CITY OF ORANGE CITY FDEP WG100 SEPTIC TO CENTRAL SEWER_ EASTERN ZONE_ PHASE I - DemandStar.pdf

PDF 56 KB Posted

Attached to
Tropical Farms Water Treatment Plant Expansion
Solicitation number
3788-0-2026/KLB
Issued by
Marion County, Florida

About this file

This is a Request for Proposals (RFP) document issued by Martin County Purchasing for the expansion of the Tropical Farms Water Treatment Facility in Stuart, Florida. Martin County is seeking proposals from licensed and experienced contractors to furnish all labor, materials, equipment, and services necessary to expand the existing treatment facility by 4.6 million gallons per day. The project scope includes reverse osmosis (RO) treatment and process improvements, site and building improvements, chemical and pumping systems, electrical and SCADA upgrades, a new 3.0-megagallon ground storage tank, and all related work necessary to provide a complete and operational system. The RFP was broadcast on August 19, 2026, with a proposal due date of October 14, 2026, at 2:30 p.m. EDT. A mandatory pre-proposal meeting is scheduled for September 17, 2026, at 10:00 a.m. at the Tropical Farms Water Treatment Plant located at 8595 SW Kansas Ave, Stuart, FL 34997. Bid documents and specifications are available for download, and a bid bond is required for submission.

The solicitation is classified under multiple commodity codes including Building Construction, General Construction services, Pipeline Construction, Sewer and Storm Drain Construction, and Utility and Underground Projects. As of the file date of August 26, 2026, the bid maintains active status with 100 planholders registered. The project is being funded in fiscal year 2026, and distribution of plans is being handled directly by the agency through eBidding platforms. Similar related projects have been identified in the region, indicating ongoing infrastructure development efforts in the Martin County area.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8/26/26, 1:50 PMCITY OF ORANGE CITY FDEP WG100 SEPTIC TO CENTRAL SEWER, EASTERN ZONE, PHASE I - DemandStar

Page 1 of 4https://www.demandstar.com/app/suppliers/bids/546442/details

Bid Details Planholders Similar Bids Required Actions

Show More !

Active

" Download Bid Package # Submit eBid Proposal

$ Watch

Bid Details

Agency Name Martin County Purchasing

Bid Writer Krysti Brotherton, NIGP-

CPP,CPPO

Bid ID RFP-3788-0-2026/KLB

Bid Type RFP - Request for Proposals

Broadcast Date Aug 19, 2026 4:00am (EDT)

Fiscal Year 2026

Due Oct 14, 2026 2:30pm (EDT)

Bid Status Text None

Additional Registration

(NEW)

NONE

Scope of Work

Martin County is seeking proposals from licensed and experienced Contractors to furnish all labor, materials, equipment, and services necessary to expand the existing

Tropical Farms Water Treatment Facility by 4.6 million gallons per day (M

Tropical Farms Water Treatment Plant Expansion

View more %

View more %

Upgrade Subscription

Similar Bids (4)

North Jensen Water… Martin County Purchasing, Stuart, FL

Fairways Townhom… City of Sunrise, Sunrise, FL

Sumter County Pur… Sumter County - Board of County Commissioners, Wildwood, FL

Planholders (100)

Accurate Drilling Systems, Inc.

Aerex Industries

Air Compressor Works, Inc.

All-site Construction

C.C. Control Corp.

https://www.demandstar.com/app/suppliers/bids/543322/details https://www.demandstar.com/app/suppliers/bids/545493/details https://www.demandstar.com/app/suppliers/bids/544722/details https://www.demandstar.com/app/subscription/renewal

8/26/26, 1:50 PMCITY OF ORANGE CITY FDEP WG100 SEPTIC TO CENTRAL SEWER, EASTERN ZONE, PHASE I - DemandStar

Page 2 of 4https://www.demandstar.com/app/suppliers/bids/546442/details

Documents

& Download all documents

FilenameType File Type

File Size

Date Modified Status

R… Bid Document Specifications

PDF 610.32

KB

Aug 14, Complete

P… Bid Document Specifications

XLS 54.50

KB

Aug 14, Complete

C… Bid Document Specifications

PDF 141.15

KB

Aug 14, Complete

A… AttachmentPDF 96.20

KB

Aug 14, Complete

B… AttachmentPDF 44.45

KB

Aug 14, Complete

B… AttachmentPDF 1021.23

KB

Aug 14, Complete

B… AttachmentDOCX 41.96

KB

Aug 14, Complete

C… AttachmentPDF 73.12

KB

Aug 14, Complete

D… AttachmentPDF 35.69

KB

Aug 14, Complete

E… AttachmentPDF 89.10

KB

Aug 14, Complete

E… AttachmentPDF 96.10

KB

Aug 14, Complete

N… AttachmentPDF 41.73

KB

Aug 14, Complete

8/26/26, 1:50 PMCITY OF ORANGE CITY FDEP WG100 SEPTIC TO CENTRAL SEWER, EASTERN ZONE, PHASE I - DemandStar

Page 3 of 4https://www.demandstar.com/app/suppliers/bids/546442/details

P… AttachmentDOC 63.00

KB

Aug 14, Complete

P… AttachmentPDF 85.27

KB

Aug 14, Complete

V… AttachmentPDF 96.50

KB

Aug 14, Complete

V… AttachmentPDF 98.62

KB

Aug 14, Complete

S… AttachmentPDF 73.95

KB

Aug 14, Complete

Distribution Info

Bid Bond Yes

Plan (blueprint) Agency distributing plans eBidding Submit

Distributed By Agency

Distribution Method Download

Distribution Options Plans are being distributed by Agency

View More Distribution Information

Publications

Stuart News (8/19/2026)

View Legal Ad

Pre-Bid Conference

MANDATORY A mandatory pre-proposal meeting will be held on September 17, 2026 at 10:00 AM at the Tropical Farms Water Treatment Plant, 8595 SW Kansas Ave, Stuart, FL 34997.

Commodity Code

[022-909-21] Building Construction, Industrial, Warehouse, etc.

https://www.demandstar.com/app/suppliers/bids/546442/response

8/26/26, 1:50 PMCITY OF ORANGE CITY FDEP WG100 SEPTIC TO CENTRAL SEWER, EASTERN ZONE, PHASE I - DemandStar

Page 4 of 4https://www.demandstar.com/app/suppliers/bids/546442/details

Show More !

[022-912-23] Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.

[022-913-40] Construction, Pipeline

[022-913-45] Construction, Sewer and Storm Drain

[022-913-56] Construction, Utility and Underground Projects

File details come from the government source that posted it. Updated .