city of mattoon 2026-0017 2026 Pavement Project Burgess Auditorium Parking Lot Specs.pdf
PDF 1 MB Posted
- Solicitation number
- 2026-0017
- Issued by
- Clinton County, Illinois
About this file
This bid specifications document is issued by the City of Mattoon, Illinois for the 2026 Pavement Project at Burgess Auditorium Parking Lot. The project encompasses removal of existing pavement, curb and gutter, sidewalk, and driveway pavement, followed by placement of new pavement, curb and gutter, driveway pavement, sidewalk, and grading and seeding. Bid line items include pavement removal (1,179 square yards), driveway pavement removal (44 square yards), curb and gutter removal (50 feet), sidewalk removal (683 square feet), Type B-6.12 curb and gutter (50 feet), 8-inch PCC pavement (1,162 square yards), 8-inch PCC driveway pavement (44 square yards), 5-inch PCC sidewalk (506 square feet), 8-inch PCC sidewalk (180 square feet), and inlet adjustment (1 each). All questions must be submitted by Wednesday, August 5, 2026 at 12:00 p.m. Sealed bids are due by 11:00 a.m. on Wednesday, August 12, 2026 at the City Clerk's office located at 208 North 19th Street, Mattoon, Illinois 61938. Bid award is expected at the August 18, 2026 City Council Meeting, with all work including final grading and seeding to be completed by October 9, 2026.
The contract will be awarded to the lowest responsive and responsible bidder. Bidders must complete a minimum of 51 percent of work with their own forces and provide three references for projects of similar scope and size. The City reserves the right to reject any or all bids and waive informalities. Contractors must comply with the Illinois Prevailing Wage Act and pay prevailing wage rates for Coles County. A Performance/Payment Bond and Certificate of Insurance with minimum coverage limits are required prior to work commencement. Commercial General Liability coverage must be at least $1,000,000 per occurrence and $2,000,000 general aggregate, with Automotive Liability of $1,000,000 combined single limit and Workers Compensation at statutory limits. Progress payments will be made monthly with 10 percent retainage withheld until final acceptance. Liquidated damages of $750 per calendar day will be assessed for completion delays beyond October 9, 2026. The contract is governed by the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction adopted January 1, 2022, and materials are exempt from Illinois State Sales Tax.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF MATTOON, ILLINOIS
MATTOON PAVEMENT PROJECT
BURGESS AUDITORIUM PARKING LOT
BID SPECIFICATIONS
INDEX
Page # Item
1 Advertisement
2 thru 4 Bid Procedures & General Requirements
5 Bid Form
6, 7 Contract
8, 9 Performance / Payment Bond
10 thru 12 Special Provisions
13 thru 19 Traffic Control standards & 420101-07
20 thru 24 Prevailing Wage Rates for Coles County
Attachments
Plans
CITY OF MATTOON
Notice to Bidders
2026 Pavement Project Proposal Contract
Legal Notice City of Mattoon 2026 Pavement Project
The City of Mattoon is accepting sealed proposals for 2026 Pavement Project Burgess Auditorium Parking Lot
Refer to link below to download all bid documents and to subscribe to get notifications of future bids. Beaconbid.com/solicitations/city-of-mattoon. All questions concerning the contract are due no later than Wednesday August 5, 2026 at 12:00 pm. Proposals shall be submitted on bid documents that are available to you. Sealed bids labeled “2026 Pavement Project Burgess Auditorium Parking Lot” are due by 11:00 A.M. on Wednesday August 12, 2026, at the City Clerk’s office at 208 North 19th Street, Mattoon, Illinois 61938. The right is reserved to waive technicalities and to reject any or all proposals.
Susan O’Brien, City Clerk
BID PROCEDURES AND GENERAL REQUIREMENTS
Bid Procedure Bids are due by 11:00 A.M. on Wednesday, August 12, 2026.
Bids are to be submitted on the attached Bid Form to:
City of Mattoon City Clerk’s Office 208 North 19th Street Mattoon, IL 61938
Bids are to be submitted in sealed envelopes marked as follows:
“2026 Pavement Project Burgess Auditorium Parking Lot”
The contract will be awarded to the lowest responsive and responsible bidder. The City of Mattoon reserves the right to reject any or all bids, to waive any informalities in the bid procedure, and to accept the bid considered to be in the best interest of the City.
Contract and Contract Bonds A Contract and Performance/Payment Bond are required. Blank forms are contained herein. The Contract and Bonds are to be completed by the successful bidder after the bid award and prior to the start of any work activities.
Governing Specifications The Illinois Department of Transportation Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022 shall govern the administration of this contract except as specifically modified herein. Where the term "Standard Specifications" is used in these contract provisions it shall be construed to mean the Standard Specifications for Road and Bridge Construction.
Qualifications and References IDOT prequalification is not required. Bidders shall furnish 3 references for projects of similar scope and size upon written request. Bidders are required to complete a minimum of 51% of the work with their own forces. Bidders shall furnish a list of equipment and manpower on written request.
BID PROCEDURES AND GENERAL REQUIREMENTS (CONT.)
Prevailing Wage Rates This contract calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”), the Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the “prevailing rate of wages” (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor’s website at https://labor.illinois.gov/laws-rules/conmed/current-prevailing-rates.html. All contractors and subcontractors must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties.
Insurance Certificate The contractor shall furnish a Certificate of Insurance with the City of Mattoon named as an additional insured prior to beginning any work on the project. The minimum insurance requirements are:
Commercial General Liability Each Occurrence $1,000,000 Personal & Advertising Injury $1,000,000 General Aggregate $2,000,000 Products & Completed Operations Aggregate $1,000,000 Automotive Liability - Owned, Non-Owned, and Hired Autos Combined Single Limit $1,000,000 Or Bodily Injury per Person $1,000,000 Bodily Injury per Accident $1,000,000 Property Damage per Accident $1,000,000 Workers Compensation Statutory Limits
Employers Liability Each Accident
$500,000
Disease - Each Employee $500,000 Disease - Policy Limit $500,000
BID PROCEDURES AND GENERAL REQUIREMENTS (CONT.)
Time Limit The bid award is expected to be approved at the August 18, 2026, City Council Meeting. A Notice to Proceed will be issued after receipt of an executed contract, contract bonds, and insurance certificate. The completion date will be adjusted for delays to the anticipated award date. No cost adjustment shall be allowed in association with such an adjustment.
All work including the final grading and seeding shall be completed by October 9, 2026.
Liquidated damages in the amount of $750 per calendar day shall be assessed for each day beyond said completion date.
Please be advised there could possibly be contractors working on the alley in this area.
Progress Payments Progress payments will be made once per month. Measurements for payment will be completed by the city. Retainage in the amount of 10% shall be withheld from all progress payments until final acceptance of the work.
Suspension of Work The City reserves the right to suspend the work, and/or annul the contract, for failure of the contractor to perform the work in accordance with the contract terms. Suspension of the work, or annulment of the contract, shall not affect the City’s right to recover damages on account of such nonperformance.
Extra Work No payment shall be made, nor is liability incurred, for any extra work unless agreed to in writing, in advance, by the City. Payment for extra work shall be in accordance with Section 109.04 of the Standard Specifications.
Taxes The materials included in this bid are exempt from Illinois State Sales Tax.
Questions All questions should be submitted through the Beacon website by Aug.5 2026.
BID FORM
I/We agree to complete the work described int the Bid specifications titled “City of Mattoon Illinois, Mattoon 2026 Pavement Project Burgess Auditorium Parking Lot at the following price(s):
Item Qty Unit Price Total
Pavement Removal 1 ,179 Sq Yd ________ _______
Driveway Pav’t Removal 44 Sq Yd _________ _________
Curb & Gutter Removal 50 Ft __________ ________
Sidewalk Removal 683 Sq Ft __________ ________
Curb & Gutter, Type B-6.12 50 Ft __________ ________
PCC Pavement 8” 1,162 Sq Yd __________ ________
PCC Driveway Pav’t 8“ 44 Sq Yd __________ ________
PCC Sidewalk 5” 506 Sq Ft __________ ________
PCC Sidewalk 8” 180 Sq Ft __________ ________
Inlet Adjustment 1 Each __________ ________
Total Bid Amount ____________________
Return bid on this form.
Bidders Name and Address
_______________________________ Phone: __________________
_______________________________ Email: ___________________
Signature: ________________________
CITY OF MATTOON
CONTRACT
1. THIS AGREEMENT, made and concluded the day of , , between the City of Mattoon, Illinois, known as the party of the first part, and , their executors, administrators, successors, or assigns, known as the party of the second part.
2. WITNESSETH: That for and in consideration of the payments and agreements mentioned in the Bid Form hereto attached, to be made by the party of the first part, and according to the terms expressed in the Bond referring to these presents, the party of the second part agrees with said party of the first part at their own expense to do all work, furnish all materials and all labor necessary to complete the work in accordance with the Plans and Specifications hereinafter described.
3. It is understood and agreed that the Bid Specifications titled
City of Mattoon Illinois, 2026 Pavement Project Burgess Auditorium Parking Lot , the bid form and the Contract Bond hereto attached are all essential documents of this contract and are a part hereof.
4. This contract calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”), the Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the “prevailing rate of wages” (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor’s website at:
https://labor.illinois.gov/laws-rules/conmed/current-prevailing-rates.html. All contractors and subcontractors must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties.
5. The party of the second part shall not discriminate on the basis of race, color, national origin, sexual orientation, or sex in the performance of this contract. Failure of the party of the second part to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or other such remedy as the Owner deems appropriate.
6. IN WITNESS WHEREOF, the said parties have executed these presents on the date above mentioned.
ATTEST: Rick Hall, Mayor, City of Mattoon
By:
City Clerk Party of the First Part
(SEAL)
Company Name:
Party of the Second Part
Print Name:
ATTEST: Company Name:
Secretary Party of Second Part
Print Name:
Project:
CONTRACT BOND
City of Mattoon Illinois, 2026 Pavement Project Burgess Auditorium Parking Lot
We, as PRINCIPAL and as SURETY, are held and firmly bound unto the City of Mattoon in the penal sum of
Dollars($ ), lawful money of the United States, well and truly to be paid unto the City of Mattoon, for the payment of which we bind ourselves, our heirs, executors, administrators, and successors, jointly to pay to the City of Mattoon this sum under the conditions of this instrument.
WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the Principal has entered into a written contract with the City of Mattoon for the construction of work on the above project, which contract is hereby referred to and made part hereof, as if written herein at length, and whereby the said Principal has promised and agreed to perform said work in accordance with the terms of said contract, and has promised to pay all sums of money due for any labor, materials, apparatus, fixtures or machinery furnished to such Principal for the purpose of performing such work and has further agreed to pay all direct and indirect damages to any person, firm company, or corporation suffered or sustained on account of the performance of such work during the time thereof and until such work is completed and accepted; and has further agreed that this bond shall inure to the benefit of any person, firm, company, or corporation, to whom any money may be due from the Principal, subcontractor or otherwise, for any such labor, materials, apparatus, fixtures or machinery so furnished and that suit may be maintained on such bond by any such person, firm, company, or corporation, for the recovery of any such money.
NOW THEREFORE, if the said Principal shall well and truly perform said work in accordance with the terms of said contract, and shall pay all sums of money due or to become due for any labor, materials, apparatus, fixtures or machinery furnished to him for the purpose of constructing such work, and shall commence and complete the work within the time prescribed in said contract, and shall pay and discharge all damages, direct and indirect, that may be suffered or sustained on account of such work during the time of the performance thereof and until the said work shall have been accepted, and shall hold the City of Mattoon harmless on account of any such damages and shall in all respects fully and faithfully comply with all the provisions, conditions, and requirements of said contract, then this obligation to be void; otherwise to remain in full force and effect.
IN TESTIMONY WHEREOF, the said Principal and the said Surety have caused this instrument to be signed by their respective officers this day of , .
PRINCIPAL
Company Name: Company Name:
By: By:
(Signature & Title) (Signature & Title)
(If PRINCIPAL is a joint venture of two or more contractors, the company names, and signatures of each contractor must be affixed.)
SURETY
(Name of Surety) (Signature of Attorney-in-Fact)
NOTARY
STATE OF , COUNTY OF ,
I, , a Notary Public in and for said County, do hereby certify that (Names of individuals signing on behalf of
PRINCIPAL AND SURETY)
Who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed, sealed and delivered said instrument as their free and voluntarily act for the uses and principals therein set forth.
Given under my hand and notary seal this day of , . My commission expires on .
Notary Public
OWNER
Approved this day of , A.D., Attest: City of Mattoon
City Clerk (SEAL) Mayor
SPECIAL PROVISIONS
Governing Specifications The Illinois Department of Transportation Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022, shall govern the construction of the work contained in this project except as specifically modified herein. Where the term "Standard Specifications" is used in these contract provisions it shall be construed to mean the Standard Specifications for Road and Bridge Construction.
Description of Work The project includes removal of existing pavement, curb & gutter, sidewalk and driveway pavement. Placement of new pavement, curb & gutter, driveway pavement, sidewalk, and grading & seeding.
Traffic Control The contractor shall protect the work areas from vehicle and pedestrian traffic using cones, drums, or barricades and shall be properly erected in accordance with the standards. The contractor shall provide prompt, courteous attention to pedestrian and vehicle traffic in the work area. Standard 701501-06,701801-06, 701901-11 are attached. The city will assist with the location of signage. The failure of the contractor to provide prompt, courteous attention to traffic may result in suspension of the work.
Traffic control will not be paid for separately but should be included in the associated pay items.
Layout The contractor shall have the lead in laying out the work in conformance with the drawings. City staff will be available for assistance as needed. A professional land surveyor is not required.
Earth Excavation This work shall comply with Section 202 of the Standard Specifications. This work will not be paid for separately but shall be included in the associated plan quantities.
Removal Items, General Removal items shall comply with Section 440 of the Standard Specifications. All items specified for removal shall be removed from the jobsite and disposed of at the contractor’s expense. Full depth saw cuts are required for all concrete removal limits.
The cost of this work shall be included in the various removal items specified.
SPECIAL PROVISIONS (cont.)
Concrete Curb & Gutter Type B-6.12 PCC Gutter shall conform to Section 606 of the Standard Specifications and the details in the plans. The minimum thickness shall be 9” at the flowline of the gutter. This work will be paid at the contract unit price, per foot, for PCC Gutter of the specified width.
Pavement 8” All work shall be done in accordance of Article 420 of the IDOT Standard Specifications for Road and Bridge Construction. Saw cuts, tie bars and reinforcements are required.
Reinforcement shall be positioned according to Article 421.04(a). The curb and gutter can be poured monolithic with the pavement, but plan must be submitted and approved by Engineer.
Tie Bars & Expansion Joints Tie bars shall be #6, grade 60, uncoated, reinforcement bars. Tie bars shall be 24” long, embedded 8” installed on 36” centers on centerline and 12” centers on transverse contraction joints. Drilled tie bars shall be grouted using Sikadur 32, 2 Part Epoxy, or an approved equivalent.
Please refer to IDOT Standard 420101-07 24’ PCC Pavement Joints for details.
Tie bars shall be required in the following locations:
Between the proposed PCC Gutter and the existing pavement.
There are no other tie bars required between the proposed work and the existing.
Expansion joint material shall comply with Section 1051 of the Standard Specifications.
A 1/2” expansion joint shall be required at the following locations:
Between the proposed PCC Driveway Pavement and the existing roadway.
Between the proposed PCC Driveway Pavement and the existing driveway pavement.
Between the PCC Driveway Pavement and the 8” PCC Sidewalk thru the driveway.
Between the PCC Base Course and the proposed PCC Driveway Pavement and/or PCC Gutter.
Between the PCC Sidewalk Ramps and the proposed PCC Gutter.
Between the PCC Sidewalk and the existing concrete gutter.
Between the proposed PCC Sidewalk and the existing sidewalks.
Transverse expansion joints are required thru the PCC Sidewalk on 100’ centers.
This work shall be included in the cost of the various concrete items.
SPECIAL PROVISIONS (cont.)
Seed Bed Preparation
The area to be seeded shall be worked to a minimum depth of (3in.) with a disk, tiller, or other equipment approved by the Engineer, reducing all soil particles to a size not larger than (2 in.) in the largest dimension. The prepared surface shall be relatively free from weeds, clods, stones, roots, sticks, rivulets, gullies, crusting, and caking.
Fertilizer is specified, 270 lb (300 kg) of fertilizer nutrients per acre (hectare) shall be applied at 1:1:1 ratio as follows.
Nitrogen Fertilizer Nutrients 90 lb/acre (100 kg/ha) Phosphorus Fertilizer Nutrients 90 lb/acre (100 kg/ha) Potassium Fertilizer Nutrients 90 lb/acre (100kg/ha)
Grading, Seeding & Mulch
Seeding and mulching shall comply with Sections 250 and 251 of the Standard Specifications. The contractor shall grade , seed, and mulch all areas disturbed by their construction activities.
The seed mixture shall be Class 1 or Class 2. Mulch shall be required and placed in accordance with Article 251.03 Method 3 of the Standard Specifications for Road and Bridge Construction. This shall be included in the unit price for associated pay items and not paid for separately.
Work Conditions During the construction, the contractor is responsible for keeping the work area, including roadways, clean of dirt and debris at all times.
(7.2 m)
24'
(3.6 m)
12'
(3.6 m)
12'
(450) sawed joint
Longitudinal
(TYPICAL 2-LANE WITH SHOULDERS)
Slope 1.5% Slope 1.5% bars at 12 (300) cts.
18 (450) Long dowel
Bar supports t t/
(225)
Lane edge or edge of pavement joint filler-full depth (typ.)
1 (25) Preformed expansion pavement has cured.
with full depth concrete after
Place casting to grade and fill keyed joint (typ.)
Longitudinal
** Casting outside limits
(3 m in
(3 m in
(typ.)
6 (150)** placed at pav't. mid-depth reinforcement bars (8 total)
2-No. 5x4' (No. 16x1.2 m)
Lane edge or edge of pavement joint or edge of pavement.
be extended to either the longitudinal achieved, the transverse joints shall
When the 12 (300) minimum cannot be*** unless otherwise shown.
All dimensions are in inches (millimeters) not shown.
See Standard 420001 for details of joints c ts
(t y p d o w e l b a rs a t ty p
(typ.)
18 (450)
36 (900) cts.
tie bars at
No. 6 (No. 19) joint contraction
Transverse sawed joint
Longitudinal ty p
TRANSVERSE CONSTRUCTION JOINT
SECTION A-A
GENERAL NOTES
FOR PAVEMENT BLOCKS-OUTS
DETAIL OF ADDED REINFORCEMENT
A
A
(450)
PAVEMENT PLAN
Pavement subbase
Stabilized subgrade
Improved
(see table)
12' or 15' (3.6 m or 4.5 m)
(see table)
12' or 15' (3.6 m or 4.5 m) clearance of 9 (225) from the end of the dowel bars.
bars in the longitudinal joint(s) to maintain a transverse joints. Also adjust the spacing of tie so the joints are in prolongation with existing use a spacing between 12' (3.6 m) and 18' (5.5 m)
When placed adjacent to existing PCC pavement, 15' (4.5 m) *10 (250) and greater
12' (3.6 m) *Less than 10 (250)
Contraction Joints
Spacing of TransversePavement Thickness drilled for bars or header board
Split header board
CL
CL
Illinois Department of Transportation
APPROVED 2022
APPROVED 2022
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES 1-1-18
STANDARD 420101-07
PCC PAVEMENT
24' (7.2 m) JOINTED
DATE REVISIONS
board callout.
contraction joints and header
Revised spacing of transverse1-1-22 bars of 36 (900).
Changed spacing of tie
ROAD
AHEAD
CONSTRUCTION
ROAD
AHEAD
WORK
ONE LANE
ROAD
AHEAD
ROAD
AHEAD
CONSTRUCTION
ROAD
AHEAD
WORK
ROAD
CLOSED
ROAD
CLOSED
AHEAD
ONE LANE
ROAD
AHEAD
ROAD
AHEAD
CONSTRUCTION
ROAD
AHEAD
WORK
4 3
1 1 max.
100' (30 m)
R11-2 min.
100' (30 m)
W20-1(0)-48
Or
W20-I103(0)-48
W20-4(0)-48
Type l or Type ll barricades
Type lll barricades
W20-3(0)-48
W20-1(0)-48
W20-I103(0)-48 Or
Type l or Type ll Barricades m
W20-4(0)-48 projects and utility maintenance
For
W20-1(0)-48 projects construction contract
For
W20-I103(0)-48
Or
One way / one lane operation
SIGN SPACING
Posted Speed Sign Spacing
50-45
<45
500' (150 m)
350' (100 m)
200' (60 m)
Work area
(not required for moving operations)
Cone, drum or barricade
Flagger with traffic control sign
Sign on portable or permanent support
Barricade or drum with flashing light
Type III barricade with flashing lights 20' (6 m) centers.
Cones, drums or barricades at may be doubled.
used. the interval between devices
Type I or Type II barricades are at 50' (15 m) centers. When drums or
(75 m). Additional cones may be placed
Cones at 25' (8 m) centers for 250'
For approved sideroad closures.
for distances.
Refer to SIGN SPACING TABLE1
4 unless otherwise shown.
All dimensions are in inches (millimeters) of one traffic lane in an urban area.
encroach on the pavement requiring the closure activities night, any vehicle, equipment, workers or their
This Standard is used where at any time, day or
W20-7(O)-48
W20-7(O)-48
SYMBOLS
GENERAL NOTES
Illinois Department of Transportation
APPROVED 2011
APPROVED 2011
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF SAFETY ENGINEERING 1-1-09
STANDARD 701501-06
2L, 2W, UNDIVIDED
URBAN LANE CLOSURE,
DATE REVISIONS
Revised flagger sign.1-1-11
Corrected sign No.'s.
Switched units to English (metric).
CONSTRUCTION
ROAD
AHEAD
WORK
ROAD
AHEAD
CONSTRUCTION
ROAD
AHEAD
WORK
SIDEWALK
CLOSED
USE OTHER
SIDE
SIDEWALK
CLOSED
SIDEWALK
CLOSED
USE OTHER
SIDE
projects construction contract
W20-I103(0)-48 for projects and utility maintenance
W20-1(0)-48 for
Or
Or projects construction contract
W20-I103(0)-48 for projects and utility maintenance
W20-1(0)-48 for
R11-I101-2418 road work traffic control.
Omit whenever duplicated by
10' (3 m) Spacing
25' (8 m) Spacing
Work area permanent support
Sign on portable or
Barricade or drum barricade
Cone, drum or
Type lll barricade
R11-I102-2430 R11-I102-2430 unless otherwise shown.
All dimensions are in inches (millimeters) detail on Standard 701901.
positioned as shown in "ROAD CLOSED TO ALL TRAFFIC"
Type lll barricades and R11-2-4830 signs shall be ends of the actual closures.
The SIDEWALK CLOSED signs shall be used at the the corners across the street from the closure.
occurs at a corner, the signs shall be erected on to each end of the closure. Where the closure placed at the nearest crosswalk or intersection
The SIDEWALK CLOSED / USE OTHER SIDE sign shall be whenever possible.
provided on the same side of the closed facilities
The temporary pedestrian facilities shall be accessible.
Temporary facilities shall be detectable and roadway traffic is affected.
other Traffic Control & Protection Standards when
This Standard must be used in conjunction with performed.
traffic must be rerouted due to work being
This Standard is used where, at any time, pedestrian
.2 m m in typical
Parking space, channelizing barricade
Detectable pedestrian
SIDEWALK DIVERSION
SIDEWALK CLOSURE
GENERAL NOTES
SYMBOLS
Illinois Department of Transportation
APPROVED 2016
APPROVED 2016
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF SAFETY ENGINEERING 1-1-12
(Sheet 1 of 2)
STANDARD 701801-06
CROSSWALK CLOSURE
SIDEWALK, CORNER OR
DATE REVISIONS
the standard spec.
standard as this is covered in
Omitted orange safety fence from4-1-16
Renamed Standard.
Modified appearance of plan views.
Added SIDEWALK DIVERSION.
CONSTRUCTION
ROAD
AHEAD
WORK
SIDEWALK
CLOSED
USE OTHER
SIDE
SIDEWALK
CLOSED
SIDEWALK
CLOSED
SIDEWALK
CLOSED
USE OTHER
SIDE
SIDEWALK
CLOSED
USE OTHER
SIDE
ROAD
AHEAD
CONSTRUCTION
ROAD
AHEAD
WORK
SIDEWALK
CLOSED
USE OTHER
SIDE
SIDEWALK
CLOSED
USE OTHER
SIDE
ROAD
CLOSED
AHEAD
Or projects construction contract
W20-I103(0)-48 for projects and utility maintenance
W20-1(0)-48 for
Or projects construction contract
W20-I103(0)-48 for projects and utility maintenance
W20-1(0)-48 for
R11-I101-2418
R11-I101-2418
Spacing
10' (3 m)
R3-1-2424
R11-I102-2430
R11-I102-2430
R11-I102-2430
R3-2-2424
R20-3(O)-48
R11-I102-2430
R11-I102-2430
CORNER CLOSURE
CROSSWALK CLOSURE
Illinois Department of Transportation
APPROVED 2016
APPROVED 2016
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF SAFETY ENGINEERING
(Sheet 2 of 2)
STANDARD 701801-06
CROSSWALK CLOSURE
SIDEWALK, CORNER OR
File details come from the government source that posted it. Updated .