CLADA_Quote_-_replacement_splash_pad_speaker_breakout_pricing_2024-12-20.pdf

PDF 39 KB Posted

Attached to
Splash Pad Speaker System
Solicitation number
Quote- 25 - 104
Issued by
Pinellas County, Florida

About this file

This document is a quote from CLADA Productions for the City of St. Petersburg, detailing a comprehensive Replacement Splash Pad Speaker System project. The quote covers the complete replacement of the existing Meyer CAL96 speaker system with a new JBL CBT1000 speaker system at the St. Pete Pier splash pad, including materials and labor. The project scope encompasses demolition of the existing system, installation of new speakers, associated rigging and safety hardware, expansion of the audio DSP system, amplifier additions, reprogramming, cable removal and installation, lift rentals, and includes a 1-year warranty. The quote is dated 11/27/2024 with a total project cost of $43,420.00, broken down into $21,662.00 for materials and $21,758.00 for labor.

The pricing is structured as a single comprehensive quote with progress billing as customary in St. Petersburg supplier contracts. The quote provides a detailed breakdown of both material and labor costs, which include technical specifications such as the JBL CBT1000 speaker system, DSP system expansion, low voltage cabling work, and associated installation labor. The vendor, CLADA Productions, is located in St. Petersburg, Florida, and has provided a complete turnkey solution for the speaker system replacement, addressing both the equipment procurement and installation requirements for the city's splash pad audio system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sub Total 43,420.00

Total $43,420.00

Estimate Date : 11/27/2024

CLADA Productions 6822 22nd Ave N Suite 298 St. Petersburg 33710 904-440-3718

Quote

# EST-000013

Bill To City of St. Petersburg

# Item & Description Qty List Total

1 Replacement Splash Pad Speaker System: Materials Cost

2. addition of new JBL CBT1000 speaker system

3. all associated rigging hardware and safety hardware

4. expansion of audio DSP system and additional required amplifier

10. 1 year warranty

1.00 21,662.00 21,662.00

2 Replacement Splash Pad Speaker System: Labor Cost

1. demo of existing Meyer CAL96

5. reprogramming of DSP system

6. removal of existing low voltage cabling

7. installation of new low voltage speaker cabling

8. lift rentals

9. all associated labor

1.00 21,758.00 21,758.00

Notes The project entails:

Replacement Splash Pad Speaker System:

1. demo of existing Meyer CAL96

2. addition of new JBL CBT1000 speaker system

3. all associated rigging hardware and safety hardware

4. expansion of audio DSP system and additional required amplifier

5. reprogramming of DSP system

6. removal of existing low voltage cabling

7. installation of new low voltage speaker cabling

8. lift rentals

9. all associated labor

10. 1 year warranty

Terms & Conditions project will be progress billing as customary in St Petersburg supplier contract.

File details come from the government source that posted it. Updated .