CLIN Structure.docx
DOCX document 21 KB Posted
- Attached to
- Penstock Gate #4 Closure
- Solicitation number
- FY255201020
About this file
The CLIN (Contract Line Item Number) Structure document details a solicitation for the Falcon Penstock #4 Closure project issued by the International Boundary and Water Commission. The CLIN structure outlines five distinct line items: assessment inspection, design of a new stop-log system, material and supplies, labor costs, and a final report, each priced as a single unit. The project is located at the Falcon Power Plant in Falcon Heights, Texas, with a performance period of 180 calendar days.
This is a 100% small business set-aside solicitation (NAICS code 332312) with a submission deadline of 3:00 PM MST on August 29, 2025. Offerors must submit a technical approach, demonstrate past performance with three references, and include an active SAM.gov registration. The government will award to the lowest-priced, technically acceptable, responsible offeror. Key submission requirements include Form SF 1442, CLIN Structure, a signed Non-Disclosure Agreement, and technical documentation. The project involves closure work for Penstock #4, with a site visit available through August 20, 2025, and quotes to be emailed to angelica.baca@ibwc.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Updated SF 1442 191BWC25R0004.pdf | ||
| Stop Logs Closure Extra Drawings.pdf | ||
| QAs 7-25-25.odt | ODT document | |
| Falcon Stop Logs 125_130.pdf | ||
| Stop Logs Project Pics.pdf | ||
| SF 1442 191BWC25R0004.pdf | ||
| PWS-Falcon Penstock 4 Gate Closure.pdf | ||
| Davis Bacon Act WD.pdf | ||
| Stop Logs Drawings.pdf | ||
| Non-Disclosure Agreement Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY255201020 Falcon Penstock#4 Closure clin structure Falcon Penstock#4 Closure
| CLIN |
| Description |
| Qty |
| Unit |
| Unit Price |
| Total Price |
| 001 |
| Perform Assessment Inspection as per PWS attached |
| 1 |
| EA |
| $ |
| $ |
| 002 |
| Design New Stop-Log System (Concrete) as per PWS attached |
| 1 |
| EA |
| $ |
| $ |
| 003 |
| Material and Supplies as per PWS attached |
| 1 |
| EA |
| $ |
| $ |
| 004 |
| Labor Cost as per PWS attached |
| 1 |
| EA |
| $ |
| $ |
| 005 |
| Final Report as per PWS attached |
| 1 |
| EA |
| $ |
| $ |
| GRAND TOTAL |
| $ |
Contractor Name _____________________________________
Active Unique Entity Identifier (UEI number) ________________________________
Contractor’s Signature __________________________________
File details come from the government source that posted it. Updated .