including unused contingency, returned to the County. The CM must provide Performance and Payment Bonds at 100 percent of the total proposal amount within 15 calendar days of notice of award. Insurance requirements include Commercial General Liability of at least $1,000,000 per occurrence, Workers' Compensation at statutory limits, Motor Vehicle Liability of at least $500,000, and Professional Liability of at least $1,000,000. Pickens County will retain 10 percent of payment until 50 percent project completion, then 5 percent through project completion. The successful proposing firm must be properly bonded, maintain current liability insurance, and comply with the Georgia Security and Immigration Compliance Act by participating in the E-Verify federal work authorization program.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice - Request for Qualifications and Price Proposal

DateIssued:August10,2026
RFQ/PTitle:ConstructionManagementatRiskServicesfortheTaxCommissionerBuilding
ConstructionProject
RFP#2026-1545-001

To all potential Proposing Firms:

ThisemailandtheattachedRequestforQuali:icationsandPriceProposal(“RFQ/P”)concernsthe
followingprojectbeingcommissionedbythePickensCountyGovernment(“PickensCounty”)under
thedirectionoftheBoardofCommissionersofPickensCounty,Georgia(“BOC”)anditsChairman:

Construction Management at Risk Services for the Tax Commissioner Building Construction Project

PickensCountyisseekingproposalsfromquali:iedProposingFirmsfortheperformanceof
constructionmanagementatriskservices(“CMARServices”)fortheTaxCommissionerBuilding
ConstructionProject(“Project”),whichwillconstitutetheconstructionofanewbuildingtohouse
theof:icesofthePickensCountyTaxCommission.

The Project will be comprised of a Preconstruction Phase and a Construction Phase.

ThesuccessfulProposingFirmwillserveasConstructionManager(“CM”)fortheProjectand,as
such,willperformCMARServicesduringtheProject.Inthisregard,theCMwillworkwithPickens
CountyandtheProjectArchitectinaprescribedmanneron:

1. Project planning

2. Project estimating

3. Value engineering

4. Arranging proposal packages

5. Awarding individual trade contracts and soliciting prior proposals related thereto

6. Managing construction until full occupancy is achieved

7. Implementing a one (1) year warranty and one (1) year warranty inspections

SealedproposalsfromProposingFirmsconcerningtheProjectwillbereceivedbyMiranda
McDowell,FinanceDirectorofPickensCounty,locatedat1266EastChurchStreetJasper,Georgia
30143,until4:30p.m.,legalprevailingtime,onSeptember11,2026.
Thereafter,inadesignatedroomandplace,atafuturetimetobedetermined,thenamesofthe
ProposingFirmswillbepubliclyread.Nofurtherinformationwillberead,discussedorprovided
untiltheevaluationofallsubmittedproposalshasbeencompletedintheprocessdescribedinthis
letterandtheRFQ/P.
Noextensionoftheproposalperiodwillbemadeotherthanbyaformalwrittenaddendummadeto
theRFQ/PbyPickensCounty.

Proposal submittal documents may be obtained by:

1. GoingtoPickensCounty'swebsiteatwww.pickenscountyga.gov;thenselecting"IWantTo..."
fromthetopnavigationmenu;then,under"Find,"selecting"BidOpenings";thenselecting
the"SPLOST"category;andthenselecting"ConstructionManagementatRiskServices–
NewTaxCommissionerBuilding."
2. ContactingtheFinanceDepartmentat1266EastChurchStreetJasper,Georgia30143,orvia
landlinephone706-253-8809toobtaintheinformationatnocharge.
PickensCountyreservestherighttorevise,clarify,interpret,oramendthisRFQ/Patanytimeby
writtenaddendum.AnyaddendumissuedshallbecomeapartoftheRFQ/Pandshallbepostedon
PickensCounty'sof:icialprocurementwebsite.Thiswebsiteisthesoleof:icialsourceforthis
RFQ/P,alladdenda,responsestoquestions,andanyotherprocurement-relatedcommunications.It
shallbethesoleresponsibilityofeachinterestedProposingFirmtomonitorthewebsiteandobtain
alladdendaandotherprocurement-relatedinformation.ProposingFirmsshallacknowledgereceipt
ofalladdendaintheirproposals.Failuretoacknowledgereceiptofanaddendummayresultina
proposalbeingdeemednon-responsive.Nooralstatement,interpretation,clari:ication,or
representationmadebyanyCountyof:icial,employee,consultant,orrepresentativeshallbe
bindingunlesscon:irmedthroughawrittenaddendumissuedbyPickensCounty.
ProposalsfortheProjectwillbeevaluated,andthepresumptiveselectionofasuccessfulProposing
Firmwillbepursuanttothefollowing:ive-stepprocess.
1. The:irststepwillconstitutethepreliminaryevaluationofproposalsubmissionsthatwill
produceashortlistofquali:iedProposingFirms.
2. ThesecondstepwillconstituteinterviewsofshortlistedProposingFirmsbya
RecommendationsCommittee.

3. The third step will constitute evaluations of the shortlisted :irms by the Recommendations Committee.

4. ThefourthstepwillconstitutethemakingofrecommendationsbytheRecommendations
CommitteetotheBOCbytheBOC’sconsiderationtowardaselection.
5. The:ifthstepwillconstitutetheselectionbytheBOCofthesuccessfulProposingFirmto
serveasCMontheProject.

All evaluations, recommendations and the BOC’s selection will be based on:

1. Qualitativefactorsincluding,butnotlimitedto,theabilityoftheprofessionalstaff,approach
toproject,experienceonsimilarprojects,performanceonpastprojectsandreferencesfor
thesameCMARServicesprovidedtootherclientsinsimilarsituations.

2. The quantitative factor of fees and costs.

AnyrecommendationbytheRecommendationsCommitteeand/ortheultimateawardofacontract
bytheBOCwillnotbesolelybasedonlowproposedfeesandcosts,butalsoonquality,references
andothersubjectivecriteriaasmaybedeemedanddeterminedasnecessaryintheirrespective
solediscretions.
AMandatoryPre-ProposalConference/SiteInspectionwillbeconductedonAugust26,2026
beginningat9AM.ThemeetingwillbeheldatthePickensCountyAdministrationBuildinglocated
at1266EastChurchStreetJasper,Georgia30143.Thismeetingismandatoryforproposal
submissioneligibility.
PickensCountywillassumenoresponsibilityforrepresentationsorunderstandingsconcerning
conditionsmadebyitsof:icialsoremployeesunlesstheyareincludedintheRFQ/P.
Allproposalswillbeevaluatedinaccordancewithapplicablerules,regulations,andlawstowhich
PickensCountyissubject.

Thank you for your interest in this RFQ/P.

MirandaMcDowell
ChiefFinancialOf:icer
PickensCountyGovernment

PICKENS COUNTY GOVERNMENT

REQUEST FOR QUALIFICATIONS AND PRICE PROPOSALS

RFP #2026-1545-001

TaxCommissionerBuilding
ConstructionProject

Construction Management at Risk Services

[ PAGE 2 OF 33 ]

Table of Contents

I. General Project Information

II. The Selection of the Construction Manager

III. Substantive Contractual Provisions

IV. General Contract Information

Af;idavit and Exhibits

S.A.V.E. Program Af;idavit

Exhibit A – Indemnity

Exhibit B – Construction Manager Price Proposal Forms and Cost Estimate Form

[ PAGE 3 OF 33 ]

I. General Project Information

A. ThePickensCountyGovernment(“PickensCounty”),operatingunderthedirectionoftheof
theBoardofCommissionersofPickensCounty,Georgia(“BOC”)anditsChairman,is
solicitingproposalsfromquali:ied:irms(“ProposingFirms”)toprovideConstruction
ManagementatRiskServices(“CMARServices”)fortheTaxCommissionerBuilding
ConstructionProject(“Project”).1
B. ProposingFirmsmustrespondtothisRequestforQuali:icationsandPriceProposal
(“RFQ/P”)tobeconsideredforselectionastheConstructionManager(“CM”)thatwill
provideCMARServicesontheProject.
C. ByrespondingtothisRFQ/P,aProposingFirmrepresentstoPickensCountythatitis
properlyquali:iedandfullyexperiencedtoperformtheCMARServicesapplicabletoall
functionsdescribedhereinandthatitisproperlystaffed,equipped,organizedand:inanced
toperformsuchfunctions.
D. TheProjectwillbecomprisedoftheconstructionofanew6,889squarefoot,single-story
TaxCommissionerBuilding.

E. Design documents can be accessed by email inquiry to the following email address:

pmillard@DCCM.com.

F. ThePreconstructionPhaseandtheConstructionPhaseoftheProjectwillrespectively
commenceatthetimesthatPickensCountydeemsappropriatebasedonfactorsdeemed
relevantbyPickensCounty.
G. TherewillbenopenaltytoPickensCountyconcerningtheconstructiondateoftheProject
orthenonconstructionoftheProjectinwholeorinpart.
H. TheobjectiveoftheworktobeperformedbytheCMwillbetheef:icient,economical,and
timelydeliveryoftheProjectresultingfromthequalitydrivenmanagementofongoingand
ultimatelycompletedprojectconstructionwithintimelimitations,withincostlimitations
andinaccordancewithestablishedqualityrequirements.
I. ThescopeoftheworktobeperformedbytheCMduringthePreconstructionPhaseandthe
ConstructionPhaseoftheProjectwillincludeworkingwithPickensCountyandtheProject

1 Design Services have already been engaged on the Project.

[ PAGE 4 OF 33 ]

Architect in the conduct of the following activities:

1. Project planning

2. Project estimating

3. Value engineering

4. Arrangements of proposal packages for individual trade contracts

5. Evaluating individual trade contract proposals and awarding individual trade contracts

6. Management of construction until occupancy and/or functionality is achieved

7. Implementation of the one (1) year warranty and one (1) year warranty inspection

[ PAGE 5 OF 33 ]

II. The Selection of the Construction Manager

A. The Five-Step Process of Evaluating Proposing Firms and Selecting the CM

1. Step One - Preliminary Evaluations

a. Countystaff,underthedirectionoftheChairmanoftheBOC,willevaluatethe
proposalsandquali:icationspresentedbytheProposingFirmsand“short-list”the
top:irmsforfurtherconsideration.
b. Tobedeemedeligibleforevaluation,ProposingFirmsmustmeetthefollowing
minimumquali:ications:
i. AProposingFirmmusthavesuf:icientbondingcapacityfortheanticipated
totalcostofwork.
ii. AProposingFirmmusthaveacurrentContractor’sPublicLiabilityInsurance
policyandmustbeinsurableinthefollowingamounts:[n]Bodilyinjury,
includingdeath-limitsof$1,000,000foreachaccident;[n]Propertydamage-
limitsof$2,000,000foreachaccidentand$10,000,000fortheaggregateof
operations;and[n]Workers’Compensation:Statutorylimitsasrequiredby
Georgialaw,includingEmployer’sLiabilityof$500,000/$500,000/$500,000.
Contractorsclaimingexemptionmustprovideacceptabledocumentationof

exemption.

iii. PickensCountyreservestherighttorequireadditionallimitsand/orcoverage
foractualcontract.

2. Step Two - Interviews

Countystaffwillscheduleandconductinterviewsofthe“short-listed”ProposingFirms
ifitdeemsnecessarytofurthervetthem.

3. Step Three - Evaluations for Recommendations

a. AfterCountystaffnarrowthe:ieldofProposingFirmstothemostquali:ied
candidates,PriceProposalsofthe“short-listed”candidatewillbereviewedand

evaluated.

[ PAGE 6 OF 33 ]

b. The following criteria will be used as the basis for the evaluation of the proposals:

i. Experience and Workload 20%

ii. References 10%

iii. Firm Personnel Experience 20%

iv. Project Approach 20%

v. Price Proposal 30%

§§ Total Possible Score 100%

4. Step Four - Recommendations

CountystaffwillmakerecommendationsofProposingFirmstotheBOCthatitbelieves
arethemostquali:iedtoserveasCMontheProject.

5. Step Five - Selection

a. The BOC will consider and act upon the recommendations received from County staff.

b. TheBOCreservestherighttorejectanyandallproposalsortoselectanyProposing
FirmtoserveasCMontheProject.
c. ShouldtheBOCchoosetoproceedforwardbyselectingaProposingFirmtoserveas
CMontheProject,theBOCwillseektoconcludeanAgreementwiththeProposing
FirmandexecuteacontracttherewithinconjunctionwiththisRFQ/P.
d. AnundersignedpartyofaProposingFirmonaproposalexpresslyunderstandsthat
theproposalofhisorherProposingFirmmayberejectedbyPickensCountyforany
reasonwithoutliabilityonpartofPickensCountytotheProposingFirmortothe
undersignedparty.

[ PAGE 7 OF 33 ]

B. Nondiscrimination

AnyrecommendationorselectionmadeasaresultofthisRFQ/Pwillbemadewithout
regardtosex,race,creed,religion,color,nationalorigin,age,veteranormilitarystatus,
sexualorientation,genderexpressionoridentity,disability,ortheuseofatrainedservice

animal.

C. Content and Format of Proposals

Theproposalsmustcontainthefollowinginformationandmustbesubmittedintheformat
prescribedinthebalanceofthissubsection.2

1. Introductory Information

a. Firm name

b. Business address

c. Contact name

d. Former :irm names

e. Out-of-state of:ices

f. The names of all af:iliated entities

g. Thenamesofanyaf:iliatedentitiesand/orjointventurepartnerswhichmaybe
involvedintheProject

h. Statement of which of:ice(s) will handle the service, if multiple of:ices.

i. AclearandconcisestatementastowhyPickensCountyshouldselecta
particularProposingFirmtoprovidetherelevantservice.
2Thefailuretomeettherequirementsimposedbythissubsectionwillbeconsidered“non-responsive,”andtheentire
submittedproposalwillberejected.

[ PAGE 8 OF 33 ]

j. Alistingofanylitigations,arbitrations,ormediationsinwhichthe:irmorany
af:iliatedentitieshasbeeninvolvedinthepast:ive(5)yearsinvolvingclaimsfor
morethan$50,000.00madebyaclientagainstthe:irmorbythe:irmagainst
theclient,andindicatethedispositionofeachclaim,thenameoftheadverse
party,andthenatureoftheclaim.
k. Statementthattheproposalwillremainineffectforandnotbewithdrawnfor
ninety(90)daysafterthedateduetoPickensCounty.
l. StatementacknowledgingthereceiptofeachandeveryaddendumthatPickens
CountymayissuetotheRFQ/P.
m. Statementthat,ifinitiallyselected,theProposingFirmwillnegotiateingood
faithwithPickensCounty.

2. Experience, Current Workload and ConNlicts of Interests

a. Experience and References of the Firm

Provideaminimumof:ive(5)toamaximumoften(10)exampleprojectsthat
demonstratetheProposingFirm’sexperienceinthepast:ive(5)yearsasCMfor
constructingfacilitiessimilartothisProject,includingthefollowinginformation
foreachexampleprovided:

i. Project name, location and dates during which services were performed

ii. Briefdescriptionofprojectandphysicaldescriptionwithsquarefootage,
numberofstories,siteareaandothersimilarrelevantinformation

iii. Total cost of the project

iv. Services performed

v. Project photographs

vi. WrittenreferencefromtheArchitect/Client/User,withcurrentphone
numbers,familiarwithyourperformanceoneachprojectlisted,including
aProgramManagerreference,ifapplicable.

[ PAGE 9 OF 33 ]

vii. AlistoftheindividualswhoservedastheProjectExecutive/Director,
ProjectManager,Superintendent,CostEstimatorandotherkeyroleson
theproject.3
viii. Thetotalquantityofchangeordersandnettotalcostincreaseofchange
orderstotheproject.
ix. Summaryoftheactualscheduleperformancerelativetotheinitialproject
schedulefortheproject.
x. ThenameofaClientrepresentative,withacurrentphonenumber,whois
mostfamiliarwithyour:irm’sperformanceoneachproject.
xi. Anexampleofanaquaticcenterandoutdoorpoolprojectcompletedby
your:irmand/oraquali:iedconstructionmanagementpartner.

b. Experience of Involved Firm Personnel

Provide the following:

i. Adescriptionofyour:irm'sproposedinternalteamorganizationasCMfor
theconstructionmanagementteamfortheProject,includingany
Superintendent,ProjectManager,ProjectDirector,CostEstimator,Project
ExecutiveandanyotherkeyparticipantsintheProject.4

Include an organizational chart.

ii. Aresumeandexperiencerecordforeachteammember,includingyearsof
experience,education,andanticipatedamountoftimeeachwillworkon
theProjectandlocationofeachperson.
iii. Identifytheindividualwho,fromstartto:inish,willbetheleaderofyour
constructionteamandtheprincipalpointofcontactbetweenyour:irm
andPickensCountyandtheProjectArchitect.
3Pleasenotewhethertheseindividualsarestillemployedwithyourfirm.
4Thisdisclosuremustincludeemployeesofanyaffiliatedentityorjointventurepartnerthatwillormightbeinvolvedin
theProject.

[ PAGE 10 OF 33 ]

c. Current Workload

Providealistofcurrentcontracts,withpercentagecompleted,andthetotal
possibleworkloadforthepersonnelproposedfortheProject.

d. ConNlicts of Interest

Providealistofanycon:lictsofinterestorpotentialthatyour:irmorpersonnel
mayhavewithPickensCountyoritsof:icialsoremployees.

2. Construction Management Approach

Provideadetaileddescriptionandoutlineofthestrategyandapproachthatthe:irm
proposestoapproachandcompletetheproposedCMARServices.
a. Includesuf:icientdiscussionofproposedvalueservices,methodologies,
techniques,andproceduresforeachworkreferencedintheaforementioned
scopeofwork.
b. Describehowyour:irmmanagescost,procurementandworkforce,schedule,
quality,andsafety.

c. Provide a timeline schedule for execution of work and completion of the Project.

3. Price Proposal

a. APriceProposalmustbesubmittedalongwiththeProposalbutinaseparate
sealedenvelopeseparateandapartanyotherproposalinformationrelatedto
theProject.
b. InthePriceProposal,eachProposingFirmmustprovidethefollowingin
relationtotheCMARServicesthatitwilldeliverrelatedtothePreconstruction
andConstructionPhasesoftheProject:

i. A percentage fee to be mutually agreed upon by Pickens County and the CM.

ii. Promptpaymentdiscountsofferedforaperiodoflessthan:ifteen(15)days
willnotbeconsideredindeterminingthelowestproposedfeeandcosts.
iii. AGuaranteedMaximumPrice(“GMP”)forthecostoftheconstructionofthe
twocomponentsoftheProjectbasedonthedesigndocuments,withthe

[ PAGE 11 OF 33 ]

supportandassistanceoftheProjectArchitect.throughwhichtheCMwill
assumeresponsibilityforthecostsofconstructionconductedduringthe

Project.

c. TheFeeProposalForms,ExhibitB,attachedtothisRFQ/P,mustbesubmittedby
eachProposingFirm.
i. Detaileditemizationofeachfeeproposalmustbeattachedtotherespective
FeeProposalForm.
ii. Additionally,witheachfeeproposal,provideacostestimatefortheProject
basedupontheDesignDevelopmentDocuments.

The Cost Estimate Form is included as part of Exhibit B.

d. Promptpaymentdiscountsofferedforaperiodoflessthan:ifteen(15)dayswill
notbeconsideredindeterminingthelowestproposedfeeandcosts.

D. Submission and Receipt of Proposals

1. Proposing Firms should submit six (6) hardcopy copies of their proposal:

a. One (1) of which must be marked “Original”

b. Five (5) marked as “Copy”

2. In addition, one (1) copy must be submitted in digital format or in PDF format.

3. ThePriceProposalmustbesubmittedinaseparatesealedenvelopeatthetime
proposalsaresubmitted.
4. Allproposalsareduenolaterthan4:30p.m.ETonSeptember11,2026.andmustbe
senttothefollowingaddressbycourierserviceand/ormail:
CourierService(FedEx,UPS)orHandDelivery
PickensCountyGovernmentAttn:MirandaMcDowell,FinanceDirector
1266EastChurchStreet
Jasper,GA30143

[ PAGE 12 OF 33 ]

5. PickensCountyacceptsnoresponsibilityforanyexpensesincurredbyProposingFirms
respondingtothisRFQ/PassuchexpensesaretheresponsibilityoftheProposing

Firms.

6. ProposalssubmittedafterthedeadlineofSeptember11,2026,willnotbeaccepted
underanycircumstances.

a. Such proposals will be returned to the sender unopened.

b. Faxed or emailed quali:ications are not acceptable.

7. Proposalsmustbeboundandcontainamaximumof:ifty(50)pages(coverpage,
schedule,andsectiondividersarenotincludedintotal).

8. All questions regarding this RFQ/P must be submitted in writing via email to:

mmcdowell@pickenscountyga.gov

9. All proposal responses become the property of Pickens County and will not be returned.

10. Noproposalmaybewithdrawnforaperiodofninety(90)daysaftertimehasbeen
calledonthedateofopening.
11. Allquali:icationsubmittalswillbeevaluatedinaccordancewithapplicablePickens
CountyrulesandFederal,Georgiaregulations,andlaws.
12. Evaluationof:irmssubmittingstatementsofquali:icationfortheProjectwillbebased
onquali:ications,experience,andperformanceonpastprojectsalongwithreferences.
13. Duringtheevaluationprocess,PickensCountyreservestheright,whenitmayserve
PickensCounty’sbestinterest,torequestinformationorclari:icationfromProposing
Firmsortoallowcorrectionsoferrorsoromissions.

E. Exceptions to SpeciNications

1. AnyawardresultingfromthisRFQ/PwillbindthesuccessfulProposingFirmtoall
terms,conditions,andspeci:icationssetforthintheRFQ/P.

2. Proposing Firms whose Proposals do not conform must note that on a separate page if necessary.

[ PAGE 13 OF 33 ]

3. WhilePickensCountyreservestherighttomakeanawardtoanonconforming
ProposingFirm,wheninitsbestinterest,suchawardswillnotbereadilymade,and
ProposingFirmsareurgedtoconformtothegreatestextentpossible.
4. NoexceptionswillbeconsideredtohavebeentakenbyaProposingFirmunlessitis
properlysetoutasprovidedabove.
5. NoexceptionwillbedeemedtohavebeentakenbyPickensCountyunlessincorporated
inanawardresultingfromthisRFQ/Pandsostated.

F. Questions and Requests for Interpretations

1. AllquestionsandrequestsforinterpretationoftheRFQ/Pmustbeinwritingand
receivedatleastten(10)calendardayspriortothetimesetforopeningofproposalsin
writingviaemailviaemailtommcdowell@pickenscountyga.gov.
2. Responsestoquestions,clari:ications,andanyresultingchangestotheRFQ/Pwillbe
issuedbywrittenaddendumandpostedonthePickensCountywebsite.
3. Itwillbetheresponsibilityofinterestedpartiestoperiodicallycheckthiswebsitefor
anynewinformation.
4. NoresponsestoquestionsorinterpretationsoftheprovisionsofthisRFQ/Pwillbe
madetoanyinterestedpartyorally.
5. PickensCountywillassumenoresponsibilityforrepresentationsorunderstandings
concerningconditionsmadebyitsof:icialsoremployeesunlesstheyareincludedinthe

RFQ/P.

G. Addenda and ClariNications

1. PickensCountyreservestherighttorevise,clarify,interpret,amend,orotherwise
modifythisRFQ/Patanytimebywrittenaddendum.
2. AlladdendashallbecomepartofthisRFQ/PandshallbepostedonPickensCounty's
of:icialprocurementwebsite.Thiswebsiteshallbethesoleof:icialsourceforthis
RFQ/P,alladdenda,responsestoquestions,andanyotherprocurement-related

communications.

[ PAGE 14 OF 33 ]

3. ItshallbethesoleresponsibilityofinterestedProposingFirmstomonitorthewebsite
andobtainalladdendaandrelatedprocurementinformation.
4. ProposingFirmsshallacknowledgereceiptofalladdendaintheirproposals.Failureto
acknowledgereceiptofanaddendummayresultinaproposalbeingdeemednon-
responsive.ThisrequirementsupplementsSectionII.C.1.l.
5. Nooralstatement,interpretation,clari:ication,representation,orinstructionbyany
Countyof:icial,employee,consultant,architect,orrepresentativeshallbebindingunless
incorporatedintoawrittenaddendumissuedbyPickensCounty.
6. Requestsforchanges,clari:ications,orinterpretationsofthisRFQ/Pmustbesubmitted
inwritingandreceivedatleastten(10)calendardayspriortotheproposalduedate.
7. PickensCountyreservestherighttoextendtheproposalduedate,reviseprocurement
deadlines,ormodifyanyrequirementofthisRFQ/Pbywrittenaddendum.

H. Pre-Proposal Conference/Site Inspection RFQ/P

1. ThePre-ProposalConference/SiteInspectionisamandatoryrequirementtosubmita
proposalifapplicable.
2. TheMandatoryPre-ProposalConference/SiteInspectionwillbeconductedonAugust
26,2026beginningat9AM.
3. ThemeetingwillbeheldatthePickensCountyAdministrationBuildinglocatedat1266
EastChurchStreetJasper,Georgia30143.
4. PickensCountywillassumenoresponsibilityforrepresentationsorunderstandings
concerningconditionsmadebyitsof:icialsoremployeesunlesstheyareincludedinthis

RFQ/P.

5. AnyinformationpresentedatthePre-ProposalConference/SiteInspection,including
meetingnotes,questionsraisedbyattendees,responsesprovidedbyPickensCounty,
interpretations,clari:ications,corrections,orrevisionstothisRFQ/P,willbe
documentedandissued,asdeterminedappropriatebyPickensCounty,througha
writtenaddendum.

[ PAGE 15 OF 33 ]

OnlyinformationcontainedinawrittenaddendumissuedbyPickensCountyshallbe
bindinguponPickensCounty.

I. Signing of Proposal

Thefailuretosigntheproposalonacoverletterin“originalform”providedwithaproposal
willresultintheproposalbeingdeclaredas“nonresponsive”andnotconsideredforaward.

J. Proposal Acceptance Time

ProposalsrequiringacceptancebyPickensCountyinlessthanninety(90)calendardays
couldberejected,unlesssostatedandacceptedbyPickensCounty.

K. Proposal IdentiNication

Allproposalsmustbereturnedinasealedenvelopewiththefollowinginformationinthe
lowerleft-handcorneroftheenvelope:RFPNumber/openingdate.

L. Withdrawal of Proposals

1. Proposalsmaybewithdrawnbywrittenrequestonlyiftherequestisreceivedpriorto
thetimeanddatesetfortheopeningofproposals.
2. NegligenceonthepartoftheProposingFirminpreparingitsproposalconfersnoright
ofwithdrawalormodi:icationofitsproposalaftertheproposalhasbeenopened.
3. Noproposalmaybewithdrawnforaperiodofninety(90)daysaftertimehasbeen
calledonthedateofopening.

G. Right to Retain Proposals and Utilize Ideas

PickensCountywillhavetherighttoretainallsubmittedproposalsandtouseanyidea(s)
containedthereinwithoutregardtowhetheranyproposalisselectedorrejected.

H. GMP Related Data and Information

Priortotheaward,theCMwillsharewithPickensCountythedraftand:inalcalculations,
estimatesandalldocumentsonwhichtheCM’sproposedGMPisbased.

[ PAGE 16 OF 33 ]

M. Award of the Contract

1. AwardwillbemadetothatProposingFirmwhoseproposal,conformingtotheRFQ/P,
willbemostadvantageoustoPickensCountyconsideringallfactorsanalyzed.
2. PickensCountyreservestherighttorejectanyand/orallproposalssubmittedandto
waiveanytechnicalities,informalitiesminorirregularitiesinsubmittedproposals.
3. Awrittenawardmailed(orotherwisefurnished)willbedeemedtoresultinabinding
contractwithoutfurtheractionbyeitherparty.
4. Anyawardedcontractorcontractswillbeonalumpsumbasisorindividualitembasis,
whicheverisfoundtobeinthebestinterestofPickensCounty.

N. Proposal Results

Interestedpartiesmayrequest,inwriting,aproposaltabulationaftertheRFQ/Phasbeen
approvedbyPickensCounty.

[ PAGE 17 OF 33 ]

III. Substantive Contractual Provisions

ThecontractthatwilleffectuatetheAgreementbetweenPickensCountyandthesuccessful
ProposingFirmwillcontainthefollowingnon-exclusivelistofsubstantiveprovisions.

A. At-Risk Nature of CM

TheCMwillbe“atrisk”intheproposedundertakingandwillberesponsiblefor
completingtheProjectattheGMPandbytheGuaranteedDeliveryDate(“GDD”),both
providedbythesuccessfulProposingFirmattheappropriatetimes.

B. Project Costs Less Than the GMP

Should the :inal cost of the Project be less than the GMP, all savings will revert to Pickens County.

C. Bonds

The CM will be required to provide the following bonds:

1. Payment and Performance Bonds

a. PickensCountywillrequiretheselectedCMtofurnishaPaymentBondanda
PerformanceBond,eachinanamountnotlessthan(100%)onehundred
percentofthetotalproposalamountawardedpriortobeingissueda"notice
toproceed"onceaGMPhasbeendeterminedunderacontractissuedasa
resultoftheRFQ/P.
b. Thebondsmustbesubmittedwithin(15):ifteencalendardaysafterbeing
furnishedwitha"noticeofaward"orupondeterminationoftheGMP.

c. All bonds must be written on a surety company licensed to do business in Georgia.

d. Failuretosupplybondswillforceyourproposaltobedeclared“non-
responsive”andnotbeconsideredforaward.

2. Bid Bond

Bid Bonds will not be required for the Project.

[ PAGE 18 OF 33 ]

D. Open-Book Project

TheProjectwillbeopen-bookandallsavings,includingunusedcontingency,willbe
returnedtoPickensCounty.

E. GMP Package

InconjunctionwithSubsectionA,theCMwillsubmitaGMPpackagetoPickensCounty
forreviewandapprovalforthetwocomponentsoftheProject,whichpackagemustbe
baseduponfeedbackfromtheprocessofinteractingwithindividualtradecontactors
solicitedbytheCMcomprisedof:

1. Arranging proposal packages

2. Developingrequirementstoensuretimemanagement,costmanagementand
qualitycontrolduringconstruction
3. Providinganestimatedprovisionalconstructionscheduleforissuancewiththe
proposalpackage

4. Advertising and distributing proposal documents

5. Generating proposer interest

6. Identifying quali:ied proposers

7. Scheduling and conducting pre-proposal conferences

8. Reviewing and analyzing proposals and recommending contract awards

9. Finalizing and awarding contracts

F. Project Schedule

The CM will also develop an overall Project schedule, which will also be a contractual obligation.

G. Commencement of Work

1. WorkwillcommenceonthePreconstructionPhasewithinten(10)calendardays
aftertheissuancebyPickensCountyofa“NoticetoProceed”ontheProject

[ PAGE 19 OF 33 ]

2. Commencementmustbedoneinaroutine,orderlymanneruntilcompletionand
acceptancebyPickensCounty.

H. Value Engineering, Maintainability and Constructability

DuringthePreconstructionPhaseoftheProject,theCMwillberesponsibleforpricing,
valueengineering,andmaintainabilityandconstructabilityissues.

I. Individual Trade Contracts

1. Individual trade contracts will be between the CM and independent trade contractors.

2. TheCMmustcompetitivelyselectallconstructionsubcontractsandotherwork
appropriateforcompetitiveselectionusingcostandotherfactors.

J. Retention of Pay Applications

PickensCountywillrequiretenpercent(10%)retainageuntil:ifty(50%)completion,
then:ivepercent(5%)retainagethroughouttheremainderoftheProjectandwill
releaseretainageatthepointof:inalcompletionand:inalacceptancebyPickens

County.

K. Termination of Project

PickensCountywillhavetheauthoritytosuspendorterminateperformanceofthe
Projectinwholeorinpart.

L. Project Planning

TheCMwillworkwithPickensCountyandtheProjectArchitecttoplantheProjectwith
planningtasksincluding:
1. Reviewingdesignconcepts,ideas,andsuggestionsofferedbyPickensCounty
andtheProjectArchitectwithregardtofeasibilityandconstructability.

2. Evaluating design with respect to constructability issues.

3. Evaluating value engineering opportunities.

4. Providing the following estimates for the two components of the Project:

[ PAGE 20 OF 33 ]

a. Design development

b. Fifty percent (50%) construction documents

c. One hundred percent (100%) construction documents (GMP)

M. Commencement of Construction

Constructionwillcommencewiththereleaseofdistinctworkpackagesbasedonthe
designdocuments.

N. Construction Phase Obligations of the CM

The CM’s assigned obligations regarding the Construction Phase of the Project will be as follows:

1. Submit a GMP package to Pickens County for review and approval.

2. TheGMPpackagewillbebaseduponproposalfeedbackfromtradecontractors
requestedbytheCM.

3. Maintain a system for review and approval of shop drawings.

4. MaintainrecordsandsubmitroutinereportstotheProjectArchitectand
PickensCounty.

5. Maintain quality control and ensure conformity to contract documents.

6. Providecostcontrolthroughprogresspaymentreviewandveri:ication
accordingtotheapprovedscheduleandcontractamounts.
7. Coordinationofpostcompletionactivities,includingtheassemblyofguarantees,
manuals,as-builtdrawings,andPickensCounty’s:inalacceptance.

8. Implement and coordinate the one (1) year warranty and one (1) year warranty inspection.

9. TheCMwillberesponsibleforallrequiredpermitsorlicenserequiredby
Federal,Georgiaandlocalregulatoryagencies.
10. APickensCountyandProjectArchitectWalk-Through(PunchList)musttake
placepriortosubstationcompletionacceptance.

[ PAGE 21 OF 33 ]

O. Payment

1. Paymentswillbemadeuponallitemscompletedeachmonthorcompletionofall
workandacceptancebyPickensCountyoninvoicessubmittedandapprovedbyan
appropriatePickensCountyrepresentative.-AllinvoicesmusthaveaPurchase
Order(PO)number.
2. Paymenttermsandprovisionshereinorotherwisefoundwithinthecontract
documentssupersedeallprovisionsoftheGeorgiaPromptPayAct(HB837;13
OCGAChapter11etseq.).
3. Promptpaymentdiscountsofferedforaperiodoflessthan:ifteen(15)dayswillnot
beconsideredindeterminingthelowestproposedfeeandcosts.
4. However,suchdiscounts,whenoffered,willbetakenprovidedpaymentismade
withinthetimespeci:ied.
5. Time,inconnectionwithdiscountsforpromptpayments,willbecomputedfromthe
dateofacceptanceofworkforwhichpaymentisclaimed,orthedatethecorrect
invoiceisreceivedbyPickensCounty,whicheverislater.
6. AllinquiriesregardingpaymentofinvoicesaretobedirectedtoAccountsPayableat
accountspayable@pickenscountyga.gov,ormailedtothefollowingaddress:
PickensCountyBoardofCommissioners
FinancialServicesDepartment
Attn:AccountsPayable1266EastChurchStreet,Suite162
Jasper,GA30143

P. CertiNicate of Insurance

The CM must procure the insurance speci:ied below during the life of the contract.

1. Workers’CompensationInsuranceforallemployeeswhoareengagedinthe
workunderthecontract.
2. PublicLiabilityandMotorVehicleLiabilityInsuranceasnecessarytoprotectit
whileperformingworkcoveredbythiscontractfromclaimsfordamageswhich
mayarisefromoperationsbyitsemployeesorbyanyotherpartydirectlyor
indirectlycontractedbyit.

[ PAGE 22 OF 33 ]

a. PublicLiabilityInsuranceinanamountnotlessthan$1,000,000onaccount
ofoneoccurrence.
b. MotorVehicleLiabilityInsuranceonallmotorvehiclesowned,leasedor
otherwiseusedbytheCMinanamountnotlessthan$500,000(combined
singlelimit)forbodilyinjuryincludingdeathandpropertydamage

combined.

c. Professional Liability Insurance in an amount not less than $1,000,000.

3. Involved insurance companies must be licensed to do business in the state of Georgia.

4. Anyprofessionalcerti:icateofinsurancecoveringtheworkrequiredaboveas
evidencethattheinsurancerequiredwillbemaintainedinforcefortheentire
durationoftheworkperformedunderthisAgreement.
5. ThecancellationofanypolicyofinsurancerequiredbythisAgreementmust
meettherequirementsofnoticeunderthelawsoftheStateofGeorgiaas
presentlysetforthinO.C.G.A.§33-24-44.
a. EachpolicyofinsurancerequiredunderthisAgreementmustprovidefor
noticerequirementsunderthelawsoftheStateofGeorgiaassetforthin
O.C.G.A.§33-24-44andbyendorsementmustprovidethatPickensCounty
willreceiveacopyofsaidnoticeofcancellation.
b. Acerti:icateofinsurancewithacancellationprovisionwhichprovidesfor
lessnoticethanthatrequiredbyO.C.G.A.§33-24-44,orwhichprovidesthat
failuretogivethewrittennoticewillnotImposeanyresponsibilityuponthe
insurer,willbeconsideredasanendorsementofthereferredtointhe
certi:icateandwillconstituteabasisforinsurancerejectionoftheinsurance
byPickensCounty.
c. Inadditiontoitsagreementtoobtainandmaintaintheinsuranceassetforth
hereinabove,theCMagreestoindemnifyandholdharmlessPickensCounty,
itsof:icials,agentsandemployeesfromanyandallclaimsagainstPickens
County,itsof:icials,agents,andemployees,whichariseoutofanyactor
omissionoftheCMoranyconsultantemployedbytheCMoranyofits
of:icers,agentsoremployees,andanyandallclaimswhichresultfromany

[ PAGE 23 OF 33 ]

conditioncreatedormaintainedbytheCMoranyconsultantretainedbythe
CMoranyoftheirof:icers,employeesoragents,whichconditionwhicha
resultofworkperformedunderthecontract.
d. Iftheinsuranceiscanceled,theCMmustdelivertoPickensCountynew
policiesofinsurance.ShouldtheCMneglecttoobtainandmaintaininforce
suchinsuranceanddeliversuchpolicyorpolicies,thenitmustbelawfulfor
PickensCountytoobtainandmaintainsuchinsurance.
Q. OtherSubstantiveRequirementsandConditions
Thecontractwillalsoincorporateothersubstantiverequirementsandconditionsas
statedinthisRFQ/P:

[ PAGE 24 OF 33 ]

IV. General Contract Information

A. Contract Execution

1. Subsequenttotheaward,thesuccessfulProposingFirmwillbepresentedwitha
contracttoeffectuatetheAgreementtoserveasCM.
2. PickensCountywillutilizeAIADocumentsA133-2019andA201-2017,asmodi:ied
byPickensCounty,astheproposedfortheProject.

3. The contract is to be executed within ten (10) calendar days of “Notice of Award.”

4. The date of presentation will be deemed to be the postmark date.

5. The CM’s proposal and this RFQ/P will be incorporated into the contract.

B. The CM is an Independent Contractor

Onceselected,theCMwillconstituteanindependentcontractorandnotasanagentof
PickensCountyintheperformanceofitsdutiesregardingtheProject.
1. Accordingly,nothingcontainedinthisRFQ/Poracontractresultingtherefrom
willbeconstruedtoconstitutetheCMoranyofitsemployees,agents,
contractorsorsubcontractorsasapartner,employeeoragentofPickensCounty
2. TheCMmust:inanceitsownoperationspursuanttoperformingitsduties
regardingtheProject.

C. ConNlicting Provisions

ShouldanyprovisionoftheRFQ/Pcon:lictwiththeprovisionofthecontract,the
provisionofthecontractwillprevail.

D. Assignment of Contractual Rights

TheCMwillnotassign,transfer,convey,orotherwisedisposeofacontractthatresults
fromthisRFQ/Poritsright,title,orinterestinortothesame,oranypartthereof,
withoutthewrittenconsentofPickensCounty.

[ PAGE 25 OF 33 ]

E. Non-Discrimination

TheCMandanyassociatedcontractorsandsubcontractorsmustprovideservicesina
mannerthatdoesnotdiscriminateonthebasisofsex,race,creed,religion,color,
nationalorigin,age,veteranormilitarystatus,sexualorientation,genderexpressionor
identity,disability,ortheuseofatrainedserviceanimal.

F. Americans with Disabilities Act (ADA)

1. TheCMandanyassociatedcontractorsandsubcontractorsmustcomplywith
PickensCounty’sADAnoticeandprocedures,whichareavailableuponrequestand
areaccessibleonPickensCounty’swebsite.
2. AnypersonwhorequiresaccommodationtoaccessPickensCounty’sservicesor
programsbecausetheyhaveaquali:ieddisabilitymaycontactPickensCounty’sADA
Coordinatorat706-253-8809fortyeight(48)hourspriortothescheduledeventor
assoonaspossibleifwithinthefortyeight(48)hourperiod.

G. Inclusion

Allitemsand/orservicesstandard,expected,necessary,and/orroutinetosuchaProject
asthisandnotactuallystatedinthisRFQ/PwillbetheresponsibilityoftheCMto
provideatnoothercosttoPickensCountyunlesssostatedontheCM’sproposalas
additionalcostitemsandacceptedbyPickensCountyatthetimeoftheawardand/or

contract.

H. Change Orders

1. Anyworkperformedoutsideofthecontractforwhichcompensationoverandabove
thecontract’stermsoccurs;mustbeconductedpursuanttoanaccompanying
changeorder.

2. Any and all change order requests made by the CM must be approved by Pickens County.

3. Shouldworkperformedoutsideofthecontractbeperformedbeforechangeorder
approval,theworkmayberejectedordeniedforcompensation.

[ PAGE 26 OF 33 ]

I. Indemnity

TheCMagrees,ifenteringintoacontractasaresultofthisRFQ/P,todefend,indemnify,
andholdharmlessPickensCountyfromanyandallcoursesofactionorclaimsof
damagesarisingoutoforrelatedtotheCM’sperformanceoractionsorthoseofits
employeesoragents,underthecontract.

J. Termination

PursuanttoO.C.G.A.§36-60-13,ifapplicable,anycontractresultingfromthisRFQ/P,if
notsoonerterminatedpursuanttotheprovisionsofterminationcontainedherein,is
terminablebytheBOConDecember31ofeachcalendaryearduringthetermofthe
contract,exceptthatthecontractwillberenewedautomaticallyonsuchdate,and
withoutanylapse,unlesspositiveactionistakentoterminatesaidcontractbytheBOC
inapublicmeetingandsuchactionenteredintheof:icialminutesoftheBOC.

K. Cancellation for Cause

1. Shouldeitherpartyfailtocomplywiththetermsandconditionsofthiscontract,the
aggrievedpartymustgive,inwriting,totheotherpartyanycomplaintfornon-
complianceofthetermsandconditionsofthiscontract.

2. The other party will have :ifteen (15) calendar days to correct the matter.

3. Ifcorrectedtothesatisfactionofbothpartieswithinthe:ifteen(15)calendardays
andstatedinwriting,thenthecontractwillcontinueuninterrupted.
4. Failuretocorrectthematterwillresultinterminationofthiscontractattheendof
thirty(30)calendardaysfollowingthedateoftheinitialletterofcomplaint.

L. Appropriation of Funds

Theinitialcontractandanycontinuationcontractswillterminateimmediatelyand
absolutelyatanysuchtimeastherearenotappropriatedandotherwiseunobligated
fundsavailabletosatisfyPickensCounty’sobligationsunderthecontracts.

M. Governing Law Clause

TheAgreementwillbegovernedbyandconstruedinaccordancewiththesubstantive
lawsoftheStateofGeorgia.

[ PAGE 27 OF 33 ]

N. Venue

TheSuperiorCourtofPickensCountyGeorgiawillhaveauthorityoveranylegalmatters
arisingfromthisAgreement

[ PAGE 28 OF 33 ]

Af$idavit and Exhibits

[ PAGE 29 OF 33 ]

S.A.V.E. Program Af.idavit

SystematicAlienVeri0icationforEntitlements(SAVE)ProgramOf0iceofU.S.Citizenship
andImmigrationService(USCIS)

o

Background

Pursuanttothe“GeorgiaSecurityandImmigrationComplianceAct,”PickensCountycannot
contractforthephysicalperformanceofservicesunlessthecontractorregistersandparticipatesin
thefederalworkauthorizationprogramtoverifyinformationofallnewemployees.Neithermay
anycontractororsubcontractorenteracontractwithPickensCountyinconnectionwiththe
physicalperformanceofservicesunlessthecontractororsubcontractorregistersandparticipates
inthefederalworkauthorizationprogramtoverifyinformationofallnewemployees.O.C.G.A.§13-
10-91.Eachcontractorisurgedto:illouttheaf:idavitbelowstatingtheycomplywiththisGeorgia
ComplianceActbeforePickensCountycanlegallyacceptthebidsfromeachcontractor/vendor.
ToregisterfortheE-VerifyProgramvisitwww.uscis.gov.YourbidwillnotbeacceptedwithoutthisE-
VerifyNumber.

Procedure

Af:irmativelanguagewillbesetforthincontractsfortheperformanceofservicesregardingthe
aboverequirement.PickensCountywillrequireanaf:idavitfromacontractorshowingits
compliancewiththerequirementsofO.C.G.A.§13-10-91atthetimeacontractfortheperformance
ofphysicalservicesisexecuted.Thecontractwillincludelanguagereferencingthisobligationand
providingthatfailuretosupplyanaf:idavitevidencingsuchcompliance(ortocontinuetomeetthe
statutoryobligationduringthelifeofthecontract)willconstituteamaterialbreachofthecontract.
Uponnoticeofsuchbreach,thecontractorwillbeentitledtocurethebreachwithinten(10)days
andprovideevidenceofsuchcure.Shouldthebreachnotbecured,PickensCountyshouldbe
entitledtoallavailableremedies,includingterminationofthecontractanddamages.

See afHidavit on following page

[ PAGE 30 OF 33 ]

S.A.V.EProgramAf.idavit
SystematicAlienVeri@icationforEntitlements(SAVE)ProgramOf@iceofU.S.Citizenshipand

Immigration Service (USCIS)

Byexecutingthisaf:idavit,theundersignedcontractorveri:iesitscompliancewithO.C.G.A.§13-10-
91,statingaf:irmativelythattheindividual,:irmorcorporationwhichiscontractingwithPickens
County,Georgia,hasregisteredandisparticipatinginafederalworkauthorizationprogram*(an
electronicveri:icationofworkauthorizationprogramoperatedbytheU.S.DepartmentofHomeland
SecurityoranyequivalentfederalworkauthorizationprogramoperatedbytheU.S.Departmentof
HomelandSecuritytoverifyinformationofnewlyhiredemployees,pursuanttotheImmigration
ReformAndControlActof1986(IRCA),inaccordancewiththedeadlinesestablishedinthe
referencedstatute.
*TheapplicablefederalworkauthorizationprogramasoftheeffectivedateofthestatuteistheE-
VerifyProgramoftheSystematicAlienVeri@icationforEntitlements(SAVE)ProgramOf@iceofU.S.
CitizenshipandImmigrationService(USCIS).ToregisterfortheE-VerifyProgramvisitwww.uscis.gov
.yourbidwillnotbeacceptedwithoutthisE-VerifyNumber.

Company Name

Street Address

By: Authorized Of:icer or Agent Date [Contractor Name]

Printed Name Contractor’s/Vendor’s E-Verify #

Subscribed and sworn before me on this the ___ day of _______________________, 20

Notary Public

My commission expires ____________________________

[ PAGE 31 OF 33 ]

EXHIBIT A

Indemnity

Tothefullestextentpermittedbylaw,theContractorshallindemnifyandholdharmlessthePickens
County,GAfromandagainstliability,claims,damages,lossesandexpenses,includingattorneys'
fees,arisingoutoforresultingfromperformanceofthework,providedthatsuchliability,claims,
damage,lossorexpenseisattributabletobodilyinjury,sickness,diseaseordeath,ortoinjurytoor
destructionoftangibleproperty(otherthantheworkitself)includinglossofuseresulting
therefrom,butonlytotheextentcausedinwholeorinpartbynegligentactsoromissionsofthe
Contractor,aSubcontractor,anyonedirectlyorindirectlyemployedbythemoranyoneforwhose
actstheymaybeliable.Inclaimsagainstanypersonorentityindemni:iedunderthisParagraphby
anemployeeoftheContractor,aSubcontractor,anyonedirectlyorindirectlyemployedbythemor
anyoneforwhoseactstheymaybeliable,theindemni:icationobligationunderthisParagraphshall
notbelimitedbyalimitationonamountortypeofdamages,compensationorbene:itspayableby
orfortheContractororaSubcontractorunderworkers'compensationacts,disabilitybene:itacts
orotheremployeebene:itacts.InsuranceRequirements:Priortocommencingwork,theFirm,atits
ownexpense,shallfurnishinsurancecerti:icateshowingthecerti:icateholderasPickensCounty,
GA.Ataminimum:CommercialGeneralLiabilityandAutomobileLiability:combinedsinglelimitat
least$1,000,000peroccurrence;Umbrellaliabilityintheamountofatleast$1,000,000thatfollows
thecoverageformsforunderlyingliabilitypoliciesorisbroader;Worker’sCompensationpolicy
providingstatutorylimits;ArchitectsandEngineersProfessionalLiability–errorsandomissions
policyintheamountofatleast$1,000,000peroccurrence.Coverageshallprovideforprofessional
errorsand/oromissionsinthepreparationofdesignsand/orspeci:icationsandincludethe
renderingofsupervisory,inspection,orengineeringservices.TitleVI:InaccordancewithTitleVIof
theCivilRightsAct,asamended,42U.S.C.§2000d,section303oftheAgeDiscriminationActof
1975,asamended,42U.S.C.§6102,section202oftheAmericanswithDisabilitiesActof1990,42
U.S.C.§12132,andallotherprovisionsofFederallaw,theCMagreesthat,duringperformanceof
thisAgreement,theFirm,forthemselves,theirassigneesandsuccessorsininterest,willnot
discriminateagainstanyemployeeorapplicantforemployment,anysubcontractor,oranysupplier
becauseofrace,color,creed,nationalorigin,gender,ageordisability.Inaddition,theCMagreesto
complywithallapplicableimplementingregulationsandshallincludetheprovisionsofthisSection
ineverysubcontractforservicescontemplatedunderthisAgreement.

[ PAGE 32 OF 33 ]

EXHIBIT B

CONSTRUCTION MANAGER GENERAL CONDITIONS AND PRICE PROPOSAL

PICKENS COUNTY TAX COMMISSIONER

Pickens County Tax Commissioner Building Construction Project

(Preconstruction Phase Only)

(Submit Proposal Fee…

This is the start of the file's text. The full file is on GovTribe.