This is a City of Alton, Illinois Invitation for Bid for the complete demolition and removal of two residential structures located at 911 Rixon Street and 515 Condit Avenue. Both properties require wet demolition methods, with all demolition debris to be managed as asbestos waste and adequately wetted to prevent visible emissions. The scope includes complete removal of buildings, foundations, footings, basement floors, fences, ancillary structures, cisterns, dead trees, and vegetation within 20 feet of the structures. All materials must be disposed of at legally approved disposal sites, with final sites including Roxana Landfill in Edwardsville, Illinois. Sealed bids were to be received by the Deputy Comptroller at 101 East Third Street, Alton, Illinois 62002, by 10:00 a.m. on Thursday, September 10, 2026, with public opening and reading immediately following. The contract award will be made on a per-address basis considering quality versus price and contractor responsibility, as determined by the City Council. Work must commence as soon as possible after the Notice to Proceed and be completed within thirty calendar days, with late fees of $100 per day assessed for completion beyond forty calendar days.
This is a prevailing wage project requiring contractors to comply with Illinois Prevailing Wage Act requirements and submit certified monthly payroll records. Successful bidders must post a $300 bond per address prior to commencing work and obtain demolition permits from the City, with permit fees waived as the work is contracted through the City. Contractors must provide a Certificate of Insurance naming the City of Alton as additional insured, with minimum coverage requirements including $1,000,000 commercial general liability per occurrence, $1,000,000 professional liability, $1,000,000 automobile liability, and workers' compensation per Illinois statutes with waiver of subrogation. All paperwork, including certificates of insurance and signed contracts, must be received and approved before work begins. Asbestos abatement notifications must be submitted to the Illinois Environmental Protection Agency at least ten working days prior to demolition, accompanied by a $150 filing fee. Respondents must submit lists of previous work, equipment to be used, and five professional references with their bid responses.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department: Owner: City of Alton
101 East Third Street
Alton, IL 62002
Vendor Name and Address: Bid Number: 2026 - 17
Date: 8/28/2026
Bids will be received until:
at 10:00 am
Demolition per the Attached Specifications for the Following:
911 Rixon Street $
Wet demolition required
515 Condit Avenue $
Wet demolition required
Dollar total of the 2 projects listed above $
THIS IS A PREVAILING WAGE PROJECT
Please Note: Our bid documents may have changed, please review carefully.
Quotation Submitted By:
(Print Name on this Line)
(Signature in this Box) (Print Title on this Line)
FEMALE AND MINORITY OWNED BUSINESS FIRMS ARE ENCOURAGED TO SUBMIT PROPOSALS AND THE SUCCESSFUL VENDOR IS ENCOURAGED
TO UTILIZE FEMALE AND MINORITY OWNED BUSINESSES AS SUBCONTRACTORS FOR SUPPLIES, EQUIPMENT, SERVICES AND CONSTRUCTION.
For further information, contact the Comptroller’s Office at 618.463.3545 or lbockholdt@cityofaltonil.gov.
Compliance with the Illinois Fair Employment Practice Commission Regulations required.
Building & Zoning
CITY OF ALTON, ILLINOIS
INVITATION FOR BID
September 10, 2026
Please sign your bid form and return, in a sealed envelope, to: Lori Bockholdt, 101 East Third Street, Alton, IL 62002. Bid number must be placed on the face of the envelope. All quotations must be FOB destination and include cost of packing and cartage. Do not include taxes in your prices. The City of Alton is exempt from Federal Excise Tax, State Sales Tax and Transportation Taxes.
BID PACKET SHOULD BE RETURNED IN ITS ENTIRETY
Return Page Bid # 2026 – 17 Demolition Bid Document Page 1 of 10
INVITATION FOR BIDS
CITY OF ALTON - DEMOLITION
The City of Alton, Illinois invites sealed bids for the demolition of buildings in accordance with the provisions, specifications, and bidding instructions set forth in this Invitation for Bid. Bids will be received by the Deputy Comptroller, Room 104, 101 East Third Street, Alton, IL 62002, until 10:00 am, Thursday, September 10, 2026;
they will be publicly opened and read immediately following. Late bids will not be considered.
Responses must be submitted in a sealed envelope containing the original copy of the response, addressed to:
Lori Bockholdt Comptroller’s Office 101 East Third Street Alton, IL 62002
Each sealed envelope containing a response must be plainly marked on the outside of the envelope with the respondent’s name, proper address, and BID #2026 – 17 DEMOLITION.
All responses must be made on the forms provided. All blank spaces must be filled in, in ink or typewritten, and the bid forms must be fully completed and executed and signed by an authorized individual.
Any questions regarding this bid should be directed to Lori Bockholdt, Comptroller’s Office, City of Alton
(618) 463-3545. Copies of the Asbestos Abatement report(s) will be provided upon request. The City cannot accept your bid response via fax.
A copy of the bid tabulation will be available upon written request to the Comptroller’s Office or by email to lbockholdt@cityofaltonil.gov. Telephone requests will not be accepted. Each written request must contain a self-addressed, stamped envelope and must reference the bid title and number.
Contractor shall guarantee, in writing, that all work conforms to the requirements of the specifications.
Award of contract will be made on the most advantageous bid, on a quality versus price basis, taking into consideration the responsibility of the Contractor, as interpreted by the City Council. Award of contract will not be made on an “all or nothing” basis but will be awarded per address (unless otherwise indicated). Proper consideration will be given to modern accepted practice, efficiency and workmanship. No award will be made for any service which does not adequately fulfill the requirements of the project.
If services offered differ from the provisions contained in the specifications, such differences must be explained in detail (see Exception Certificate).
The City of Alton reserves the right to reject any or all of the bids, or any part thereof, on any basis and without disclosure of a reason. The failure to make such a disclosure shall not result in accrual of any right, claim or cause of action by any unsuccessful bidder against the City of Alton, Illinois. The City further reserves the right to accept any bid or any part thereof, or to waive any informalities and to make an award in its best interest.
All paperwork (i.e., certificate of insurance and signed contract, etc.) must be received and in order before work may begin on project. Failure to do so could result in disqualification of the bidder.
Return Page Bid # 2026 – 17 Demolition Bid Document Page 2 of 10
CONTRACTOR/SUBCONTRACTOR CLAUSE
The contractor/subcontractor agrees, in performance of this contract, to observe and comply with all applicable federal, state and local safety rules and regulations including, but not limited to, the Occupational Safety and Health Act of 1970.
The contractor/subcontractor agrees to indemnify and hold the City of Alton, Illinois harmless for, or and from, any loss, including but not limited to any fines, penalties and corrective measures the City of Alton, Illinois may sustain by reason of contractor/subcontractor’s failure to comply with said laws, rules and regulations in connection with the performance of said contract.
All work that is unsatisfactory, in the judgment of the City, shall be redone properly at no additional expense to the City. Should the Respondent fail to do this within a reasonable time, the City may deny payment and perform the work itself in any manner it sees fit. At no time, shall the Respondent or any of the Respondent’s personnel, be considered an agent or employee of the City of Alton.
Where not more specifically described in any of the sections of these specifications, workmanship shall conform to all the methods and operations of the best standards and accepted practices of the trade or trades involved. All work shall be executed by personnel skilled in their respective lines of work. No portion of this project may be subcontracted unless authorized by the City prior to the award of the contract. The Contractor shall not assign his contract to any other party or parties without the official approval of the corporate authorities of the City.
Section 1
1.1 Contractor’s Performance
It is the intent of these specifications to provide for the City of Alton the materials, equipment, labor, transportation, supervision and insurance necessary to demolish the building(s) per the following specifications. Contractor shall guarantee, in writing, that all work conforms to the specifications.
1.2 Requirements
a) Project Description The project consists of the complete demolition and removal and disposal of any existing buildings, fences and similar appurtenances located on the premises. The foundation, footing and basement floors shall be completely removed from the demolition site and disposed of at an approved disposal site. Any cisterns or similar reservoirs found on the premise are to be removed.
Both 911 Riley Street and 515 Condit Avenue are to be demolished using the “Wet Demolition” method.
b) Deposits The Contractor who is the successful bidder shall post a three hundred-dollar bond ($300.00 per address) prior to commencement of project.
c) Permits – Per Each Address The Contractor shall obtain the necessary demolition permits from the City of Alton prior to beginning the project and shall perform all work in strict conformity therewith. As this project is contracted through the City, the fee for demolition permit will be waived.
Return Page Bid # 2026 – 17 Demolition Bid Document Page 3 of 10
d) Utilities The contractor shall be responsible for notifying all utility companies of the demolition prior to beginning the project. All rules and regulations of the utility companies and City Codes must be complied with before, during and after the demolition project. The Contractor shall seal all existing drains and open lines connected to a public sewer system. The Contractor shall either completely remove all septic tanks, cisterns and sewage disposal systems of any kind from the property or fill the systems with sand, at the option of the Contractor subject to approval by Alton. Prior to fill being placed, the Department of Public Works shall be notified (618- 463-3530), as well as Illinois-American Water Company to arrange inspection of the sewer for proper capping (required by ILAW to be at the property line). Contact information for ILAW will be provided at the meeting after the awarding of work. Contractor shall not fill any sewer excavation until approved by the sewer service provider, currently Illinois-American Water Co. or its designee. A Sewer Inspection Fee for each address may be charged as established from time to time.
e) Fill The Contractor shall fill only with clean dirt up to twelve (12”) inches below the level of grade of the existing surrounding area. The top layer of fill shall be a minimum of twelve (12”) inches of soil capable of encouraging vegetation. Prior to fill being placed, Contractor shall notify the Department of Building & Zoning to schedule an inspection for the approval of the fill material to be used. The Contractor shall rake smooth and apply grass seed and straw to the entire soil surface. Care shall be taken to prevent the occurrence of voids in the fill or undue settlement after the fill has been placed. Lumber, lath, siding, shingling, guttering and other building materials will not be permitted in the fill. All material which is not suitable for fill materials shall not be used and shall be removed from the site and disposed of at the Contractor’s expense.
f) Disposal Any and all materials to be disposed of shall be disposed of at a legally approved disposal area. Receipt of the disposal transaction with the approval of the disposal site (photocopies are not acceptable) shall be retained and presented to the City of Alton before final payment will be made. The burning of any materials will not be authorized or permitted. Any unauthorized materials remaining on the premises at the completion of the project will delay final acceptance until such time as said materials have been removed. The premises shall be left orderly and clean, free of debris and/or building materials.
g) Salvageable Materials There is no guarantee of salvable materials in any building involved in this project. No responsibility shall be assumed by any party for loss of salvable materials.
h) Complete Demolition All ancillary buildings on the lot with the principal structure shall likewise be demolished and removed unless specified otherwise in the bid specifications. Any trees not scheduled to be removed shall not be damaged, and if damaged, shall be removed at the Contractor’s expense. Dead trees located on the subject premises are to be removed by Contractor as a part of the bid project. The contractor shall inquire of the city as to whether any fencing or walls on the subject lot are to be removed as part of the demolition proceeding, if such issue is not addressed in the bid specifications. As a final step of the bid project, the Contractor shall clean the subject property by removal of all garbage, debris, scrub trees, and cutting of weeds and grass, including but not limited to the area between the subject property and the adjoining streets.
i) Time of Completion The Contractor shall commence the work required by the project as soon as possible after the date of the “Notice to Proceed” and shall complete the work within thirty (30) calendar days of said notice unless the
Return Page Bid # 2026 – 17 Demolition Bid Document Page 4 of 10 period for completion is extended otherwise by the contract. Should Contractor fail to complete all aspects of the bid project within forty (40) days after the date of the “Notice to Proceed”, the Contractor shall owe a late fee in the sum of One-Hundred Dollars ($100.00) for each day thereafter until the bid project is deemed complete by the City. Said sum may be withheld by City from the contract price otherwise payable to Contractor to cover the total late fee.
1.3 Additional Requirements
Respondents must familiarize themselves with any conditions which may affect performance and prices. It is the intent of these specifications to provide for the City the materials, equipment, labor, transportation and supervision necessary for the completion of the project, per the following specifications. Respondent shall guarantee, in writing, that all work conforms to the specifications.
The Respondent shall furnish all labor, equipment, materials, tools and all incidentals necessary to perform such services as are requested by this Invitation for Bid. The Respondent shall also remove all litter, rubbish, trash, debris, garbage and other matter generated during the performance of this project. All acts must be performed in accordance with all applicable Regulations, Statutes and Ordinances. All work shall be performed under the direction of the Department of Building & Zoning and shall be completed according to the standards of the industry, and to the complete satisfaction of the City.
Per State of Illinois Statute 625ILCS5/12-712; 713 Contractor shall be required to use trucks and equipment with their company name prominently and legibly displayed on the sides. Per State of Illinois Statute 720ILCS605 Contractor shall be required to use neon orange “construction” fencing around the perimeter of the demolition area.
Contractor shall, at all times, observe and comply with all Federal and State laws, local ordinances and regulations which affect the conduct of this work. Contractor shall be solely responsible for all claims and liabilities arising from or based upon the violation of any such laws, ordinances or regulations whether by himself or his employees
This contract calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed.
The Department publishes the prevailing wage rates on its website at http//labor.illinois.gov/. The Department revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Department’s web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor’s website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties. Each contractor and subcontractor on public works projects must submit certified payroll records on a monthly basis to the City. The certified payroll records shall include, for every worker, the name, address and telephone number, social security number, job classification, hourly wages paid in each pay period, number of hours worked each day, and starting and ending time of work each day. The Grantee agrees by the acceptance of the funds from the City of Alton that the Grantee shall abide by all requirements of the Prevailing Wage Act of the State of Illinois to the extent required by law.
All work under this contract shall be coordinated with the Department of Code Enforcement, Department of Planning and Development or the Department of Public Works, whichever is found to be appropriate. Any changes to the established schedule must have prior Alton departmental approval.
Return Page Bid # 2026 – 17 Demolition Bid Document Page 5 of 10
1.4 Safety
The Contractor shall keep the premises clean of all rubbish and debris generated by the work involved and shall leave the premises neat and clean. All surplus material, rubbish and debris shall be properly disposed of by the Contractor at the Contractor’s expense. The work area shall be cleaned at the end of each workday. All material, tools, equipment, etc. shall be removed or safely stored. The City is not responsible for theft or damage to the Contractor’s property. All possible safety hazards to workers or the public shall be corrected immediately, and the project area left in a safe condition at the end of each workday. If there is a question in this area, the Department of Code Enforcement will be consulted.
The City does not assume responsibility, at any time, for the protection of or for loss of materials and/or personnel, from the time that the contract operations have commenced through the final acceptance of the work.
The Contractor shall perform all work so that no damage to the surrounding buildings, grounds or personal property results. The Contractor shall be responsible for any damage that does occur, to the satisfaction of Alton at no cost to the City.
Contractor will be responsible for proper set-up, usage and removal of all necessary safety/traffic control equipment required to protect its employees, the public, surrounding areas, equipment and vehicles. The free passage to and from adjacent buildings or the flow of vehicular traffic shall not be impeded at any time during this project. The safety of the Contractor’s employees and the public is of prime concern to the City, and the Contractor must take all necessary steps to assure proper safety during the performance of the contract. Any bidders that have a history of safety problems or a high incidence of accidents will not be considered for award of the contract. The Contractor shall, at all times, observe and comply with all Federal and State laws, local ordinances and regulations which affect the conduct of this work. The Contractor shall be solely responsible for all claims and liabilities arising from or based upon the violation of any such laws, ordinances or regulations whether by the Contractor or its employees.
Successful Contractor must submit a certificate of insurance naming the City of Alton as “additional named insured” per the attached minimum insurance requirements and sign the attached hold harmless agreement.
1.5 Submittals
On a separate sheet of paper, please submit the following with your bid response:
1. List of previous work (include contract amount and location)
2. List of equipment/machinery to be used on the bid project
Section 2
2.1 Payment Terms
Bidder shall be paid within thirty (30) days after Alton’s acceptance of the completion of the bid project, including the submission of all documentation required.
2.2 Award of Contract
Award will not be made on an “all or none” basis. In the event only one response is received, the City may require that the bidder submit a cost proposal in sufficient detail for the City to perform a cost/price analysis to determine if the bid price is fair and reasonable.
2.3a The undersigned Respondent declares Respondent has carefully examined the General Instructions/Conditions, Specifications and Forms for the City’s Invitation for Bid and the figures submitted are the lowest responsible cost for this work. The Respondent further understands that Respondent is
Return Page Bid # 2026 – 17 Demolition Bid Document Page 6 of 10 responsible for any errors or omissions affecting coverage based on these specifications as submitted on the forms.
2.3b The undersigned Respondent further declares that this quotation is made without any connection with any person making another quotation for the same contract, that the quotation is in all respects fair and without collusion or fraud, that no member of the Alton City Council or City of Alton employee is directly or indirectly interested in this quotation, or in any portion of the profits thereof.
2.3c The undersigned Respondent certifies that it is not barred from being awarded a contract or subcontract under Section 10.1 of the Illinois Purchasing Act.
2.3d The undersigned Respondent certifies that it has not been barred from contracting with a unit of State or local government as a result of a violation of Section 33E-3 or 33E-4 of the Criminal Code of 1961.
Signature
Respondent’s Name
Section 3 Company Information The undersigned does hereby agree and certify that none of the work described above will be subcontracted to any City employee
Bidder certifies it is a: proprietorship ; partnership ; corporation
Length of time company has been in business
Illinois Sales Tax Number
Use Tax Number for Out-of-State Suppliers
Taxpayer’s Federal Identification Number
Bidder certifies that bidder has read, understands and will fully and faithfully comply with this invitation for the bid, its attachments, addenda and any referenced documents. Bidder also certifies that the prices offered were independently developed without consultation with any of the other bidders or potential bidders.
All work items shall be performed in accordance with the City of Alton Demolition Specifications.
Company’s Legal Name
Address
City, State and Zip Code
Telephone Number
Company’s Fax Number
Company’s Toll-Free Number
Email Address and Website
Return Page Bid # 2026 – 17 Demolition Bid Document Page 7 of 10
Signature of Authorized Agent
Printed Name and Title
Email Address:
Mailing Addresses:
Purchase Order Name
Address
City, State and Zip Code
Payment Address
Name
Address
City, State and Zip Code
References Please list five (5) references that have contracted with your company.
Name/Contact Person Company/Entity
Address Telephone Number/Email
1.
2.
3.
4.
5.
Return Page Bid # 2026 – 17 Demolition Bid Document Page 8 of 10
Section 4 Paperwork
All paperwork (i.e., certificate of insurance, signed contract, hold harmless agreement and related documents) must be received and approved by Alton as “in order”, within one week from the date of award. Failure to do so could result in disqualification of the respondent.
Note: Successful respondent shall be responsible for providing lien waivers before final payment is made.
Section 5 Qualifications
5.1 The undersigned Respondent shall ensure that Respondent is appropriately licensed (when applicable) and qualified to perform the described work.
5.2 The undersigned Respondent agrees that Respondent is insured and shall provide a “Certificate of Insurance”, listing the City of Alton as additional insured in amounts per the attached minimum requirements shall be provided. Cost of compliance shall be included as an incidental expense in the project and shall not be paid for separately.
5.3 The undersigned Respondent agrees to save and keep the City of Alton, including it Officials, Agents and Employees, free and harmless from all liability including but not limited to, losses, damages, costs, attorney’s fees, expenses, causes of action, claims or judgments resulting from claimed injury, death, damage to property or loss of use of property or any person or legal entity arising out of or in any way connected with the performance of work or work to be performed under this Contract, except in the case of gross negligence of the City of Alton, Illinois or its employees as to which this Hold Harmless and Indemnity Agreement. The Respondent shall indemnify the City of Alton, Illinois, for any costs, expenses, judgments and attorneys’ fees paid or incurred, by or on behalf of the City of Alton, its Officials, Agents or Employees or by insurance purchased or self-insurance provided by the City of Alton, as this Hold Harmless and Indemnity Agreement requires.
5.4 The Respondent shall further hold harmless the City of Alton, its Officials, Agents and Employees from liability or claims for any injuries to or death of the Contractor’s employees or Subcontractor’s employees, arising out of, or in any way connected with, the work or work to be performed under this Contract, including protection against any claim of the Contractor or Subcontractor for any payments under any worker’s compensation law or any expenses of or any payments made by any worker’s compensation insurance carrier on behalf of said Contractor or Subcontractor and the Contractor shall indemnify the City of Alton for any costs, expenses, judgments and attorneys’ fees with respect to any above referenced worker’s compensation claim incurred or paid by the City of Alton or paid on its behalf or behalf of its Officials, Agents or Employees by insurance purchased or self-insurance provided by the City of Alton. Contractor agrees to waive subrogation in favor of the City of Alton, IL.
Section 6
6.1 Authorized Signature
By my signature, I hereby affirm that I have read, understood, and agree to comply with all of the instructions set forth in this invitation for bid. (Must be signed by an authorized agent of the Respondent.)
Signature
Printed Name
Title
Date
Return Page Bid # 2026 – 17 Demolition Bid Document Page 9 of 10
MINIMUM INSURANCE REQUIREMENTS AND INSURANCE CERTIFICATE
UPON AWARD OF CONTRACT
The City of Alton has developed insurance requirements in order to protect the municipality from suffering a financial loss that is not directly under its control.
A municipal contractor must file with the Deputy Comptroller the Certificate of Insurance naming the City of Alton as additional insured as required herein.
Please forward the signed the Certificate of Insurance with the named additional insured immediately upon the award of the bid. The Certificate Holder shall be shown as follows:
City of Alton, IL Attn: Lori Bockholdt 101 East Third Street Alton, IL 62002
Email: lbockholdt@cityofaltonil.gov
Phone: 618-463-3545
The certificate must provide insurance coverage that meets the established minimum insurance requirements, as follows:
Coverage Limits
Commercial General Liability $1,000,000 per occurrence $2,000,000 aggregate
Professional Liability $1,000,000 per occurrence (Errors and Omissions) $1,000,000 annual aggregate
Automobile Liability $1,000,000 per occurrence Bodily Injury $1,000,000 per occurrence Property Damage $1,000,000 per occurrence
Employer’s Liability $1,000,000 per occurrence $1,000,000 each accident – policy limit $1,000,000 each disease – policy limit $1,000,000 disease – each employee
Worker’s Compensation Per State of Illinois Statutes, with Waiver of Subrogation in favor of City of Alton, IL
CONTRACT WORK SHALL NOT BEGIN NOR SHALL INVOICES BE PAID WITHOUT A CURRENT CERTIFICATE OF
INSURANCE ON FILE, PER THE ABOVE MINIMUM REQUIREMENTS.
Return Page Bid # 2026 – 17 Demolition Bid Document Page 10 of 10
EXCEPTION CERTIFICATION
INVITATION FOR BID/PROPOSAL
CITY OF ALTON, ILLINOIS
It is hereby certified, by the Respondent or by a legally authorized agent of the Respondent, that any and all exceptions (variations) from the specifications are noted and explained in detail as set forth in the invitation.
Signature
Printed Name and Title
Company
Date www.EnviroLifeConsulting.com Office: 618.372.3740 I Cell: 618.616.1724 I 16532 Conrad Road, Brighton, IL 62012
August 4, 2026
City of Alton – Christine Little
Building & Zoning Department
101 E. Third St., Alton, IL 62002 clittle@cityofaltonil.com
Re: Asbestos Inspection – 911 Rixon Ave., Alton, IL 62002
Dear Ms. Little:
On August 3, 2026, EnviroLife Consulting (ELC) attempted to perform an asbestos inspection at the above location (Site) to identify the presence, condition, and amount of asbestos containing material
(ACM), prior to intended demolition. ACM is defined as any material containing more than one percent
(>1%) asbestos. This inspection was conducted pursuant to the National Emission Standards for
Hazardous Air Pollutants (NESHAP) Asbestos – 40 CFR 61, Subpart M.
SITE DESCRIPTION
Built in 1947, the Site is a one-story wood-framed residence with 980 square feet (27x36’), a Crawl
Space, and cinderblock foundation. The Site was found with severely fire damage, preventing safe and thorough access to the interior. The Site was too fire damaged to inspect thoroughly, pursuant to
NESHAP regulations, so this asbestos inspection was incomplete.
ASBESTOS FINDINGS
No bulk sampling or analysis was completed for this inspection; however, the Site was found with various suspect building materials, all of which should be presumed ACM. A thorough inspection of asbestos could not be completed, due to safety concerns and inadequate thoroughness (per NESHAP);
therefore, the following suspect building materials, among others, should be presumed ACM:
• Shingle Roofing
• Tarpaper Roofing
• Interior Walls (incinerated)
• Interior Flooring (incinerated)
City of Alton – Building & Zoning 911 Rixon St.
Asbestos Inspection Alton, IL 62002
SITE PHOTOGRAPHS
Photographs below depict the Site at the time of inspection:
Front (SE) exterior view of the Site Front (NE) exterior view of the Site
Rear (NW) exterior view of the Site Rear (SW) exterior view of the Site
E interior view inside the NW corner of Site E interior view inside the SW entry of Site
Photographs below depict Presumed ACM at the time of inspection:
SW interior view from back door of Site NW interior view from back door of Site
Exterior of metal shed in back yard Interior of metal shed in back yard
Exterior of detached garage N-NE of residence Interior of detached garage
REGULATORY SUMMARY
Asbestos is regulated by several agencies, including the U.S. Environmental Protection Agency (EPA), Illinois Department of Public Health (IDPH), and Occupational Safety & Health Administration (OSHA).
The EPA regulates asbestos under the Asbestos Hazard Emergency Response Act (AHERA) – 40 CFR 763 and the National Emission Standards for Hazardous Air Pollutants (NESHAP) – 40 CFR 61, Subpart M.
While AHERA regulations generally apply to schools (K-12), the NESHAP regulations apply to demolition and renovation of public/commercial facilities. IDPH regulated asbestos under the Asbestos Abatement for Public and Private Schools and Commercial and Public Buildings in Illinois (77 Ill. Adm. Code 855); the
Asbestos Abatement Act (105 ILCS 105); and the Commercial and Public Building Asbestos Abatement
Act (225 ILCS 207). OSHA regulates Asbestos in Construction (29 CFR 1926.1101) and Asbestos in
Industry (29 CFR 1910.1001). Below provides further details of EPA, IDPH, and OSHA regulations.
Federal asbestos NESHAP regulations require removal of Regulated ACM (RACM), prior to demolition, when found in combined amounts of at least 260 linear feet, 160 square feet, or 35 cubic feet. RACM includes (1) Friable ACM; (2) Category I Non-Friable ACM that has become friable or has or will be subjected to sanding, grinding, cutting, or abrading; and (3) Category II Non-Friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations. Notification of these projects must be made to the Illinois Environmental Protection Agency (IEPA) at least ten (10) working days before the start of the asbestos removal and renovation/demolition. The notification must be accompanied with a $150 filing fee made payable to the IEPA. Additional information can be referenced at www.epa.state.il.us/air/asbestos.
State regulations require notification of asbestos abatement in commercial and public buildings to IDPH.
Notification of both Friable and Non-Friable asbestos abatement projects ranging in size from 3 square feet/3 linear feet to 160 square feet/260 linear feet to be performed in commercial/public buildings shall be made to IDPH at least two (2) working days before initiating the abatement. Work procedures and controls specified in 77 IAC 855.220(c) must be followed. Clearance air monitoring is required upon completion of final cleaning, inspection, and when all surfaces in the critical barriers are dry. Clearance air sampling shall be conducted by an air sampling professional. Results shall be less than or equal to
0.01 fibers per cubic centimeter (f/cc). The building owner shall give a copy of the test results to the contractor and retain a copy for its records for three (3) years. Additional information can be referenced at www.idph.state.il.us/envhealth/asbestos.htm.
OSHA asbestos rules apply to construction, alteration, repair, renovation, or demolition of structures, substrates, or portions that contain asbestos. Coverage under the OSHA standard is generally based on the nature of the work operation involving asbestos exposure. OSHA establishes a classification system for asbestos work that spells out mandatory, simple, technological work practices that employers must follow to reduce worker exposures. Disturbance of any presumed asbestos materials at the Site must be performed in accordance with the appropriate methods of compliance. Additional information can be referenced at www.osha.gov/SLTC/asbestos.
CONCLUSIONS & RECOMMENDATIONS
NESHAP regulations make a special provision for demolition of structures that are unsafe and in eminent danger of collapse, making them too dangerous to inspect or remove asbestos. A demolition order must be made by the City of Alton to allow ACM to remain in place during demolition, despite the presumed asbestos likely being present in amounts greater than the NESHAP thresholds.
NESHAP regulations require that ALL demolition debris be managed as asbestos waste. ALL demolition debris MUST BE adequately wetted to allow ZERO visible emissions during demolition, loading, transport, and disposal. All suspect building materials are presumed ACM. All asbestos waste must be placed into leak (dust/water) tight containers and transported for disposal at a licensed waste facility as friable asbestos contaminated waste. This is typically accomplished with lined trucks or roll-offs.
Any contractor who removes ACM at the Site must use appropriate work practices (e.g. wet methods), engineering controls (e.g. critical barriers), and personal protective equipment (PPE), pursuant to OSHA regulations. Additional references to OSHA regulations and interpretations may be required to ensure compliance with applicable safety standards during asbestos removal and/or demolition.
NOTIFICATION INSTRUCTIONS
A Notification of Demolition has been drafted and attached to this report. Please review all completed portions to ensure accuracy and complete any remaining portions of the notification. At least one (1) representative, trained in the applicable provisions of NESHAP, must be on site during demolition. Once completed, please submit the notification to the IEPA at least ten (10) working days prior to beginning any asbestos removal or demolition activities. A $150 filing fee to the IEPA is also required.
LIMITATIONS OF INSPECTION
Where access to the Site, or portions thereof, was limited by coverings and/or contents, ELC renders no opinions as to the presence or indirect evidence of asbestos. ELC performed this inspection pursuant to applicable provisions of NESHAP and generally accepted environmental consulting practices. No other warranty, expressed or implied, is made for the information presented in this report. This report may not contain sufficient information for other purposes or other parties’ uses. Any exceptions or deviations in access or inspection methodology are specified in this report.
Please contact me at (618) 616-1724 if you have any questions or concerns.
Sincerely, Nathaniel Brooks IL Asbestos Inspector L#100-09894
EnviroLife Consulting LLC
TYPE OF NOTIFICATION: � original � demolition � renovation � cancellation � revision � courtesy � annual Check Type of Project Below: (Check all that apply.)
� Friable School Project � Non-Friable School Floor Tile Project � Commercial Public Building (Friable & Non-Friable) Revised by: � Contractor � Owner � Project Designer #of times revised: _______ List Section #ʼs being revised: ______________
1. FACILITY INFORMATION:
Facility name: School Bldg ID:
Location of Asbestos Containing Material (ACM) in Structure:
Bldg Size: Sq.Ft.: #Flrs: Age: Present Use:
Prior Use: Future Use (demo) Address:
City: County: Zip:
Contact: Phone:
2. FACILITY OWNER OR SCHOOL DISTRICT: (Tip: Complete for all projects Commercial/Public or Schools) Facility Owner Name: Address:
City: State: Zip:
Contact: Phone:
Copies of abatement permission and written verification certification to all building occupants and users from the building owner or school board shall be submitted for IDPH public and private school facilities as required by Section 855.350 of the IDPH Asbestos Code.
3. ASBESTOS CONTRACTOR NAME: ID#:
Address:
City: State: Zip:
Contact: Phone:
4. DEMOLITION CONTRACTOR NAME:
Address:
City: State: Zip:
Contact: Phone:
5. ABATEMENT INFORMATION: Is Asbestos Present? � Yes � No Description of Planned Demolition or Renovation Work and Methods to be Employed Including Demolition or Renovation Techniques:
Description of Work Practice(s) and Engineering Controls used to Prevent Emissions at the Demolition or Renovation Site:
6. Quantities:
Pipes (Ln. Ft.):
Surface Area (Sq. Ft.):
Volume (Cu. Ft.):
Tip: CAT I non-friable ACM are asbestos-containing resilient floor coverings (vinyl asbestos tile (VAT), asphalt roofing products, packing and gaskets. All other non-friable ACM are considered CAT II non-friable ACM. (RACM) is (a) friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations.
7. ABATEMENT START DATE: Finish Date: Work hours: AM/PM AM/PM Scheduled Demolition Start Date: Finish Date: Work hours: AM/PM AM/PM Working Weekends? � Yes � No Working Evenings? � Yes � No Tip: Ten day notification requires at minimum, ten (10) business days (Monday-Friday including holidays) prior to the commencement date. Ten days begin with the US postmark date or date received in office by commercial services or hand delivery. IEPA and Cook County cannot accept faxed copies, however, IDPH will accept faxed submissions. Phased projects will not be accepted.
STATE OF ILLINOIS
DEMOLITION/RENOVATION/ASBESTOS PROJECT NOTIFICATION FORM
Projects greater than 3 sq./ft and/or 3 linear ft. and all school projects shall be submitted to Illinois Department Public Health.
Projects greater than 160 sq./ft or 260 linear ft., or 1 cubic meter and demolition projects shall be submitted to Illinois Environmental Protection Agency.
All projects in Cook County must notify Cook County Environmental Control.
This form and appropriate fee shall be submitted for all original notifications to IDPH (no fee), IEPA ($150), and Cook County ($200).
This form shall also be used for revisions to the IEPA and IDPH. A Cook County Revision Form must be used to cancel an asbestos permit.
Copies of this form may be found at: www.ienconnect.com/enviro
Regulated Asbestos Non-friable asbestos not to Non-friable asbestos Containing Material to be removed (demolition) to be removed TOTAL ASBESTOS be removed (RACM) CAT I CAT II CAT I CAT II TO BE REMOVED
IL532-1296 APC 430 Rev. 10/2008
Vacant Residence NA All suspect material Presumed ACM
27x36' 980 1 1947 Vacant Residence Occupied Residence Vacant Lot
911 Rixon St.
Alton Madison 62002
Christine Little - City of Alton - Building & Zoning (618) 463-3533
ALL DEMOLITION DEBRIS SHALL BE MANAGED AS ASBESTOS WASTE. The facility will be demolished to grade using hydraulic excavators and loaded into trucks and/or rolloffs prior to transport to a licensed waste facility. Smaller excavators and/or manual labor may also be used to collect/load/transport demolition debris.
ALL DEBRIS shall be adequately wetted, removed, containerized, labeled, transported, and disposed of. Demolition debris shall be adequately wetted to maintain zero visible emissions during demolition, loading, transport, and disposal
Submit this form to the appropriate agencies:
IL Environmental Protection Agency, P.O. Box 19276 Mail Code #41, Springfield, IL 62794-9276 $150 fee
IL Department of Public Health, 525 W. Jefferson St., Springfield, IL 62761 (FAX: 217-785-5897) Cook Co. Dept. of Env. Control, 69 W. Washington, Suite 1900, Chicago, IL 60602-3004 $200 fee
8. PROJECT DESIGNER ID#: 100- Name:
Complete Project Designer Name and License ID# if this project was designed by a Designer.
9. INSPECTOR ID#: 100- Name:
Tip: If procedure utilized is visual inspection, the inspector ID# must be provided.
10. PROCEDURE, INCLUDING ANALYTICAL METHOD, USED TO DETECT THE PRESENCE OF ASBESTOS
Name of Analytical Testing Laboratory:
11. ASBESTOS PROJECT MANAGER ID#: 100- Name:
12. AIR SAMPLING PROFESSIONAL ID#: 100- Name:
13. DISPOSAL SITE/LANDFILL NAME:
Address: Contact:
City: State: Zip: Phone:
14. WASTE TRANSPORTER/NAME:
Address: Contact:
City: State: Zip: Phone:
15. IS DEMOLITION ORDERED BY A GOVERNMENT AGENCY? � Yes � No (If yes, a signed copy of Order must be attached.)
Government representative ordering the activity:
Title: Date of Order: Order Demolition Date:
16. FOR EMERGENCY RENOVATION:
Date and hour of emergency (mm/dd/yy): AM/PM Describe sudden unplanned event. ( example: boiler explosion) Explain how the event caused unsafe conditions or would cause equipment failure or an unreasonable financial burden.
17. Description of procedures to be followed in the event that unexpected asbestos is found or previously non-friable asbestos material becomes crumbled, pulverized or reduced to powder.
I certify that at least one representative trained in the provisions of 40 CFR Part 61, Subpart M, shall be on site during demolition or renovation, having in his or her possession for inspection, evidence that the requisite training has been accomplished.
CERTIFICATE # _____________________ NAME OF TRAINING COURSE __________________________________________
I certify the above information is correct.
Signature of Demolition/Abatement Contractor or the Owner Date
Tip: All notification forms must be hand signed and dated. Hand stamps are not acceptable. IEPA and Cook County require original signatures on their notification forms. IDPH will accept photocopies. All notifications submitted to IEPA & Cook County must be accompanied by the appropriate fee. There is no fee for notification to IDPH.
ILLINOIS EPA AGENCY USE ONLY
Date Received: Input to ACTS: Post Mark Date: To Cook/City:
Champaign LaSalle Springfield Rockford Moline Marion
For Cook County Departmental Use Only.
Date Received CCDEC: Post Mark Date: Input Into Computer:
Inspection Fee Received: Inspection Priority: Top � High � Low � Must be Inspected:
Date(s) of Inspections:
Inspection Report Attached: Yes � No � Violation Copies Attached: Yes � No �
ENVIRONM
ENTAL ASSISTANCE PROGRAM
S
Printed by the Authority of the State of Illinois • W.O. #080089 550 10/08 • IOCI0490-09
09894 Nathaniel Brooks
All demolition debris is presumed ACM, so no bulk sampling or analysis was completed.
NA
Roxana Landfill 4600 Cahokia Creek Road
Edwardsville IL 62025 (618) 656-6912
Demolition activities will be haulted immediately. Suspect ACM shall then be adequately wetted until proper sampling and/or removal can be arranged. Any confirmed or presumed ACM shall be disposed of as soon as possible.
www.EnviroLifeConsulting.com Office: 618.372.3740 I Cell: 618.616.1724 I 16532 Conrad Road, Brighton, IL 62012
August 4, 2026
City of Alton – Christine Little
Building & Zoning Department
101 E. Third St., Alton, IL 62002 clittle@cityofaltonil.com
Re: Asbestos Inspection – 515 Condit Ave., Alton, IL 62002
Dear Ms. Little:
On August 3, 2026, EnviroLife Consulting (ELC) attempted to perform an asbestos inspection at the above location (Site) to identify the presence, condition, and amount of asbestos containing material
(ACM), prior to intended demolition. ACM is defined as any material containing more than one percent
(>1%) asbestos. This inspection was conducted pursuant to the National Emission Standards for
Hazardous Air Pollutants (NESHAP) Asbestos – 40 CFR 61, Subpart M.
SITE DESCRIPTION
Built in 1949, the Site is a one-story wood-framed residence with 825 square feet (25x33’), an unfinished
Basement, and cinderblock foundation. The Site was found with severe structural damage, due to a large fallen tree, preventing safe access to the interior. The Site was too dangerous to inspect thoroughly, pursuant to NESHAP regulations, so this asbestos inspection was incomplete.
ASBESTOS FINDINGS
No bulk sampling or analysis was completed for this inspection; however, the Site was found with various suspect building materials, all of which should be presumed ACM. A thorough inspection of asbestos could not be completed, due to safety concerns; therefore, the following suspect building materials, among others, should be presumed ACM:
• Shingle Roofing
• Tarpaper Roofing
• Interior Drywall
• Interior Joint Compound
• Interior Flooring
City of Alton – Building & Zoning 515 Condit Ave.
Photographs below depict the Site at the time of inspection:
Front (E-SE) exterior view of the Site Front (NE) exterior view of the Site
Rear (NW) exterior view of the Site Rear (SW) exterior view of the Site
Fallen tree collapsing half of the Site roof Condemned signage on boarded front door
Photographs below depict Presumed ACM at the time of inspection:
Fallen tree collapsing north half of the roof South half of Site roof remains intact
No safe access of interior (left window view) No safe access of interior (right window view)
Kitchen exterior in SE corner of Site → Kitchen interior view through window
REGULATORY SUMMARY
Asbestos is regulated by several agencies, including the U.S. Environmental Protection Agency (EPA), Illinois Department of Public Health (IDPH), and Occupational Safety & Health Administration (OSHA).
The EPA regulates asbestos under the Asbestos Hazard Emergency Response Act (AHERA) – 40 CFR 763 and the National Emission Standards for Hazardous Air Pollutants (NESHAP) – 40 CFR 61, Subpart M.
While AHERA regulations generally apply to schools (K-12), the NESHAP regulations apply to demolition and renovation of public/commercial facilities. IDPH regulated asbestos under the Asbestos Abatement for Public and Private Schools and Commercial and Public Buildings in Illinois (77 Ill. Adm. Code 855); the
Asbestos Abatement Act (105 ILCS 105); and the Commercial and Public Building Asbestos Abatement
Act (225 ILCS 207). OSHA regulates Asbestos in Construction (29 CFR 1926.1101) and Asbestos in
Industry (29 CFR 1910.1001). Below provides further details of EPA, IDPH, and OSHA regulations.
Federal asbestos NESHAP regulations require removal of Regulated ACM (RACM), prior to demolition, when found in combined amounts of at least 260 linear feet, 160 square feet, or 35 cubic feet. RACM includes (1) Friable ACM; (2) Category I Non-Friable ACM that has become friable or has or will be subjected to sanding, grinding, cutting, or abrading; and (3) Category II Non-Friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations. Notification of these projects must be made to the Illinois Environmental Protection Agency (IEPA) at least ten (10) working days before the start of the asbestos removal and renovation/demolition. The notification must be accompanied with a $150 filing fee made payable to the IEPA. Additional information can be referenced at www.epa.state.il.us/air/asbestos.
State regulations require notification of asbestos abatement in commercial and public buildings to IDPH.
Notification of both Friable and Non-Friable asbestos abatement projects ranging in size from 3 square feet/3 linear feet to 160 square feet/260 linear feet to be performed in commercial/public buildings shall be made to IDPH at least two (2) working days before initiating the abatement. Work procedures and controls specified in 77 IAC 855.220(c) must be followed. Clearance air monitoring is required upon completion of final cleaning, inspection, and when all surfaces in the critical barriers are dry. Clearance air sampling shall be conducted by an air sampling professional. Results shall be less than or equal to
0.01 fibers per cubic centimeter (f/cc). The building owner shall give a copy of the test results to the contractor and retain a copy for its records for three (3) years. Additional information can be referenced at www.idph.state.il.us/envhealth/asbestos.htm.
OSHA asbestos rules apply to construction, alteration, repair, renovation, or demolition of structures, substrates, or portions that contain asbestos. Coverage under the OSHA standard is generally based on the nature of the work operation involving asbestos exposure. OSHA establishes a classification system for asbestos work that spells out mandatory, simple, technological work practices that employers must follow to reduce worker exposures. Disturbance of any presumed asbestos materials at the Site must be performed in accordance with the appropriate methods of compliance. Additional information can be referenced at www.osha.gov/SLTC/asbestos.
CONCLUSIONS & RECOMMENDATIONS
NESHAP regulations make a special provision for demolition of structures that are unsafe and in eminent danger of collapse, making them too dangerous to inspect or remove asbestos. A demolition order must be made by the City of Alton to allow ACM to remain in place during demolition, despite the presumed asbestos likely being present in amounts greater than the NESHAP thresholds.
NESHAP regulations require that ALL demolition debris be managed as asbestos waste. ALL demolition debris MUST BE adequately wetted to allow ZERO visible emissions during demolition, loading, transport, and disposal. All suspect building materials are presumed ACM. All asbestos waste must be placed into leak (dust/water) tight containers and transported for disposal at a licensed waste facility as friable asbestos contaminated waste. This is typically accomplished with lined trucks or roll-offs.
Any contractor who removes ACM…