City of Cedar Park Hike and Bike Trail Improvements_Tech Specs_2026.08.03.pdf

PDF 2 MB Posted

Attached to
Hike and Bike Trail Improvements
Solicitation number
2026-0026-013
Issued by
Williamson County, Texas

About this file

This is a supplemental technical specifications document for the City of Cedar Park's 2026 Hike and Bike Trail Improvements project in Cedar Park, Texas, which includes work at three locations: Milburn Park, Veterans Park, and Brushy Creek Lake Park. The project encompasses demolition of existing decomposed granite trails, asphalt trails, and select concrete sections, with replacement and realignment using concrete flatwork, concrete water crossings, and stabilized decomposed granite. The technical specifications cover comprehensive construction requirements including temporary tree and plant protection, selective demolition, concrete formwork and cast-in-place concrete work, pipe and tube railings, site clearing, earth moving, dewatering, landscape maintenance, concrete paving with colored finishes (#750 Salmon), and related infrastructure improvements. The project manual identifies Paul Naughton as the Senior Project Manager for the City of Cedar Park (450 Cypress Creek Rd., Bldg. 1, Cedar Park, TX 78613), with design team oversight from Jonathan Wagner at studio 16:19, llc and Civil Engineer Laura Firello at Garver. The maintenance period extends for ninety days after Notice of Substantial Completion or until prescribed grass coverage reaches 99 percent for final acceptance.

The specifications establish comprehensive quality assurance requirements including contractor responsibility for formwork design and engineering, compliance with ACI standards for concrete work, and performance standards for railings withstanding uniform loads of 50 pounds per linear foot and concentrated loads of 200 pounds. Concrete mixtures require a minimum compressive strength of 3,500 psi at 28 days with a maximum water-cement ratio of 0.40, incorporating synthetic micro-fiber reinforcement at not less than 1.0 pound per cubic yard. The contractor must provide all labor, equipment, and materials for maintenance operations, including weekly mowing, regular pruning, irrigation system management, and debris removal. Damaged materials caused by contractor negligence must be replaced at no cost to the owner, while damage from vandalism or theft prior to substantial completion is the contractor's responsibility. The document includes detailed schedules for landscape maintenance activities across all twelve months, with monthly frequency requirements for mowing (ranging from 3 to 5 times), edging, debris removal, and irrigation monitoring.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLEMENTAL

TECHNICAL SPECIFICATIONS

FOR SCOPE PROVIDED BY

NOTE:

SHOULD ANY OVERLAP IN CONTRACT DOCUMENT LANGUAGE

OCCUR, ALL CONTRACT LANGUAGE WITHIN GENERAL NOTES

PROVIDED BY STUDIO 16:19 AS PART OF THE CONSTRUCTION

DOCUMENT OR TECHNICAL SPECIFICATIONS SHALL BE SUPERSEDED

BY OFFICIAL CITY OF CEDAR PARK CONTRACT DOCUMENTS AND

SPECIFICATIONS AS PROVIDED IN THE BID DOCUMENTS.

2026 HIKE AND BIKE TRAIL IMPROVEMENTS CEDAR PARK, TX

AUGUST – 2026

SUPPLEMENTAL TECHNICAL SPECS 000101 - 1

TABLE OF CONTENTS

GENERAL REQUIREMENTS

01 56 39 TEMPORARY TREE & PLANT

PROTECTION

02 41 19 SELECTIVE DEMOLITION

CONCRETE

03 11 00 CONCRETE FORMWORK

03 30 00 CAST-IN-PLACE CONCRETE

SPECIALTY

05 51 13 PIPE AND TUBE RAILINGS

EARTHWORK

31 10 00 SITE CLEARING

31 20 00 EARTH MOVING

31 23 19 DEWATERING

EXTERIOR IMPROVEMENTS

32 01 30 LANDSCAPE MAINTENANCE

32 13 13 CONCRETE PAVING

32 13 73 CONCRETE PAVING JOINT

SEALANTS

32 17 23 PAVEMENT MARKINGS

32 17 26 TACTILE WARNING SURFACING

32 84 00 PLANTING IRRIGATION

32 91 13 SOIL PREPARATION

32 92 00 TURF AND GRASSES

32 93 00 PLANTS

PROJECT MANUAL SEALS 000107 - 1

Project Manual Seals for

2026 HIKE AND BIKE TRAIL IMPROVEMENTS

CEDAR PARK, TX

PROJECT OWNER CONTACTS

For Information Regarding Proposals:

Paul Naughton, Senior Project Manager

City of Cedar Park

450 Cypress Creek Rd., Bldg. 1

Cedar Park, TX 78613 p :: 512.401.5100

Paul.Naughton@cedarparktexas.gov

DESIGN TEAM CONTACTS

Project PM / Landscape Architect

Jonathan Wagner, ASLA, LI studio 16:19, llc

305 West Liberty Avenue, Round Rock, TX 78664 p :: 512.534.8680 jwagner@studio1619.com

Civil Engineer

Laura Firello, P.E.

Garver

3755 S. Capital of Texas Highway, Suite 325

Austin, TX 78704 p :: 512.485.0022

LMFriello@GarverUSA.com

PROJECT MANUAL SEALS 000107 - 2

AUGUST - 2026

TEMPORARY TREE AND PLANT PROTECTION 015639 - 1

SECTION 01/56/39 - TEMPORARY TREE AND PLANT PROTECTION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction.

1.2 DEFINITIONS

A. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings.

B. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated on Drawings.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings:

1. Include plans and locations of protection-zone fencing and signage, showing relation of equipment-movement routes and material storage locations with protection zones.

C. Tree Pruning Schedule: Written schedule detailing scope and extent of pruning of trees to remain that interfere with or are affected by construction.

1.5 INFORMATIONAL SUBMITTALS

A. Certification: From arborist, certifying that trees indicated to remain have been protected during construction according to recognized standards and that trees were promptly and properly treated and repaired when damaged.

B. Maintenance Recommendations: From arborist, for care and protection of trees affected by construction during and after completing the Work.

C. Existing Conditions: Documentation of existing trees and plantings indicated to remain, which establishes preconstruction conditions that might be misconstrued as damage caused by construction activities.

TEMPORARY TREE AND PLANT PROTECTION 015639 - 2

1.6 QUALITY ASSURANCE

A. Arborist Qualifications: Certified Arborist as certified by ISA, licensed arborist in jurisdiction where

Project is located, current member of ASCA, or registered Consulting Arborist as designated by

ASCA.

1.7 FIELD CONDITIONS

A. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Moving or parking vehicles or equipment.

3. Foot traffic.

4. Erection of sheds or structures.

5. Impoundment of water.

6. Excavation or other digging unless otherwise indicated.

7. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

B. Do not direct vehicle or equipment exhaust toward protection zones.

C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Backfill Soil: Stockpiled soil mixed with planting soil of suitable moisture content and granular texture for placing around tree; free of stones, roots, plants, sod, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster, building debris, and other extraneous materials harmful to plant growth.

1. Mixture: Well-blended mix of two parts stockpiled soil to one part planting soil.

2. Planting Soil: Planting soil as specified in Section 329113 "Soil Preparation".

B. Organic Mulch: Free from deleterious materials and suitable as a top dressing for trees and shrubs, consisting of one of the following:

1. Type: Shredded hardwood.

C. Protection-Zone Fencing: Fencing fixed in position and meeting one of the following requirements:

TEMPORARY TREE AND PLANT PROTECTION 015639 - 3

1. Wood Bark Protection Fencing: Where any exceptions result in a fence being closer than 60 inches to a tree trunk; Protect the trunk with strapped on 2-by-4 planking starting as low as the roots allow to a minimum height of 96 inches, or to the limits of lower branching in addition to the reduced fencing provided. Major scaffold limbs may also need protection as directed by the city forester.

a. Height: 48 inches minimum, or to limits of lower branching.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Erosion and Sedimentation Control: Examine the site to verify that temporary erosion- and sedimentation-control measures are in place. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.

3.2 PREPARATION

A. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.

B. Tree-Protection Zones: Mulch areas inside tree-protection zones and other areas indicated. Do not exceed indicated thickness of mulch.

1. Apply 4-inch uniform thickness of organic mulch unless otherwise indicated. Do not place mulch within 6 inches of tree trunks.

3.3 PROTECTION ZONES

A. Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones in a manner that will prevent people from easily entering protected areas except by entrance gates.

1. Chain-Link Fencing: Install to comply with ASTM F 567 and with manufacturer's written instructions.

2. Posts: Set or drive posts into ground one-third the total height of the fence without concrete footings. Where a post is located on existing paving or concrete to remain, provide appropriate means of post support acceptable to Landscape Architect.

B. Maintain protection zones free of weeds and trash.

C. Maintain protection-zone fencing in good condition as acceptable to Landscape Architect and remove when construction operations are complete and equipment has been removed from the site.

TEMPORARY TREE AND PLANT PROTECTION 015639 - 4

3.4 EXCAVATION

A. General: Excavate at edge of protection zones and for trenches indicated within protection zones according to requirements in Section 312000 "Earth Moving" unless otherwise indicated.

B. Trenching within Protection Zones: Where utility trenches are required within protection zones, excavate under or around tree roots by hand or with air spade, or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots as required for root pruning.

C. Do not allow exposed roots to dry out before placing permanent backfill.

3.5 ROOT PRUNING

A. Prune tree roots that are affected by temporary and permanent construction. Prune roots as follows:

1. Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots.

2. Temporarily support and protect roots from damage until they are permanently redirected and covered with soil.

3. Cover exposed roots with burlap and water regularly.

4. Backfill as soon as possible according to requirements in Section 312000 "Earth Moving."

B. Root Pruning at Edge of Protection Zone: Prune tree roots by cleanly cutting all roots to the depth of the required excavation.

C. Root Pruning within Protection Zone: Clear and excavate by hand or with air spade to the depth of the required excavation to minimize damage to tree root systems. If excavating by hand, use narrow-tine spading forks to comb soil to expose roots. Cleanly cut roots as close to excavation as possible.

3.6 CROWN PRUNING

A. Prune branches that are affected by temporary and permanent construction. Prune branches as directed by arborist.

1. Prune to remove only injured, broken, dying, or dead branches unless otherwise indicated.

Do not prune for shape unless otherwise indicated.

2. Do not remove or reduce living branches to compensate for root loss caused by damaging or cutting root system.

TEMPORARY TREE AND PLANT PROTECTION 015639 - 5

3. Pruning Standards: Prune trees according to ANSI A300 (Part 1).

B. Cut branches with sharp pruning instruments; do not break or chop.

C. Do not paint or apply sealants to wounds unless directed by City Urban Forester.

D. Chip removed branches and dispose of off-site.

3.7 REGRADING

A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.

B. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.

C. Minor Fill within Protection Zone: Where existing grade is 2 inches or less below elevation of finish grade, fill with backfill soil. Place backfill soil in a single uncompacted layer and hand grade to required finish elevations.

3.8 FIELD QUALITY CONTROL

A. Inspections: Engage a qualified arborist to direct plant-protection measures in the vicinity of trees, shrubs, and other vegetation indicated to remain and to prepare inspection reports.

3.9 REPAIR AND REPLACEMENT

A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be relocated that are damaged by construction operations, in a manner approved by Landscape

Architect.

1. Perform repairs of damaged trunks, branches, and roots within 24 hours according to arborist's written instructions.

2. Replace trees and other plants that cannot be repaired and restored to full-growth status, as determined by Landscape Architect.

B. Excess Mulch: Rake mulched area within protection zones, being careful not to injure roots. Rake to loosen and remove mulch that exceeds a 4-inch uniform thickness to remain.

3.10 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Disposal: Remove excess excavated material, displaced trees, trash, and debris and legally dispose of them off Owner's property.

END OF SECTION 01/56/39

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected site elements.

2. Salvage of existing items to be reused or recycled.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to

Owner that may be uncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.3 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1.4 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property for environmental protection, dust control, and noise control. Indicate proposed locations and construction of barriers.

B. Schedule of selective demolition activities with starting and ending dates for each activity.

C. Predemolition photographs or video.

1.5 CLOSEOUT SUBMITTALS

A. Inventory of items that have been removed and salvaged.

1.6 FIELD CONDITIONS

A. Owner and public will occupy portions of site immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

SELECTIVE DEMOLITION 024119 - 2

C. Notify Landscape Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the

Work.

1. If suspected hazardous materials are encountered, do not disturb; immediately notify

Landscape Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

G. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.7 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Inventory and record the condition of items to be removed and salvaged.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

SELECTIVE DEMOLITION 024119 - 3

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated services/systems when requested by Contractor.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3.3 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

C. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Salvaged Items:

SELECTIVE DEMOLITION 024119 - 4

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area on-site.

5. Protect items from damage during transport and storage.

D. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.

3.5 CLEANING

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

CONCRETE FORMWORK 031100 - 1

SECTION 031100 - CONCRETE FORMWORK

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Design, fabrication, erection, and stripping of formwork for cast-in-place concrete including shoring, reshoring, falsework, bracing, proprietary forming systems, prefabricated forms, void forms, permanent metal forms, bulkheads, keys, blockouts, sleeves, pockets, and accessories.

Erection shall include installation in formwork of items furnished by other trades.

1.02 RELATED SECTIONS

A. Division 03 Section 1100 � Concrete Reinforcement.

B. Division 03 Section 3000 - Cast in Place Concrete.

1.03 REFERENCES

A. The latest adopted edition of all standards referenced in this section shall apply, unless noted otherwise:

1. ACI 117 - Standard Specifications for Tolerances for Concrete Construction and Materials.

2. ACI 301 - Specifications for Structural Concrete for Buildings.

3. ACI 347R - Guide to Formwork for Concrete.

4. ACI SP-4 - Formwork for Concrete.

1.04 QUALITY ASSURANCE

A. Construct and erect concrete formwork in accordance with ACI 117, 301 and 347R.

B. Forms, shores, reshores, falsework, bracing, and other temporary supports shall be designed by the Contractor to support all loads imposed during construction including weight of construction equipment, live loads, and lateral loads due to wind and imbalance or discontinuity of building components.

C. The Contractor shall be responsible for determining when temporary supports and bracing may be safely removed, but in no case shall the curing time before form removal be less than specified herein.

D. Landscape Architect shall examine formwork prior to concrete installation.

1.05 TOLERANCES

A. Construct formwork to provide completed concrete surfaces complying with the following tolerances:

1. Vertical alignment:

a. Lines, surfaces and arises less than 100 feet in height - 1 inch.

b. Outside corner of exposed corner columns and control joints in concrete exposed to view less than 100 feet in height - 1/2 inch.

2. Lateral alignment:

a. Members - 1 inch.

b. Centerline of openings 12 inches or smaller and edge location of larger openings in slabs - 1/2 inch.

c. Sawcuts, joints, and weakened plane embedments in slabs - 3/4 inch.

CONCRETE FORMWORK 031100 - 2

3. Level alignment:

a. Elevation of slabs-on-grade - 3/4 inch.

b. Elevation of top surfaces of formed slabs before removal of shores - 3/4 inch.

c. Elevation of formed surfaces before removal of shores - 3/4 inch.

d. Lintels, sills, parapets, horizontal grooves, and other lines exposed to view - 1/2 inch.

4. Cross-sectional dimensions: Overall dimensions of beams, joists, and columns and thickness of walls and slabs.

a. 12 inch dimension or less - plus 3/8 inch to minus 1/4 inch.

b. Greater than 12 inch to 3 foot dimension - plus 1/2 inch to minus 3/8 inch.

c. Greater than 3 foot dimension - plus 1 inch to minus 3/4 inch.

5. Relative alignment:

a. Vertical alignment of outside corner of exposed corner columns and control joint grooves in concrete exposed to view - 1/4 inch in 10 feet.

b. All other conditions - 3/8 inch in 10 feet.

c. Offsets between pieces of formwork facing material:

1) Class A - Architecturally or prominently exposed surfaces - 1/8 inch gradual or abrupt.

2) Class B - Surfaces to receive plaster or stucco - 1/4 inch gradual or abrupt.

3) Class C - Exposed surfaces in generally unfinished spaces - ¼ inch abrupt, 1/2 inch gradual.

4) Class D - Concealed surfaces - 1 inch gradual or abrupt.

1.06 SUBMITTALS

A. See Division 01 Section - Submittal Procedures for submittal procedures.

B. Submittals for Review:

1. Shop drawings for fabrication and erection of forms for concrete surfaces architecturally exposed to view. Show general construction of forms including jointing and special formed joints or reveals, location and pattern of form tie placement, inserts and anchorages, and other items which visually affect exposed concrete.

2. Samples of chamfer strips, form liners, form ties, and other items which visually affect exposed concrete.

C. Submittals for Information:

1. Submit manufacturer's product data and installation instruction for proprietary materials used in exposed concrete work including form liners, release agents, form systems, ties, and accessories.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver form materials in manufacturer's packaging with installation instructions.

B. Store off ground in ventilated and protected area to prevent deterioration from moisture or damage.

PART 2 - PRODUCTS

2.01 FORM MATERIALS

A. Forms for Exposed Concrete:

1. Construct formwork with plywood, metal, or other panel type materials designed to

CONCRETE FORMWORK 031100 - 3

provide continuous straight and smooth as-cast surfaces with minimum number of joints.

Joints shall be made tight and shall be backed so that edges of adjoining formwork remain flush. Joints shall be vertical or horizontal, unless noted otherwise.

2. Wood forms shall be constructed of 3/4 inch, APA B-B Plyform, Class 1, Exterior conforming to PS-1. Panels shall be mill oiled and all edges shall be sealed.

B. Cylindrical Forms:

1. Forms to be used at exposed columns, light pole bases and other exposed cylindrical concrete locations, shall be constructed from one of the following:

a. Paper or Fiber Tubes: standard (Seamless) plastic-lined units furnished full length without splices.

b. Steel: Thickness and sufficient backing to prevent bulges and warps. Provide units to minimize joints. Seal and finish joints so joints are not visible in finished concrete.

Units shall be free of bends, dents, holes, and rust.

c. Glass Fiber Reinforced Plastic Forms: Thickness and sufficient backing to prevent bulges and warps. Provide units to minimize joints. Seal and finish joints so joints are not visible in finished concrete. Units shall be free of bends, dents, and holes.

2.02 FORMWORK ACCESSORIES

A. Form Ties: Removable or snap-off metal of adjustable length; cone type; one inch break back dimension; free of defects that will leave holes larger than one inch diameter in concrete surface.

B. Form Release Agent: Colorless material which will not stain concrete, absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.

C. Rustications, Bevels and Chamfers: Steel, polyvinyl chloride, or milled and sealed wood of size and shape shown on the Drawings.

D. Protection Board: For use over void forms under structural slabs. Hard-pressed cellulose fiber board, 1/4 inch minimum thickness, or "SureCover Board�, as manufactured by VoidForm

Products, Inc.

E. Sleeves and Blockouts: Formed with galvanized metal, galvanized pipe, polyvinyl chloride pipe, fiber tubes, or wood.

F. Nails, Spikes, Lag Bolts, Through Bolts, and Anchorages: Sized as required; of strength and character to maintain formwork in place while placing concrete.

PART 3 - EXECUTION

3.01 FORM CONSTRUCTION

A. General: Construct forms to the sizes, shapes, lines and dimensions shown on the Drawings.

Provide for openings, offsets, keyways, rustications, reglets, chamfers, blockouts, bulkheads, anchorages, inserts, and other features as required. Form all openings in concrete slabs as required for the vertical passage of ducts, pipes, conduits, etc. The design and engineering of the formwork, as well as its construction, shall be the responsibility of the Contractor.

Adequately shore all concrete members to safely support all loads and lateral pressures outlined in "Recommended Practice for Concrete Formwork" (ACI 347) without distortion, excessive deflection or other damage.

CONCRETE FORMWORK 031100 - 4

B. Construction forms shall be provided for any and all items of concrete work required for or in connection with the satisfactory completion of the project, whether each such item is specifically shown or referred to or not.

C. Fabricate formwork for easy removal without hammering or prying against concrete surfaces.

Form removal shall be accomplished as a hand operation, with due care to avoid damage to any finished concrete work or any reinforcing passing through forms being removed.

D. Kerf wood inserts as required for ease of removal.

E. Provide temporary ports in formwork to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain. Close ports with tight fitting panels, flush with in side face of forms, neatly fitted so that joints will not be apparent in exposed concrete surfaces.

F. Fit forms placed for successive concrete placements for continuous surfaces, to accurate alignment, and within allowable tolerances.

G. Minimize form joints. Symmetrically align joints and make watertight to prevent leakage of mortar. Should construction joints prove to be absolutely unavoidable, locate such joints within the middle third of spans or as detailed on the drawings. Make no additional construction joints under any circumstances without the written approval of the Architect.

Provide appropriate keys in all construction joints, whether horizontal or vertical.

H. Form intersecting planes to provide true corners with edge grain of plywood not exposed as form for concrete.

I. Erect, support, brace, and maintain falsework to safely support all applied loads until such loads can be supported by the concrete structure.

J. Construct formwork to cambers shown or specified on the Drawings to allow for structural deflection of the hardened concrete. Provide additional elevation or camber in formwork as required for anticipated formwork deflections due to weight and pressures of concrete and construction loads.

K. Forms for Exposed Concrete:

1. Drill forms from the contact face to the outside to suit form ties used. Do not splinter forms by driving ties through improperly prepared holes.

2. Provide sharp, clean corners at intersecting planes without visible edges or offsets.

Back joints with extra studs or girts if required to maintain corners.

3. Provide extra studs, girts, walers, and bracing to prevent bowing of forms.

4. Form shapes, recesses and projections with smooth finish materials, and install in forms with sealed joints.

5. Locate form ties in level horizontal rows, plumbed vertically, and in symmetrical arrangements, unless noted otherwise.

6. Special care shall be given to formwork, ties, bracing, etc. for any concrete surface to be left exposed to permanent view. Waves, bulges, form marks, staining, joint marks or irregularities shall be considered unacceptable.

L. Corner Treatment: Form exposed corners of beams, walls and columns with chamfered edges, unless noted or shown otherwise.

1. Form chamfers with 3/4 inch by 3/4 inch strips, unless noted otherwise.

2. Unexposed corners may be formed square or chamfered.

CONCRETE FORMWORK 031100 - 5

M. Foundation Elements: The sides of all below grade portions of beams, pier caps, walls, and columns shall be formed straight and to the lines and grades specified.

3.02 APPLICATION OF FORM RELEASE AGENT

A. Apply form release agent on formwork in accordance with manufacturer's instructions. Apply prior to placing reinforcing steel, anchoring devices, and embedded items.

B. Do not apply form release agent where concrete surfaces are scheduled to receive subsequent finishes which may be affected by agent. Soak contact surfaces of untreated forms with clean water. Keep surfaces wet prior to placing concrete.

3.03 INSERTS, EMBEDDED PARTS, AND OPENINGS

A. Provide formed openings where required for work embedded in or passing through concrete. In case of conflict with reinforcing steel or structural embeds, consult Architect before placement.

B. Coordinate work of other Sections in forming and setting openings, slots, recesses, chases, sleeves, bolts, anchors, and other inserts.

C. Install accessories in accordance with manufacturer's instructions, level and plumb. Ensure items are not disturbed during concrete placement.

3.04 FORM REMOVAL

A. Formwork not supporting concrete, such as side forms for beams, walls, and columns, may be removed after cumulatively curing at not less than 50 degrees Fahrenheit (10 degrees Celsius) for 12 hours after placing concrete, provided concrete is sufficiently hard to not be damaged by form removal, and provided curing and protection operations are maintained.

B. Formwork supporting conventionally reinforced concrete shall not be removed until concrete has attained 85 percent of its specified 28 day compressive strength as established by tests of field cured cylinders. In the absence of cylinder tests, supporting formwork shall remain in place until the concrete has cured at a temperature of at least 50 degrees Fahrenheit (10 degrees Celsius) for the minimum cumulative time periods given in ACI 347, Section 3.7.2.3.

When the surrounding air temperature is below 50 degrees Fahrenheit (10 degrees Celsius), that time period shall be added to the minimum listed time period. Formwork for two-way conventionally reinforced slabs shall remain in place for at least the minimum cumulative time periods specified for one-way slabs of the same maximum span.

C. Minimum cumulative curing times may be reduced by the use of high-early strength cement or forming systems which allow form removal without disturbing shores, but only after the

Contractor has demonstrated to the satisfaction of the Architect that the early removal of forms will not cause excessive sag, distortion or damage to the concrete elements.

D. Wood forms shall be completely removed. Provide temporary openings if required.

E. Provide adequate methods of curing and thermal protection of exposed concrete if forms are removed prior to completion of specified curing time.

F. Areas required to support construction loads in excess of 20 pounds per square foot

(psf) shall be reshored to properly distribute construction loading. Construction loads up to the rated live load capacity may be placed on unshored construction provided the concrete has attained the specified 28 day compressive strength.

CONCRETE FORMWORK 031100 - 6

G. Obtaining concrete compressive strength tests for the purposes of form removal shall be the responsibility of the Contractor.

3.05 SHORES AND RESHORES FOR MULTILEVEL STRUCTURES

A. Comply with ACI 347 and these specifications regarding shoring and reshoring.

B. The Contractor shall be solely responsible for proper shoring and reshoring.

3.06 REUSE OF FORMS

A. Clean and repair surfaces of forms to be reused. Damaged forming material shall not be replaced and shall not be used in construction.

B. Apply form release agent to concrete contact surfaces prior to each reuse of the forms.

3.07 CLEANING

A. Upon completion of work of this section, remove related debris from job site.

END OF SECTION 031100

CAST-IN-PLACE CONCRETE 033000 - 1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes.

B. Related Requirements:

1. Section 312000 "Earth Moving" for drainage fill under pavement.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Design Mixtures: For each concrete mixture.

C. Steel Reinforcement Shop Drawings: Placing Drawings that detail fabrication, bending, and placement.

1.3 INFORMATIONAL SUBMITTALS

A. Material certificates.

B. Material test reports.

C. Formwork Shop Drawings: Prepared by or under the supervision of a qualified professional engineer, detailing fabrication, assembly, and support of formwork.

D. Floor surface flatness and levelness measurements indicating compliance with specified tolerances.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production

Facilities."

B. Testing Agency Qualifications: An independent agency qualified according to ASTM C 1077 and

ASTM E 329 for testing indicated.

CAST-IN-PLACE CONCRETE 033000 - 2

1.5 PRECONSTRUCTION TESTING

A. Preconstruction Testing Service: Engage a qualified testing agency to perform preconstruction testing on concrete mixtures.

1.6 FIELD CONDITIONS

A. Cold-Weather Placement: Comply with ACI 306.1.

1. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

B. Hot-Weather Placement: Comply with ACI 301 and ACI 305.1.

PART 2 - PRODUCTS

2.1 CONCRETE, GENERAL

A. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:

1. ACI 301.

2. ACI 117.

2.2 FORM-FACING MATERIALS

A. Smooth-Formed Finished Concrete: Form-facing panels that provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material. Provide lumber dressed on at least two edges and one side for tight fit.

2.3 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.

B. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice."

2.4 CONCRETE MATERIALS

A. Cementitious Materials:

1. Portland Cement: ASTM C 150/C 150M, Type I, gray.

2. Fly Ash: ASTM C 618, Class F or C.

3. Slag Cement: ASTM C 989/C 989M, Grade 100 or 120.

CAST-IN-PLACE CONCRETE 033000 - 3

4. Blended Hydraulic Cement: ASTM C 595/C 595M, Type IL, portland-limestone cement.

B. Normal-Weight Aggregates: ASTM C 33/C 33M, graded.

1. Maximum Coarse-Aggregate Size: 3/4 inch nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

C. Lightweight Aggregate: ASTM C 330/C 330M, 3/8-inch nominal maximum aggregate size.

D. Air-Entraining Admixture: ASTM C 260/C 260M.

E. Chemical Admixtures: Certified by manufacturer to be compatible with other admixtures and that do not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Retarding Admixture: ASTM C 494/C 494M, Type B.

F. Water: ASTM C 94/C 94M and potable.

2.5 WATERSTOPS

A. Flexible Rubber Waterstops: CE CRD-C 513, for embedding in concrete to prevent passage of fluids through joints. Factory fabricate corners, intersections, and directional changes.

2.6 VAPOR RETARDERS

A. Sheet Vapor Retarder: ASTM E 1745, Class A. Include manufacturer's recommended adhesive or pressure-sensitive tape.

2.7 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately

9 oz./sq. yd. when dry.

C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable.

E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.

F. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, nondissipating, certified by curing compound manufacturer to not interfere with bonding of floor covering.

CAST-IN-PLACE CONCRETE 033000 - 4

G. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, 18 to 25 percent solids, nondissipating, certified by curing compound manufacturer to not interfere with bonding of floor covering.

H. Clear, Solvent-Borne, Membrane-Forming Curing and Sealing Compound: ASTM C 1315, Type 1, Class A.

I. Clear, Waterborne, Membrane-Forming Curing and Sealing Compound: ASTM C 1315, Type 1, Class A.

2.8 RELATED MATERIALS

A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber.

2.9 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

B. Cementitious Materials: Use fly ash, pozzolan, slag cement, and silica fume as needed to reduce the total amount of portland cement, which would otherwise be used, by not less than 40 percent.

C. Admixtures: Use admixtures according to manufacturer's written instructions.

1. Use water-reducing admixture in concrete, as required, for placement and workability.

2. Use water-reducing and -retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

3. Use water-reducing admixture in pumped concrete, concrete for heavy-use industrial slabs and parking structure slabs, concrete required to be watertight, and concrete with a w/c ratio below

0.50.

2.10 CONCRETE MIXTURES FOR BUILDING ELEMENTS

A. Normal-Weight Concrete:

1. Minimum Compressive Strength: 3500 psi at 28 days.

2. Maximum W/C Ratio: 0.40.

3. Slump Limit: 4 inches, plus or minus 1 inch.

4. Air Content: 5.5 percent, plus or minus 1.5 percent at point of delivery for 1-1/2-inch nominal maximum aggregate size.

5. Air Content: 6 percent, plus or minus 1.5 percent at point of delivery for 3/4-inch nominal maximum aggregate size.

CAST-IN-PLACE CONCRETE 033000 - 5

6. Air Content: Do not allow air content of trowel-finished floors to exceed 3 percent.

7. Synthetic Micro-Fiber: Uniformly disperse in concrete mixture at manufacturer's recommended rate, but not less than a rate of 1.0 lb/cu. yd.

2.11 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.12 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M, and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to

60 minutes.

PART 3 - EXECUTION

3.1 FORMWORK INSTALLATION

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads.

B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

C. Chamfer exterior corners and edges of permanently exposed concrete.

3.2 EMBEDDED ITEM INSTALLATION

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

3.3 VAPOR-RETARDER INSTALLATION

A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder according to ASTM E 1643 and manufacturer's written instructions.

1. Lap joints 6 inches and seal with manufacturer's recommended tape.

3.4 STEEL REINFORCEMENT INSTALLATION

A. General: Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

CAST-IN-PLACE CONCRETE 033000 - 6

1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.

3.5 JOINTS

A. General: Construct joints true to line with faces perpendicular to surface plane of concrete.

B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.

C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints, sectioning concrete into areas as indicated. Construct contraction joints for a depth equal to at least one-fourth of concrete thickness as follows:

1. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut 1/8-inch- wide joints into concrete when cutting action does not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.

D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.

3.6 WATERSTOP INSTALLATION

A. Waterstops: Install in construction joints and at other locations indicated, according to manufacturer's written instructions.

3.7 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections are completed and required slopes of formwork are confirmed to be met.

B. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete is placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated. Deposit concrete to avoid segregation.

1. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.

3.8 FINISHING FORMED SURFACES

A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

1. Apply to concrete surfaces not exposed to public view.

CAST-IN-PLACE CONCRETE 033000 - 7

B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch tie holes and defects. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

1. Apply to concrete surfaces exposed to public view, or to be covered with a coating or covering material applied directly to concrete.

C. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces.

Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.

3.9 FINISHING FLOORS AND SLABS

A. General: Comply with ACI 302.1R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces.

B. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and elsewhere as indicated.

1. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with Architect before application.

3.10 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.

Comply with ACI 306.1 for cold-weather protection and ACI 305.1 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for remainder of curing period.

D. Cure concrete according to ACI 308.1, by one or a combination of the following methods:

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven

CAST-IN-PLACE CONCRETE 033000 - 8

days. Immediately repair any holes or tears during curing period, using cover material and waterproof tape.

3.11 CONCRETE SURFACE REPAIRS

A. Defective Concrete: Repair and patch defective areas when approved by Architect. Remove and replace concrete that cannot be repaired and patched to Architect's approval.

3.12 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a special inspector and qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

END OF SECTION 033000

PIPE AND TUBE RAILINGS 055213 - 1

SECTION 055213 - PIPE AND TUBE RAILINGS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel pipe and tube railings.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1. Manufacturer's product lines of mechanically connected railings.

2. Railing brackets.

3. Grout and anchoring cement products.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

C. Samples: For each type of exposed finish required.

D. Delegated-Design Submittal: For railings, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.3 INFORMATIONAL SUBMITTALS

A. Product Test Reports: For pipe and tube railings, for tests performed by a qualified testing agency, according to ASTM E 894 and ASTM E 935.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Structural Performance: Railings, including attachment to building construction, shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:

1. Handrails and Top Rails of Guards:

a. Uniform load of 50 lbf/ ft. applied in any direction.

b. Concentrated load of 200 lbf applied in any direction.

c. Uniform and concentrated loads need not be assumed to act concurrently.

2. Infill of Guards:

PIPE AND TUBE RAILINGS 055213 - 2

a. Concentrated load of 50 lbf applied horizontally on an area of 1 sq. ft.

b. Infill load and other loads need not be assumed to act concurrently.

2.2 METALS, GENERAL

A. Brackets, Flanges, and Anchors: Cast or formed metal of same type of material and finish as supported rails unless otherwise indicated.

1. Provide type of bracket with predrilled hole for exposed bolt anchorage and that provides 1-1/2-inch clearance from inside face of handrail to finished wall surface.

2.3 STEEL AND IRON

A. Tubing: ASTM A 500 (cold formed).

B. Pipe: ASTM A 53/A 53M, Type F or Type S, Grade A, Standard Weight (Schedule 40), unless another grade and weight are required by structural loads.

1. Provide galvanized finish for exterior installations and where indicated.

2.4 FASTENERS

A. General: Provide the following:

1. Hot-Dip Galvanized Railings: Type 304 stainless-steel or hot-dip zinc-coated steel fasteners complying with ASTM A 153/A 153M or ASTM F 2329 for zinc coating.

B. Post-Installed Anchors: Torque-controlled expansion anchors capable of sustaining, without failure, a load equal to 6 times the load imposed when installed in unit masonry and 4 times the load imposed when installed in concrete, as determined by testing according to ASTM E 488/E 488M, conducted by a qualified independent testing agency.

1. Material for Interior Locations: Carbon-steel components zinc-plated to comply with ASTM B 633 or ASTM F 1941, Class Fe/Zn 5, unless otherwise indicated.

2.5 MISCELLANEOUS MATERIALS

A. Welding…

This is the start of the file's text. The full file is on GovTribe.