CLARIFICATION # 1.pdf

PDF 110 KB Posted

Attached to
FDOT Generator Installation for Palm Beach County
Solicitation number
ITB-04510
Issued by
Broward County, Fruitville CDP, Florida

About this file

This document is a clarification issued by the Florida Department of Transportation (FDOT) District Four regarding a generator installation project at the FDOT Palm Beach Operations Center in West Palm Beach, Florida. The project involves the installation of a 316-gallon fuel tank generator system within approximately 100 feet of the welding shop and 320 feet of the crew building. Bidders must acknowledge receipt of this clarification when submitting their bids for the project.

The contract opportunity is for a stand-by generator system with a standard five-year warranty. The project is located at 7900 Forest Hill Blvd, West Palm Beach, FL 33413 and falls under the jurisdictions of Broward County and the City of Fort Lauderdale. No other pricing, set-aside, incumbent, or funding details are provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

3400 West Commercial Boulevard

Fort Lauderdale, FL 33309

JARED W. PERDUE, P.E.

SECRETARY

www.fdot.gov

CLARIFICATION #1

PROJECT: FCO F4005 FDOT PALM BEACH OPERATIONS CENTER -WEST PALM

BEACH, GENERATOR INSTALLATION AT 7900 FOREST HILL BLVD, WEST PALM

BEACH, FL 33413

FM # 444755-7-52-01; 444755-7-32-01; 450056-2-52-01

Please find the questions and answers regarding FCO Palm Beach Operations Center - West Palm Beach, Generator Installation, Advertisement Number: F4005

Question # 1:

What size fuel tank you are requiring. Also, what is the distance between the proposed installation site and the buildings you need wired into the generator.

Answer:

Fuel Tank Size (316 Gallon)

Proposed Distance 100 feet from welding shop and 320 feet approximately to crew building.

You must acknowledge receipt of this Clarification #1 when you submit your bid.

Regards.

Maria Velarde for Margaret Simpkins

District 4, District Contract Administrator

Copy: File

File details come from the government source that posted it. Updated .