This document is a Construction Documentation Report for the 2022 Landfill Gas Collection and Control System (GCCS) prepared by Cornerstone Environmental Group, LLC for Clark-Floyd Landfill, LLC, a joint venture between Clark and Floyd Counties located in Borden, Indiana. The report details the installation of interim gas conveyance piping during the 2022 calendar year, including the installation of approximately 2,071 feet of 10-inch diameter HDPE header/lateral pipe, 185 feet of 6-inch diameter pipe, 210 feet of 4-inch diameter pipe, and 311 feet of 3-inch diameter pipe. The project involved modifying interim conveyance piping to work around ongoing waste disposal operations, with the work concentrated on the east phase of the landfill.

The documentation includes a comprehensive record of pipeline construction, with details on pipe configurations, well connections, and condensate management. The report notes that no final gas collection system components were installed during this period, with final conveyance piping planned for future installation as the landfill approaches final grades. The project involved multiple parties, including Clark-Floyd Landfill, LLC as the operator and pipeline constructor, Pioneer Environmental & Engineering for pipeline construction, and ISCO Industries, Inc. and PumpOne as suppliers of pipes, fittings, and wellhead equipment. The report is part of the ongoing documentation and quality assurance process for the landfill's gas collection and control system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION

DOCUMENTATION REPORT

2022 Landfill Gas Collection and Control System Construction

February 2023

Prepared for:

Clark-Floyd Landfill, LLC 14304 IN Route 60 Borden, IN 47106

Building lifetime relationships with our clients and employees.

39395 W, 12 Mile Road Farmington Hills, MI

(877) 633-5520

Rev. 0, 2/28/23 Project 209-4201671 ii

Clark-Floyd Landfill - 2022 GCCS Certification Rpt - DRAFT 2-28-23 w-edits

REPORT CERTIFICATION

2022 Landfill Gas Collection and Control System Construction Documentation Report

Clark-Floyd Landfill Borden, Indiana

The material and data in this report were prepared under the supervision and direction of the undersigned.

Cornerstone Environmental Group, LLC

Jerry McGraner, PE, PLS Technical Manager

Rev. 0, 2/28/23 Project 209-4201671 iv

Clark-Floyd Landfill - 2022 GCCS Certification Rpt - DRAFT 2-28-23 w-edits

TABLE OF CONTENTS

1 INTRODUCTION

1.1 PROJECT SUMMARY

1.2 REFERENCE DOCUMENTS

1.3 PARTIES

2 LANDFILL GAS COLLECTION AND CONTROL SYSTEM

2.1 SUMMARY OF CQA SERVICES

2.2 GCCS CONSTRUCTION COMPONENTS

2.2.1 PIPELINE CONFIGURATION

2.2.2 CONDENSATE MANAGEMENT

3 SUMMARY AND CONCLUSIONS

LIMITATIONS

APPENDICES

APPENDIX A GCCS RECORD DRAWINGS

1 INTRODUCTION

1.1 Project Summary

This report presents construction documentation of the landfill gas collection and control system (GCCS) components installed at the Clark-Floyd Landfill Recycling & Disposal Facility during the 2022 calendar year. The landfill, located in Borden, Indiana, is jointly owned by the Clark and Floyd Counties and operated by Clark-Floyd Landfill, LLC (CFL).

The following report summarizes the installation of GCCS components, quality control observations and record documentation of the construction. It needs to be noted that the piping and installation work documented in this report relates to interm conveyance and not final GCCS components as outlined in the GCCS design Plan submitted to IDEM , February 2012.

Further, with waste disposal operations being concentrated on the east phase of the landfill and with the upward landfill growth on the east phase, interim conveyance piping is constantly changing to work around waste disposal operations; therefore, interim conveyance piping is being modified monthly with the final changes occurring during December 2022.

CFL performed pipeline construction and provided the as-built survey information for this report. These were used by Cornerstone to prepare the GCCS record drawings of the construction.

The construction involved the following:

Installation of replacement sections of header/laterals; and Construction of airlines and forcemains.

1.2 Reference Documents

The following documents were utilized fo the 2022 GCCS Construction Certification Report:

Drawing titled: “Landfill Gas Collection and Control System – 2022 As-Built”, one (1) sheet, dated 1/26/2023, produced by Tetra Tech.

1.3 Parties

The following parties were involved in the 2022 GCCS Construction:

Clark-Floyd Landfill, LLC – Landfill Operator/Pipeline Construction

Bruce Schmucker, P.E. – Vice President of Engineering and Environmental Affairs Albert Masticola – Field Technician/Surveyor Caleb Priddy – Filed Engineer

Pioneer Environmental & Engineering – Pipeline Construction Tim Shannon – Filed Technician

Cornerstone Environmental Group, LLC (Cornerstone) – Design Engineer/ Certifying Engineer/Construction Quality Assurance Jerry McGraner, P.E., L.S. - Project Manager /Certifying Engineer

ISCO Industries, Inc. – Pipe, Fittings, & Wellhead Supplier Andy Rogers – Supplier Contact

PumpOne – Well Pump & Fittings Supplier

Shawn DeVinney – Supplier Contact

2 LANDFILL GAS COLLECTION AND CONTROL SYSTEM

2.1 Summary of CQA Services

CFL provided CQA services during the 2022 GCCS construction. Cornerstone has toured the eastern half of the landfill and reviewed the as-built interim gas conveyance piping to confirm locations.

The installed and modified interim gas conveyance components consisted of:

Pipe Installation in the wellfield o 10-inch diameter SDR 17 HDPE solid header/lateral pipe totaling approximately 2,071 feet;

o 6-inch diameter SDR 17 HDPE solid header/lateral pipe totaling approximately 185 feet;

o 4-inch diameter SDR 11 HDPE solid lateral pipe totaling approximately 210 feet; and o 3-inch diameter SDR 11 HDPE solid lateral pipe totaling approximately 311 feet.

Pipe Removed/Abandoned in the wellfield o 6-inch diameter HDPE SDR 17 solid lateral pipe totaling approximately 1,500 feet.

2.2 GCCS Construction Components

2.2.1 Pipeline Configuration

As depicted on the Record Drawings included with this report, new interim, header and lateral piping were installed at several locations.

o A new, interim 10-inch HDPE SDR 17 header was installed from a 90-degree elbow on the west side of Unit 1 to new well W1.9R.

o A new, interim 10-inch HDPE SDR 17 header was installed in Unit 1 from W1.9R to a Tee – continuing west to well W1.2R and east to well W1.4R.

o A new, interim 10-inch HDPE SDR 17 lateral was installed in Unit 1 from W1.4R to well W1.8RR.

o A new,interim 6-inch HDPE SDR 17 lateral was installed in Unit 1 from the new 10” header to well WW 03.

o A new,interim 4-inch HDPE SDR 17 lateral was installed in Unit 1 from the new 10” header to well W1.10.

o A new, interim 10-inch HDPE SDR 17 header was installed in Unit 2 from near well W2.5 to well W2.6.

o A new, interim 4-inch HDPE SDR 17 lateral was installed in Unit 2 from well W2.6 to a point between well W2.6 and well W2.9. A new, interim 3” HDPE SDR 11 lateral was installed from the end of the 4” lateral to well W2.9.

o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a point between well W2.11 and well W2.7 to well W2.8.

o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a point between well W2.11 and well W2.7 to well W2.8.

o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a the new 10” header to well W2.5.

o A new, interim 3-inch HDPE SDR 17 lateral was installed in Unit 2 from a the new 10” header to well W2.6.

2.2.2 Condensate Management

LFG condensate from the newly installed, interim GCCS lateral pipes drain to existing header pipes and to existing condensate sumps.

3 SUMMARY AND CONCLUSIONS

Cornerstone has compiled and reviewed the documentation of the 2022 as-built GCCS, as constructed by CFL, in accordance with the GCCS Design Plan (dated February 2012) for the Clark-Floyd Landfill. This report provides documentation describing the extent and details of the GCCS construction.

No final gas collection portion of the system was installed during this calendar year. Future final collection system components will be installed in general accordance with the GCCS design plan and permit drawings approved by IDEM in August 2011. A Record Drawing of the GCCS layout is included in Appendix A. Final conveyance piping will be installed at this landfill as it approaches final grades and will likely be installed as part of cap installation so the piping can be accessed without damaging geosynthetic components of the cap system.

LIMITATIONS

The work product included in the attached was undertaken in full conformity with generally accepted professional consulting principles and practices and to the fullest extent as allowed by law we expressly disclaim all warranties, express or implied, including warranties of merchantability or fitness for a particular purpose. The work product was completed in full conformity with the contract with our client and this document is solely for the use and reliance of our client (unless previously agreed upon that a third party could rely on the work product) and any reliance on this work product by an unapproved outside party is at such party's risk.

The work product herein (including opinions, conclusions, suggestions, etc.) was prepared based on the situations and circumstances as found at the time, location, scope and goal of our performance and thus should be relied upon and used by our client recognizing these considerations and limitations. Cornerstone shall not be liable for the consequences of any change in environmental standards, practices, or regulations following the completion of our work and there is no warrant to the veracity of information provided by third parties, or the partial utilization of this work product.

APPENDIX A

GCCS RECORD DRAWINGS

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

PM-6

PM-5

PM-11

PM-12

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.

W.P.

W.P.

W.P.

W.P.

W.P.

C.O.

C.O.

C.O.

C.O.

C.O.

C.O.C.O.

C.O.

C.O.

C.O.

AIR

A

IR

A

IR

LANDFILL GAS COLLECTION AND CONTROL SYSTEM

DECEMBER 2022 AS-BUILT

AutoCAD SHX Text 486.3

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 479.1

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 481.8

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 481.0

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 483.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 518.424

AutoCAD SHX Text 510.185

AutoCAD SHX Text 544.746

AutoCAD SHX Text 548.106

AutoCAD SHX Text 543.344

AutoCAD SHX Text 538.181

AutoCAD SHX Text 488.452

AutoCAD SHX Text 536.738

AutoCAD SHX Text 537.545

AutoCAD SHX Text 545.945

AutoCAD SHX Text 496.466

AutoCAD SHX Text 495.891

AutoCAD SHX Text

POST

AutoCAD SHX Text

SIGN

AutoCAD SHX Text 486.3

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 480.7

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 478.6

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 479.1

AutoCAD SHX Text W.S.E.

AutoCAD SHX Text 544.5

AutoCAD SHX Text

SECTION 6

AutoCAD SHX Text

CELL W-1

AutoCAD SHX Text

SECTION 5

AutoCAD SHX Text

SEDIMENTATION BASIN #2

AutoCAD SHX Text

C&D VERTICAL EXPANSION AREA

AutoCAD SHX Text

SECTION 7 HORIZONTAL EXPANSION

AutoCAD SHX Text

FUTURE SEDIMENT BASIN

AutoCAD SHX Text

PM-7

AutoCAD SHX Text

PM-6

AutoCAD SHX Text

PM-5

AutoCAD SHX Text

PM-11

AutoCAD SHX Text

PM-12

AutoCAD SHX Text

PM-9

AutoCAD SHX Text

PM-10

AutoCAD SHX Text

PM-8

AutoCAD SHX Text

MW-10-14

AutoCAD SHX Text

MW-B1-11

AutoCAD SHX Text

MW-9-11

AutoCAD SHX Text

MW-B11-10

AutoCAD SHX Text

MW-14-1

AutoCAD SHX Text

MW-15-11

AutoCAD SHX Text

MW-16-10

AutoCAD SHX Text

MW-12-10

AutoCAD SHX Text

MW-11-11

AutoCAD SHX Text

MW-6-11

AutoCAD SHX Text

MW-5-10

AutoCAD SHX Text

MW-4-16

AutoCAD SHX Text

MW-3

AutoCAD SHX Text

MW-2

AutoCAD SHX Text

MW-1-11

AutoCAD SHX Text

MW-B4B-10

AutoCAD SHX Text

MW-B4A-10

AutoCAD SHX Text W.P.

AutoCAD SHX Text W.P.

AutoCAD SHX Text W.P.

AutoCAD SHX Text W.P.

AutoCAD SHX Text W.P.

AutoCAD SHX Text

SUMP 2

AutoCAD SHX Text

SUMP 8

AutoCAD SHX Text

SUMP 7

AutoCAD SHX Text

SUMP 6

AutoCAD SHX Text

SUMP 5

AutoCAD SHX Text

SUMP 5A

AutoCAD SHX Text

GP-L

AutoCAD SHX Text

GP-M

AutoCAD SHX Text

GP-N

AutoCAD SHX Text

GP-O

AutoCAD SHX Text

UNIT 2

AutoCAD SHX Text

UNIT 1 SOUTH

AutoCAD SHX Text

UNIT 1 NORTH

AutoCAD SHX Text

C&D VERTICAL EXPANSION AREA

AutoCAD SHX Text

6" LINE "B"

AutoCAD SHX Text 12"

AutoCAD SHX Text

10" LINE "A"

AutoCAD SHX Text

14" LINE "A"

AutoCAD SHX Text 16"

AutoCAD SHX Text 16"

AutoCAD SHX Text 18"

AutoCAD SHX Text S

AutoCAD SHX Text 12"

AutoCAD SHX Text

10" LINE "B"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"

AutoCAD SHX Text W1.2

AutoCAD SHX Text W1.10

AutoCAD SHX Text W1.1

AutoCAD SHX Text W1.9

AutoCAD SHX Text W1.3

AutoCAD SHX Text W1.8

AutoCAD SHX Text W1.7

AutoCAD SHX Text W1.6

AutoCAD SHX Text W1.5

AutoCAD SHX Text W2.1

AutoCAD SHX Text W2.2

AutoCAD SHX Text W2.3

AutoCAD SHX Text W2.5

AutoCAD SHX Text W2.6

AutoCAD SHX Text W2.9

AutoCAD SHX Text W2.10

AutoCAD SHX Text W2.8

AutoCAD SHX Text W2.11

AutoCAD SHX Text W5.3

AutoCAD SHX Text W5.1

AutoCAD SHX Text W5.0

AutoCAD SHX Text W5.2

AutoCAD SHX Text W5.9

AutoCAD SHX Text W5.6

AutoCAD SHX Text W5.5

AutoCAD SHX Text W5.7

AutoCAD SHX Text W5.8

AutoCAD SHX Text W5.4

AutoCAD SHX Text W2.7

AutoCAD SHX Text W2.4

AutoCAD SHX Text W2.13

AutoCAD SHX Text W2.14

AutoCAD SHX Text W1.15

AutoCAD SHX Text W2.12

AutoCAD SHX Text W2.16

AutoCAD SHX Text W2.17

AutoCAD SHX Text W2.18

AutoCAD SHX Text W2.19

AutoCAD SHX Text W2.22

AutoCAD SHX Text W2.21

AutoCAD SHX Text W2.20

AutoCAD SHX Text W2.23

AutoCAD SHX Text W2.24

AutoCAD SHX Text W2.25

AutoCAD SHX Text W2.27

AutoCAD SHX Text W2.26

AutoCAD SHX Text W1.11

AutoCAD SHX Text W1.25

AutoCAD SHX Text W1.24

AutoCAD SHX Text W1.23

AutoCAD SHX Text W1.22

AutoCAD SHX Text W1.21

AutoCAD SHX Text W1.20

AutoCAD SHX Text W1.19

AutoCAD SHX Text W1.18

AutoCAD SHX Text W1.17

AutoCAD SHX Text W1.16

AutoCAD SHX Text W1.15

AutoCAD SHX Text W1.13

AutoCAD SHX Text W1.12

AutoCAD SHX Text W6.1

AutoCAD SHX Text W6.2

AutoCAD SHX Text W6.3

AutoCAD SHX Text W6.5

AutoCAD SHX Text W6.6

AutoCAD SHX Text W6.9

AutoCAD SHX Text W6.10

AutoCAD SHX Text W6.12

AutoCAD SHX Text W6.13

AutoCAD SHX Text W6.14

AutoCAD SHX Text W6.16

AutoCAD SHX Text W6.8

AutoCAD SHX Text W6.7

AutoCAD SHX Text W6.15

AutoCAD SHX Text 18"

AutoCAD SHX Text 18"

AutoCAD SHX Text 18"

AutoCAD SHX Text 4"

AutoCAD SHX Text 10"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"

AutoCAD SHX Text

CS-3

AutoCAD SHX Text

CS-4

AutoCAD SHX Text

CS-6

AutoCAD SHX Text

CS-7

AutoCAD SHX Text

CS-8

AutoCAD SHX Text

CS-9

AutoCAD SHX Text

CS-10

AutoCAD SHX Text

CS-12

AutoCAD SHX Text

CS-11

AutoCAD SHX Text 10"

AutoCAD SHX Text W1.1R

AutoCAD SHX Text W1.8R

AutoCAD SHX Text W6.11R

AutoCAD SHX Text W1.7R

AutoCAD SHX Text W1.5R

AutoCAD SHX Text

WW.01

AutoCAD SHX Text

WW.02

AutoCAD SHX Text

WW.03

AutoCAD SHX Text

WW.05

AutoCAD SHX Text

WW.04

AutoCAD SHX Text

WW.06

AutoCAD SHX Text

WW.07

AutoCAD SHX Text

WW.08

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"x6"x6" TEE

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 3"

AutoCAD SHX Text

HP

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text W1.3R

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

NEW CONDENSATE SUMP

AutoCAD SHX Text

NEW FLARE

AutoCAD SHX Text W6.14R

AutoCAD SHX Text

WW.09

AutoCAD SHX Text

WW.11

AutoCAD SHX Text

WW.15

AutoCAD SHX Text

WW.14

AutoCAD SHX Text

WW.13

AutoCAD SHX Text

WW.12

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

REMOVED

AutoCAD SHX Text

ABANDONED IN PLACE

AutoCAD SHX Text

ABANDONED IN PLACE

AutoCAD SHX Text 6"

AutoCAD SHX Text

HC001

AutoCAD SHX Text

BARRIER WALL GAS COLLECTION CONNECTION

AutoCAD SHX Text

ABANDONED IN PLACE

AutoCAD SHX Text 6"

AutoCAD SHX Text

REMOTE WELLHEAD FOR W1.18

AutoCAD SHX Text

ABANDONED IN PLACE

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"x6" RED.

AutoCAD SHX Text W6.4R

AutoCAD SHX Text W1.2R

AutoCAD SHX Text W1.4R

AutoCAD SHX Text W1.14R

AutoCAD SHX Text

REMOTE WELLHEAD FOR W6.8

AutoCAD SHX Text

REMOTE WELLHEAD FOR W1.8R

AutoCAD SHX Text

REMOTE WELLHEAD FOR WW.11

AutoCAD SHX Text

REMOTE WELLHEAD FOR W1.25

AutoCAD SHX Text 10"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text

LS-1

AutoCAD SHX Text

W1.7RR

AutoCAD SHX Text W1.13R

AutoCAD SHX Text 6"

AutoCAD SHX Text

REMOTE WELLHEAD

AutoCAD SHX Text

REMOTE WELLHEAD

AutoCAD SHX Text

REMOTE WELLHEAD

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

W1.8RR

AutoCAD SHX Text

WW.06R

AutoCAD SHX Text

WW.04R

AutoCAD SHX Text W1.9R

AutoCAD SHX Text 6"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6"

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text 10"

AutoCAD SHX Text

FUTURE SEDIMENT BASIN

AutoCAD SHX Text E 282,000

AutoCAD SHX Text E 278,000

AutoCAD SHX Text N 1,169,000

AutoCAD SHX Text N 1,168,000

AutoCAD SHX Text E 279,000

AutoCAD SHX Text E 280,000

AutoCAD SHX Text E 281,000

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

CLARK-FLOYD LANDFILL, INC.

AutoCAD SHX Text

CLARK-FLOYD LANDFILL RECYCLING & DISPOSAL FACILITY

AutoCAD SHX Text

BORDEN, INDIANA

AutoCAD SHX Text 209-4201671

AutoCAD SHX Text 1/26/23

AutoCAD SHX Text

SSW

AutoCAD SHX Text

JLM

AutoCAD SHX Text

JLM

AutoCAD SHX Text

JLM

AutoCAD SHX Text

CHK BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

DATE OF ISSUE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REV

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

DWN BY

AutoCAD SHX Text

DES BY

AutoCAD SHX Text

APP BY

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NO.

AutoCAD SHX Text 1"

AutoCAD SHX Text 1/2"

AutoCAD SHX Text 0"

AutoCAD SHX Text 1"

AutoCAD SHX Text ALL PROFESSIONAL ENGINEERING WORK IS PERFORMED BY DULY LICENSED PROFESSIONAL ENGINEERS UNDER THE APPROPRIATE STATE REGISTERED PROFESSIONAL ENTITY.

AutoCAD SHX Text

GP-O

AutoCAD SHX Text

SUMP 6

AutoCAD SHX Text

PM-9

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text W5.7

AutoCAD SHX Text PROPERTY LINE SOLID WASTE BOUNDARY EXISTING GROUND 10' CONTOUR EXISTING GROUND 2' CONTOUR EXISTING ROAD/HAUL ROAD EXISTING FENCE LINE WETLANDS EXISTING MONITORING WELL EXISTING GAS MONITORING PROBE EXISTING PIEZOMETER EXISTING BARRIER WALL SUMP EXISTING GAS EXTRACTION WELL

AutoCAD SHX Text C.O.

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

WW.01

AutoCAD SHX Text EXISTING GAS EXTRACTION REMOTE WELLHEAD EXISTING INACTIVE WELL EXISTING HEADER ACCESS RISER EXISTING HEADER BLIND FLANGE EXISTING CONDENSATE SUMP EXISTING ISOLATION VALVE EXISTING ROAD CROSSING EXISTING LEACHATE COLLECTION RISER EXISTING AIRLINE AND FORCEMAIN EXISTING AIRLINE ONLY EXISTING FORCEMAIN ONLY

AutoCAD SHX Text EXISTING BELOW GROUND LANDFILL GAS HEADER EXISTING GAS HORIZONTAL COLLECTOR LATERAL CONNECTION (ABOVE GROUND) LATERAL ABANDONED/REMOVED ABANDONED GAS EXTRACTION WELL

AutoCAD SHX Text

MW-12-10

AutoCAD SHX Text

CS-7

AutoCAD SHX Text W1.4

AutoCAD SHX Text NOTES: 1. TOPOGRAPHIC MAP WAS PROVIDED BY JACOBI, TOOMBS & LANZ TOPOGRAPHIC MAP WAS PROVIDED BY JACOBI, TOOMBS & LANZ DATE OF PHOTO: 01/05/2022, SUPPLEMENTED BY AEI ON 02/24/2022. 2. GAS SYSTEM INFORMATION UPDATED DECEMBER 2022. GAS SYSTEM INFORMATION UPDATED DECEMBER 2022. 3. BARRIER WALL INFORMATION FROM POST CONSTRUCTION SURVEY BARRIER WALL INFORMATION FROM POST CONSTRUCTION SURVEY PROVIDED BY JACOBI TOOMBS AND LANZ, INC. AND PROPOSED BARRIER WALL CONSTRUCTION DRAWINGS FROM ATC. 4. A MULTIPURPOSE TRENCH EXISTS APPROXIMATELY 20 FEET INSIDE A MULTIPURPOSE TRENCH EXISTS APPROXIMATELY 20 FEET INSIDE THE BARRIER WALL CONTAINING LEACHATE COLLECTION, HORIZONTAL LANDFILL GAS COLLECTION, ELECTRIC CONDUIT AND LEACHATE FORCEMAIN.

Clark-Floyd Landfill - 2022 GCCS Certification Rpt - DRAFT 2-28-23.pdf
CONSTRUCTION DOCUMENTATION REPORT
2022 Landfill Gas Collection and Control System Construction
February 2023
TABLE OF CONTENTS
1 introduction
1.1 Project Summary
1.2 Reference Documents
1.3 Parties
2 Landfill gas collection and control system
2.1 Summary of CQA Services
2.2 GCCS Construction Components
2.2.1 Pipeline Configuration
2.2.2 Condensate Management
3 summary and conclusions