The document is a detailed set of technical design and electrical specifications for a firing range project for the Clarendon County Sheriff's Office in South Carolina, prepared by Action Target Inc. The plans provide comprehensive engineering drawings for a tactical shooting range, including range layout, electrical schematics, target control module details, power supply configurations, and compressor room specifications. The design includes precise measurements for a 25-yard range with specific electrical requirements such as 120/240 VAC circuits, multiple power disconnects, target control systems, and infrastructure for range equipment like target mechanisms, communications systems, and air compressor installations.
The technical submittal is marked as a 100% revision dated February 8, 2024, with subsequent minor revisions on March 5 and June 18, 2024. The electrical specifications outline requirements for electrical infrastructure to be provided by others, including internet access, power supplies, conduit, and wiring. The documents emphasize that the plans are proprietary to Action Target Inc. and are restricted to the original project site, with reproduction prohibited. Critical electrical components include a Target Control Module (TCM) with 10 channels, direct service power supplies, ethernet connections, and specific receptacle and junction box configurations to support the range's operational systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024 - Q004 - Addendum 1 - FINAL.pdf | ||
| 2024-Q004 Addendum 2 Final.pdf | ||
| 2024-Q004 Final Quote.pdf | ||
| 2024-10-04 Building-Target Site Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. FIXED POSITION FIRING RANGE:
· TRAJECTORIES START AT 1' ABOVE FINISHED FLOOR AT FIRING LINE.
PAST 25 YARDS, SECONDARY TRAJECTORIES DESIGNED TO CONTAIN
6° PROJECTILE DEFLECTION.
· BAFFLE LAYOUT PROVIDES STEEL COVERAGE OF TRAJECTORY + 2"
ON BAFFLE/TRAP.
· COVERAGE EXTENDS 36" BEHIND FIRING LINE, PROVIDING A 90°
CONTAINMENT AREA AT FIRING LINE.
· BAFFLE ANGLE DESIGNED TO NOT EXCEED 30°.
· TARGETRY HEIGHT DESIGNED TO PLACE THE TOP OF HEAD AT 5'-10"
AFF.
2. TACTICAL FIRING RANGE:
· TRAJECTORIES START AT 1' ABOVE FINISHED FLOOR AT FURTHEST
FIRING POSITION TO 10 YARDS. TRAJECTORIES AT 3 YARD TO 10
YARD LOCATIONS START AT 4' ABOVE FINISHED FLOOR. SECONDARY
TRAJECTORIES DESIGNED TO CONTAIN 6° PROJECTILE DEFLECTION.
· BAFFLE LAYOUT PROVIDES STEEL COVERAGE OF 1" HORIZONTAL
OVERLAP ON BAFFLES AND 2" TRAJECTORY OVERLAP ON TRAP.
· COVERAGE EXTENDS 36" BEHIND FIRING LINE
· LAYOUT PROVIDES A 90° CONTAINMENT AREA FROM THE 3 METER
LINE TO THE FURTHEST FIRING POSITION.
· BAFFLE ANGLE DESIGNED TO NOT EXCEED 18°. TARGETRY HEIGHT
DESIGNED TO PLACE THE TOP OF HEAD AT 5'-10" AFF.
3. M.A.T.C.H. (MODULAR ARMORED TACTICAL COMBAT HOUSE):
· DESIGNED TO CONTAIN ROUNDS FIRED BETWEEN 0"AFF AND 84" AFF.
WALLS DESIGNED TO BE A NOMINAL 8' TALL, WITH 84" AFF AND
ABOVE DESIGNATED NO SHOOT ZONE.
· WALL SYSTEM AND GRID REFERENCES DESIGNED ON A 4'-0" x 4'-0"
GRID.
· PAINT SCHEME:
·· RED PAINT - NO SHOOT ZONE
·· WHITE PAINT - SHOOT ZONE
··· WHEN CONFIGURING TRAINING SCENARIO'S BE AWARE OF
THE TRAJECTORY OF THE ROUND AFTER IT PENETRATES
THE INTENDED TARGET.
·· TAN PAINT - CAUTION ZONE
··· ROUNDS HAVE POTENTIAL TO PENETRATE THIS ZONE.
4. BUILDING / EQUIPMENT ACCESS:
· SCREW CONVEYOR SYSTEM / DUST COLLECTION SYSTEM:
·· SUGGESTED ACCESS AREA AROUND EQUIPMENT FOR THE
DISPOSE OF COLLECTED MATERIALS IS:
··· 4'-6" - FOR A FORKLIFT
··· 3'-0" - FOR A PALLET JACK
· SPACE NEEDED FOR MATERIALS INSTALLATION AND INSTALLATION
EQUIPMENT:
·· SUGGESTED ACCESS AREA TO RANGE AREA: (FOR ENTIRE
DURATION OF INSTALLATION)
··· MIN (1) 4'-6" WIDE BY 7'-6" TALL ACCESS PER RANGE/BAY
5. CONCRETE SPECS:
· ALL CONCRETE MUST HAVE A FLATNESS TOLERANCE OF 1/8" OVER
20' (3MM OVER 6M) FOR ANY CONCRETE WORK WHERE ACTION
TARGET EQUIPMENT WILL BE INSTALLED AND/OR ATTACHED (WALLS
AND FLOOR). CONCRETE SURFACES MUST NOT BE CROWNED OR
SLOPED UNLESS SPECIFICALLY NOTED ON ACTION TARGET
DRAWINGS.
· RANGE FLOOR CONCRETE SHOULD BE 3,000 PSI MINIMUM, IDEALLY
5,000 PSI. IF CMU BLOCKS ARE USED FOR RANGE SIDE WALLS, THEY
SHOULD BE HIGH DENSITY BLOCKS OF AT LEAST 4,000 PSI, CAVITIES
MUST BE FILLED WITH 4,000 PSI CONCRETE. MORTAR LINES SHOULD
BE "FLUSH" WITH THE BLOCK INSIDE RANGE AND NOT "INDENTED".
CLARENDON CSO, SC
DESIGN CRITERIA: DISCLAIMERS:
NOTICE TO BUILDER & ALL SUBCONTRACTORS
THESE DOCUMENTS PROVIDE INFORMATION ONLY ABOUT ACTION TARGET'S
PRODUCTS AND NOTHING MORE. IT IS THE INTENT OF ACTION TARGET THAT
THESE DOCUMENTS BE ACCURATE, PROVIDING LICENSED PROFESSIONALS
CLEAR INFORMATION. EVERY ATTEMPT HAS BEEN MADE TO PREVENT
ERROR. THE CUSTOMER, OWNER, BUILDER, AND ALL SUBCONTRACTORS
ARE REQUIRED TO REVIEW ALL THE INFORMATION CONTAINED IN THESE
DOCUMENTS PRIOR TO THE COMMENCEMENT OF ANY WORK. ACTION
TARGET IS NOT RESPONSIBLE FOR ANY ERRORS, OMISSIONS, OR
MISINTERPRETATIONS UNDETECTED AND NOT REPORTED TO ACTION
TARGET PRIOR TO CONSTRUCTION. ALL CONSTRUCTION MUST BE IN
ACCORDANCE WITH THE INFORMATION FOUND IN THESE DOCUMENTS. ANY
QUESTIONS REGARDING THE INFORMATION FOUND IN THESE DOCUMENTS
SHOULD BE DIRECTED TO OUR OFFICE AT (801) 377-8033 IMMEDIATELY. NO
BACKCHARGES WILL BE CONSIDERED FOR REIMBURSEMENT BY ACTION
TARGET WITHOUT ADVANCED NOTIFICATION AND APPROVAL BY ACTION
TARGET. PAYMENTS WILL BE MADE IN ACCORDANCE WITH THE TERMS OF
THE AGREEMENT
· ELECTRICAL:
WHERE ELECTRICAL CONTRACTOR IS REQUIRED ALL ACTION TARGET
INC. ELECTRICAL DRAWINGS WILL BE USED ONLY AS REFERENCE
MATERIAL FOR THE ELECTRICAL CONTRACTOR TO UTILIZE IN THEIR
DESIGN OF THE COMPLETE BUILDING / RANGE SYSTEM (UNLESS
NOTED OTHERWISE.) FINAL LOCATION OF ELECTRICAL EQUIPMENT
CONTAINED IN THE ACTION TARGET INC. ELECTRICAL LAYOUTS TO BE
VERIFIED WITH ACTION TARGET INC., ELECTRICAL CONTRACTOR,
AND CUSTOMER BEFORE INSTALLATION.
· ARCHITECTURAL:
ALL BUILDING MEASUREMENTS ARE TO BE CONSIDERED ACTION
TARGET INC. SUGGESTIONS, UNLESS PROPER DIMENSIONAL PLANS /
INFORMATION HAS BEEN PROVIDED. ACTION TARGET INC. IS NOT
LIABLE FOR ANY CONFLICTS BETWEEN ITS EQUIPMENT AND ANY
VARIATIONS FROM THE BUILDING DESIGN (AS PORTRAYED FROM
CUSTOMER TO ACTION TARGET INC. EITHER BY PROVIDED PLANS OR
OTHER FORM OF COMMUNICATION) AND THE COMPLETED BUILDINGS
DIMENSIONS AND LAYOUT. ADDITIONAL MATERIAL AND PRODUCT
REDESIGN MAY BE REQUIRED IF THE STRUCTURE VARIES FROM
INDICATED SIZE AND LAYOUT.
· STRUCTURAL:
WHERE ENGINEER IS REQUIRED ALL ITEMS PERTAINING TO ACTION
TARGET INC. MATERIALS AND EQUIPMENT, AND IT'S CONNECTION TO
/ SUPPORT FROM THE STRUCTURE IS TO BE VERIFY AND APPROVED
BY THE ENGINEER OF RECORD. ALL ACTION TARGET INC. PLANS
INDICATING ANCHOR SIZES AND CONNECTION METHOD, CONCRETE
DEPTH, REBAR LAYOUTS, AND ANY OTHER ITEMS PERTAINING TO
THE CONNECTION AND SUPPORT OF ACTION TARGET INC.
EQUIPMENT TO BE UTILIZED BY ENGINEER AS ACTION TARGET INC.'S
PREFERRED METHOD.
· USE AND REPRODUCTION:
THE USE OF THESE PLANS SHALL BE RESTRICTED TO THE ORIGINAL
PROJECT SITE FOR WHICH THEY WERE PREPARED. PUBLICATIONS
EXPRESSLY LIMITED TO SUCH USE, RE-USE, REPRODUCTION, OR
PUBLICATION BY ANY METHOD IN WHOLE OR PART IS PROHIBITED,
UNLESS WRITTEN CONSENT IS PROVIDED BY ACTION TARGET INC.
DRAWINGS REMAIN THE PROPERTY OF ACTION TARGET INC.
WITHOUT RESERVATION.
· SHEETS Z5XX.X
STANDARD DETAIL SHOWN FOR REFERENCE ONLY ACTUAL
INSTALLATION MAY VARY.
SHEET INDEX:GENERAL ELECTRICAL NEEDS:
1. RANGE WILL HAVE 120/240 VAC AND MULTIPLE 20 AMP CIRCUITS
PROVIDED BY OTHERS IF ANY OF THE FOLLOWING CONDITIONS ARE
PRESENT IN ATTACHED RANGE DESIGN:
· TARGETRY IS PRESENT.
· TARGETRY CONTROL EQUIPMENT IS PRESENT.
· STALL (AND/OR) RANGE LIGHTING IS PRESENT.
· COMMUNICATION SYSTEMS ARE PRESENT.
· A DUST COLLECTION UNIT IS PRESENT.
· AN AIR COMPRESSOR IS PRESENT
2. RANGE WILL HAVE MULTIPLE 3 PHASE 208/240/480 VAC DISCONNECTS
PROVIDED BY OTHERS IF ANY OF THE FOLLOWING CONDITIONS ARE
PRESENT IN ATTACHED RANGE DESIGN:
· A SCREW CONVEYOR SYSTEM IS PRESENT. (TYPICALLY UTILIZES 2
OR MORE 3HP 3 PHASE MOTORS)
· A DUST COLLECTION UNIT IS PRESENT.
3. CUSTOMER TO PROVIDE ACCESS TO INTERNET FOR ACTION TARGET
EQUIPMENT.
4. - THE DENOTES HOME RUN OF CAT5e OR GREATER FROM DATA
JACK LOCATION TO GENESIS RANGE SERVER PATCH PANEL.
5. - THE (XX) DENOTES PORT ID# AND CORRESPONDING PATCH PANEL
WIRING LOCATION.
ABBREVIATED UN-ABBREVIATED
~ APPROXIMATE / APPROXIMATELY
AFF ABOVE FINISHED FLOOR
APROX APPROXIMATE / APPROXIMATELY
ATI ACTION TARGET INC.
AWG AMERICAN WIRE GAUGE
BOS BOTTOM OF STEEL
BOT BOTTOM
CL CENTER LINE
CFM CUBIC FEET PER MINUTE
DCU DUST COLLECTION UNIT
EMT ELECTRICAL METALLIC TUBING
EQ EQUAL / EQUALS
EQ APROX EQUAL APPROXIMATE
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
LBS POUNDS
MDU MOTOR DRIVE UNIT
NTS NOT TO SCALE
PSI POUNDS PER SQUARE INCH
RBT RUBBER BERM TRAP
SCS SCREW CONVEYOR SYSTEM
SPKR SPEAKER
TCT TOTAL CONTAINMENT TRAP
TCT 2 TOTAL CONTAINMENT TRAP VERSION 2
TCT 4 TOTAL CONTAINMENT TRAP VERSION 4
TCT 4D TOTAL CONTAINMENT TRAP VERSION 4D
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
GSR GENESIS SERVER RACK
SRAS SMART RANGE AXIS SCREEN
# FLOOR PLAN
Scale - 1/4" = 1'-0"#
SYMBOLS & CALLOUTS
DETAIL NUMBER
DETAIL PAGE
AREA /
ITEM DETAILED
PAGE NUMBER
DETAIL NAME
DETAIL SCALE
DETAIL NUMBER
PAGE NUMBER
END OF DETAIL
SECTION AREA DETAIL NUMBER
PAGE NUMBER
FULL SECTION CUT LINE
20'-0" [6.10]
STANDARD METRIC (METERS)
DETAIL NUMBER
Z101 RANGE PLAN
· ALL DIMENSION LINES SHOW DEFAULT OF U.S. STANDARD UNITS, WITH
METRIC UNITS AS SECONDARY INDICATED BY THERE LOCATION
BETWEEN THE FOLLOWING SYMBOLS [ ]
SEE EXAMPLE BELOW FOR CLARIFICATION:
ABBREVIATIONS:
DIMENSIONS CLARIFICATION:
XX
XX
Z301 RANGE SECTION
Z001 INDEX PAGE
Z535.5 POWER 90 DETAILS
Z700 GENERAL ELECTRICAL NOTES
Z701 ELECTRICAL RANGE PLAN
Z704.1 TARGET CONTROL MODULE DETAILS
Z745.5 POWER 90 ELECTRICAL SCHEMATIC
Z757.1 COMPRESSOR ROOM DETAILS
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z001
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
INDEX
PAGE
Signature:
Printed Name:
Date:
CUSTOMER APPROVAL:
NOTWITHSTANDING THE CONTRACT DOCUMENTS, APPROVAL OF THESE DRAWINGS SHALL ACT AS AN AMENDMENT
TO THE PARTIES' AGREEMENT AND SUPERSEDE ALL PREVIOUS DRAWINGS.
75'-0"
[25 YD]
9'-0"
[3 YD]
'-8
7' -0
7'
-0
7' -0
7'
-0
7' -0
7'
-0
7' -0
7'
-0
~5 '-4
FIRING
LINE
TARGET
LINE
3 YD
FIRING
LINE
CL
LANE LINES SHOWN FOR CLARITY ONLY
-BY OTHERS
POWER 90
SEE Z535.5
~5 '-4
Z101
1 RANGE PLAN
Scale - 3/16" = 1'-0"
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z101
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
RANGE
PLAN
75'-0"
[25 YD]
9'-0"
[3 YD]
FIRING
LINE
TARGET
LINE
3 YD
FIRING
LINE
1'-3"
0'-1 3/4"
1'-0"
1'-4 3/4"
0' -6
LE
G
TARGET
LINE
3 YD
FIRING
LINE
5' -0
TRAJECTORY LINE
POWER 90
SEE Z535.5
2' -6
VE
R
IF
Y H
EI
G
H T
O F
EX
IS
TI
N
G
KN
EE
W
AL
L
Z301
Z301
2 Target Line Section Scale - 1/2" = 1'-0"
Z301
1 Range Section Scale - 3/16" = 1'-0"
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z301
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
RANGE
SECTION
NOTE:
SPACE BELOW STRUCTURAL MEMBER SHALL
BE FREE OF OBSTRUCTIONS UNLESS
COORDINATED WITH ACTION TARGET.
WOOD HOLDER
FOR TARGET
TARGET
POWER 90
HOLDER
HOLDER
WING BOLT
POWER 90 LEG
ACTUATOR ASSEMBLY
0' -8
0' -1
0"
1'-3 3/4"
1'-4 1/2"
BASE LENGTH
POWER 90 MOTOR
LEG BASE TO CONCRETE FLOOR
1'-1 3/4"
Ø0'-0 1/2"
TYP.
TARGET LINE
POWER 90
TARGET LINE
CONCRETE WEDGE ANCHORS
1/2" FLEX W/ TIE DOWN STRAP
3" WIRE RACEWAY
1'-4 3/4"
BALLISTIC KNEE-WALL REQUIRED
TO PROTECT POWER 90
-BY OTHERS
CONCRETE PAD
-BY OTHERS
2' -6
M
IN
0'-3"
MIN.
0' -6
LE
G
2'-1 1/2"
STANDARD TARGET HOLDER
Z535.5
1 Power 90 Target Details Scale - 1 - 1/2" = 1'-0"
Z535.5
Z535.5
2 Power 90 Top View Scale - 6" = 1'-0"
Z535.5
3 Power 90 ELEVATION VIEW Scale - 1 - 1/2" = 1'-0"
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z535.5
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
POWER 90 DETAILS
1. INSTALLATION OF ALL WORK SHALL BE IN ACCORDANCE WITH THE FOLLOWING
REGULATIONS, CODES, ETC.
A. LOCAL CODES AND ORDINANCES
B. THE EDITION OF THE NATIONAL ELECTRICAL CODE NFPA 70 (NEC) IN EFFECT.
2. PRIOR TO BEGINNING ANY WORK, SECURE NECESSARY PERMITS OR CLEARANCES FROM
THE AUTHORITIES HAVING JURISDICTION. PROVIDE ALL LABOR AND MATERIALS FOR A
COMPLETE INSTALLATION. WORK SHALL BE EXECUTED BY EXPERIENCED ELECTRICIANS
WHO ARE LICENSED IN THE JURISDICTION WHERE THE PROJECT IS LOCATED.
3. THE CONTINUITY OF ALL EXISTING CIRCUITS TO REMAIN SHALL BE MAINTAINED.
4. THE ELECTRICAL PLANS ARE DIAGRAMMATIC ONLY. COORDINATE ELECTRICAL
EQUIPMENT LOCATION AND INSTALLATION WITH EQUIPMENT BEING SERVED. PROVIDE
ALL POWER AND TELECOMMUNICATION FINAL CONNECTIONS TO THE SYSTEM
FURNITURE AS REQUIRED.
5. ALL EQUIPMENT SUCH AS RELAYS, SWITCHES, PANELS, AND OTHER APPURTENANCES
SHALL HAVE IDENTIFICATION PLATES OF BLACK LAMINATED PLASTIC WITH 1/2" WHITE
LETTERS. ALL JUNCTION BOXES IN CEILING CAN BE MARKED WITH BLACK PERMANENT
MARKER ON COVER PLATES AS PANEL DESIGNATION AND CIRCUIT NUMBER FROM WHICH
THEY ARE FED.
6. ALL CONDUCTORS SHALL BE IDENTIFIED. ALL WIRING DEVICES SHALL BE USED WITH
TYPED LABEL ON THE COVER PLATE IDENTIFYING THE PANEL DESIGNATION AND CIRCUIT
NUMBER FROM WHICH THEY ARE FED.
7. ALL EQUIPMENT SHALL BE "UL" LISTED.
8. ELECTRICAL SYSTEMS SHALL BE GROUNDED PER ARTICLE 250 OF THE NATIONAL
ELECTRICAL CODE.
9. ALL CONNECTIONS TO DEVICES SHALL BE TAPED WITH SCOTCH 33 ELECTRICAL TAPE.
10. ALL CONDUITS AND JUNCTION BOXES SHALL BE CONCEALED IN FINISHED AREAS. PRIOR
TO CONCEALMENT OF NEW CONSTRUCTION, ALL WORK BEHIND FINISHED SURFACES
SHALL BE INSPECTED BY THE OWNER'S REPRESENTATIVE.
11. CONTRACTOR SHALL INFORM THE OWNER'S REPRESENTATIVE PRIOR TO BEGINNING
CONSTRUCTION AND PRIOR TO COMPLETION OF CONSTRUCTION TO ALLOW SUFFICIENT
TIME FOR COORDINATION OF EXISTING BUILDING ACTIVITIES WITH THE CONSTRUCTION
WORK.
12. CONTROL WIRING SHALL BE TAGGED AT EACH END AND TERMINATED WHERE WORK HAS
BEEN PERFORMED IN ACCORDANCE WITH EQUIPMENT MANUFACTURES SPECIFICATIONS.
13. IF MATERIAL OR EQUIPMENT IS INSTALLED BEFORE IT IS APPROVED, THE CONTRACTOR
SHALL BE LIABLE FOR ITS REMOVAL AND REPLACEMENT AT NO ADDITIONAL CHARGE OR
IF IN THE OPINION OF ACTION TARGET, THE MATERIAL OR EQUIPMENT
DOES NOT MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS.
14. THE CONTRACTOR SHALL INCLUDE IN THE WORK, WITHOUT EXTRA COST, ANY LABOR,
MATERIALS, SERVICES, APPARATUS, AND DRAWINGS IN ADDITION TO CONTRACT
DOCUMENTS, IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS, INDICATED AND/OR
SPECIFIED. PROVIDE ALL ELECTRICAL EQUIPMENT WITH ALL NECESSARY ASSOCIATED
ACCESSORIES AND CONDUIT INFRASTRUCTURE AS REQUIRED TO ENSURE A COMPLETE
AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO OWNER.
15. BEFORE SUBMITTING BIDS, THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE ALL
ADJOINING EXISTING BUILDINGS, EQUIPMENT, AND SPACE CONDITIONS ON WHICH HIS
WORK IS IN ANY WAY DEPENDANT FOR THE BEST WORKMANSHIP AND OPERATION
ACCORDING TO THE INTENT OF THE SPECIFICATIONS AND DRAWINGS. HE SHALL REPORT
TO ACTION TARGET ANY CONDITION WHICH MIGHT PREVENT HIM FROM
INSTALLING HIS COMPONENTS IN THE MANNER SPECIFIED OR AS SHOWN IN CONTRACT
DOCUMENTS TEN BUSINESS DAYS PRIOR TO SUBMISSION OF BIDS. NO CONSIDERATION
OR ALLOWANCE WILL BE GRANTED FOR FAILURE TO VISIT THE SITE, NOR FOR ANY
ALLEGED MISUNDERSTANDING OF MATERIALS TO BE FURNISHED OR WORK TO BE
PERFORMED. THE CONTRACTOR SHALL INCLUDE IN HIS BID PRICE ALL LABOR AND
MATERIAL THAT MAY EFFECT HIS WORK.
16. THE CONTRACTOR SHALL NOTIFY ACTION TARGET IN WRITING OF ANY
DISCOVERED CONFLICTS BETWEEN EXISTING INSTALLATIONS WHICH ARE NOT
SCHEDULED FOR DEMOLITION AND THE NEW WORK INDICATED WITHIN THE CONTRACT
DOCUMENTS. SUCH NOTIFICATION SHALL BE ACCOMPANIED BY A DRAWING DELINEATING
THE PROPOSED SOLUTION PRIOR TO STARTING ANY WORK IN THE AFFECTED AREA.
17. ALL MATERIALS AND WORK SHALL BE ACCORDING TO BASE BUILDING SPECIFICATIONS
UNLESS OTHERWISE NOTED.
18. REFER TO ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATION, ELEVATION,
MOUNTING HEIGHTS AND DETAILS OF ALL LIGHT FIXTURES AND DEVICES. REPORT ANY
DISCREPANCIES TO ACTION TARGET IMMEDIATELY.
19. VERIFY DOOR SWINGS BEFORE INSTALLING SENSORS AND LIGHT SWITCHES.
20. PROVIDE PLASTER RING WITH PULL STRING TO SPACE ABOVE SUSPENDED CEILING FOR
ALL TELEPHONE, DATA, FAX, MODEM, CATV, CARD READER, ETC. OUTLETS INSTALLED IN
HOLLOW PARTITIONS. PROVIDE 3/4" EMPTY CONDUIT AND PULL STRING TO SPACE ABOVE
SUSPENDED CEILING FOR THESE OUTLETS INSTALLED IN AN INSULATED PARTITION.
PROVIDE 1" E.C. WITH 2 STRINGS FOR COMBINATION DATA/TEL OUTLET.
21. MAINTAIN INTEGRITY OF THE FIRE RATED CONSTRUCTION WHERE CONDUITS PASS
THROUGH WALLS AND FLOORS.
22. ALL BACK BOXES INSTALLED ON OPPOSITE SIDES OF THE SAME PARTITION SHALL BE
STAGGERED. DO NOT MOUNT THE BACK BOXES BACK TO BACK.
23. TYPE MC CABLE MAY BE USED IN LIEU OF EMT FOR BRANCH CIRCUITS, IN DRYWALL
PARTITION AND IN CEILING PLENUM WHERE IS ALLOWED BY NEC AND THE BUILDING
OWNER. (MC CABLE FOR ISOLATED CIRCUIT SHALL HAVE TWO (2) SEPARATE GROUNDING
CONDUCTORS).
24. CONTRACTOR'S SCOPE OF WORK INCLUDES TRACING ALL EXISTING CIRCUITS IN THE
CONSTRUCTION AREA BACK TO SOURCE. IF REMOVAL OF EXISTING ELECTRICAL
EQUIPMENT AFFECTS ANY EXISTING CIRCUITS, CONTRACTOR SHALL PROVIDE CIRCUIT
BREAKERS, WIRING, CONDUIT, ETC. REQUIRED TO RECONNECT EXISTING-TO-REMAIN
25.ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL, PLUMBING, AND OTHER
TRADES TO PROVIDE ALL EQUIPMENT ASSOCIATED WITH THEIR RESPECTIVE TRADES WITH
NECESSARY WIRING AND CONDUIT INFRASTRUCTURE FOR ALL SENSORS, AND CONTROL
SYSTEMS AS REQUIRED.
ELECTRICAL GENERAL NOTES ELECTRICAL SYMBOL LIST:
-GENERAL ELECTRICAL NOTES FOR INDOOR AND OUTDOOR RANGES:
J JUNCTION BOX (AS SIZED IN SCHEDULE)
S
3 WAY SWITCH
SWITCH
WEATHER PROOF REC.
GROUND FAULT REC.
\ SWITCHED REC.
DUPLEX REC.
L15-30 RECEPTACLE
P PULL BOX (AS SIZED IN SCHEDULE)
S
START AND STOP SWITCH
5E CAT5E JACK & WALL PLATE
ELECTRICAL ABBREVIATIONS
AMP AMPERE
AFF ABOVE FINISHED FLOOR
AWG AMERICAN WIRE GAUGE
BRK BREAKER
C CONDUIT
CB CIRCUIT BREAKER
CP CONDENSATE PUMP
D EXISTING TO BE DEMOLISHED
DISCSW DISCONNECT SWITCH
DP DISTRIBUTION PANEL
DWG DRAWING
E, EX EXISTING TO REMAIN
EG EQUIPMENT GROUND
EM DEVICE ON EMERGENCY CIRCUIT
EMT ELECTRICAL METALLIC TUBING
EW EMERGENCY WHITE (NIGHT) LIGHT
EWH ELECTRIC WATER HEATER
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FATC FIRE ALARM TERMINAL CABINET
FLA FULL LOAD AMPS
G, GND GROUND
GFI GROUND FAULT INTERRUPTER
HP HORSE POWER
IG INTERRUPTER ISOLATED GROUND
KVA KILOVOLT-AMPS
KW KILOWATT
MCB MAIN CIRCUIT BREAKER
MD MOTORIZED DAMPER
MLO MAIN LUGS ONLY
MDP MAIN DISTRIBUTION PANEL
N NEW
NEC NATIONAL ELECTRICAL CODE
NF NON FUSED
N/L NIGHT LIGHT FIXTURE ON A TIMER
NTS NOT TO SCALE
P POLE
PH, Ø PHASE
PNL PANEL
PSRH PROJECT STANDARD RECEPTACLE HEIGHT
PSSH PROJECT STANDARD SWITCH HEIGHT
R RELOCATED AT NEW LOCATION
RR REMOVE AND RELOCATE
S.N. SOLID NEUTRAL
SM MOTOR THERMAL SWITCH CONTROL
SWBD SWITCHBOARD
TEL TELEPHONE
T, XFMR TRANSFORMER
TYP TYPICAL
U.H. UNIT HEATER
U.O.A. UNLESS OTHERWISE NOTED
V VOLTS
W WATTS
WP WEATHERPROOF
DIMENSION CLARIFICATION
ALL DIMENSION LINES SHOW DEFAULT OF U.S. STANDARD UNITS, WITH METRIC UNITS AS
SECONDARY INDICATED BY THERE LOCATION BETWEEN THE FOLLOWING SYMBOLS [ ]
SEE EXAMPLE BELOW FOR CLARIFICATION:
20'-0" [6.10]
STANDARD METRIC (METERS)
-GENERAL ELECTRICAL SYMBOLS
-ELECTRICAL SCHEMATIC SYMBOLS
C0
AP
5E
(ALL ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS)
ELECTRICAL COORDINATION NOTES:
-GENERAL
1. ALL CONDUIT, J BOXES, SITE PREPARATIONS, AND HIGH VOLTAGE COMPONENTS SHALL BE
PROVIDED BY THE CUSTOMER OR ELECTRICAL CONTRACTOR UNLESS OTHERWISE SPECIFIED IN
THE DRAWINGS.
2. ALL COMPONENTS ASSOCIATED WITH SYSTEMS AND EQUIPMENT TO BE REMOVED OR
RELOCATED MAY NOT BE SPECIFICALLY INDICATED. REMOVE ALL ASSOCIATED ELECTRICAL
COMPONENTS, HANGERS, WIRING, CABLING, CONDUIT, BOXES, DEVICES AND ALL OTHER
ITEMS RELATED TO EQUIPMENT AND MATERIALS WHICH ARE INDICATED TO BE REMOVED OR
RELOCATED. REMOVE ALL WIRING/CONDUIT BACK TO THE SOURCE IN EXISTING CIRCUITS
WHICH ARE BEING DEMOLISHED. UNLESS SPECIFICALLY INDICATED, NO EQUIPMENT,
MATERIALS OR ASSOCIATED COMPONENTS SHALL BE ABANDONED IN PLACE.
-DISPOSAL OF DEMOLITION
1. CONTRACTOR SHALL CLEAN THE PROJECT SITE AT THE END OF EACH WORKING DAY.
CONTRACTOR SHALL NOTIFY BUILDING OWNER PRIOR TO DISPOSAL OF ALL DEMOLISHED
MATERIALS TO ALLOW THE OWNER TO SALVAGE ANY USABLE MATERIALS. AFTER INSPECTING
FROM THE OWNER'S REPRESENTATIVE ALL UNUSED MATERIALS SHALL BE REMOVED FROM
THE JOB SITE WITH DISPOSAL IN ACCORDANCE WITH APPLICABLE SPECIFICATIONS AND
REGULATIONS.
-PROTECTION
1. PROTECT FROM DAMAGE ALL EXISTING WORK TO REMAIN. ANY EXISTING TO REMAIN OR
EXISTING TO BE RELOCATED MATERIALS AND EQUIPMENT DAMAGED DURING THE COURSE
OF THE WORK SHALL BE REPLACED WITH MATERIALS AND EQUIPMENT CONFORMING TO
THESE SPECIFICATIONS AT NO ADDITIONAL COST TO THE OWNER. CARE MUST TAKEN IN
REMOVING ALL EXISTING MATERIALS.
AP ACCESS PORT
EQUIPMENT
PROVIDED - BY OTHERS
EQUIPMENT
PROVIDED - BY ACTION TARGET
CONDUIT/CONTROLS
PROVIDED - BY OTHERS
CONDUIT
PROVIDED - BY OTHERS
ACCESS PORT
PROVIDED - BY ACTION TARGET
CAT5E JACK & WALL PLATE
PROVIDED - BY OTHERS
WP
SPKR SPEAKER
PROVIDED -BY ACTION TARGET
MICROPHONE
PROVIDED -BY ACTION TARGET
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z700
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
GENERAL
ELECTRICAL NOTES
FIRING
LINE
TARGET
LINE
3 YD
FIRING
LINE
RCP2
JB
RCP2
ACP
ACB
PWR2
PWR1TCM1
RCP1
SRC ETH
RCP1
Z701
1 ELECTRICAL RANGE PLAN
Scale - 3/16" = 1'-0"
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z701
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
ELECTRICAL
RANGE PLAN
CONTROL ROOM
Z701
2 CONTROL ROOM
Scale - 3/4" = 1'-0"
Z701
TCM CHANNEL 1
TCM CHANNEL 2
TCM CHANNEL 3
TCM CHANNEL 4
TCM CHANNEL 5
TCM CHANNEL 6
TCM CHANNEL 7
TCM CHANNEL 8
TCM CHANNEL 9
TCM CHANNEL 10
TCM CONTROL CARD
TCM PROGRAMMING
BUTTON
NETWORK RJ45
CONNECTION
WIRING LAYOUT FOR TCM BANK 1
RANGE TARGET TCM CHANNEL CABLE COLOR
1 COMMON N/A N/A 1+ BLACK
1 COMMON N/A N/A 1+ RED
1 1 10.0.0.11 1 1+ BLUE
1 1 10.0.0.11 1 IN 4- ORANGE
1 2 10.0.0.11 2 1+ YELLOW
1 2 10.0.0.11 2 IN 4- BROWN
1 COMMON N/A N/A 2+ BLACK
1 COMMON N/A N/A 2+ RED
1 3 10.0.0.11 3 1+ BLUE
1 3 10.0.0.11 3 IN 4- ORANGE
1 4 10.0.0.11 4 1+ YELLOW
1 4 10.0.0.11 4 IN 4- BROWN
1 COMMON N/A N/A 3+ BLACK
1 COMMON N/A N/A 3+ RED
1 5 10.0.0.11 5 2+ BLUE
1 5 10.0.0.11 5 IN 5- ORANGE
1 6 10.0.0.11 6 2+ YELLOW
1 6 10.0.0.11 6 IN 5- BROWN
1 COMMON N/A N/A 4- BLACK
1 COMMON N/A N/A 4- RED
1 7 10.0.0.11 7 2+ BLUE
1 7 10.0.0.11 7 IN 5- ORANGE
1 8 10.0.0.11 8 2+ YELLOW
1 8 10.0.0.11 8 IN 5- BROWN
1 COMMON N/A N\A 5- BLACK
1 COMMON N/A N/A 5- RED
1 9 10.0.0.11 9 3+ BLUE
1 9 10.0.0.11 9 IN 6- ORANGE
1 10 10.0.0.11 10 3+ YELLOW
1 10 10.0.0.11 10 IN 6- BROWN
TCM CHANNEL 1 IN
TCM CHANNEL 2 IN
TCM CHANNEL 3 IN
TCM CHANNEL 4 IN
TCM CHANNEL 5 IN
TCM CHANNEL 6 IN
TCM CHANNEL 7 IN
TCM CHANNEL 8 IN
TCM CHANNEL 9 IN
TCM CHANNEL 10 IN
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z704.1
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
TARGET CONTROL
MODULE DETAILS
Z704.1
1 TARGET CONTROL MODULE
Scale - NONE
CONTROL ROOM AREA
TARGET LINE AREA
AC POWER PROVIDED
-BY OTHERS
RETRIEVERS/WIRES PROVIDED
-BY ACTION TARGET
CONDUIT/WIRES PROVIDED
-BY OTHERS
C# CONDUIT PROVIDED
-BY OTHERS
ELECTRICAL KEY
R
AC
EW
AY
(R W
TARGET CONTROL MODULE
(TCM)
CP1
CP2
SMART RANGE COMPUTER
(SRC)
E E E
(PWR1)
POWER SUPPLYDIRECT SERVICE
13.8V @ 20 AMP D.C.
(PWR2)
POWER SUPPLYDIRECT SERVICE
13.8V @ 40 AMP D.C.
EXTERNAL INTERNET
CONNECTION
-BY OTHERS
E E
AIR COMMAND CORDLESS PHONE
(ACP)
AIR COMMAND INTERFACE BOX
(ACB)
ETHERNET SWITCH
(ETH)
POWER 90
(X10)
(RCP1) NEMA 5-20R
125V @ 16 FLA
(RCP1) NEMA 5-20R
125V @ 16 FLA
CP1
CP2
(JB)
JUNCTION BOX
(JB)
JUNCTION BOX
CONDUIT SCHEDULE - BY OTHERS
ITEM QTY DESCRIPTION
CP1 2 3" CONDUIT
CP2 2 1-1/2" CONDUIT
CONDUIT FILL SCHEDULE - BY ACTION TARGET
ITEM QTY DESCRIPTION
CP1
5 16/6 GA WIRE
CP2
2 1/2" AIRLINE
EQUIPMENT SCHEDULE - BY ACTION TARGET
ITEM QTY ABBREV
POWER 90 10
RACE WAY 1 RW
TARGET CONTROL MODULE 1 TCM
POWER SUPPLY 2 PWR
SMART RANGE COMPUTER 1 SRC
ETHERNET SWITCH 1 ETH
AIR COMMAND INTERFACE BOX 1 ACB
AIR COMMAND CORDLESS PHONE 1 ACP
AIR COMPRESSOR 1 AC
AUTO DRAIN 1 AD
REFRIDERATED DRYER 1 DRY
JUNCTION BOX 12X12X6 3 JB
ELECTRICAL RECEPTACLE SCHEDULE - BY
OTHERS
ITEM QTY DESCRIPTION
RCP1 2 NEMA 5-20 ISOLATED GROUND DUPLEX RECEPTACLE FOR ETHERNET SWITCH
RCP2 2 NEMA 5-20 ISOLATED GROUND DUPLEX RECEPTACLE FOR AD DRYER AND DRAIN
RANGE AIR
(AC)
AIR COMPRESSOR
(DRY)
REFRIGERATED DRYER
(JB)
JUNCTION BOX
(AD)
AUTO DRAIN
(RCP2) NEMA 5-20R
125V @ 20 FLA GROUND
(RCP2) NEMA 5-20R
125V @ 20 FLA GROUND
(GB)
GANGE BOX
EQUIPMENT POWER SCHEDULE - BY OTHERS
PRODUCT LINE PRODUCT QTY PHASE VOLTS AMPS
POWER SUPPLY PSR 1 1 1 13.8 20 AMP D.C.
POWER SUPPLY PSR 2 1 1 13.8 40 AMP D.C.
REFRIGERATED
DRYER DRY 1 1 120 20 AMP
AUTO DRAIN AD 1 1 120 20 AMP
AIR COMPRESSOR AC 1 1 120 2 HP
DIRECT SERVICE
120V @ 2 HP
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z745.5
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
POWER 90
ELECTRICAL
SCHEMATIC
CONDUIT FOR DCU SWITCH
-BY OTHERS
JUNCTION BOX
DUPLEX RECEPTACLE FOR
REFRIGERATED DRYER
-BY OTHERS
WATER SEPARATORS
JUNCTION BOX
CONDUIT FOR RANGE AIR
-BY OTHERS REFRIGERATED DRYER
CONDUIT FOR DCU SWITCH
-BY OTHERS
AUTO DRAIN
DUPLEX RECEPTACLE FOR AIR
COMPRESSOR AND AUTO DRAIN
-BY OTHERS
2 HORSEPOWER
AIR COMPRESSOR
WATER SEPARATORS
DUPLEX RECEPTACLE
FOR REFRIGERATED
DRYER
-BY OTHERS
JUNCTION BOX
CONDUIT FOR RANGE AIR
-BY OTHERS
REFRIGERATED DRYER
CONDUIT FOR DCU STOP SWITCH
-BY OTHERS
JUNCTION BOX
CONDUIT FOR DCU SWITCH
-BY OTHERS
AUTO DRAIN
DUPLEX RECEPTACLE FOR AIR
COMPRESSOR AND AUTO DRAIN
-BY OTHERS
2 HORSEPOWER
AIR COMPRESSOR
SCALED FOR ORIGINAL DRAWING AT 22" X 34"
Z757.1
CLARENDON CSO, SC
100% SUBMITTAL
SA
VE
D : 2
4-
-2
:4 4:
B
Y:
J
AL
LR
ED
A
T:
T
:\P R
O
JE
C
TS
\O pe n\ C la re nd on
C
SO
, S C
\C
AD
_W or ki ng
\C la re nd on C
SO
, S
C _1
_R ev 3.
dw g
13092
Project Manager:
Territory Manager:
Project Engineer:
Drawn By:
Approved By:
Origination Date:
JAMIE HADERLIE
02/08/24
JA
AARON LUDWIG
ROB DECOSTA
DAVID JOHNSON
REVISION DATENo BY
PROJECT STATUS
PROJECT NAME
DRAWING NUMBER
SHEET NAME
SHEET NUMBER
3 JA SWITCH OUT EQUIPMENT 06/20/24
2 JA CHANGE NOTES 06/18/24
1 JA BRING TO 100% 03/05/24
P O
B ox
, P ro vo U
T, O ffi ce
1)
-8
F ax
1)
-8 w w w
.A ct io nT ar ge t.c om
Th e us e of th es e pl an s sh al l b e re st ric te d to th e or ig in al p ro je ct s ite fo r w hi ch th ey w er e pr ep ar ed
Pu bl ic at io ns e xp re ss ly li m ite d to s uc h us e.
R e-us e, re pr od uc tio n, o r p ub lic at io n by a ny m et ho d in w ho le or p ar t i s pr oh ib ite d.
d ra w in gs a nd d es ig ns re m ai n th e pr op er ty o f a ct io n ta rg et in c.
w ith ou t r es er va tio n.
Ac tio n Ta rg et
In c.
Al l R ig ht s
R es er ve d
COMPRESSOR
ROOM DETAILS
Z757.1
2 COMPRESSOR ROOM PLAN
Scale - 1-1/2" = 1'-0"
Z757.1
2 COMPRESSOR ROOM SECTION
Scale - 1-1/2" = 1'-0"
| Sheets and Views |
| Clarendon CSO, SC_100_Rev3-Z001 |
| Clarendon CSO, SC_100_Rev3-Z101 |
| Clarendon CSO, SC_100_Rev3-Z301 |
| Clarendon CSO, SC_100_Rev3-Z535.5 |
| Clarendon CSO, SC_100_Rev3-Z700 |
| Clarendon CSO, SC_100_Rev3-Z701 |
| Clarendon CSO, SC_100_Rev3-Z704.1 |
| Clarendon CSO, SC_100_Rev3-Z745.5 |
| Clarendon CSO, SC_100_Rev3-Z757.1 |
File details come from the government source that posted it. Updated .