Summary
This is a Procurement Specifications document and project manual for the City of Geneva Electric Department's Keslinger Road Substation Upgrade Package Procurement (Bid Proposal No. 26-02). The City of Geneva, located in Geneva, Illinois, is seeking qualified bidders to design, fabricate, and deliver substation equipment, steel, and miscellaneous materials for the Keslinger Road Substation Upgrade project located at 3000 Keslinger Road, Geneva, Illinois 60134. The work encompasses general manufacturing, testing, and delivery of all required materials in accordance with detailed specifications and drawings provided in the contract documents. Bids are due by 10:00 AM on Monday, December 14, 2026, at the Office of the City Administrator, 22 South First Street, Geneva, Illinois 60134. The delivery date is specified as September 3, 2027, or the earliest date to which the seller can commit, with coordination required with the owner at the time of shipment. All work must comply with prevailing wage rate requirements for Kane County, Illinois, and prevailing wage certifications must accompany all bids.
The contract is structured as a lump sum bid with potential unit adjustment prices for site services of a service engineer and transportation expenses. Bidders must submit a bid bond equal to 10% of the bid price; a performance bond is not required. Submission requirements include three hard copies and one PDF copy of the entire bid package, with clarifications or exceptions to specifications to be enclosed in a separately sealed envelope. The City reserves the right to defer acceptance of proposals for up to 60 days after bids are received and to reject any or all bids and waive technicalities. Delivery is F.O.B. the Point of Destination with the seller bearing all packaging, transportation, and insurance costs. The seller is responsible for unloading goods from the carrier and must provide at least 10 days' written notice of shipment and arrange for the carrier to provide 24 hours' notice prior to delivery. Liquidated damages are set at $750 per day for each day delivery is delayed beyond the specified date. Progress payments will be made at 10% upon first application after shop drawing approvals, 90% upon acknowledgment of receipt of goods, and final payment upon completion and acceptance. Additional information and bid packages may be obtained from Mr. Philip Schulz at Stanley Consultants, Inc., 225 Iowa Avenue, Muscatine, Iowa 52761, via email at schulzphil@stanleygroup.com or by telephone at 563-264-6461.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ms2389 1
CITY OF GENEVA ELECTRIC DEPARTMENT
1800 SOUTH STREET
GENEVA, IL 60134
SPECIFICATIONS AND CONTRACT DOCUMENTS 26-02
For
KESLINGER ROAD SUBSTAITON UPDATE PACKAGER PROCURMENT
Bid Opening: 10:00 am Monday, December 14th, 2026
Bid Deposit: NOT REQUIRED
Bid Bond: 10% of Bid Price
Specifications: Attached
Return Bids To: City Administrator
City of Geneva
22 South First Street
Geneva, IL 60134
Please Mark the Return Envelope and specify the:
1. Bid Opening Date & Time
2. Title of Job
For Additional Information regarding bid, contact:
Mr. Philip Schulz
Stanley Consultants, Inc.
225 Iowa Avenue
Muscatine, Iowa 52761
563-264-6461 schulzphil@stanleygroup.com
Please submit three hard copies and one PDF of the entire document, intact.
©Stanley Consultants, Inc. 2026
Project Manual for
Bid Proposal No. 26-02 Keslinger Road Substation Upgrade Package Procurement
Geneva, Illinois
Issue for Bid November 13, 2026
00 01 05.doc
Project Manual for
Bid Proposal No. 26-02 Keslinger Road Substation Upgrade Package Procurement
Geneva, Illinois
32643.01.00 TABLE OF CONTENTS
ms2389 SECTION 00 01 10 - Page 1
CONTRACT NO. 26-02
KESLINGER ROAD SUBSTATION UPGRADE
PACKAGE PROCURMENT
CITY OF GENEVA
GENEVA, ILLINOIS
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
Resp.
Charge Document Title Page JS 00 01 15 Drawing List 1 JS Notice N-1 JS RFP Information 1 JS Instructions to Bidders IB-1 to IB-3 JS Attachment A – Certification of Compliance A-1 to A-2 JS Form of Proposal FP-1 to FP-2 JS 00 52 63 Agreement between Buyer and Seller
– EJCDC P-520 (2010 Edition) 1 to 5 JS 00 72 63 Standard General Conditions for Procurement Contracts 1 to 12
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
Resp.
Charge Section Title Page
DIVISION 01 GENERAL REQUIREMENTS
JS 01 11 00 Summary of Work 1 JS 01 25 13 Product Substitutions Procedures 1 to 2 JS Product Substitution Request Form 1 JS 01 33 00 Submittal Procedures 1 to 6 JS Submittal Transmittal Form 1 JS 01 43 33 Manufacturer’s Field Services 1 JS 01 60 00 Product Requirements 1 to 3 JS 01 70 00 Execution and Closeout Requirements 1 JS 01 78 23 Operating and Maintenance Data 1 to 4 JS Operating and Maintenance Manual Cover Diagram 1
FACILITY SERVICES SUBGROUP
DIVISION 33 UTILITIES
JS 33 72 25 Distribution Substation Equipment 1 to 7 JS 33 72 26 Substation Structures, Buses, and Insulators 1 to 10
32643.01.00 DRAWING LIST
ms2389 SECTION 00 01 15 - Page 1
Drawing No. Title Rev. No.
GI01 COVER INDEX & DRAWING INDEX C
EO01 ONE-LINE DIAGRAM SHEET 1 C
EP01 General Arrangement B
EP02 H.V. ELEVATIONS B
EP03 SECTION C-C B
REFERENCE DRAWINGS
The following drawings are issued for information only and do not form a part of the Contract Documents
IL0018901-13 ERECTION DRAWING 34.5KV TERMINAL STRUCTURE 3
ms2389 N-1
November 16, 2026
NOTICE
Three original copies and one PDF of sealed BIDS submitted in a sealed envelope with the words "KESLINGER ROAD SUBSTATION UPGRADE PACKAGE PROCURMENT” marked on it, will be received by the City of Geneva, Illinois, until 10:00 AM, Monday, December 14th, 2027, at the Office of the Administrator, City of Geneva, 22 South First Street, Geneva, Illinois, 60134.
This work shall be done in accordance with the specifications of the City of
Geneva.
Contractors and Subcontractors shall pay not less than the prevailing Rate of Wages as found by the Department of Labor or as are determined by the Court of Appeal, Kane County, to all laborers, workers, and mechanics performing work in Kane County, Illinois under the
Contract. A signed certification stating the above, as well as the fact that the bidder is not barred from bidding as a result of a violation of either Section 33E-3 or 33E-4 of Chapter 38, Illinois Revised statutes, (as amended) must be submitted with the sealed bid.
The City reserves the right to defer acceptance of any proposal for a period not to exceed
(60) days after the date bids are received.
The City of Geneva reserves the right to reject any or all bids and waive technicalities.
Bid packages can be obtained by contacting Mr. Philip Schulz, Stanley Consultants, Inc., 225 Iowa Avenue, Muscatine, Iowa 52761, email: schulzphil@stanleygroup.com, telephone
563-264-6461 or City’s website www.geneva.il.us/bids.aspx.
To be published in the Daily Herald on the following date: November 16th, 2026 ms2389 1
CITY OF GENEVA
BID PROPOSAL NO. 26-02 OPENING DATE: December 14th, 2026
FOR: KESLINGER ROAD SUBSTAITON UPGRADE PACKAGE PROCUREMENT
OPENING TIME: 10:00 AM
DEPARTMENT: PUBLIC WORKS
QUANTITIES: SPECIFIC QUANTITIES
BID DEPOSIT REQUIREMENTS: CHECK OR BID BOND 10% OF BID PRICE
PERFORMANCE BOND: NOT REQUIRED
SAMPLES: NOT REQUIRED
DESCRIPTIVE LITERATURE & TECHNICAL DATA: TO BE SUBMITTED WITH BID
ms2389 IB-1
INSTRUCTIONS TO BIDDERS
Bids shall be submitted to the City Administrator, City of Geneva, 22 South First Street, Geneva, IL 60134.
Bids shall be in sealed envelopes clearly marked as to what the bid pertains to as well as time and date of bid opening. Return address should be on outside of bid envelope.
Three unbound original copies and one PDF copy shall be submitted to the City of Geneva.
Bids shall be received on or before the time specified at which time the bids will be publicly opened and read aloud at the office of the City Administrator. Bids received after the specified time and date will be returned to the bidder unopened.
BIDS SHALL BE SUBMITTED ON CITY OF GENEVA BID FORMS INCLUDED IN THE
CONTRACT DOCUMENT (BID PACKAGE).
The manufacture or assembly of equipment shall be commenced within ten (10) calendar days after written notice to proceed and shall be completed within the time stated in the successful bidder's proposal.
The City reserves the right to consider such factors as time of completion or delivery, materials, method of construction, experience, and responsibility of the bidder and similar factors in determining which bid it deems to be in the City's best interest.
The City reserves the right to reject any or all of the bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be in the best interest of the City of Geneva.
A bid deposit will be required if indicated on the “NOTICE TO BIDDERS” form. Each bid
MUST be accompanied by a Bid Bond signed by a surety company authorized to do business in
Illinois, or by a cashier’s check or certified check in the amount of 10% of the Bid Price. Any bid not accompanied by a required bid deposit may be rejected.
All bid deposits (except that of the lowest responsible bidder) will be returned after the lowest responsible bidder is determined by the City Council. The return of the bid deposit to the successful bidder or awardee will be contingent upon that bidder’s execution of a written contract with the City.
Any bidder may withdraw his or her bid by letter or telegraphic request or, with proper identification, by personally securing the bid proposal at any time prior to the time fixed for opening of bids and provided that written confirmation of any telegraphic withdrawal over the signature of the Bidder is placed in the mail and postmarked prior to the time set for bid opening.
Telephonic request to withdraw a bid will not be considered.
ms2389 IB-2
The City of Geneva is exempt from the Illinois Retailers Sales and Occupation Tax. An exemption certification will be furnished upon request.
Delivery of Goods F.O.B. Point: 3000 Keslinger Rd, Geneva, IL 60134. Should any goods be damaged during shipment, bidder shall repair or replace any damaged equipment or materials.
The City shall be notified 48 hours prior to any shipment of materials or equipment. Please contact Jose Ruiz at (630) 232-1503 during the hours of 7:00 AM to 3:00 P.M. Monday through
Friday.
All deliveries are to be made during City of Geneva Electric Utility business hours of 7:00 AM to 11:30 A.M. and 12:30 P.M. to 3:00 P.M. Monday through Friday.
Each bidder shall submit a lump sum price for material or equipment covered by the specifications, together with any prices for alternate materials or equipment or other prices or data listed in the Form of Proposal or as specified.
ESCALATION CLAUSES ARE NOT ACCEPTABLE.
CLAUSES THAT NULLIFY OR VOID CITY CONTRACTUAL OR TECHNICAL
REQUIREMENTS ARE NOT ACCEPTABLE AND ARE A BASIS FOR REJECTION OF
BIDS.
CLARIFICATIONS OR EXCEPTIONS TO THE SPECIFICATIONS OR CONTRACT
DOCUMENTS MUST BE ENCLOSED IN A SEPARATELY SEALED ENVELOPE AND
INCLUDED WITH THE BIDDER’S PROPOSAL FORM. Each clarification or exception must be marked as either “clarification” or “exception” and identify the specific section of the
Specifications or Contract Documents to which they apply. By signing the Bidder’s Proposal
Form, the Bidder acknowledges that pre-printed terms and conditions provided by the Bidder do not apply and the only clarifications or exceptions to be recognized by the City of Geneva shall be submitted as identified above.
The bidder may at his option, base quotes on furnishing substitutions that are equivalent of any item described, named, or specified, provided the selection meets the quality and are direct equals to the item specified. Burden of proof that proposed substitutions are equivalent rests with the bidder.
Submit separate prices, alternate prices, or adjusted prices for materials or equipment as requested in the Form of Proposal. Bidders may in addition, submit prices for a combination of these separately priced schedules. If submitting combination quotes, bidders must submit separate schedule bids. Each schedule will be independent and subject to acceptance or rejection without alteration or qualification.
The City may award Purchase Order on basis of separate quotes or combination bids.
A legally authorized representative of bidder shall sign the bid.
ms2389 IB-3
Submit manufacturer’s specifications and descriptive data on proposed materials.
All laborers, workers, mechanics, etc., employed in any public work in Kane County, Illinois under this contract by Seller shall be paid in accordance with the Prevailing Wage Rates approved by the City of Geneva, Kane County, Illinois as found by the Department of Labor or as are determined by the Court of Appeal , Kane County, Illinois.
A statement certifying that the bidder is not barred from bidding on the Project Specifications as a result of a violation of either Section 33E-3 or 33E-4 of Chapter 38, Illinois Revised Statutes, 1987 (as amended) shall be submitted with the bid prior to the time of the bid opening. The certificate form, ATTACHMENT A, is attached to the Project Specifications.
Bidders must supply a self addressed, stamped envelope for bid results.
Absolutely no results will be given out over the telephone.
Questions regarding this Legal Notice, Instructions to Bidders, and Specifications should be directed to Mr. Philip Schulz, Stanley Consultants, Inc., 225 Iowa Avenue, Muscatine, Iowa
52761, email: schulzphil@stanleygroup.com, telephone 563-264-6461.
USE FORM OF PROPOSAL INCLUDED HEREIN
ms2389 A-1
ATTACHMENT A
CERTIFICATION OF COMPLIANCE
The undersigned hereby certifies as follows:
1. That they have the authority and consent to make this certification on behalf of the bidder, (Name of Company)
2. That they have knowledge of the City of Geneva Codes pertaining to the disqualification of certain bidders.
3. That they know that the bidder listed above is not disqualified from bidding under the aforementioned sections.
4. That they have knowledge of the City of Geneva ordinances relating to Fair Employment
Practices and knows and understands the contents thereof; they certify hereby that it is the policy of the bidder to recruit, hire, train, upgrade, promote, and discipline its employees without regard to race, creed, color, religion, age, sex, or physical or mental impairment.
5. That said bidder is not barred from bidding on the aforementioned contract as a result of a violation of Sections 33E-3 or 33E-4 of Chapter 38 of the Illinois Revised Statutes, 1989.
6. That pursuant to Chapter 24, Section 11-42.1-1 of the Illinois Revised Statutes, the bidder is not delinquent in the payment of any taxes administered by the Department of
Revenue.
7. That the contractor (either as an individual or company) agrees to provide a drug free workplace as provided for by the Public Act 86-1459.
8. That all work under this contract shall comply with the Occupational Safety and Health
Act (OSHA) of 1975, and all other Federal, State, or Local statutes, rules, or regulations including all City of Geneva Safety Procedures affecting the work done under the contract.
9. That all work done in Kane County, Illinois under this contract shall comply with the
Prevailing Wage Rate Act of the State of Illinois, County of Kane, Illinois Revised
Statutes, 1987, Chapter 48, par 39s-1, et. seq. and as amended by Public Acts 86-799 and
86-693, in effect at the time work is performed.
ms2389 A-2
ATTACHMENT A (continued)
By submission of this bid, I certify that the bid has been arrived at independently and has been submitted without collusion between or among any vendor of materials, supplies, equipment, or services.
Name of Corporation, Partnership, or Proprietor
Address
City State Zip
Telephone
Authorized Signature/Title
SUBSCRIBED AND SWORN to before me this ____________day of _______________ , 20_______ .
Notary Public
My commission expires: __________________________ ms2389 FP-1
NOTICE: SUBMIT PROPOSALS ON PROPOSAL FORM ONLY
FORM OF PROPOSAL
Name of Bidder ______________________________________________________________
Address of Bidder_____________________________________________________________
Telephone No. of Bidder________________________________________________________
To: City Administrator
22 South First Street
Geneva, IL 60134
The undersigned bidder, having examined the specifications of the following proposal, hereby proposes to provide the required labor, services, and materials described in this Form of
Proposal, the Instruction to Bidders, and Specifications for the sum or sums stated hereinafter:
I. LUMP SUM BID PRICE – KESLINGER ROAD SUBSTATION UPGRADE
PACKAGE PROCUREMENT :
Design, fabricate, and deliver FOB substation as specified for the sum of:
_______________________________________________________ (Dollars)
To be delivered on: ________________________________, 20_____________.
Prices contained herein are firm through ______________________________.
Price for extending warranty:
2 years $______________________________.
5 years $______________________________.
II. UNIT ADJUSTMENT PRICES: Required Base Bid quantities of the items listed below are set forth in the Specifications. If increases or decreases in these quantities occur, the
Contract Price is to be adjusted by Change Order on the basis of the following.
Adjustment prices are subject to acceptance by Owner, and rejection of one or more adjustment prices will not invalidate acceptance of this Bid.
Item Unit Unit Adjustment Price
Site services of Service Engineer per day $
Transportation, travel time, and out-of-pocket expenses for travel of
Service Engineer to Site per round trip ms2389 FP-2
The undersigned bidder states that this proposal is made in conformity with the specifications and agrees that, in the event of any discrepancies between any conditions of this proposal and the specifications prepared by the City of Geneva, the provisions of the latter shall prevail.
The undersigned bidder certifies that this proposal is made in good faith, without collusion or connection with any other person or persons bidding for these services, labor and materials.
Signed by:
BIDDER: _____________________________________
BY: __________________________________________
TITLE: _______________________________________
DATE: _______________________________________
NOTICE: SUBMIT PROPOSALS ON THIS FORM ONLY
32643.01.00 AGREEMENT BETWEEN BUYER AND SELLER
ms2389 SECTION 00 52 63 - Page 1
THIS AGREEMENT is by and between ___________________________________________________ (Buyer) and
________________________________________ (Seller).
Buyer and Seller, in consideration of the mutual covenants hereinafter set forth, agree as follows:
Article 1. GOODS AND SPECIAL SERVICES
1.1 Seller shall furnish the Goods and Special Services as specified or indicated in the Contract Documents.
The Goods and Special Services to be furnished are described in Section 01 11 00.
Article 2. THE PROJECT
2.1 The Project for which the Goods and Special Services to be provided under the Contract Documents may be the whole or only a part is generally described as Keslinger Road Substation Upgrade Package Procurement Project.
Article 3. ENGINEER
3.1 The Contract Documents for the Goods and Special Services have been prepared by Stanley Consultants, Inc. who is hereinafter called Engineer and who is to assume all duties and responsibilities and have the rights and authority assigned to Engineer in the Contract Documents in connection with the furnishing of Goods and Special Services.
Article 4. POINT OF DESTINATION
4.1 The place where the Goods are to be delivered is defined in the General Conditions as the Point of Destination and is designated as: Keslinger Substation, address 3000 Keslinger Rd., Geneva, IL 60134.
Article 5. CONTRACT TIMES
5.1 Time of the Essence. All time limits for Milestones, if any, for the delivery of Goods and the furnishing of Special Services as stated in the Contract Documents are of the essence of the Contract.
5.2 Days for Submittal of Shop Drawings. All Shop Drawings and Samples required by the Contract
Documents will be submitted to Buyer for Engineer's review within 30 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions.
5.3 Dates for Delivery of Goods. The Goods are to be delivered to the Point of Destination and ready for
Buyer's receipt of delivery on (or within a period of 15 days prior to or after) September 3rd, 2027 or the earliest date to which the Seller can commit. Coordinate with Owner on exact date at time of shipment.
5.4 Liquidated Damages. Buyer and Seller recognize that Buyer will suffer financial loss if the Goods are not delivered at the Point of Destination and ready for receipt of delivery by Buyer within the time specified in Paragraph 5.3 above, plus any extensions thereof allowed in accordance with Article 7 of the General Conditions. The parties also recognize that the timely performance of services by others involved in the Project is materially dependent on the Sellers specific compliance with the requirements of Paragraph 6.02. Further, they recognized the delays, expense, and difficulties involved in proving the actual loss suffered by Buyer if complete acceptable Goods are not delivered on time. Accordingly, instead of requiring such proof, Buyer and Seller agree that as liquidated damages for delay (but not as a penalty) Seller shall pay buyer $750 for each day that expires after the time specified in Paragraph 5.3 B for delivery of acceptable Goods.
Article 6. CONTRACT PRICE.
6.1 Buyer shall pay Seller for furnishing the Goods and Special Services in accordance with the Contract Documents an amount in current funds as follows:
AGREEMENT BETWEEN BUYER AND SELLER 32643.01.00
SECTION 00 52 63 - Page 2 ms2389
6.1.1 A Lump Sum of:
(words) (figures)
6.1.2 Unit Adjustment Prices. To adjust Lump Sum for changes from quantities required by Contract Documents.
Item Unit Unit Adjustment Price
Site services of service engineer per day $
Transportation, travel time, and out-of-pocket expenses for travel of service engineer to Site per round trip $
Article 7. PAYMENT PROCEDURES.
7.1 Submittal and Processing of Payments. Seller shall submit Applications for Payment in accordance with Article 10 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
7.2 Progress Payments; Retainage.
7.2.1 Buyer shall make progress payments on account of the Contract Price on the basis of Seller's
Applications for Payment as follows:
7.2.1.1 Upon receipt of the first Application for Payment submitted in accordance with Paragraph 10.01.A.1 of the General Conditions and accompanied by Engineer's recommendation of payment in accordance with Paragraph 10.02.A of the General Conditions, an amount equal to 10% of the Contract Price, less such amounts as Engineer may determine in accordance with Paragraph 10.02.A.3 of the General Conditions.
7.2.1.2 Upon receipt of the second such Application for Payment accompanied by
Engineer's recommendation of payment in accordance with Paragraph 10.01.A.2 of the General Conditions, an amount sufficient to increase total payments to Seller to 90% of the Contract Price, less such amounts as Engineer may determine in accordance with Paragraph 10.02.A.3 of the General Conditions.
7.3 Final Payment. Upon receipt of the final Application for Payment accompanied by Engineer's recommendation of payment in accordance with Paragraph 10.06 of the General Conditions, Buyer shall pay the remainder of the Contract Price as recommended by Engineer.
Article 8. INTEREST.
8.1 All moneys not paid when due as provided in Article 10 of the General Conditions shall bear interest at the rate of 4% per annum.
Article 9. SELLER'S REPRESENTATIONS.
9.1 In order to induce Buyer to enter into this Agreement, Seller makes the following representations:
9.1.1 Seller has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
9.1.2 If specified or if, in Seller's judgment, any local condition may affect cost, progress or the furnishing of the Goods and Special Services, Seller has visited the Point of Destination and ms2389 SECTION 00 52 63 - Page 3 become familiar with and is satisfied as to the local conditions that may affect cost, progress or the furnishing of the Goods and Special Services.
9.1.3 Seller is familiar with and is satisfied as to all local federal, state and local Laws and Regulations that may affect cost, progress and the furnishing of the Goods and Special Services.
9.1.4 Seller has carefully studied and correlated the information known to Seller, and information and observations obtained from Seller's visits, if any, to the Point of Destination, with the Contract
9.1.5 Seller has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that
Seller has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Seller.
9.1.6 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for furnishing Goods and Special Services.
Article 10. CONTRACT DOCUMENTS.
10.1 The Contract Documents consist of the following:
10.1.1 This Agreement (pages 1 to 5, inclusive).
10.1.2 Exhibits to this Agreement (pages 1 to ___, inclusive).
10.1.3 General Conditions (pages 1 to 12, inclusive).
10.1.4 Specifications as listed in Project Manual table of contents.
10.1.5 Drawings consisting of a cover sheet and sheets as listed in Drawing List and in Standard Drawing List.
10.1.6 Addenda numbers ___ to ___, inclusive.
10.1.7 The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:
10.1.7.1 Notice to Proceed (pages _____ to _____, inclusive);
10.1.7.2 Written Amendment(s);
10.1.7.3 Work Change Directive(s);
10.1.7.4 Change Order(s).
10.2 The documents listed in paragraph 10.1 are attached to this Agreement (except as expressly noted otherwise above).
10.3 There are no Contract Documents other than those listed above in this Article 10.
10.4 The Contract Documents may only be amended, modified, or supplemented as provided in paragraph
3.04 of the General Conditions.
Article 11. MISCELLANEOUS.
11.1 Defined Terms. Terms used in this Agreement will have the meanings indicated in the General Conditions and the Supplementary Conditions.
AGREEMENT BETWEEN BUYER AND SELLER 32643.01.00
SECTION 00 52 63 - Page 4 ms2389
11.2 Assignment. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound. Specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law). Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract
11.3 Successors and Assigns. Buyer and Seller each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract
11.4 Severability. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Buyer and Seller, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
11.5 Waiver. It is agreed that no waiver or modification of this contract or of any covenant, condition or limitation contained in it shall be valid unless it is in writing and duly executed by the party to be charged with it, and that no evidence of any waiver or modification shall be offered or received in evidence in any proceeding, arbitration, or litigation between the parties arising out of or affecting this contract, or the right or obligations of any party under it, unless such waiver or modification is in writing, duly executed as above. The parties agree that the provisions of this paragraph may not be waived except by a duly executed writing.
11.7 Entire Agreement. This Agreement states the entire contract between the parties hereto with respect to the subject matter hereof, and all prior and contemporaneous understandings, representations, and agreements are merged herein or superseded hereby. No alterations, modifications, release, or waiver of this contract or any of the provisions hereof shall be effective unless in writing, executed by the parties.
ms2389 SECTION 00 52 63 - Page 5
IN WITNESS WHEREOF, Buyer and Seller have signed this Agreement in duplicate. One counterpart each has been delivered to Buyer and Seller. All portions of the Contract Documents have been signed or identified by Buyer and Seller or on their behalf.
This Agreement will be effective on , 20 (which is the Effective Date of the Agreement).
Buyer:
By:
(CORPORATE SEAL)
Attest
Address for giving notices:
(If Buyer is a corporation, attach evidence of authority to sign. If Buyer is a public body, attach evidence of authority to sign and resolution or other documents authorizing execution of Agreement.)
Designated Representative:
Name:
Title:
Address:
Phone:
Facsimile:
Seller:
By:
(CORPORATE SEAL)
Attest
Address for giving notices
Agent for service of process:
(If Seller is a corporation, attach evidence of authority to sign.)
Designated Representative:
Name:
Title:
Address:
Phone:
Facsimile:
END OF SECTION
ms2389 00 72 63-1
STANDARD GENERAL CONDITIONS FOR PROCUREMENT CONTRACTS
ARTICLE 1- DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Whenever used in the Bidding Requirements or Contract
Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to the singular or plural thereof. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms.
1. Addenda-Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents.
2. Agreement-The written instrument signed by both Buyer and Seller covering the Goods and Special Services and which lists the Contract Documents in existence on the Effective Date of the Agreement.
3. Application for Payment-The form acceptable to Buyer which is used by Seller in requesting progress and final payments and which is accompanied by such supporting documentation as is required by the Contract Documents.
4. Bid- The offer or proposal of a Seller submitted on the prescribed form setting forth the prices for the Goods and Special Services to be provided.
5. Bidder-The individual or entity that submits a Bid directly to Buyer.
6. Bidding Documents-The Bidding Requirements and the proposed Contract Documents (including all Addenda).
7. Bidding Requirements-The advertisement or invitation to bid, Instructions to Bidders, Bid security of acceptable form, if any, and Bid Form with any supplements.
8. Buyer- individual or entity purchasing the Goods and Special Services. The term "Buyer" is used to be consistent with the Uniform Commercial Code (UCC).
9. Change Order-A document which is signed by Seller and Buyer and authorizes an addition, deletion, or revision to the Contract Documents or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. Change Orders may be the result of mutual agreement by Buyer and Seller, or of resolution of a Claim.
10. Claim-A demand or assertion by Buyer or Seller seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.
11. Contract-The entire and integrated written agreement between Buyer and Seller concerning the Goods and Special Services.
The Contract supersedes prior negotiations, representations, or agreements, whether written or oral.
12. Contract Documents-Those items so designated in the Agreement. Shop Drawings and other Seller submittals are not Contract Documents, even if accepted, reviewed, or approved by Engineer or Buyer.
13. Contract Price-The moneys payable by Buyer to Seller for furnishing the Goods and Special Services in accordance with the Contract Documents as stated in the Agreement.
14. Contract Times-The times stated in the Agreement by which the Goods must be delivered and Special Services must be furnished.
15. Drawings-That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Goods and Special Services to be furnished by Seller.
Shop Drawings and other Seller submittals are not Drawings as so defined.
16. Effective Date of the Agreement-The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.
17. Engineer-The individual or entity designated as such in the Agreement.
18. Field Order-A written order issued by Engineer which requires minor changes in the Goods or Special Services but which does not involve a change in the Contract Price or Contract Times.
19. General Requirements-Sections of Division 01 of the Specifications. The General Requirements pertain to all sections of the Specifications.
20. Goods-The tangible and movable personal property that is described in the Contract Documents, regardless of whether the property is to be later attached to realty.
21. Goods and Special Services-The full scope of materials, equipment, other items, and services to be furnished by Seller, including Goods, as defined herein, and Special Services, if any, as defined herein. This term refers to both the Goods and the Special Services, or to either the Goods or the Special Services, and to any portion of the Goods or the Special Services, as the context requires.
22. Laws and Regulations; Laws or Regulations-Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction.
23. Milestone-A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to the Contract Times.
24. Notice of Award-The written notice by Buyer to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, Buyer will sign and deliver the Agreement.
25. Notice to Proceed-A written notice given by Buyer to Seller fixing the date on which the Contract Times commence to run and on which Seller shall start to perform under the Contract.
26. Point of Destination-The specific address of the location where delivery of the Goods shall be made, as stated in the Agreement.
27. Project-The total undertaking of which the Goods and Special Services may be the whole, or only a part.
28. Project Manual-The documentary information prepared for bidding and furnishing the Goods and Special Services. A listing of the contents of the Project Manual is contained in its table of contents.
29. Samples-Physical examples of materials, equipment, or workmanship that are representative of some portion of the Goods and Special Services and which establish the standards by which such portion of the Goods and Special Services will be judged.
30. Seller-The individual or entity furnishing the Goods and Special Services.
31. Shop Drawings-All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Seller and submitted by Seller to illustrate some portion of the Goods and Special Services.
32. Special Services-Services associated with the Goods to be furnished by Seller as required by the Contract Documents.
33. Specifications-That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the furnishing of the Goods and Special Services, and certain administrative requirements and procedural matters applicable thereto.
34. Successful Bidder-The Bidder submitting a responsive Bid, to whom Buyer makes an award.
35. Supplementary Conditions-That part of the Contract Documents which amends or supplements these General Conditions.
36. Work Change Directive-A written statement to Seller issued on or after the Effective Date of the Agreement and signed by Buyer ordering an addition, deletion, or other revision in the Contract Documents with respect to the Goods and Special Services. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times.
1.02 Terminology
A. The words and terms discussed in Paragraphs 1.02.B and
1.02.C are not defined, but have the indicated meanings when used in the Bidding Requirements or Contract Documents.
B. Intent of Certain Terms or Adjectives:
1. The Contract Documents include the terms “as allowed,” “as approved,” “as ordered,” “as directed” or terms of like effect or import to authorize an exercise of professional judgment by Engineer. In ms2389 00 72 63-2 addition, the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of like effect or import are used to describe an action or determination of Engineer as to the Goods and Special Services. It is intended that such exercise of professional judgment, action, or determination will be commercially reasonable and will be solely to evaluate, in general, the Goods and Special Services for compliance with the requirements of and information in the Contract Documents and conformance with the design concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise).
The use of any such term or adjective shall not be effective to assign to Engineer any duty or authority to supervise or direct the furnishing of Goods or Special Services or any duty or authority to undertake responsibility contrary to any other provision of the Contract Documents.
2. The word “non-conforming” when modifying the words “Goods and Special Services,” “Goods,” or “Special Services,” refers to Goods and Special Services that fail to conform to the Contract Documents.
3. The word “receipt” when referring to the Goods, shall mean the physical taking and possession by the Buyer under the conditions specified in Paragraph 8.01.B.3.
4. The word “day” means a calendar day of 24 hours measured from midnight to the next midnight.
5. The word "furnish," when used in connection with the Goods and Special Services shall mean to supply and deliver said Goods to the Point of Destination (or some other specified location) and to perform said Special Services fully, all in accordance with the Contract
C. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning.
ARTICLE 2 - PRELIMINARY MATTERS
2.01 Delivery of Bonds
A. When Seller delivers the executed counterparts of the
Agreement to Buyer, Seller also shall deliver such bonds as Seller may be required to furnish.
2.02 Evidence of Insurance
A. When Seller delivers the executed counterparts of the
Agreement to Buyer, Seller shall deliver to Buyer, with copies to each additional insured identified by name in Paragraph 4.2.C.1, certificates of insurance (and other evidence of insurance which either of them or any additional insured may reasonably request) which Seller is required to purchase and maintain in accordance with Article 4.
2.03 Commencement of Contract Times; Notice to Proceed
A. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Agreement or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 30 days after the Effective Date of the Agreement. In no event will the Contract Times commence to run later than the sixtieth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever date is earlier.
2.04 Designated Representatives
A. Buyer and Seller shall each designate its representative at the time the Agreement is signed. Each representative shall have full authority to act on behalf of and make binding decisions in any matter arising out of or relating to the Contract.
2.05 Progress Schedule
A. Within 15 days after the Contract Times start to run, Seller shall submit to Buyer and Engineer an acceptable progress schedule of activities, including at a minimum, Shop Drawing and Sample submittals, tests, and deliveries as required by the Contract
Documents. No progress payment will be made to Seller until an acceptable schedule is submitted to Buyer and Engineer.
B. The progress schedule will be acceptable to Buyer and
Engineer if it provides an orderly progression of the submittals, tests, and deliveries to completion within the specified Milestones and the Contract Times. Such acceptance will not impose on Buyer or Engineer responsibility for the progress schedule, for sequencing, scheduling, or progress of the work nor interfere with or relieve Seller from Seller’s full responsibility therefor. Such acceptance shall not be deemed to acknowledge the reasonableness and attainability of the schedule.
2.07 Preliminary Conference
A. Within 20 days after the Contract Times start to run, a conference attended by Seller, Buyer, Engineer and others as appropriate will be held to establish a working understanding among the parties as to the Goods and Special Services and to discuss the schedule referred to in Paragraph 2.06.A, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records.
2.08 Safety
A. Buyer and Seller shall comply with all applicable Laws and
Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss. When Seller's personnel, or the personnel of any subcontractor to Seller, are present at the Point of Destination or any work area or site controlled by Buyer, the Seller shall be responsible for the compliance by such personnel with any applicable requirements of Buyer's safety programs that are made known to Seller.
ARTICLE 3- CONTRACT DOCUMENTS: INTENT AND AMENDING
3.01 Intent
A. The Contract Documents are complementary; what is called for by one is as binding as if called for by all.
B. Any labor, documentation, services, materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce or furnish the indicated Goods and Special Services will be provided, whether or not specifically called for, at no additional cost to Buyer.
C. Clarifications and interpretations of, or notifications of minor variations and deviations in, the Contract Documents, will be issued by Engineer as provided in Article 9.
3.02 Standards, Specifications, Codes, Laws and Regulations
A. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws and Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws and Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents.
B. No provision of any such standard, specification, manual or code, or any instruction of a supplier shall be effective to change the duties or responsibilities of Buyer or Engineer, or any of their subcontractors, consultants, agents, or employees from those set forth in the Contract Documents, nor shall any such provision or instruction be effective to assign to Buyer or Engineer, or any of their consultants, agents, or employees any duty or authority to supervise or direct the performance of Seller’s obligations or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract
3.03 Reporting and Resolving Discrepancies
A. Reporting Discrepancies:
1. Seller’s Review of Contract Documents Before the
Performance of the Contract: Before performance of the Contract, Seller shall carefully study and compare the Contract Documents and ms2389 00 72 63-3 check and verify pertinent figures therein and all applicable field measurements. Seller shall promptly report in writing to Engineer any conflict, error, ambiguity, or discrepancy which Seller discovers or has actual knowledge of and shall obtain a written interpretation or clarification from Engineer before proceeding with the furnishing of any Goods and Special Services affected thereby.
2. Seller’s Review of Contract Documents During the Performance of the Contract: If, during the performance of the Contract, Seller discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents or between the Contract Documents and any provision of any Law or Regulation applicable to the performance of the Contract, any standard, specification, manual or code, or of any instruction of any Supplier, Seller shall promptly report it to Engineer in writing. Seller shall not proceed with the furnishing of the Goods and Special Services affected thereby until an amendment to or clarification of the Contract Documents has been issued.
3. Seller shall not be liable to Buyer or Engineer for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Seller had actual knowledge thereof.
B. Resolving Discrepancies: Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and:
1. the provisions of any standard, specification, manual, code, or instruction (whether or not specifically incorporated by reference in the Contract Documents); or
2. the provisions of any Laws or Regulations applicable to the furnishing of the Goods and Special Services (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation).
3.04 Amending and Clarifying Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions to the Goods and Special Services or to modify contractual terms and conditions by a Change Order.
B. Buyer may issue a Work Change Directive providing for additions, deletions, or revisions to the Goods and Special Services, in which case (1) the Contract Price shall be equitably adjusted to account for any reasonable and necessary credits to Buyer for any such deletion, or for costs (including reasonable overhead and profit) incurred by Seller to accommodate such an addition or revision and (2) the Contract Times shall be equitably adjusted to account for any impact on progress and completion of performance. Such adjustments subsequently shall be duly set forth in a Change Order.
C. The requirements of the Contract Documents may be supplemented and minor variations and deviations in the Goods and Special Services may be authorized, by one or more of the following ways:
1. Field Order;
2. Engineer’s written interpretation or clarification.
ARTICLE 4- BONDS AND INSURANCE
4.01 Bonds
A. Seller shall furnish to Buyer payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all of Seller's obligations under the Contract Documents. This bond shall remain in effect until 1) one year after the date when final payment becomes due or 2) completion of the correction period specified in Paragraph 8.03, whichever is later, except as provided otherwise by Laws or Regulations or by the Contract Documents. Seller shall also furnish such other bonds as are required by the Contract Documents.
B. Bond shall be in the form prescribed by the Contract
Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the current list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. Bond signed by an agent or attorney-in-fact must be accompanied by a certified copy of that individual's authority to bind the surety. The evidence of authority shall show that it is effective on the date the agent or attorney-in-fact signed each bond.
C. If the surety on any bond furnished by Seller is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of Paragraph 4.01.B, Seller shall promptly notify Buyer and Engineer and shall, within 20 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01.B and 4.02.
4.02 Insurance
A. Property Insurance: Seller shall assume all risk of loss or damage to the Goods prior to acceptance of delivery by Buyer at the point of delivery; and shall purchase and maintain insurance on the Goods during the process of fabrication and while in transit to insure against the perils of fire and extended coverage including “all risk” insurance for physical loss and damage including theft, vandalism and malicious mischief, collapse, water damage and such other perils as may be provided herein and as Seller deems appropriate.
B. Liability Insurance Seller shall purchase and maintain such liability and other insurance as is appropriate for the furnishing of Goods and Special Services and as will provide protection from claims set forth below which may arise out of or result from Seller's furnishing of the Goods or Special Services and Seller's other obligations under the Contract Documents, whether the furnishing of Goods or Special Service, or other obligations are to be performed by Seller, any subcontractor or supplier, or by anyone directly or indirectly employed by any of them to furnish the Goods or Special Services, or by anyone for whose acts any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of Seller's employees;
3. claims for damages because of bodily injury, sickness or disease, or death of any person other than Seller's employees;
4. claims for damages insured by reasonably available personal injury liability coverage which are sustained: (i) by any person as a result of an offense directly or indirectly related to the employment of such person by Seller, or (ii) by any other person for any other reason;
5. claims for damages, other than to the Goods, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and
6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle.
C. The policies of insurance so required by this Paragraph 4.02 to be purchased and maintained shall:
1. with respect to insurance required by Paragraphs 4.02.B.3 through 4.02.B.6 inclusive, include as additional insureds (subject to any customary exclusion in respect of professional liability) City of Geneva, Illinois, Stanley Consultants, Inc., their consultants, shall…