About this file
This document is a comprehensive engineering and construction plan set for a fiber optic cable installation project by KMV FiberTelecom Inc. for the City of Pembroke Pines, Florida. The project, designated KMV-PP-24-001, involves installing underground and aerial fiber optic conduits along Pines Boulevard/Hollywood Boulevard (SR 820), spanning approximately 1,900 linear feet from Fire Station 79 to West Pines Soccer Field. The project will utilize directional boring and hand trenching techniques to install two 1.5-inch HDPE conduits with fiber optic cables, with multiple handhole installations at strategic locations. The work will take place within the Florida Department of Transportation (FDOT) right-of-way, with a planned completion date of May 28, 2024.
The project requires careful coordination with local utilities, adherence to strict FDOT and City of Pembroke Pines specifications, and implementation of comprehensive traffic management and pedestrian safety plans. The construction will involve crossing multiple existing utilities, including water mains, force mains, storm sewers, and electrical infrastructure. Key technical specifications include maintaining minimum cover depths of 120 inches for directional bore sections and 36 inches for hand trench sections, with specific requirements for bore pit restoration, utility protection, and surface restoration. The project budget and specific funding sources are not detailed in the documents, but the plans indicate rigorous engineering standards and meticulous planning to minimize disruption to the existing infrastructure and public spaces.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING NAME:
CHECKED BY:
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
UG FIBER - PROPOSED
AERIAL FIBER - EXISTING
STRAND - EXISTING
INNERDUCT - EXISTING
UG FIBER - EXISTING
CONDUIT - EXISTING
AERIAL FIBER - PROPOSED
STRAND - PROPOSED
CONDUIT - PROPOSED
INNERDUCT - PROPOSED
GAS
WATER
TELEPHONE
ELECTRIC
SANITARY SEWER (SEW)
STORM DRAIN
FENCE
CABLE TV
STEAM
OIL
UNKNOWN UTILITY
LINETYPES
RIGHT OF WAY
EDGE OF PAVEMENT
STREET LIGHT
FOC
FORCE MAIN
TRAFFIC
RECLAIMED WATER
EASEMENT
ASBUILT CONDUIT
SITE LOCATION
CONFIDENTIAL/PROPRIETARY
SHEET: OF 01 14
STA 0+00 START
PROJECT: KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER FIELD BUILDING
ADDRESS: 19900 PINES BLVD, PEMBROKE PINES, FL 33029 - ENGINEERING
CONTACTS
KMV
Fibertelecom
FTGJOB DESCRIPTION
SUMMARY DATA
1900'DIRECTIONAL BORE
TWP : RNG : SEC :
PLAT BOOK : PAGE :
51S 39E 14
DATE SUBMITTED
05/28/2024
PEMBROKE PINES
JOHN L.ENGLAND
DESIGN ENGINEER
PHONE: (954) 518-8905
JENGLAND@PPINES.COM
KMV FIBERTELECOM INC
SANDRA KARINA VARGAS
10604 NW 48TH ST
CORAL SPRINGS FL 33076
PHONE: 954-937-5239
KARINAV@KMVFIBERTELECOM.COM
Know what's below.
before you dig.Call
R
STA 20+30 END
JURISDICTION:
* CITY OF PEMBROKE PINES
* FDOT
01 OF 14 - COVER SHEET/SITE LOCATION
02 OF 14 - OVERALL MAP
03 OF 14 - CONSTRUCTION NOTES
04 OF 14 TO 06E OF 14 - PLAN VIEWS & PROFILES
07 OF 14 - PHOTOGRAPHS
08 OF 14 TO 11 OF 14 - TYPICAL
12 OF 14 TO 14 OF 14 - MOTS
SITE INDEX
10'HAND TRENCH
PERMITTING
SCALE: NTS
90'EXISTING CONDUIT
4HANDHOLE
STA 18+70 END
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
CONFIDENTIAL/PROPRIETARY
SHEET: OF 02 14
Know what's below.
before you dig.Call
R
END
20+30
CITY OF PEMBROKE PINES
PERMIT
FDOT
PERMIT
SCALE: NTS
FDOT MILEPOST: 15.404
MOT INDEX 102 - 602
MOT INDEX 102 - 660
MOT INDEX 102 - 602
MOT INDEX 102 - 660
START
0+00
PINES BLVD / HOLLYWOOD BLVD / SR 820
END
18+70
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
CONSTRUCTION NOTES
TYPICAL UNDERGROUND CONSTRUCTION:
- RESTORE ALL SURFACES TO EQUAL OR BETTER CONDITION.
- CONTRACTOR TO VERIFY ALL MEASUREMENTS AND DISTANCES PRIOR TO CONSTRUCTION.
- CONTRACTOR TO VERIFY LOCATION AND CONDITION OF EXISTING CONDUIT PRIOR TO CONSTRUCTION.
- CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS AND CONDITIONS ON THE JOB SITE AND IMMEDIATELY NOTIFY THE ENGINEER IN
WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
- MAINTAIN A MIN BENDING RADIUS OF 5' ON ALL DUCT CONFIGURATION.
- ANY CHANGES ON PROPOSED RUNNING LINE HAVE TO GET APPROVAL FROM BLUE STREAM CONSTRUCTION MANAGER.
FOR CONSTRUCTION:
- EXTREME CAUTION TO BE TAKEN TO CONTAIN SLURRY AROUND WORK AREAS NEAR WETLANDS TO AVOID ANY WATER QUALITY ISSUES!
- LOCATIONS, ELEVATIONS LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER SITE FEATURES SHOWN
ON THE DRAWINGS ARE BASED ON LIMITED INVESTIGATION TECHNIQUES AND SHOULD BE CONSIDERED APPROXIMATE ONLY. PLEASE CONTACT
SUNSHINE STATE ONE-CALL AT 1-800-432-4770
- CAUTION: EXISTING UNDERGROUND UTILITIES IN AREA. NO ELEVATION RECORDS FOR EXISTING UTILITIES AVAILABLE. CONTRACTOR SHOULD
CONTACT SUNSHINE 811, LOCATE ALL UTILITIES AND VERIFY ALL DEPTHS PRIOR TO CONSTRUCTION
DESIGN TICKET
#xxxxxxxxxxxx
FDOT GENERAL NOTES:
· EXISTING F.D.O.T. DRAINAGE SYSTEM SHALL BE PROTECTED AT ALL TIMES BY THE PERMITTEE. ANY DAMAGE TO THE F.D.O.T. DRAINAGE SYSTEM (STRUCTURES OR PIPES) SHALL BE REPAIRED/REPLACED BY THE PERMITTEE AT NO COST TO THE DEPARTMENT.
· EXISTING GAS MAIN SHALL BE PROTECTED AT ALL TIMES DURING EXCAVATION, DRILLING AND CONDUIT INSTALLATION ACTIVITIES. UTILITY GAS COMPANY SHALL BE PRESENT AT THE PRE-CONSTRUCTION MEETING AND GIVE WRITTEN CLEARANCE PRIOR TO COMMENCEMENT OF ANY PERMIT
OPERATIONS.
· ANY DAMAGE TO CONCRETE SIDEWALK, CURB AND GUTTER, PEDESTRIAN CURB RAMPS, AND TRAFFIC SEPARATORS SHOULD BE RESTORED PER FDOT STANDARDS PLANS INDEX NO. 522-001, 520-001, 522-002, AND 520-020, ADA STANDARDS, AND FDOT STANDARD SPECIFICATION 522.
DAMAGED SIDEWALK, CURB AND GUTTER, AND TRAFFIC SEPARATORS SHALL BE RESTORED WITH FULL FLAGS/JOINT TO JOINT AT THE PERMITTEES EXPENSE; PATCHING IS NOT PERMITTED. IMPACTED PEDESTRIAN RAMPS SHALL BE REPLACED COMPLETELY; HANDHOLES MUST NOT BE LOCATED WITHIN PEDESTRIAN RAMPS. MAKE SURE TO FURNISH APPROPRIATE EXPANSION JOINTS PER FDOT STANDARDS PLANS INDEX 350-001. IMPACTED DETECTABLE WARNING SURFACES NEED TO BE RESTORED IN ACCORDANCE WITH FDOT STANDARD PLANS INDEX NO. 522-002 AND
SPECIFICATION 527.
· HANDHOLES AND PULL BOXES SHALL NOT BE INSTALLED WITHIN THE FOOTPRINT OF EXISTING PEDESTRIAN ADA CURB RAMP NEITHER DRIVEWAY ENTRY AREA. REFER TO PPM, VOL. 2, CH. 8, SECTION 8.3.2 REGARDING NONSLIP TOP SURFACE IF THE HAND HOLE IS PROPOSED WITHIN PEDESTRIAN CURB RAMP. DO NOT INSTALL NEW HH AT LEAST 10' FROM ADA CURB RAMPS, FIRE HYDRANTS, BUS BOOTH-BENCHES
· WHERE PEDESTRIAN FACILITIES ARE DETOURED, BLOCKED, OR CLOSED DURING THE WORK, PLEASE ENSURE TO PROVIDE SAFE ALTERNATE ACCESSIBLE ROUTES THROUGH OR AROUND THE WORK ZONE THAT MEETS THE REQUIREMENTS OF THE ADA STANDARDS AND FDOT STANDARD
PLAN INDEX 102-660.
· RESTORATION OF SODDING AND TURF SHOULD BE DONE ACCORDING TO FDOT 2023-2024 STANDARD INDEX No 570-001.
· PROVIDE PROTECTION TO THE EXISTING TREES AND AVOID ANY IMPACT TO THE ROOTS. WHEN CONSTRUCTION AFFECTS TREE ROOTS
OR CANOPY, PROVIDE TRIMMING PER FDOT STANDARD PLANS INDEX 110-100.
· PROVIDE APPROPRIATE EROSION CONTROL DEVICES DURING CONSTRUCTION.
· LANDSCAPING, TREES, SOD SHALL BE REPLACED AT THE COST OF THE PERMITTEE
· THE CONTRACTOR SHALL COORDINATE WITH BROWARD COUNTY DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS (DTPW), TRAFFIC SIGNALS & SIGNS DIVISION AT LEAST 5 WORKING DAYS PRIOR TO ANY WORK DONE AT SIGNALIZED INTERSECTIONS , WHICH
EITHER CLOSE ANY LANES, NEED CHANGES IN THE SIGNAL OPERATION OF TIMING, DAMAGE OR HINDER ANY SIGNAL SENSOR, OR
DAMAGE ANY CABLE OR SIGNAL EQUIPMENT.
· PERMITTEE IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND FACILITIES PRIOR TO DIRECTIONAL DRILLING/TRENCH WORK AND
ASSUMES ALL RESPONSIBILITY FOR ANY DAMAGE DONE TO UNDERGROUND FACILITIES AND ABOVE GROUND FACILITIES. DIRECTIONAL
BORING SHALL BE CONDUCTED ACCORDING TO LATEST SECTION 555 OF FDOT'S STANDARD SPECIFICATIONS AND 3.16.9.1 OF THE 2017
U.A.M. OPEN TRENCH SHALL BE CARRIED OUT PER 3.16.4. OF 2017 U.A.M
· CONDUIT INSTALLATION SHALL ADHERE TO THE LATEST FDOT STANDARD PLANS INDEX NO. 630-001
· ACCORDING TO SECTION 3.10 OF 2017 U.A.M, WHEN UNDERGROUND AND AERIAL UTILITIES OCCUPY THE SAME ROADSIDE, UNDERGROUND UTILITIES SHALL NOT BE PLACED WITHIN THREE (3) FEET OF THE R/W LINE.
· DAMAGED SIDEWALK, CURB AND GUTTER, AND TRAFFIC SEPARATORS SHALL BE RESTORED WITH FULL FLAGS/JOINT TO JOINT AT THE
PERMITTEES EXPENSE; PATCHING IS NOT PERMITTED. RESTORATION SHALL MATCH EXISTING CONCRETE PATTERN, PAVERS, AND
COLOR. IMPACTED PEDESTRIAN RAMPS AND DRIVEWAYS SHALL BE REPLACED COMPLETELY. INCLUDE 1 FOOT OF LEVEL EMBANKMENT
FOR EROSION AND ENSURE TO NOT CREATE ANY DROP OFF HAZARDS AS SHOWN ON FDM FIGURE 222.4.1. IMPACTED DETECTABLE
WARNING SURFACES NEED TO BE RESTORED IN ACCORDANCE WITH FDOT STANDARD PLANS INDEX NO. 522-002 AND SPECIFICATION 527
· PROPOSED HANDHOLES MUST ADHERE TO LATEST FDOT STANDARD PLANS INDEX NO. 635-001”. ENSURE ALL HANDHOLE LIDS ON
SIDEWALK ARE FLUSH AND ADA COMPLIANT. MAINTAIN THE TEMPORARY PATCHES AROUND THE HANDHOLE BOX EDGES AND/OR
ANYWHERE ELSE WHERE SIDEWALK HAS BEEN IMPACTED/DAMAGED BY THE DB WORK OR UTILITY INSTALLATION, SO IT PROVIDES A
SMOOTH -ALL WEATHER SURFACES ALWAYS. ONCE THE HANDHOLE IS INSTALLED THE LID MUST BE KEPT IN PLACE, BOLTED, AND
SECURED.
· TEMPORARY BARRIERS FOR PEDESTRIAN DETOURS MUST COMPLY WITH THE LATEST FDOT STANDARD PLANS INDEX NO. 102-100.
· RESTORATION OF SODDING AND TURF SHOULD BE DONE ACCORDING TO FDOT 2023-24 DESIGN STANDARDS INDEX 570-010.
· PERMITTEE MUST TAKE PICTURES OF THE EXISTING STREET LIGHTNING SYSTEM WORKING-DURING NIGHT-TIME-WITHIN THE LIMITS OF
THIS PROPOSED JOB PRIOR TO BEGIN SAID WORK. TO AVOID FUTURE DISPUTE ABOUT UNFORESEEN DAMAGES TO THE LIGHTNING
SYSTEM.
· CONTAMINATED SITES LOCATED WITHIN A 500-FOOT RADIUS OF THE PROJECT AREA THAT COULD IMPACT THE FDOT ROW HAVE BEEN
IDENTIFIED. THE PERMITTEE SHALL ASSURE THAT ANY ACTIONS CARRIED OUT ARE IN ACCORDANCE WITH ALL ENVIRONMENTAL
REGULATORY REQUIREMENTS.
· ANY ABOVEGROUND FEATURES THAT MAY BE IMPACTED BY PROPOSED WORK MUST BE IDENTIFIED TO BE
ADJUSTED/RELOCATED/REPLACED. IF SIGNS ADD ARE DAMAGED, THESE MUST BE REPLACED ACCORDING THE LATEST FDOT STANDARD
PLANS INDEX NO. 700-101. ENSURE LATERAL OFFSET AND CLEAR ZONE STANDARDS ARE BEING ADHERED TO.
CITY OF PEMBROKE PINES GENERAL NOTES
- THE CITY OF PEMBROKE PINES ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE LOCATIONS AND ELEVATIONS OF
CITY UTILITIES AS REFLECTED ON THE DRAWINGS BASED UPON INFORMATION PROVIDED FROM CITY RECORDS NOR
DOES THE CITY GUARANTEE THE COMPLETENESS OF THE CITY UTILITIES INFORMATION AS PROVIDED FROM CITY
RECORDS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND UTILITY OWNER TO FIELD LOCATE AND FIELD VERIFY
ALL EXISTING UTILITIES IN THE WORK AREA FOR THE ENTIRE LIMITS OF THE PROJECT.
- A MINIMUM OF 7.5' OF HORIZONTAL SEPARATION AND A MINIMUM OF 18" OF VERTICAL SEPARATION SHALL BE
MAINTAINED TO ALL CITY OF PEMBROKE PINES UTILITIES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.
- ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL
BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY OF "SOFT DIG"
METHODS PRIOR TO THE START OF CONSTRUCTION.
- CONTRACTOR SHALL CALL "SUNSHINE ONE" AT 1-800-432-4770 OR 811 A MINIMUM OF 72 HOURS PRIOR TO THE START OF
CONSTRUCTION TO ALLOW FOR "FIELD LOCATES" OF ALL EXISTING UTILITIES WITHIN THE PROJECT LIMITS.
- ALL STREET, SIDEWALK AND SWALE (SOD) RESTORATION SHALL COMPLY WITH CITY STANDARDS AND/OR
SPECIFICATIONS, UNLESS THE STANDARDS AND/OR SPECIFICATIONS OF ANOTHER PERMITTING GOVERNMENTAL
AGENCY SUPERCEDES THOSE OF THE CITY.
- A M.O.T. PLAN PREPARED BY A F.D.O.T. CERTIFIED M.O.T. ENGINEER SHALL BE SUBMITTED FOR CONSTRUCTION PERMIT
BASED UPON THE SCOPE OF THE PROPOSED PROJECT AND EXISTING ROADWAY/STREET CONDITIONS.
- A PRECONSTRUCTION MEETING IS REQUIRED TO BE HELD WITH THE ENVIRONMENTAL SERVICES/ENGINEERING
DIVISION AS A PREREQUISITE TO THE CITY'S RELEASE OF THE CONSTRUCTION PERMIT.
- MAINTENANCE OF TRAFFIC (M.O.T.) SHALL BE PROVIDED BY A F.D.O.T. CERTIFIED M.O.T. CONTRACTOR.
CONFIDENTIAL/PROPRIETARY
SHEET: OF 03 14
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
T
R
F
T
R
F
T
R
F
T
R
F
C L
C L
24" WATER MAINELECTRIC 6" GAS
CATV FOCFOC FOCFOC8" WATER MAIN14" FORCE MAIN 8" FORCE MAIN
PINES BLVD / HOLLYWOOD BLVD / SR 820
F
D O
T
R
O W
F
D O
T
R
O W
U
E
PULL W/FIBER OPTIC CABLE THROUGH
EXISTING CONDUIT
STA 5+10
PROPOSED BORE PIT
REMOVE AND RESTORE 42sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
15' UTILITY EASEMENT
REF.: PLAT 160-16
STA 0+00
BEGIN EXISTING CONDUIT (90')
STA 0+90
END EXISTING CONDUIT
DIG & INTERCEPT EXISTING CONDUIT &
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
BEGIN DIRECTIONAL BORE (1900')
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50
CONFIDENTIAL/PROPRIETARY
SHEET: OF 04 14
M A
T C
H
T
O
S
H E
E T
S
T A
Know what's below.
before you dig.Call
R
PLAN VIEW
SCALE: 1"=50'
CITY OF PEMBROKE PINES GENERAL NOTES
- THE CITY OF PEMBROKE PINES ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE LOCATIONS AND ELEVATIONS OF CITY UTILITIES
AS REFLECTED ON THE DRAWINGS BASED UPON INFORMATION PROVIDED FROM CITY RECORDS NOR DOES THE CITY GUARANTEE
THE COMPLETENESS OF THE CITY UTILITIES INFORMATION AS PROVIDED FROM CITY RECORDS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR AND UTILITY OWNER TO FIELD LOCATE AND FIELD VERIFY ALL EXISTING UTILITIES IN THE WORK AREA FOR THE ENTIRE
LIMITS OF THE PROJECT.
- A MINIMUM OF 7.5' OF HORIZONTAL SEPARATION AND A MINIMUM OF 18" OF VERTICAL SEPARATION SHALL BE MAINTAINED TO ALL
CITY OF PEMBROKE PINES UTILITIES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.
- ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL BE VERIFIED
FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY OF "SOFT DIG" METHODS PRIOR TO THE START OF
CONSTRUCTION.
- CONTRACTOR SHALL CALL "SUNSHINE ONE" AT 1-800-432-4770 OR 811 A MINIMUM OF 72 HOURS PRIOR TO THE START OF
CONSTRUCTION TO ALLOW FOR "FIELD LOCATES" OF ALL EXISTING UTILITIES WITHIN THE PROJECT LIMITS.
- ALL STREET, SIDEWALK AND SWALE (SOD) RESTORATION SHALL COMPLY WITH CITY STANDARDS AND/OR SPECIFICATIONS, UNLESS
THE STANDARDS AND/OR SPECIFICATIONS OF ANOTHER PERMITTING GOVERNMENTAL AGENCY SUPERCEDES THOSE OF THE CITY.
- A M.O.T. PLAN PREPARED BY A F.D.O.T. CERTIFIED M.O.T. ENGINEER SHALL BE SUBMITTED FOR CONSTRUCTION PERMIT BASED UPON
THE SCOPE OF THE PROPOSED PROJECT AND EXISTING ROADWAY/STREET CONDITIONS.
- A PRECONSTRUCTION MEETING IS REQUIRED TO BE HELD WITH THE ENVIRONMENTAL SERVICES/ENGINEERING DIVISION AS A
PREREQUISITE TO THE CITY'S RELEASE OF THE CONSTRUCTION PERMIT, UNLESS OTHERWISE NOTED BY THE CITY ON PAGE 2 OF
THE PERMIT APPLICATION.
- MAINTENANCE OF TRAFFIC (M.O.T.) SHALL BE PROVIDED BY A F.D.O.T. CERTIFIED M.O.T. CONTRACTOR.
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR
OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF
MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT DIG" AND/OR EXCAVATION
METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
FDOT MILEPOST: 15.404
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
6+502+50 3+50 4+50 5+503+00 4+00 5+00 6+001+50 2+000+50 1+00
PROFILE - PINES BLVD / HOLLYWOOD BLVD / SR 820 (LOOKING NORTH)
HORIZONTAL SCALE: 1''=50'
VERTICAL SCALE: 1''=5'
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
DRIVEWAY
FOC
GRADE LEVEL
STA 0+90
END EXISTING CONDUIT
DIG & INTERCEPT EXISTING CONDUIT &
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
BEGIN DIRECTIONAL BORE (1900')
M
I N
M
I N
STA 5+10
PROPOSED BORE PIT
REMOVE AND RESTORE 42sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
BORE PITENTRY / EXIT
PIPE
BORE PITENTRY / EXIT
PIPE
R
'R
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
R
CONFIDENTIAL/PROPRIETARY
SHEET: OF 04A 14
M A
T C
H
T
O
S
H E
E T
A
S
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
Know what's below.
before you dig.Call
R
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
DIG" AND/OR EXCAVATION METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
P I N
E
B
L V
D
H
O L
L Y
W O
O D
B
L V
D
S
R
C/L
C/L
8" WATER MAIN
4" FORCE MAIN
TELEPHONE
TELEPHONE
36" STORM SEWER
15" STORM SEWER
15" STORM SEWER
CATV
FOC
FOC
FOC
FOC
14" FORCE MAIN
8" FORCE MAIN
8" WATER MAIN
FOC
W
A T
E R
M
I N
E L E
C T
R I C
G
A S
262' FDOT ROW
162' 100'
262' FDOT ROW
162' 100'
15' UE
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
STA 9+50
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
STA 14+05
PROPOSED BORE PIT
REMOVE AND RESTORE 48sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
15' UTILITY EASEMENT
REF.: PLAT 155-21
21'
95'
41'
5'
CONFIDENTIAL/PROPRIETARY
SHEET: OF 05 14
MATCH TO SHEET 04 - STA 6+90
M A
T C
H
T
O
S
H E
E T
Know what's below.
before you dig.Call
R
PLAN VIEW
SCALE: 1"=50'
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR
OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF
MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT DIG" AND/OR EXCAVATION
METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
CITY OF PEMBROKE PINES GENERAL NOTES
- THE CITY OF PEMBROKE PINES ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE LOCATIONS AND ELEVATIONS OF CITY UTILITIES
AS REFLECTED ON THE DRAWINGS BASED UPON INFORMATION PROVIDED FROM CITY RECORDS NOR DOES THE CITY GUARANTEE
THE COMPLETENESS OF THE CITY UTILITIES INFORMATION AS PROVIDED FROM CITY RECORDS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR AND UTILITY OWNER TO FIELD LOCATE AND FIELD VERIFY ALL EXISTING UTILITIES IN THE WORK AREA FOR THE ENTIRE
LIMITS OF THE PROJECT.
- A MINIMUM OF 7.5' OF HORIZONTAL SEPARATION AND A MINIMUM OF 18" OF VERTICAL SEPARATION SHALL BE MAINTAINED TO ALL
CITY OF PEMBROKE PINES UTILITIES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.
- ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL BE VERIFIED
FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY OF "SOFT DIG" METHODS PRIOR TO THE START OF
CONSTRUCTION.
- CONTRACTOR SHALL CALL "SUNSHINE ONE" AT 1-800-432-4770 OR 811 A MINIMUM OF 72 HOURS PRIOR TO THE START OF
CONSTRUCTION TO ALLOW FOR "FIELD LOCATES" OF ALL EXISTING UTILITIES WITHIN THE PROJECT LIMITS.
- ALL STREET, SIDEWALK AND SWALE (SOD) RESTORATION SHALL COMPLY WITH CITY STANDARDS AND/OR SPECIFICATIONS, UNLESS
THE STANDARDS AND/OR SPECIFICATIONS OF ANOTHER PERMITTING GOVERNMENTAL AGENCY SUPERCEDES THOSE OF THE CITY.
- A M.O.T. PLAN PREPARED BY A F.D.O.T. CERTIFIED M.O.T. ENGINEER SHALL BE SUBMITTED FOR CONSTRUCTION PERMIT BASED UPON
THE SCOPE OF THE PROPOSED PROJECT AND EXISTING ROADWAY/STREET CONDITIONS.
- A PRECONSTRUCTION MEETING IS REQUIRED TO BE HELD WITH THE ENVIRONMENTAL SERVICES/ENGINEERING DIVISION AS A
PREREQUISITE TO THE CITY'S RELEASE OF THE CONSTRUCTION PERMIT, UNLESS OTHERWISE NOTED BY THE CITY ON PAGE 2 OF
THE PERMIT APPLICATION.
- MAINTENANCE OF TRAFFIC (M.O.T.) SHALL BE PROVIDED BY A F.D.O.T. CERTIFIED M.O.T. CONTRACTOR.
FDOT MILEPOST: 15.404
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
7+50 8+508+007+00
PROFILE - PINES BLVD / HOLLYWOOD BLVD / SR 820 (LOOKING NORTH)
HORIZONTAL SCALE: 1''=50'
VERTICAL SCALE: 1''=5'
9+00 9+50 10+00
DRIVEWAY
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
4" FORCE MAIN
FOC
M
I N
STA 9+50
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
GRADE LEVEL
BORE PITENTRY / EXIT
PIPE
R
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
CONFIDENTIAL/PROPRIETARY
SHEET: OF 05A 14
M A
T C
H
T
O
S
H E
E T
B
S
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
GRASS
7.00
8.00
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
ENTRY / EXIT PIPE
STA 9+50
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
BORE PIT
(TYPICAL)
8'
R
4'
4" FORCE MAIN
E O
P
CONFIDENTIAL/PROPRIETARY
SHEET: OF 05B 14
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
DIG" AND/OR EXCAVATION METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
PROFILE - PINES BLVD / HOLLYWOOD BLVD / SR 820 (LOOKING NORTH)
HORIZONTAL : 1''=8'
VERTICAL : 1''=1'
12+50 13+5013+00 14+0011+50 12+0010+50 11+009+00 10+009+50
PROFILE - (LOOKING EAST)
HORIZONTAL SCALE: 1''=50'
VERTICAL SCALE: 1''=5'
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
C/L
CATV
8" FORCE MAIN
14" FORCE MAIN
FOC
8" WATER MAIN
6" GAS
ELECTRIC
24" WATER MAIN
FOC
FOC
FOC
FOC
PINES BLVD / HOLLYWOOD BLVD / SR 820
4" FORCE MAIN
STA 9+50
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
STA 14+05
PROPOSED BORE PIT
REMOVE AND RESTORE 48sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
GRADE LEVEL
262' FDOT ROW
100'162'
15' UE
M
I N
M
I N
BORE PITENTRY / EXIT
PIPE
BORE PIT
ENTRY / EXIT
PIPE
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
R
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
R
DRAWING NAME:
CHECKED BY:
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
M A
T C
H
T
O
S
H E
E T
A
S
CONFIDENTIAL/PROPRIETARY
SHEET: OF 05C 14
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
8" WATER MAIN
36" STORM SEWER
LIFT STATION4" FORCE MAIN
8" FORCE MAIN
8" WATER MAIN
36" STORM SEWER
8" WATER MAIN
36" STORM SEWER
36" STORM SEWER
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
HAND TRENCH
INSTALL (1) 1.5'' HDPE CONDUIT
W/FIBER OPTIC CABLE
36" MINIMUM COVER
STA 20+30
END HAND TRENCH
REMOVE AND RESTORE 30sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
15' UTILITY EASEMENT
REF.: PLAT 155-21
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
29'
25'
STA 18+60
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
BEGIN HAND TRENCH (40')
STA 19+90
END DIRECTIONAL BORE
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
BEGIN HAND TRENCH (40')
STA 18+70
END HAND TRENCH
REMOVE AND RESTORE 30sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
CONFIDENTIAL/PROPRIETARY
SHEET: OF 06 14
M A
T C
H
T
O
S
H E
E T
Know what's below.
before you dig.Call
R
PLAN VIEW
SCALE: 1"=50'
CITY OF PEMBROKE PINES GENERAL NOTES
- THE CITY OF PEMBROKE PINES ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE LOCATIONS AND ELEVATIONS OF CITY UTILITIES
AS REFLECTED ON THE DRAWINGS BASED UPON INFORMATION PROVIDED FROM CITY RECORDS NOR DOES THE CITY GUARANTEE
THE COMPLETENESS OF THE CITY UTILITIES INFORMATION AS PROVIDED FROM CITY RECORDS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR AND UTILITY OWNER TO FIELD LOCATE AND FIELD VERIFY ALL EXISTING UTILITIES IN THE WORK AREA FOR THE ENTIRE
LIMITS OF THE PROJECT.
- A MINIMUM OF 7.5' OF HORIZONTAL SEPARATION AND A MINIMUM OF 18" OF VERTICAL SEPARATION SHALL BE MAINTAINED TO ALL
CITY OF PEMBROKE PINES UTILITIES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.
- ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL BE VERIFIED
FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY OF "SOFT DIG" METHODS PRIOR TO THE START OF
CONSTRUCTION.
- CONTRACTOR SHALL CALL "SUNSHINE ONE" AT 1-800-432-4770 OR 811 A MINIMUM OF 72 HOURS PRIOR TO THE START OF
CONSTRUCTION TO ALLOW FOR "FIELD LOCATES" OF ALL EXISTING UTILITIES WITHIN THE PROJECT LIMITS.
- ALL STREET, SIDEWALK AND SWALE (SOD) RESTORATION SHALL COMPLY WITH CITY STANDARDS AND/OR SPECIFICATIONS, UNLESS
THE STANDARDS AND/OR SPECIFICATIONS OF ANOTHER PERMITTING GOVERNMENTAL AGENCY SUPERCEDES THOSE OF THE CITY.
- A M.O.T. PLAN PREPARED BY A F.D.O.T. CERTIFIED M.O.T. ENGINEER SHALL BE SUBMITTED FOR CONSTRUCTION PERMIT BASED UPON
THE SCOPE OF THE PROPOSED PROJECT AND EXISTING ROADWAY/STREET CONDITIONS.
- A PRECONSTRUCTION MEETING IS REQUIRED TO BE HELD WITH THE ENVIRONMENTAL SERVICES/ENGINEERING DIVISION AS A
PREREQUISITE TO THE CITY'S RELEASE OF THE CONSTRUCTION PERMIT, UNLESS OTHERWISE NOTED BY THE CITY ON PAGE 2 OF
THE PERMIT APPLICATION.
- MAINTENANCE OF TRAFFIC (M.O.T.) SHALL BE PROVIDED BY A F.D.O.T. CERTIFIED M.O.T. CONTRACTOR.
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR
OPEN TRENCH INSTALLATION WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF
MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT DIG" AND/OR EXCAVATION
METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
17+50 18+5018+00 19+0016+50 17+0014+50 15+5015+00 16+00
PROFILE - (LOOKING EAST)
HORIZONTAL SCALE: 1''=50'
VERTICAL SCALE: 1''=5'
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
DRIVEWAY
8" WATER MAIN
36" STORM SEWER
STA 18+60
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
GRADE LEVEL
M
I N
M
I N
BORE PIT
ENTRY / EXIT
PIPE
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
R
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
R
STA 18+70
END HAND TRENCH
REMOVE AND RESTORE 30sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
HAND TRENCH
INSTALL (1) 1.5'' HDPE CONDUIT
W/FIBER OPTIC CABLE
36" MINIMUM COVER
M
I N
BORE PIT
ENTRY / EXIT
PIPE
CONFIDENTIAL/PROPRIETARY
SHEET: OF 06A 14
M A
T C
H
T
O
S
H E
E T
B
S
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
18+50 19+00 20+0019+50
PROFILE - (LOOKING SOUTH)
HORIZONTAL SCALE: 1''=50'
VERTICAL SCALE: 1''=5'
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
4" FORCE MAIN
36" STORM SEWER
8" WATER MAIN
DRIVEWAY
STA 18+60
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
STA 19+90
END DIRECTIONAL BORE
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
BEGIN HAND TRENCH (40')
M
I N
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
GRADE LEVEL
M
I N
M
I N
BORE PITENTRY / EXIT
PIPE
BORE PITENTRY / EXIT
PIPE
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
R
R
GRADE LEVEL
CONFIDENTIAL/PROPRIETARY
SHEET: OF 06B 14
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
6.00
S/W
E O
P
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
GRASS
7.00
8.00
ENTRY /
EXIT PIPE
STA 18+60
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
BORE PIT
(TYPICAL)
10'
19'
4'
R
MIN. RADIUS CURVATURE
OF HDPE CONDUIT = 25'
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
7.00
8.00
4" FORCE MAIN
DIRECTIONAL BORE
MAX BACK REAMER SIZE = 6''
INSTALL (2) 1.5'' HDPE CONDUITS
W/FIBER OPTIC CABLE
120" MINIMUM COVER
CONFIDENTIAL/PROPRIETARY
SHEET: OF 06C 14
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
DIG" AND/OR EXCAVATION METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
PROFILE - (LOOKING SOUTH)
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
20+5020+00
PROFILE - (LOOKING EAST)
HORIZONTAL SCALE: 1''=50'
VERTICAL SCALE: 1''=5'
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
08.00
07.00
06.00
05.00
04.00
03.00
02.00
01.00
00.00
-01.00
-02.00
-03.00
-04.00
-05.00
-06.00
-07.00
-08.00
-09.00
-10.00
-11.00
-12.00
STA 19+90
END DIRECTIONAL BORE
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
BEGIN HAND TRENCH (40')
STA 20+30
END HAND TRENCH
REMOVE AND RESTORE 30sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
M
I N
HAND TRENCH
INSTALL (1) 1.5'' HDPE CONDUIT
W/FIBER OPTIC CABLE
36" MINIMUM COVER
BORE PIT
ENTRY / EXIT
PIPE
BORE PITENTRY / EXIT
PIPE
STORM SEWER
CONFIDENTIAL/PROPRIETARY
SHEET: OF 06D 14
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
GRASS
7.00
8.00
HAND TRENCH
INSTALL (1) 1.5'' HDPE CONDUIT
W/FIBER OPTIC CABLE
36" MINIMUM COVER
ENTRY /
EXIT PIPE
STA 19+90
END DIRECTIONAL BORE
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
BEGIN HAND TRENCH (40')
BORE PIT
(TYPICAL)
4'
6.00
5.00
4.00
3.00
2.00
1.00
0.00
-1.00
-2.00
-3.00
-4.00
-5.00
-6.00
-7.00
7.00
8.00
S/W
5'
STA 20+30
END HAND TRENCH
REMOVE AND RESTORE 30sq ft OF CONCRETE
SIDEWALK TO EQUAL OR BETTER CONDITION
FULL FLAG RESTORATION JOINT TO JOINT
ENTRY /
EXIT PIPE
BORE PIT
(TYPICAL)
STORM SEWER
GRASS GRASS
7'
CONFIDENTIAL/PROPRIETARY
SHEET: OF 06E 14
Know what's below.
before you dig.Call
R
RECORD ON UTILITY PLANS
CONSTRUCTION CONTRACTOR
SHALL CALL LOCATES AND SOFT DIG TO DETERMINE
UTILITY ELEVATION BEFORE CONSTRUCTION.
DITCH WITCH JT20 - SPECS
ENTRY ANGLE 10-14°
BEND RADIUS, MIN 107FT
MIN DEPTH 3' 3"
NOTE: AS A CONDITION OF PERMIT, ALL CROSSINGS OF THE PROPOSED DIRECTIONAL BORE AND/OR OPEN TRENCH INSTALLATION
WITH CITY UTILITIES SHALL BE VERIFIED FOR CONFIRMATION OF MINIMUM VERTICAL SEPARATION REQUIREMENTS BY WAY "SOFT
DIG" AND/OR EXCAVATION METHODS PRIOR TO THE START OF CONSTRUCTION.
*USE EXTREME CAUTION WHEN EXCAVATING NEAR WATER AND SEWER SERVICES.
PROFILE - (LOOKING EAST)
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
STA 0+90 INSTALL PEMBROKE PINES HANDHOLE 2
STA 9+50 INSTALL PEMBROKE PINES HANDHOLE
STA 14+05 PROPOSED BORE PIT 4
STA 18+60 INSTALL PEMPROKE PINES HANDHOLE 5
STA 20+50 INSTALL PEMBROKE PINES HANDHOLE
PHOTOGRAPHS
STA 0+90
END EXISTING CONDUIT
DIG & INTERCEPT EXISTING CONDUIT &
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
BEGIN DIRECTIONAL BORE (1900')
STA 9+50
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
STA 14+05
PROPOSED BORE PIT
REMOVE AND RESTORE 48sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
STA 18+60
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
REMOVE AND RESTORE 30sq ft OF GRASS
TO EQUAL OR BETTER CONDITION
STA 19+90
END DIRECTIONAL BORE
INSTALL (1) 30''Wx48''Lx36''D HANDHOLE
LID = 15K , BOX = 22K
LEAVE 100' SLACK STORAGE
BEGIN HAND TRENCH (40')
SHEET: OF 07 14
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
CONFIDENTIAL/PROPRIETARY
SHEET: OF 08 14
TYPICAL BORE PIT RESTORATION DETAIL
3/8-7 X 4 [102] LONG S.S. HEX HEAD
AUGER BOLT
2 PLACES
Ø3/8 [16] S.S.
FLAT WASHER
2 PLACES
1/2 [13] X 4 [102] PULL SLOT W/ Ø1/4 [6]
CENTER PIN (2 PLACES)
Ø5/8 [16] THRU HOLE W/ Ø1 1/4 [32]
X 1/2 [13] DEEP C'BORE (2 PLACES)
QUAZITE LOGO
PG3048HS00EV2
SKID RESISTANT
SURFACE MS-86
PG3048B856
3/8-7 LAG THREAD SELF ALIGNING,
REPLACEABLE S.S. EZ-NUT
2 PLACES
1/2-13 UNC
LIFTING BOLT
4 PLACES
24 [610] CABLE RACK
4 PLACES
7 1/2 [191] CABLE
RACK HOOK
4 PLACES
Ø4 3/4 [121] KNOCKOUT
2 EACH END
QUAZITE 30X48X36 ASSEMBLY
W/(4) 24" CABLE RACKS
& (4) 7 1/2" HOOKS
PG3048Z987EV2
TYPICAL DETAIL - # 2
TIER 22 (15K DESIGN LOAD/ 22.5 TEST LOAD)
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
CONFIDENTIAL/PROPRIETARY
SHEET: OF 09 14
JR20 DIRECTIONAL DRILL SPECIFICATIONS
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
SHEET: OF 10 14
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
SHEET: OF 11 14
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
SHEET: OF 12 14
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
CONFIDENTIAL/PROPRIETARY
SHEET: OF 13 14
N
DO NOT APPLY
PROPOSAL UNDERGROUND CONDUITS IN R/W
PINES BLVD / HOLLYWOOD BLVD / SR 820
PINES BLVD / HOLLYWOOD BLVD / SR 820
45mph Speed Limit
ENGINEERING FIRM:
PROJECT NUMBER:
LOCATION:
KMV-PP-24-001 - FIRE STATION 79 TO WEST PINES SOCCER
FIELD BUILDING 4-4-24.dwg
NO.
GIULIANO LEON
KMV FIBERTELECOM INC
KMV-PP-24-001
19900 PINES BLVD
PEMBROKE PINES, FL 33029
CONFIDENTIAL/PROPRIETARY
SHEET: OF 14 14
N
DO NOT APPLY
PROPOSAL UNDERGROUND CONDUITS IN R/W
PINES BLVD / HOLLYWOOD BLVD / SR 820
PINES BLVD / HOLLYWOOD BLVD / SR 820
DO NOT APPLY
File details come from the government source that posted it. Updated .