City_Hall_Second_Floor_Door_Replacements.pdf
PDF 457 KB Posted
- Attached to
- City Hall Second Floor Door Replacements
- Solicitation number
- 26-097-ITB
- Issued by
- Yolo County, California
About this file
This Invitation to Bid (ITB #26-097-ITB) is issued by the City of West Sacramento, California for the removal and replacement of two existing half-swing doors with two new full-height, lockable interior doors at the public permitting counter on the second floor of City Hall. The project scope includes demolition of existing doors, installation of solid-core wood doors with hardware and frames, access control preparation for the main door, patch and repair work, and all necessary permitting and inspections to meet the California Building Code. The City anticipates a project value of $8,500. Bids must be submitted electronically through the City's OpenGov portal no later than Tuesday, November 24, 2026 at 3:00 pm. A non-mandatory public bid opening will occur at the same time via Microsoft Teams. The deadline for questions is November 10, 2026 at 5:00 pm, with question responses due by November 17, 2026. Contract award is anticipated for November 25, 2026. Bids must remain valid for at least ninety (90) business days after the proposal due date.
The cost proposal must be completed using the electronic pricing table provided in the e-Procurement portal and will be kept separate from other bid response materials. This is a prevailing wage project subject to California Labor Code requirements; contractors and subcontractors must be registered with the Department of Industrial Relations. Bidders must hold all necessary business and professional licenses and certifications, including a valid California Contractors State License. All proposals must comply with the City's standard contract terms and insurance requirements as outlined in the Insurance Checklist. The bid includes a base bid for standard door replacement and one additive alternate for full glass vision lite doors with optional partition framing. Bidders must submit a completed W-9 form, Certification Regarding Debarment, evidence of proper licensure, and a bid bond. The City reserves the right to reject any or all bids and to award based on the base bid alone or in combination with alternate bid items at its sole discretion. Award will be made to the lowest responsive, responsible bidder whose bid complies with all requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
26-097-ITB
CITY HALL SECOND FLOOR DOOR REPLACEMENTS
City of West Sacramento
1110 W Capitol Ave
West Sacramento, CA 95691
RELEASE DATE: November 3, 2026
DEADLINE FOR QUESTIONS: November 10, 2026
RESPONSE DEADLINE: November 24, 2026, 3:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d
City of West Sacramento
INVITATION TO BID
City Hall Second Floor Door Replacements
I. Introduction II. Project Details
III. Terms and Conditions IV. Bid Submittal V. Cost Table
VI. Contract Award
Attachments:
A - Insurance Checklist
B - Bid Packet - City Hall Second Floor Door Replacements
Invitation to Bid #26-097-ITB Title: City Hall Second Floor Door Replacements
1. Introduction
1.1. Summary
The City of West Sacramento is accepting sealed responses for the following:
Removal and replacement of two existing half-swing doors with two new full-height, lockable interior doors at the public permitting counter on the second floor of City Hall.
Bids shall be submitted no later than Tuesday, November 24, 2026 at 3:00 pm.
The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full
1.2. Background
West Sacramento is a vibrant riverfront community centrally located in Northern California. West
Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. West Sacramento has a Council/Manager form of government. Citizens elect four City Council Members by district (as of the November, 2022 election) who serve four year terms and directly elect the mayor who serves a four-year term. The City is full-service with nine (9) departments and nearly 500 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. In addition, the City maintains port, water, wastewater, and solid waste enterprise funds. Other activities and related entities include the West Sacramento Redevelopment Successor Agency, Reclamation District 900 and the West Sacramento Area Flood Control Agency.
1.3. Contact Information
Blake Wickstrom
Facilities Supervisor
4300 West Capitol Ave
West Sacramento, CA 95691
Email: blakew@cityofwestsacramento.org
Phone: (916) 759-4136
Department:
Public Works Operations and Maintenance
1.4. Timeline
Release Project Date November 3, 2026 https://secure.procurenow.com/portal/cityofwestsacramento/projects/317570/document?section=undefined mailto:blakew@cityofwestsacramento.org tel:(916)759-4136
Question Submission Deadline November 10, 2026, 5:00pm
Question Response Deadline November 17, 2026, 5:00pm
Proposal Submission Deadline November 24, 2026, 3:00pm
Public Bid Opening (Non-Mandatory) November 24, 2026, 3:00pm
Join:
https://teams.microsoft.com/meet/295405296142
775?p=rG3Vac5BiDIKYgIwkW
Meeting ID: 295 405 296 142 775
Passcode: Ae97BH9F
Contract Award Date November 25, 2026 https://teams.microsoft.com/meet/295405296142775?p=rG3Vac5BiDIKYgIwkW https://teams.microsoft.com/meet/295405296142775?p=rG3Vac5BiDIKYgIwkW
2. Project Details
2.1. Important Instructions for Electronic Submittal
The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full
2.2. Project Scope
1. Overview
Remove the two existing half-swing doors at the public permitting counter and replace them with two new full-height, lockable interior doors (frames and hardware included). Work must meet current
California Building Code. Contractor must field-verify all existing conditions and dimensions before pricing or fabrication.
2. Demolition
• Remove and dispose of the two existing half-swing doors and related debris.
• Protect the counter, millwork, flooring, and wall finishes during demo and install.
3. Doors, Frames, and Hardware
• Base Bid: Solid-core wood doors with hap glass vision lite (both).
• Add Alternate: Solid-core wood doors with a full glass vision lite (safety glazing, laminated preferred for security). Applies to both doors.
• Finish: Commercial-grade solid core; color/style subject to staff approval.
• Frames: Hollow metal; color/style subject to staff approval.
o New partition framing (studs, drywall, finish) to receive the frame (if applicable)
• Hardware: Both doors must lock, main door to work with access control
• Door bottoms: Undercut to clear carpet pile, doors must swing freely with no dragging or wear track. No sweeps over carpet.
https://secure.procurenow.com/portal/cityofwestsacramento/projects/317570/document?section=undefined
Door 1 (Main/Accessible) – primary staff entrance; must meet accessible specs below.
Door 2 (Secondary) – same door type/glazing/finish
Accessible Door Specs (Door 1, minimum):
• 36" leaf, 32" clear opening at 90°.
• Lever handle, 34"–48" AFF, one-hand operable (no pinch/twist/grasp).
• No raised threshold where carpet is continuous; if a threshold exists at a material transition, ½" max, beveled.
• Verify maneuvering clearance at the door approach with plan check.
• Laminated and tempered for shatter resistance.
• Full-lite alternate: keep bottom 10" of push side solid (glazing stops 10" up or add a 10" kick plate).
4. Access Control (Installation by another vendor)
Main door will get badge access (The access control system itself is not part of this sow)
Contractor provides door/frame prep only:
• Electrified/electric strike prep
• Door position switch prep
• Power transfer path (electric hinge or transfer device)
• Conduit/raceway with pull string from door to device
• Supply electrified hardware for the door
Coordinate exact prep with the access control vendor and City IT/PWOM before fabrication.
Egress requirement: The access-controlled door must always allow free exit, no key, tool, or special knowledge required on the egress side.
5. Patch and Repair
Repair/refinish counter, flooring, and walls affected by the work, matching existing adjacent finishes.
Leave everything clean and ready for use.
6. Code and Permits
All work must meet CBC. Contractor submits and pulls all permits needed and coordinate inspections.
*Prevailing wage applies
2.3. Project Estimate
The City anticipates a project value of: 8,500.
3. Terms and Conditions
3.1. Prevailing Wages
A. Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this
ITB is subject to compliance monitoring and enforcement by the DIR.
B. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification.
3.2. Statement of Offer
Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost
Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.
3.3. Questions and/or Objections
It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).
A Proposer may submit Questions related to this ITB to the City through the City’s e-Procurement Portal at or before:
Tuesday, November 10, 2026 at 5:00 pm.
Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.
3.4. Amendment and Cancellation
The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications.
https://secure.procurenow.com/portal/CityofWestSacramento
3.5. Right of Rejection
A. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety.
B. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected.
C. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected.
D. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB.
3.6. Prohibition of Respondent Terms and Conditions
A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB.
3.7. Joint Ventures and Partnering
A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following:
A. The Proposal shall respond to each section and subsection of this ITB.
B. The Proposal shall clearly set forth the respective responsibilities and functions that each
Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB.
C. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB.
D. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information.
3.8. Proposal of Alternate Services
A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected.
3.9. Proposal of Additional Services
A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the
Contract before execution.
3.10. Severability
If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and
Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid.
3.11. Licensure and Special Certification
Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all
Proposers to submit evidence of proper licensure and certifications.
3.12. Disclosure of Proposal Contents
All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals shall be open for review by the public to the extent required by the California Public
Records Act, Government Code section 7920.000 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection.
Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.
3.13. Conflict of Interest and Restrictions
By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB.
3.14. Proprietary Information
A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law.
Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection.
Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.
If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver.
4. Bid Submittal
4.1. Please upload a signed W-9 form*
Please download the IRS 2024 Form W-9 and upload a completed, signed copy. Acceptable signatures include either a handwritten (wet) signature or a valid electronic signature.
• W-9_Form_ver._2024_-_BLANK.pdf
*Response required
4.2. Please enter Legal Company Name and related DBA*
Please state your company name and any related DBA's based on your California Secretary of State
Filing.
*Response required
4.3. Cost Proposal using Electronic Pricing Table*
The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder.
☐ Please confirm
*Response required
4.4. Response (without Cost Proposal)*
Please Upload Your Response Here, excluding your Cost Proposal.
*Response required
4.5. Statement of Offer*
Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost
Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.
☐ Please confirm
*Response required
4.6. Bid Bond*
Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs
*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/4713e161-0e9b-428f-be7a-2b0ae306a414_W-9_Form_ver._2024_-_BLANK.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MWOKDYB7%2F20261103%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261103T205835Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjENX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIFgrUZSmbjA1tjv%2FxJMypaJfxia0u%2BsLHFgTzgtiMVgbAiAvjbFJpAaO3l4rT9naUPwb9%2BLChCrdQix4PMZ5xt4xniqVBQid%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMj0FrPnn9R7RATTnyKukEXDJ5MlTRN1ja4xNsQKIExSrkk4Fs50cjyrEOz3QeOZ5uhuQbHLbqo6Qvm3mZnqnAHe%2FWXe41Tzm2tUY1xn%2Ft3YLqrvjLKLI9v3hJ89ifKs%2Bj0ho%2Bdv7axB8xAFjTmSbsDCiqsfDviDFtqichertlqyEWsYyBPkAsxEPZEb5vyr%2BU5R6gYDcE65u5LoDjOPCop6fZK1T%2BRk7QNpjc%2FkWpna9GydMBdp5hgTG3qIp9UqOI88uPuC8isiBUG5kks7sxF%2BiN2mYhuyYFPrqAL2OSyxCGRhPyOvCu150lUMDUC52fg0NniKnbNvSO79IjImAbItVdifIUHJ%2BXKCZwOgNo75q2L0DWUDZwIp9BCR%2FDO6ar49Cs2G4nEacX%2FZj8bCaHMH6%2FPKjjjtw%2BN%2BhDTjqBPob735JzrgtzhzX0Dmdx2GQ0SP6bvzYueOClLvxGmCeslhwyi5SQAYxg2jzSU3Sr8HVBUQiyoUd7%2FCUFVURUG1nryMGMeScKAP3wVBiFXXrLZK17nL0bgwL2ndyIZZktyUyYyVsoDkiCDlbz6mrPDiKibvuoiUS34Bb%2FATL6VQNnOjw2Zu%2BYOahmL7XjSsZ6Vlprvn49dXWfmmoVtE%2BdjVw9i%2FW6LYaLqxZzVtQYeiioBky766%2B8FJFyHB9B9DyuBGsXy1joKxIBPhAclAgHin4OMevGMT0Dr%2FclZbHugff1pWta0Myq6iEi0vhcOOmRD0gHFOJxhb1Rp1jJZI9vnwfEATAP2it6GG61dvurx1ts%2B9okdOgSX7q5N4d8xH8B8gCgz0hH1H3HPGs9YX0go6B5YPl6%2BrVFUi0wnImp1wY6mgF1Nspk3aUBz5KPDKBEwDqTEJWtQdarHS5vDbGvCjZmVCPDA2PeOrXW0weO8QDZFxCUHsBpLb7V62X09aVlduGtal%2BhlrJ10O0rtHKTuJq%2B7T371at%2BLmVf3ECNuq%2FqhCFMw4ooDr8%2BwfCIe%2Bdz%2BPimdiJhT0m08%2Bbz7obCWw9j3eZOHB35uOzdNKMsM%2FFFNUKuGyHtX%2ByydNhp&X-Amz-Signature=d1f942c81f8fe7ec9f8aa8c47f2b5ecc0d103f7c8959f3f0100b1055046c4d8f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9_Form_ver._2024_-_BLANK.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/317570/document?section=3004902
4.7. California Contractors State License Board
Please enter your contractor license number for verification.
4.8. Certification regarding Debarment
The City performs a SAM.GOV verification check to confirm debarment status. Please download the attached document, complete the form, and upload.
A unique entity identifier is requested for contracts greater than $25,000 or funded with Federal dollars.
Your entity may register for a unique entity identifier on SAM.GOV at the following link https://sam.gov/content/entity-registration.
For all other proposers, the completed form is sufficient.
• Certification_Regarding_Deb...
4.9. City Contract *
The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract.
☐ Yes
☐ No
*Response required
4.10. Insurance Requirements*
The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the
Insurance Checklist in Attachments. Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award.
☐ Yes
☐ No
*Response required
4.11. Authorized Contract Signer *
Please provide the name, title and email address of the authorized contract signer.
*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/7fbcd8f3-7d1e-4b79-a50c-03f71fe54e62_Certification_Regarding_Debarment_Form_COWS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MWOKDYB7%2F20261103%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261103T205835Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjENX%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIFgrUZSmbjA1tjv%2FxJMypaJfxia0u%2BsLHFgTzgtiMVgbAiAvjbFJpAaO3l4rT9naUPwb9%2BLChCrdQix4PMZ5xt4xniqVBQid%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMj0FrPnn9R7RATTnyKukEXDJ5MlTRN1ja4xNsQKIExSrkk4Fs50cjyrEOz3QeOZ5uhuQbHLbqo6Qvm3mZnqnAHe%2FWXe41Tzm2tUY1xn%2Ft3YLqrvjLKLI9v3hJ89ifKs%2Bj0ho%2Bdv7axB8xAFjTmSbsDCiqsfDviDFtqichertlqyEWsYyBPkAsxEPZEb5vyr%2BU5R6gYDcE65u5LoDjOPCop6fZK1T%2BRk7QNpjc%2FkWpna9GydMBdp5hgTG3qIp9UqOI88uPuC8isiBUG5kks7sxF%2BiN2mYhuyYFPrqAL2OSyxCGRhPyOvCu150lUMDUC52fg0NniKnbNvSO79IjImAbItVdifIUHJ%2BXKCZwOgNo75q2L0DWUDZwIp9BCR%2FDO6ar49Cs2G4nEacX%2FZj8bCaHMH6%2FPKjjjtw%2BN%2BhDTjqBPob735JzrgtzhzX0Dmdx2GQ0SP6bvzYueOClLvxGmCeslhwyi5SQAYxg2jzSU3Sr8HVBUQiyoUd7%2FCUFVURUG1nryMGMeScKAP3wVBiFXXrLZK17nL0bgwL2ndyIZZktyUyYyVsoDkiCDlbz6mrPDiKibvuoiUS34Bb%2FATL6VQNnOjw2Zu%2BYOahmL7XjSsZ6Vlprvn49dXWfmmoVtE%2BdjVw9i%2FW6LYaLqxZzVtQYeiioBky766%2B8FJFyHB9B9DyuBGsXy1joKxIBPhAclAgHin4OMevGMT0Dr%2FclZbHugff1pWta0Myq6iEi0vhcOOmRD0gHFOJxhb1Rp1jJZI9vnwfEATAP2it6GG61dvurx1ts%2B9okdOgSX7q5N4d8xH8B8gCgz0hH1H3HPGs9YX0go6B5YPl6%2BrVFUi0wnImp1wY6mgF1Nspk3aUBz5KPDKBEwDqTEJWtQdarHS5vDbGvCjZmVCPDA2PeOrXW0weO8QDZFxCUHsBpLb7V62X09aVlduGtal%2BhlrJ10O0rtHKTuJq%2B7T371at%2BLmVf3ECNuq%2FqhCFMw4ooDr8%2BwfCIe%2Bdz%2BPimdiJhT0m08%2Bbz7obCWw9j3eZOHB35uOzdNKMsM%2FFFNUKuGyHtX%2ByydNhp&X-Amz-Signature=0326c8090498a58e504fe50bc0e30e9de675473020be1beb90a8070938eb9801&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Debarment_Form_COWS.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/317570/document?section=undefined
5. Cost Table
DOOR REPLACEMENTS (BASE BID)
Replace two existing half-swing doors at the public permitting counter and replace them with two new full-height, lockable interior doors (frames and hardware included)
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Demolition - Remove and dispose of the two existing half-swing doors and related debris. Protect the counter, millwork, flooring, and wall finishes during demo and install.
1 LS
2 Door 1 (Main/Accessible) - Solid-core wood door with hap glass vision lite.
Commercial-grade solid core finish
(color/style subject to staff approval).
Must meet specifications outlined in scope of work noted in project details.
1 LS
8 Door 2 (Secondary) - Solid-core wood door with hap glass vision lite.
Commercial-grade solid core finish
(color/style subject to staff approval).
Must be same door type/glazing/finish as Door 1.
1 LS
4 Frames - Hollow metal (color/style subject to staff approval)
1 LS
5 Hardware - Both doors must lock;
main door to work with access control
1 LS
6 Door Bottoms - undercut to clear carpet pile; doors must swing freely with no dragging or wear track. No sweeps over carpet
1 LS
TOTAL
ACCESS CONTROL PREP (BASE BID)
Preperation of main door for badge access (control system installation not included in work)
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Electrified/electric strike prep 1 LS
2 Door position switch prep 1 LS
3 Power transfer path (electric hinge or transfer device)
1 LS
4 Conduit/raceway with pull string from door to device
1 LS
5 Coordinate exact prep with the access control vendor and City IT and Public
Works Departments before fabrication
PATCH AND REPAIR (BASE BID)
Measure Unit Cost Total
1 Repair/refinish counter, flooring, and walls affected by the work, matching existing adjacent finishes. Leave everything clean and ready for use.
PERMITS (BASE BID)
Measure Unit Cost Total
1 Pull all necessary permits and coordinate all necessary inspections needed and complete scope of work
(all work must meet California
Building Code)
ADD ALTERNATE
Measure Unit Cost Total
1 Two (2) Solid-core wood doors with a full glass vision lite (safety glazing, laminated preferred for security).
keep 10" of push side solid (glazing stops 10" up or add a 10" kick plate)
1 LS
2 New partition framing (studs, drywall, finish) to receive the frame
6. Contract Award
6.1. Opening & Award of Contract
Bids will be opened publicly and read aloud at the time and date established in the invitation to Bidders.
Bid Summaries may be made available to Bidders after the Bid Date.
The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001
The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids.
Before a Bid is considered for award, the City may, in addition to the Experience & Qualifications form included in the Bid documents, require a Bidder to submit a statement of facts and detail as to its business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the City may require evidence that the Bidder has performed other work of comparable magnitude and type. The City expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the bidder’s Subcontractors) is not sufficiently qualified for the work Bid upon and, therefore, justifies such rejection.
Award of Contract
The award of the Contract, if it is awarded, will be to the lowest responsive, responsible Bidder whose
Bid complies with the requirements set forth herein. The City reserves the right to award the Contract based on the Base Bid alone or the Base Bid plus any combination of Additive Alternate Bid items, in any order, as determined to be in the best interest of the City.
The issuance by the City of a notice to the successful Bidder of the award of the Contract (“Notice of
Award”) shall be deemed the Award of Contract.
6.2. Bid Protests
The lack of a prompt procedure to resolve disputes regarding the bidding process would impair the
City’s ability to carry out its purpose of constructing this project in a timely manner. Therefore, to the maximum extent authorized by law and notwithstanding any other procedures specified in documents referenced herein, all disputes and/or protests regarding the bidding process shall be subject to the following procedure. In submitting a Bid to the City for this project, the Bidder agrees to comply with and to be bound by this procedure.
Any Bid protest must be submitted in writing to the Director of Capital Projects & Transportation of the
City of West Sacramento before 5:00 p.m. on the fifth (5th) working day following Bid opening.
(a) The initial protest document must contain a complete statement of the basis for the protest, and all supporting documentation.
(b) The party filing the protest must have actually submitted a Bid for the Work. A Subcontractor of a party submitting a Bid for the Work may not submit a Bid protest. A party may not rely on the Bid protest submitted by another Bidder, but must timely pursue its own protest.
(c) The protest must refer to the specific portion of the Contract Documents which forms the basis for the protest.
(d) The protest must include the name, address and telephone number of the person representing the protesting party.
(e) The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
(f) The City will give the protested Bidder five (5) working days after the receipt of the protest to submit a written response. The responding Bidder shall transmit the response to the protesting Bidder concurrent with delivery to the City.
(g) The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of Bid protest. The Bidder’s failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid protest, including filing a Government
Code Claim or legal proceedings.
(h) If the City determines that a protest is frivolous, the protesting Bidder may be determined to be non-responsible and that Bidder may be determined to be ineligible for future contract awards.
| 1. Introduction |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. Project Details |
| 2.1. Important Instructions for Electronic Submittal |
| 2.2. Project Scope |
| 2.3. Project Estimate |
| 3. Terms and Conditions |
| 3.1. Prevailing Wages |
| 3.2. Statement of Offer |
| 3.3. Questions and/or Objections |
| 3.4. Amendment and Cancellation |
| 3.5. Right of Rejection |
| 3.6. Prohibition of Respondent Terms and Conditions |
| 3.7. Joint Ventures and Partnering |
| 3.8. Proposal of Alternate Services |
| 3.9. Proposal of Additional Services |
| 3.10. Severability |
| 3.11. Licensure and Special Certification |
| 3.12. Disclosure of Proposal Contents |
| 3.13. Conflict of Interest and Restrictions |
| 3.14. Proprietary Information |
| 4. Bid Submittal |
| 4.1. Please upload a signed W-9 form* |
| 4.2. Please enter Legal Company Name and related DBA* |
| 4.3. Cost Proposal using Electronic Pricing Table* |
| 4.4. Response (without Cost Proposal)* |
| 4.5. Statement of Offer* |
| 4.6. Bid Bond* |
| 4.7. California Contractors State License Board |
| 4.8. Certification regarding Debarment |
| 4.9. City Contract * |
| 4.10. Insurance Requirements* |
| 4.11. Authorized Contract Signer * |
| 5. Cost Table |
| 6. Contract Award |
| 6.1. Opening & Award of Contract |
| 6.2. Bid Protests |
File details come from the government source that posted it. Updated .