This document is a Construction Documentation Report for the 2022 Landfill Gas Collection and Control System (GCCS) prepared by Cornerstone Environmental Group, LLC for Clark-Floyd Landfill, LLC, a joint venture between Clark and Floyd Counties located in Borden, Indiana. The report details the installation of interim gas conveyance piping during the 2022 calendar year, including the installation of approximately 2,071 feet of 10-inch diameter HDPE header/lateral pipe, 185 feet of 6-inch diameter pipe, 210 feet of 4-inch diameter pipe, and 311 feet of 3-inch diameter pipe. The project involved modifying interim conveyance piping to work around ongoing waste disposal operations, with the work concentrated on the east phase of the landfill.
The documentation includes a comprehensive record of pipeline construction, with details on pipe configurations, well connections, and condensate management. The report notes that no final gas collection system components were installed during this period, with final conveyance piping planned for future installation as the landfill approaches final grades. The project involved multiple parties, including Clark-Floyd Landfill, LLC as the operator and pipeline constructor, Pioneer Environmental & Engineering for pipeline construction, and ISCO Industries, Inc. and PumpOne as suppliers of pipes, fittings, and wellhead equipment. The report is part of the ongoing documentation and quality assurance process for the landfill's gas collection and control system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION
DOCUMENTATION REPORT
2022 Landfill Gas Collection and Control System Construction
February 2023
Prepared for:
Clark-Floyd Landfill, LLC 14304 IN Route 60 Borden, IN 47106
Building lifetime relationships with our clients and employees.
39395 W, 12 Mile Road Farmington Hills, MI
(877) 633-5520
Rev. 0, 2/28/23 Project 209-4201671 ii
Clark-Floyd Landfill - 2022 GCCS Certification Rpt - DRAFT 2-28-23 w-edits
REPORT CERTIFICATION
2022 Landfill Gas Collection and Control System Construction Documentation Report
Clark-Floyd Landfill Borden, Indiana
The material and data in this report were prepared under the supervision and direction of the undersigned.
Cornerstone Environmental Group, LLC
Jerry McGraner, PE, PLS Technical Manager
Rev. 0, 2/28/23 Project 209-4201671 iv
Clark-Floyd Landfill - 2022 GCCS Certification Rpt - DRAFT 2-28-23 w-edits
TABLE OF CONTENTS
1 INTRODUCTION
1.1 PROJECT SUMMARY
1.2 REFERENCE DOCUMENTS
1.3 PARTIES
2 LANDFILL GAS COLLECTION AND CONTROL SYSTEM
2.1 SUMMARY OF CQA SERVICES
2.2 GCCS CONSTRUCTION COMPONENTS
2.2.1 PIPELINE CONFIGURATION
2.2.2 CONDENSATE MANAGEMENT
3 SUMMARY AND CONCLUSIONS
LIMITATIONS
APPENDICES
APPENDIX A GCCS RECORD DRAWINGS
1 INTRODUCTION
1.1 Project Summary
This report presents construction documentation of the landfill gas collection and control system (GCCS) components installed at the Clark-Floyd Landfill Recycling & Disposal Facility during the 2022 calendar year. The landfill, located in Borden, Indiana, is jointly owned by the Clark and Floyd Counties and operated by Clark-Floyd Landfill, LLC (CFL).
The following report summarizes the installation of GCCS components, quality control observations and record documentation of the construction. It needs to be noted that the piping and installation work documented in this report relates to interm conveyance and not final GCCS components as outlined in the GCCS design Plan submitted to IDEM , February 2012.
Further, with waste disposal operations being concentrated on the east phase of the landfill and with the upward landfill growth on the east phase, interim conveyance piping is constantly changing to work around waste disposal operations; therefore, interim conveyance piping is being modified monthly with the final changes occurring during December 2022.
CFL performed pipeline construction and provided the as-built survey information for this report. These were used by Cornerstone to prepare the GCCS record drawings of the construction.
The construction involved the following:
Installation of replacement sections of header/laterals; and Construction of airlines and forcemains.
1.2 Reference Documents
The following documents were utilized fo the 2022 GCCS Construction Certification Report:
Drawing titled: “Landfill Gas Collection and Control System – 2022 As-Built”, one (1) sheet, dated 1/26/2023, produced by Tetra Tech.
1.3 Parties
The following parties were involved in the 2022 GCCS Construction:
Clark-Floyd Landfill, LLC – Landfill Operator/Pipeline Construction
Bruce Schmucker, P.E. – Vice President of Engineering and Environmental Affairs Albert Masticola – Field Technician/Surveyor Caleb Priddy – Filed Engineer
Pioneer Environmental & Engineering – Pipeline Construction Tim Shannon – Filed Technician
Cornerstone Environmental Group, LLC (Cornerstone) – Design Engineer/ Certifying Engineer/Construction Quality Assurance Jerry McGraner, P.E., L.S. - Project Manager /Certifying Engineer
ISCO Industries, Inc. – Pipe, Fittings, & Wellhead Supplier Andy Rogers – Supplier Contact
PumpOne – Well Pump & Fittings Supplier
Shawn DeVinney – Supplier Contact
2 LANDFILL GAS COLLECTION AND CONTROL SYSTEM
2.1 Summary of CQA Services
CFL provided CQA services during the 2022 GCCS construction. Cornerstone has toured the eastern half of the landfill and reviewed the as-built interim gas conveyance piping to confirm locations.
The installed and modified interim gas conveyance components consisted of:
Pipe Installation in the wellfield o 10-inch diameter SDR 17 HDPE solid header/lateral pipe totaling approximately 2,071 feet;
o 6-inch diameter SDR 17 HDPE solid header/lateral pipe totaling approximately 185 feet;
o 4-inch diameter SDR 11 HDPE solid lateral pipe totaling approximately 210 feet; and o 3-inch diameter SDR 11 HDPE solid lateral pipe totaling approximately 311 feet.
Pipe Removed/Abandoned in the wellfield o 6-inch diameter HDPE SDR 17 solid lateral pipe totaling approximately 1,500 feet.
2.2 GCCS Construction Components
2.2.1 Pipeline Configuration
As depicted on the Record Drawings included with this report, new interim, header and lateral piping were installed at several locations.
o A new, interim 10-inch HDPE SDR 17 header was installed from a 90-degree elbow on the west side of Unit 1 to new well W1.9R.
o A new, interim 10-inch HDPE SDR 17 header was installed in Unit 1 from W1.9R to a Tee – continuing west to well W1.2R and east to well W1.4R.
o A new, interim 10-inch HDPE SDR 17 lateral was installed in Unit 1 from W1.4R to well W1.8RR.
o A new,interim 6-inch HDPE SDR 17 lateral was installed in Unit 1 from the new 10” header to well WW 03.
o A new,interim 4-inch HDPE SDR 17 lateral was installed in Unit 1 from the new 10” header to well W1.10.
o A new, interim 10-inch HDPE SDR 17 header was installed in Unit 2 from near well W2.5 to well W2.6.
o A new, interim 4-inch HDPE SDR 17 lateral was installed in Unit 2 from well W2.6 to a point between well W2.6 and well W2.9. A new, interim 3” HDPE SDR 11 lateral was installed from the end of the 4” lateral to well W2.9.
o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a point between well W2.11 and well W2.7 to well W2.8.
o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a point between well W2.11 and well W2.7 to well W2.8.
o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a the new 10” header to well W2.5.
o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a the new 10” header to well W2.6.
2.2.2 Condensate Management
LFG condensate from the newly installed, interim GCCS lateral pipes drain to existing header pipes and to existing condensate sumps.
3 SUMMARY AND CONCLUSIONS
Cornerstone has compiled and reviewed the documentation of the 2022 as-built GCCS, as constructed by CFL, in accordance with the GCCS Design Plan (dated February 2012) for the Clark-Floyd Landfill. This report provides documentation describing the extent and details of the GCCS construction.
No final gas collection portion of the system was installed during this calendar year. Future final collection system components will be installed in general accordance with the GCCS design plan and permit drawings approved by IDEM in August 2011. A Record Drawing of the GCCS layout is included in Appendix A. Final conveyance piping will be installed at this landfill as it approaches final grades and will likely be installed as part of cap installation so the piping can be accessed without damaging geosynthetic components of the cap system.
LIMITATIONS
The work product included in the attached was undertaken in full conformity with generally accepted professional consulting principles and practices and to the fullest extent as allowed by law we expressly disclaim all warranties, express or implied, including warranties of merchantability or fitness for a particular purpose. The work product was completed in full conformity with the contract with our client and this document is solely for the use and reliance of our client (unless previously agreed upon that a third party could rely on the work product) and any reliance on this work product by an unapproved outside party is at such party's risk.
The work product herein (including opinions, conclusions, suggestions, etc.) was prepared based on the situations and circumstances as found at the time, location, scope and goal of our performance and thus should be relied upon and used by our client recognizing these considerations and limitations. Cornerstone shall not be liable for the consequences of any change in environmental standards, practices, or regulations following the completion of our work and there is no warrant to the veracity of information provided by third parties, or the partial utilization of this work product.
APPENDIX A
GCCS RECORD DRAWINGS
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
PM-6
PM-5
PM-11
PM-12
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
W.P.
W.P.
W.P.
W.P.
W.P.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.C.O.
C.O.
C.O.
C.O.
AIR
A
IR
A
IR
LANDFILL GAS COLLECTION AND CONTROL SYSTEM
DECEMBER 2022 AS-BUILT
AutoCAD SHX Text 486.3
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 479.1
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 481.8
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 481.0
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 483.1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 518.424
AutoCAD SHX Text 510.185
AutoCAD SHX Text 544.746
AutoCAD SHX Text 548.106
AutoCAD SHX Text 543.344
AutoCAD SHX Text 538.181
AutoCAD SHX Text 488.452
AutoCAD SHX Text 536.738
AutoCAD SHX Text 537.545
AutoCAD SHX Text 545.945
AutoCAD SHX Text 496.466
AutoCAD SHX Text 495.891
AutoCAD SHX Text
POST
AutoCAD SHX Text
SIGN
AutoCAD SHX Text 486.3
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 480.7
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 478.6
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 479.1
AutoCAD SHX Text W.S.E.
AutoCAD SHX Text 544.5
AutoCAD SHX Text
SECTION 6
AutoCAD SHX Text
CELL W-1
AutoCAD SHX Text
SECTION 5
AutoCAD SHX Text
SEDIMENTATION BASIN #2
AutoCAD SHX Text
C&D VERTICAL EXPANSION AREA
AutoCAD SHX Text
SECTION 7 HORIZONTAL EXPANSION
AutoCAD SHX Text
FUTURE SEDIMENT BASIN
AutoCAD SHX Text
PM-7
AutoCAD SHX Text
PM-6
AutoCAD SHX Text
PM-5
AutoCAD SHX Text
PM-11
AutoCAD SHX Text
PM-12
AutoCAD SHX Text
PM-9
AutoCAD SHX Text
PM-10
AutoCAD SHX Text
PM-8
AutoCAD SHX Text
MW-10-14
AutoCAD SHX Text
MW-B1-11
AutoCAD SHX Text
MW-9-11
AutoCAD SHX Text
MW-B11-10
AutoCAD SHX Text
MW-14-1
AutoCAD SHX Text
MW-15-11
AutoCAD SHX Text
MW-16-10
AutoCAD SHX Text
MW-12-10
AutoCAD SHX Text
MW-11-11
AutoCAD SHX Text
MW-6-11
AutoCAD SHX Text
MW-5-10
AutoCAD SHX Text
MW-4-16
AutoCAD SHX Text
MW-3
AutoCAD SHX Text
MW-2
AutoCAD SHX Text
MW-1-11
AutoCAD SHX Text
MW-B4B-10
AutoCAD SHX Text
MW-B4A-10
AutoCAD SHX Text W.P.
AutoCAD SHX Text W.P.
AutoCAD SHX Text W.P.
AutoCAD SHX Text W.P.
AutoCAD SHX Text W.P.
AutoCAD SHX Text
SUMP 2
AutoCAD SHX Text
SUMP 8
AutoCAD SHX Text
SUMP 7
AutoCAD SHX Text
SUMP 6
AutoCAD SHX Text
SUMP 5
AutoCAD SHX Text
SUMP 5A
AutoCAD SHX Text
GP-L
AutoCAD SHX Text
GP-M
AutoCAD SHX Text
GP-N
AutoCAD SHX Text
GP-O
AutoCAD SHX Text
UNIT 2
AutoCAD SHX Text
UNIT 1 SOUTH
AutoCAD SHX Text
UNIT 1 NORTH
AutoCAD SHX Text
C&D VERTICAL EXPANSION AREA
AutoCAD SHX Text
6" LINE "B"
AutoCAD SHX Text 12"
AutoCAD SHX Text
10" LINE "A"
AutoCAD SHX Text
14" LINE "A"
AutoCAD SHX Text 16"
AutoCAD SHX Text 16"
AutoCAD SHX Text 18"
AutoCAD SHX Text S
AutoCAD SHX Text 12"
AutoCAD SHX Text
10" LINE "B"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text W1.2
AutoCAD SHX Text W1.10
AutoCAD SHX Text W1.1
AutoCAD SHX Text W1.9
AutoCAD SHX Text W1.3
AutoCAD SHX Text W1.8
AutoCAD SHX Text W1.7
AutoCAD SHX Text W1.6
AutoCAD SHX Text W1.5
AutoCAD SHX Text W2.1
AutoCAD SHX Text W2.2
AutoCAD SHX Text W2.3
AutoCAD SHX Text W2.5
AutoCAD SHX Text W2.6
AutoCAD SHX Text W2.9
AutoCAD SHX Text W2.10
AutoCAD SHX Text W2.8
AutoCAD SHX Text W2.11
AutoCAD SHX Text W5.3
AutoCAD SHX Text W5.1
AutoCAD SHX Text W5.0
AutoCAD SHX Text W5.2
AutoCAD SHX Text W5.9
AutoCAD SHX Text W5.6
AutoCAD SHX Text W5.5
AutoCAD SHX Text W5.7
AutoCAD SHX Text W5.8
AutoCAD SHX Text W5.4
AutoCAD SHX Text W2.7
AutoCAD SHX Text W2.4
AutoCAD SHX Text W2.13
AutoCAD SHX Text W2.14
AutoCAD SHX Text W1.15
AutoCAD SHX Text W2.12
AutoCAD SHX Text W2.16
AutoCAD SHX Text W2.17
AutoCAD SHX Text W2.18
AutoCAD SHX Text W2.19
AutoCAD SHX Text W2.22
AutoCAD SHX Text W2.21
AutoCAD SHX Text W2.20
AutoCAD SHX Text W2.23
AutoCAD SHX Text W2.24
AutoCAD SHX Text W2.25
AutoCAD SHX Text W2.27
AutoCAD SHX Text W2.26
AutoCAD SHX Text W1.11
AutoCAD SHX Text W1.25
AutoCAD SHX Text W1.24
AutoCAD SHX Text W1.23
AutoCAD SHX Text W1.22
AutoCAD SHX Text W1.21
AutoCAD SHX Text W1.20
AutoCAD SHX Text W1.19
AutoCAD SHX Text W1.18
AutoCAD SHX Text W1.17
AutoCAD SHX Text W1.16
AutoCAD SHX Text W1.15
AutoCAD SHX Text W1.13
AutoCAD SHX Text W1.12
AutoCAD SHX Text W6.1
AutoCAD SHX Text W6.2
AutoCAD SHX Text W6.3
AutoCAD SHX Text W6.5
AutoCAD SHX Text W6.6
AutoCAD SHX Text W6.9
AutoCAD SHX Text W6.10
AutoCAD SHX Text W6.12
AutoCAD SHX Text W6.13
AutoCAD SHX Text W6.14
AutoCAD SHX Text W6.16
AutoCAD SHX Text W6.8
AutoCAD SHX Text W6.7
AutoCAD SHX Text W6.15
AutoCAD SHX Text 18"
AutoCAD SHX Text 18"
AutoCAD SHX Text 18"
AutoCAD SHX Text 4"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text
CS-3
AutoCAD SHX Text
CS-4
AutoCAD SHX Text
CS-6
AutoCAD SHX Text
CS-7
AutoCAD SHX Text
CS-8
AutoCAD SHX Text
CS-9
AutoCAD SHX Text
CS-10
AutoCAD SHX Text
CS-12
AutoCAD SHX Text
CS-11
AutoCAD SHX Text 10"
AutoCAD SHX Text W1.1R
AutoCAD SHX Text W1.8R
AutoCAD SHX Text W6.11R
AutoCAD SHX Text W1.7R
AutoCAD SHX Text W1.5R
AutoCAD SHX Text
WW.01
AutoCAD SHX Text
WW.02
AutoCAD SHX Text
WW.03
AutoCAD SHX Text
WW.05
AutoCAD SHX Text
WW.04
AutoCAD SHX Text
WW.06
AutoCAD SHX Text
WW.07
AutoCAD SHX Text
WW.08
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"x6"x6" TEE
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 3"
AutoCAD SHX Text
HP
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text W1.3R
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
NEW CONDENSATE SUMP
AutoCAD SHX Text
NEW FLARE
AutoCAD SHX Text W6.14R
AutoCAD SHX Text
WW.09
AutoCAD SHX Text
WW.11
AutoCAD SHX Text
WW.15
AutoCAD SHX Text
WW.14
AutoCAD SHX Text
WW.13
AutoCAD SHX Text
WW.12
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
REMOVED
AutoCAD SHX Text
ABANDONED IN PLACE
AutoCAD SHX Text
ABANDONED IN PLACE
AutoCAD SHX Text 6"
AutoCAD SHX Text
HC001
AutoCAD SHX Text
BARRIER WALL GAS COLLECTION CONNECTION
AutoCAD SHX Text
ABANDONED IN PLACE
AutoCAD SHX Text 6"
AutoCAD SHX Text
REMOTE WELLHEAD FOR W1.18
AutoCAD SHX Text
ABANDONED IN PLACE
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"x6" RED.
AutoCAD SHX Text W6.4R
AutoCAD SHX Text W1.2R
AutoCAD SHX Text W1.4R
AutoCAD SHX Text W1.14R
AutoCAD SHX Text
REMOTE WELLHEAD FOR W6.8
AutoCAD SHX Text
REMOTE WELLHEAD FOR W1.8R
AutoCAD SHX Text
REMOTE WELLHEAD FOR WW.11
AutoCAD SHX Text
REMOTE WELLHEAD FOR W1.25
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text
LS-1
AutoCAD SHX Text
W1.7RR
AutoCAD SHX Text W1.13R
AutoCAD SHX Text 6"
AutoCAD SHX Text
REMOTE WELLHEAD
AutoCAD SHX Text
REMOTE WELLHEAD
AutoCAD SHX Text
REMOTE WELLHEAD
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
W1.8RR
AutoCAD SHX Text
WW.06R
AutoCAD SHX Text
WW.04R
AutoCAD SHX Text W1.9R
AutoCAD SHX Text 6"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text
FUTURE SEDIMENT BASIN
AutoCAD SHX Text E 282,000
AutoCAD SHX Text E 278,000
AutoCAD SHX Text N 1,169,000
AutoCAD SHX Text N 1,168,000
AutoCAD SHX Text E 279,000
AutoCAD SHX Text E 280,000
AutoCAD SHX Text E 281,000
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
CLARK-FLOYD LANDFILL, INC.
AutoCAD SHX Text
CLARK-FLOYD LANDFILL RECYCLING & DISPOSAL FACILITY
AutoCAD SHX Text
BORDEN, INDIANA
AutoCAD SHX Text 209-4201671
AutoCAD SHX Text 1/26/23
AutoCAD SHX Text
SSW
AutoCAD SHX Text
JLM
AutoCAD SHX Text
JLM
AutoCAD SHX Text
JLM
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
DATE OF ISSUE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REV
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
DWN BY
AutoCAD SHX Text
DES BY
AutoCAD SHX Text
APP BY
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text 1"
AutoCAD SHX Text 1/2"
AutoCAD SHX Text 0"
AutoCAD SHX Text 1"
AutoCAD SHX Text ALL PROFESSIONAL ENGINEERING WORK IS PERFORMED BY DULY LICENSED PROFESSIONAL ENGINEERS UNDER THE APPROPRIATE STATE REGISTERED PROFESSIONAL ENTITY.
AutoCAD SHX Text
GP-O
AutoCAD SHX Text
SUMP 6
AutoCAD SHX Text
PM-9
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text W5.7
AutoCAD SHX Text PROPERTY LINE SOLID WASTE BOUNDARY EXISTING GROUND 10' CONTOUR EXISTING GROUND 2' CONTOUR EXISTING ROAD/HAUL ROAD EXISTING FENCE LINE WETLANDS EXISTING MONITORING WELL EXISTING GAS MONITORING PROBE EXISTING PIEZOMETER EXISTING BARRIER WALL SUMP EXISTING GAS EXTRACTION WELL
AutoCAD SHX Text C.O.
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
WW.01
AutoCAD SHX Text EXISTING GAS EXTRACTION REMOTE WELLHEAD EXISTING INACTIVE WELL EXISTING HEADER ACCESS RISER EXISTING HEADER BLIND FLANGE EXISTING CONDENSATE SUMP EXISTING ISOLATION VALVE EXISTING ROAD CROSSING EXISTING LEACHATE COLLECTION RISER EXISTING AIRLINE AND FORCEMAIN EXISTING AIRLINE ONLY EXISTING FORCEMAIN ONLY
AutoCAD SHX Text EXISTING BELOW GROUND LANDFILL GAS HEADER EXISTING GAS HORIZONTAL COLLECTOR LATERAL CONNECTION (ABOVE GROUND) LATERAL ABANDONED/REMOVED ABANDONED GAS EXTRACTION WELL
AutoCAD SHX Text
MW-12-10
AutoCAD SHX Text
CS-7
AutoCAD SHX Text W1.4
AutoCAD SHX Text NOTES: 1. TOPOGRAPHIC MAP WAS PROVIDED BY JACOBI, TOOMBS & LANZ TOPOGRAPHIC MAP WAS PROVIDED BY JACOBI, TOOMBS & LANZ DATE OF PHOTO: 01/05/2022, SUPPLEMENTED BY AEI ON 02/24/2022. 2. GAS SYSTEM INFORMATION UPDATED DECEMBER 2022. GAS SYSTEM INFORMATION UPDATED DECEMBER 2022. 3. BARRIER WALL INFORMATION FROM POST CONSTRUCTION SURVEY BARRIER WALL INFORMATION FROM POST CONSTRUCTION SURVEY PROVIDED BY JACOBI TOOMBS AND LANZ, INC. AND PROPOSED BARRIER WALL CONSTRUCTION DRAWINGS FROM ATC. 4. A MULTIPURPOSE TRENCH EXISTS APPROXIMATELY 20 FEET INSIDE A MULTIPURPOSE TRENCH EXISTS APPROXIMATELY 20 FEET INSIDE THE BARRIER WALL CONTAINING LEACHATE COLLECTION, HORIZONTAL LANDFILL GAS COLLECTION, ELECTRIC CONDUIT AND LEACHATE FORCEMAIN.
| Clark-Floyd Landfill - 2022 GCCS Certification Rpt - DRAFT 2-28-23.pdf |
| CONSTRUCTION DOCUMENTATION REPORT |
| 2022 Landfill Gas Collection and Control System Construction |
| February 2023 |
| TABLE OF CONTENTS |
| 1 introduction |
| 1.1 Project Summary |
| 1.2 Reference Documents |
| 1.3 Parties |
| 2 Landfill gas collection and control system |
| 2.1 Summary of CQA Services |
| 2.2 GCCS Construction Components |
| 2.2.1 Pipeline Configuration |
| 2.2.2 Condensate Management |
| 3 summary and conclusions |
| 01-CFL-S-GCCS-2022_ASBUILT-01.pdf |
| Sheets and Views |
| 01 |
File details come from the government source that posted it. Updated .