About this file

This is a Bid Advertisement for a state and local construction project issued by Central Lake Public Schools in Michigan. The project, titled "BP3 - Athletic Lighting," involves the removal of existing athletic lighting and associated components and installation of a new owner-supplied SportsCluster system with Total Light Control. Central Lake Public Schools serves as the owner, French Associates as the architect, and Moore Trosper Construction Company as the construction manager. Sealed lump sum proposals must be submitted to Dr. Ryan Cunningham, Superintendent, at the MS/HS main office located at 8169 W State Street, Central Lake, Michigan by 10:00 a.m. on Wednesday, August 19, 2026. No pre-bid conference will be held; however, potential bidders may conduct independent site visits at 1034 N. M-88 Highway, Central Lake, Michigan. Bids will be opened publicly immediately following the deadline. Bid documents, drawings, and specifications are available for electronic download through Moore Trosper Construction Company's Procore site, with access requests directed to Heather Place at hplace@mooretrosper.com or (517) 694-6310.

Bidders must meet several requirements prior to contract award, including submission of a 5 percent bid bond and demonstrated ability to provide performance and labor and material payment bonds for 100 percent of the bid amount. All contractors and subcontractors are required to comply with prevailing wage requirements and submit certified payroll documentation. Additionally, Public Act 10 of 2023 mandates that all contractors and subcontractors working on 100 percent state-funded projects complete annual registration with the Michigan Department of Labor and Economic Opportunity and provide proof of registration to the District. Pre-qualification review will include evaluation of financials, safety records, and litigation history. All bidding inquiries must be directed to Heather Place at hplace@mooretrosper.com; direct contact with the architect or owner is prohibited. The project is posted on the State of Michigan SIGMA VSS, Builders Exchange locations in Lansing, Kalamazoo, Grand Rapids, and Northwest Michigan, and the Construction Association of Michigan.

View the file

Other files for this state and local contract opportunity

Other files attached to Athletic Lighting Project, newest first.
File Type Posted
CLPS BP3 Addendum 01 08-17-26.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTRAL LAKE PUBLIC SCHOOLS

BP3 – ATHLETIC LIGHTING

SECTION 001100

BID ADVERTISEMENT

MOORE-TROSPER CONSTRUCTION CO.

Project No. 25-113

Section 001100 - Page 1 of 2

PROJECT: Central Lake Public Schools BP3 – Athletic Lighting

MTCC PROJECT NO.: 25-113

OWNER: Central Lake Public Schools 8190 W State Street Central Lake, Michigan 49622

ARCHITECT: French Associates 2851 High Meadow Cir. Suite 100

Auburn Hills, Michigan 48326

CONSTRUCTION MANAGER: Moore Trosper Construction Company 4224 Keller Road Holt, Michigan 48842 Sr. Project Manager: Heather Place E-mail: hplace@mooretrosper.com

Pre-bid Conference:

No pre-bid conference will be held however, bidders may visit the project site at 1034 N. M-88 Hwy, Central Lake, MI for an independent site visit.

Bid Date:

Lump sum sealed proposals will be received addressed to, Dr. Ryan Cunningham, Superintendent, Central Lake Public Schools, 8169 W State Street, Central Lake, MI at the MS/HS main office by 10:00 am on Wednesday, August 19, 2026. Proposals will only be accepted on the proposal form provided under specification section 004126. The bids will be opened publicly immediately after.

Bid Categories:

26-03 Athletic Lighting

Scope of Work:

Remove existing athletic lighting and associated components and install new owner-supplied SportsCluster system with Total Light Control.

Documents:

Bid Documents, drawings and specifications will be available for electronic download through Moore Trosper Construction Company’s Procore site. Potential bidders that would like access to the documents should contact Heather Place at hplace@mooretrosper.com or calling (517) 694-6310.

Bidders are responsible for all documents and cost of printing and shipping of plans and specs. Documents obtained from sources other than Moore Trosper’s Procore site shall be used at the risk of the bidder.

Invitations to Bid will be posted on:

• State of Michigan SIGMA VSS (Vendor Self Service)

• Builders Exchange of Lansing

• Builders Exchange of Kalamazoo mailto:hplace@mooretrosper.com

CENTRAL LAKE PUBLIC SCHOOLS

BP3 – ATHLETIC LIGHTING

SECTION 001100

BID ADVERTISEMENT

MOORE-TROSPER CONSTRUCTION CO.

Project No. 25-113

Section 001100 - Page 2 of 2

• Builders Exchange of Grand Rapids

• Builders Exchange of Northwest Michigan

• Construction Association of Michigan (CAM)

• Construction News Service of West Michigan (CNS)

Request for Further Information:

All questions during the bidding period shall be emailed to Heather Place at hplace@mooretrosper.com.

Absolutely no direct contact with the Architect or Owner will be permitted.

Pre-Qualification

All bidders are required to be pre-qualified prior to award of contract (not prior to bidding). Review New Vendor Evaluation form in specification 006200 – Miscellaneous Forms for prequalification requirements prior to award.

Interest in Project

Any bidder wishing to be on the bidders list for this project please send an e-mail to Moore Trosper Construction Company at hplace@mooretrosper.com. The requirements for bidding this project in addition to the above referenced items are:

• A bid bond will be required (5% of total bid).

• Ability to provide a performance bond and a labor and material payment bond for 100% of the amount of each bid.

• Pay applications per AIA documents.

• Pre-qualification including a review of financials, safety records and lawsuits, etc.

• PREVAILING WAGES AND CERTIFIED PAYROLL ARE REQUIRED.

• Public Act 10 of 2023 requires all contractors and subcontractors working on 100% state-funded projects to complete an annual registration with the Department of Labor and Economic Opportunity (LEO). Contractors must complete the registration process and provide proof of registration to the District.https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage#contractor-registration

END OF SECTION