City of Yonkers -City Hall 1st Floor Hallway - Asbestos Removal Specifications.pdf
PDF 3 MB Posted
- Solicitation number
- IFB-7506
- Issued by
- Westchester County, New York
About this file
This document is an Asbestos Removal Specification for the City of Yonkers City Hall, specifically for the hallway outside Room 109-1, dated June 2025. The specification provides comprehensive technical guidelines for the safe removal of asbestos-containing materials (ACM) from a 110 square foot interior area on the first floor. The project involves removing multiple ACM materials including contaminated black mastic, green and tan 9"x9" floor tiles, contaminated plywood, carpet, and carpet glue, following strict regulatory requirements from agencies such as OSHA, New York State Department of Labor, and Environmental Conservation.
The specification outlines detailed procedures for asbestos abatement, including worker protection, air monitoring, negative air pressure filtration, decontamination protocols, waste disposal, and restoration of utilities. Contractors must comply with multiple federal and state regulations, maintain specific certifications, and follow precise removal techniques. The work requires extensive personal protective equipment, respiratory protection, medical monitoring, and comprehensive documentation. Waste must be transported and disposed of by licensed haulers using specific manifests, and all materials must be carefully containerized and labeled according to EPA and DOT regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .