CLIN 0005 Itemized prcing.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- USS ROOSEVELT Pipe Lagging Federal contract opportunity
- Solicitation number
- N5523623Q0137
About this file
This combined synopsis/solicitation requests quotes for pipe lagging services onboard USS Roosevelt (CVN-71). There are five contract line item numbers for requirements with unique specifications and period of performance dates. Quotes are requested for the removal of existing pipe insulation and installation of new materials. The applicable NAICS code is 336611. Quotes must be received by June 7, 2023 to be considered for award. A ship check is scheduled for May 24-25, 2023 to meet at the Naval Station North Island security gate. The solicitation is set aside for small businesses and quotes from large businesses are ineligible. The Department of the Navy Naval Sea Systems Command is the issuing agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_N5523623Q0137 amend 1.pdf | ||
| CLIN 0003 Itemized pricing.xlsx | XLSX spreadsheet | |
| CLIN 0002 Itemized pricing.xlsx | XLSX spreadsheet | |
| CLIN 0001 Itemized pricing.xlsx | XLSX spreadsheet | |
| Solicitation_N5523623Q0137.pdf | ||
| CLIN 0004 Itemized pricing.xlsx | XLSX spreadsheet | |
| N5523623Q0137_RFC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Itemized Pricing
| CONTRACT: | PIPE LAGGING SERVICES |
| CONTRACTOR: | |
| PURCHASE ORDER: | |
| SHIP: | USS THEODORE ROOSEVELT (CVN-71) |
| LOCATION: | NAVY REGION SOUTHWEST |
| ITEM NO CLIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | EXTENDED AMOUNT | ||
| 0001 | COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS THEODORE ROOSEVELT (CVN-71) | ||||||
| CATAPULT NO. 3 | 1 | LOT | $0.00 | ||||
| REMOVAL, DISPOSAL AND INSTALLATION REQUIREMENTS: |
The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
INSTALLATION REQUIREMENTS:
The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
| EA10-L010 | CATAPULT # 3 | ||
| 03-156-4-Q LAUNCH VALVE | 125 SF | Pipe size: Four (4) inch NPS to nine (9) inch NPS TEMPERATURE OF 401 DEGREES AND HIGHER | |
| EA10-L010 | CATAPULT # 3 | ||
| 03-156-4-Q LAUNCH VALVE | 130 SF | Remove existing and install new epoxy covered lagging on steam atomization piping in accordance with the statement of work. | |
| EA10-L010 | CATAPULT # 3 | ||
| 03-156-4-Q LAUNCH VALVE | 50 SF | Pipe unions, pipe hangers, valve bodies, bulkhead penetrations, etc. TEMPERATURE OF 401 DEGREES AND HIGHER |
| NEW MILESTONE EVENT | DATE |
| PURCHASE ORDER START DATE | 22-Jul-2023 |
| PURCHASE ORDER END DATE | 5-Aug-2023 |
| NOTES: |
| 1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work. |
| 2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .