About this file
This is a bid drawing document prepared by French Associates, Inc. for Croswell-Lexington Community Schools (CLCS) related to a boiler replacement and new generator installation project at the Geiger Center in Croswell, Michigan. Project Number 2019-057.1 was issued for bid on January 9, 2020. The project encompasses comprehensive mechanical and electrical work including boiler room demolition, installation of a new condensing boiler system, heating hot water system piping and controls, a new generator, and associated electrical infrastructure. The bid drawings package consists of multiple sheets organized into mechanical and electrical divisions, with mechanical drawings (GE-M.0 through GE-M.3) detailing boiler room plans, HVAC systems, piping diagrams, control systems, equipment schedules, and installation details, and electrical drawings (GE-E.0 through GE-E.2) addressing demolition plans, new work plans, one-line diagrams, and control systems. The drawings include boiler schedules, pump schedules, variable frequency drive specifications, expansion tank details, hot water unit heater piping diagrams, gas meter specifications, and DDC system architecture for automated controls.
The drawings were prepared by Strategic Energy Solutions (SES) under Project #190019-09 with design coordination by French Associates, Inc., located at 236 Mill Street, Rochester, Michigan. The documents serve as the technical basis for contractor bidding and include standard mechanical and electrical abbreviations, symbols, drawing notations, piping legends, and applicable codes and regulations. No pricing information, contract terms, funding sources, set-asides, or incumbent contractor details are contained within these bid drawing documents, which function solely as technical reference materials for the proposed construction work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLCS Middle School roof bid drawings 200109.pdf | ||
| CLCS High School Boiler Repl bid drawings 200109.pdf | ||
| 19057 00 1000 Advertisement for Bids.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF DRAWINGS
GE- M.0 MECHANICAL GENERAL INFORMATION
GE- M.1 BOILER ROOM DEMOLITION AND NEW WORK PLANS
GE- M.2 MECHANICAL DIAGRAMS AND CONTROLS
GE- M.3 MECHANICAL SCHEDULES AND DETAILS
MECHANICAL
CROSWELL- LEXINGTON COMMUNITY SCHOOLS
BOILER REPLACEMENT
GEIGER CENTER
CROSWELL, MI
2019-057.1
JANUARY 9, 2020 BID DOCUMENTS
PROJECT NO.
c FRENCH ASSOCIATES, INC.
X
Y Z
P
R O
J E
C T
FRENCH
associates architects planners interiors
GE- E.0 ELECTRICAL GENERAL INFORMATION
GE- E.1 BOILER ROOM DEMOLITION AND NEW WORK PLANS
GE- E.2 ELECTRICAL DETAILS, SCHEDULES AND DIAGRAMS
ELECTRICAL
MECHANICAL ABBREVIATIONS MECHANICAL ABBREVIATIONSMECHANICAL ABBREVIATIONS MECHANICAL SYMBOLS
DRAWING NOTATION
SECTION
MECHANICAL PIPING SYMBOLS
PIPING LEGEND
APPLICABLE CODES
AND REGULATIONS
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
MECHANICAL
GENERAL
INFORMATION
GE-M.0
DJL
DJL
DJL
DRAWING INDEX
MECHANICAL ROOM MECHANICAL DEMOLITION PLAN
MECHANICAL DEMOLITION NOTES
HVAC GENERAL NOTES
DEMOLITION KEYED NOTES KEYED NOTES
MECHANICAL ROOM MECHANICAL NEW WORK PLAN
REVISION TO GAS LOAD
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
MECHANICAL ROOM
MECHANICAL
DEMOLITION AND
NEW WORK PLANS
GE-M.1
DJL
HEATING HOT WATER SYSTEM PIPING DIAGRAM - NEW WORK
HEATING HOT WATER SYSTEM CONTROL DIAGRAM
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
MECHANICAL
DIAGRAMS AND
CONTROLS
GE-M.2
DJL
BOILER SCHEDULE
PUMP SCHEDULE
VARIABLE FREQUENCY DRIVE SCHEDULE
EXPANSION TANK SCHEDULE
INSULATED PIPE HANGER DETAIL
CONDENSING BOILER STACK DETAIL
HOT WATER UNIT HEATER PIPING DIAGRAM (3-WAY VALVE)
GAS METER WITH UNDERGROUND SUPPLY LINE DETAIL
DDC SYSTEM ARCHITECTURE
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
MECHANICAL
SCHEDULES AND
DETAILS
GE-M.3
DJL
ELECTRICAL ABBREVIATIONS
SECTION
DRAWING NOTATION
POWER SYMBOL LIST
LIGHTING CONTROLS LEGEND TECHNOLOGY SYMBOL LIST
APPLICABLE CODES
AND REGULATIONS
COPPER FEEDER SCHEDULE
FIRE ALARM SYMBOL LIST
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
ELECTRICAL
GENERAL
INFORMATION
GE-E.0
SET
RWC
JWS
DRAWING INDEX
MECHANICAL ROOM ELECTRICAL DEMOLITION PLAN
DEMOLITION KEYED NOTES
KEYED NOTES
MECHANICAL ROOM ELECTRICAL NEW WORK PLAN
ELECTRICAL GENERAL NOTES
Know what's below .
Call before you dig.
ELECTRICAL DEMOLITION NOTES
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
MECHANICAL ROOM
ELECTRICAL
DEMOLITION AND
NEW WORK PLANS
GE-E.1
SET
RWC
G
DEMOLITION KEYED NOTES
KEYED NOTES
DEMOLITION ONE LINE DIAGRAM
NEW WORK ONE LINE DIAGRAM
BOILER ROOM SHUNTOFF CONTROL DIAGRAM
SES
Strategic Energy Solutions
4000 W. Eleven Mile Road Berkley, MI 48072
Phone 248.399.1900 Fax 248.399.1901 www.sesnet.com
SES Project #19 0019 09
ISSUE DATE ISSUED FOR
CHECKED
APPROVED
DRAWN
PROJECT
SHEET
PROJECT NUMBER
SHEET NUMBER
c FRENCH ASSOCIATES, INC.
associates
F 248.656.7746 T 248.656.1377 48307 Rochester, MI 236 Mill Street
FRENCH
architects planners interiors
1/9/2020 BID DOCUMENTS
CLCS
GEIGER CENTER
BOILER REPLACEMENT
AND NEW GENERATOR
CROSWELL,
MICHIGAN
2019-000
-0
B
OI
LE
R
RE
PL
AC
EM
EN
T
AN
D
NE
W
G
EN
ER
AT
OR
ELECTRICAL
DETAILS,
SCHEDULES AND
DIAGRAMS
GE-E.2
SET
RWC
| 190571 a000 Geiger-A000 |
| GE-M.0 MECHANICAL GENERAL INFORMATION |
| Sheets and Views |
| GE-M.0 MECHANICAL GENERAL INFORMATION |
| GE-M.1 MECHANICAL ROOM MECHANICAL DEMOLITION AND NEW WORK PLANS |
| Sheets and Views |
| GE-M.1 MECHANICAL ROOM MECHANICAL DEMOLITION AND NEW WORK PLANS |
| GE-M.2 MECHANICAL DIAGRAMS AND CONTROLS |
| Sheets and Views |
| GE-M.2 MECHANICAL DIAGRAMS AND CONTROLS |
| GE-M.3 MECHANICAL SCHEDULES AND DETAILS |
| Sheets and Views |
| GE-M.3 MECHANICAL SCHEDULES AND DETAILS |
| GE-E.0 ELECTRICAL GENERAL INFORMATION |
| Sheets and Views |
| GE-E.0 ELECTRICAL GENERAL INFORMATION |
| GE-E.1 MECHANICAL ROOM ELECTRICAL DEMOLITION AND NEW WORK PLANS |
| Sheets and Views |
| GE-E.1 MECHANICAL ROOM ELECTRICAL DEMOLITION AND NEW WORK PLANS |
| GE-E.2 ELECTRICAL DETAILS, SCHEDULES AND DIAGRAMS |
| Sheets and Views |
| GE-E.2 ELECTRICAL DETAILS, SCHEDULES AND DIAGRAMS |
File details come from the government source that posted it. Updated .