Questions from Industry Day

1. Will the Ops checks, and any confidence flights be the responsibility of the contractor or the USG? Who will provide the aircrews for any flights? Contractors are responsible for ground ops checks (to include engine runs if needed). DCMA will provide flight crews for Acceptance Check Flights (or unit pilots can also be requested if DCMA cannot support).

2. Will the Govt perform their own independent cost estimate? With this being FFP. The Government will perform an independent cost estimate for planning, budgeting, and proposal analysis purposes.

3. What level of Security Clearance will be required for this effort? The program has an overall SECRET classification. The facilities must protect the aircraft in accordance with PL-4 standards.

However, the COMSEC equipment must be protected at a SECRET level and the COMSEC managers, certain staff, and program managers will have the appropriate affiliated clearances.

4. Pertaining to the technical library, will you be providing a list of all the parts to be included in the kits and the support equipment needed? The Performance Work Statement will include the relevant TCTO necessary for successfully program execution. In the TCTO’s will list each part in the 7.0-8.1 retrofit kits and equipment required to perform the install or operational checks for the CKI II effort.

5. Should a contractor anticipate also accomplishing due periodic maintenance? Periodic maintenance on the aircraft will need to be completed by the contractor in accordance with (IAW) the Technical Data.

6. Will there be a limit on the AFTO 103 add-ons discussed during the pre-induction meeting? Pre-dock meetings will be attended by unit maintenance leadership, unit planners/schedulers, and members from the modification install location (potentially a mod manager as well). During the pre-dock GO 81 screens, 8035 and 9188’s will be reviewed (supplied by unit) and maintenance decisions will be discussed prior to the aircraft arriving at the modification location.

7. Who will be responsible for executing the “weight and balance” of tasks regarding this effort?

The Contractor is responsible for completing a Weight & Balance for each aircraft variant IAW Tech Data. Results will be supplied by Contractor Install Location and placed into the Automated Weight and Balance System by a unit representative.

8. What are the anticipated program risks and/or opportunities regarding this effort? The program office has not completed the Risk/Opportunities Assessment for the CKI 2 program at this time.

However, the Program Office anticipates similarities to the first iteration of CKI. There is a particular need for contractor flexibility in handling unforeseen equipment/maintenance issues during the modification process in order to ensure the modified aircraft are ready for flight with 7.0/8.1 Block Upgrade during contract execution.

9. Who will be responsible for W&B pre/post install? Contractor (see question 7).

10. On the 120-day turnaround time for the installs, how did you come to confirm this time is appropriate to accomplish the work? The 120-day turn-around was based off historical time frame completions of similar platform modifications and the last two years of modifications as executed under the ongoing CKI I contracting effort.

11. Is this the only Industry Day presentation? We do not have additional Industry Days planned at this time.

12. Can you please post the slide deck on SAM.gov? Yes, they will be posted with this list of questions.