About this file

This is a construction plan document prepared by KEWO Engineering Corporation for the City of Thousand Oaks, California, detailing the installation of electric vehicle charging infrastructure at the Civic Arts Plaza. The project, designated CI 5708 CAP Level 2 EVSE Project, involves the installation of thirteen (13) single-port Level 2 EV chargers and associated electrical infrastructure across multiple levels of a multi-story parking structure located at 2100 East Thousand Oaks Boulevard. The scope of work includes removing and replacing existing conduit and circuit breakers, installing two new electrical panelboards (EV3 and EV6), each rated 208Y/120V, 3-phase, 4-wire, 225-amp service, installing seven 100-amp circuit breakers and one 200-amp circuit breaker at panelboard EV3, installing ten 100-amp circuit breakers at panelboard EV6, installing power cables and conduits from the panelboards to the charging stations, installing communication conduits and CAT6 cable between charging units, and testing and commissioning all equipment per manufacturer instructions. The project plans are designated as 100% design documents issued for plan check, with revisions updated per plan check comments dated March 12, 2026. The chargers are designated for fleet vehicles only and are not available to the general public, with signage and striping to be installed by the City.

The plans specify that all work must comply with the 2025 California Building Code, 2025 California Electrical Code, 2025 California Fire Code, 2025 California Green Building Standards Code, and 2023 NFPA 70 National Electric Code Article 625 for electrical vehicle power transfer systems. The contractor must possess a valid Class A General Engineering License and is required to call USA Underground Service Alert at least two days but not more than seven days prior to construction to locate existing underground utilities. All electrical equipment shall be UL-listed and installed in accordance with manufacturer instructions and applicable electrical codes. The contractor is responsible for field verification of existing conditions, checking all dimensions and clearances, maintaining a clean worksite, repairing any structures damaged during construction, and notifying the authority having jurisdiction for required inspections. The existing Civic Arts Plaza facility contains 757 parking spaces and 24 accessible spaces; installation of the new chargers allows for the removal of only two accessible spaces while maintaining the required minimum of 16 accessible spaces. All new materials and equipment must be furnished and installed by the contractor, except for the EV chargers themselves, which are to be furnished and installed by others.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF THOUSAND OAKS DWG. _________

CITY OF THOUSAND OAKSCITY OF THOUSAND OAKS

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK0

KEWO

ENGINEERING

CORPORATION

02/03/26

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

100% DESIGN. ISSUED FOR PLAN CHECK.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/261 03/12/26100% DESIGN. UPDATED PER PLAN CHECK COMMENTS.

SHEET INDEX

SHT. NO. DESCRIPTION

VICINITY MAP

NO SCALE

PUBLIC WORKS DEPARTMENT

101 FREEW

AY

FR

EEW

A Y

F R

E E

W A

Y

R D

RD.

R D

W

ES

TL

AK

E

RD.

OAKS

OLS

EN

RD.

E R

B E S

M O

O R

P A

R K

BLVD.

LYNN

RD.

LYN

N

HILLCREST

DR.

HILLCREST

D R

THOUSAND

BLVD.

BORCHARD

RD.

R

AN

C H

O

C

N E J

O B

L V

D

KANAN

R D

J A

N S S

ARBOLES

AVENIDA

DE

LOS

R E

IN

O

R D

W E

N D

Y D

R

POTRERO

RD.

TITLE SHEET

PROJECT SITE

NO SCALE

SITE MAP

SINGLE LINE DIAGRAM AND PANEL SCHEDULE

GENERAL NOTES

POWER PLAN (LEVEL 3)

CITY COUNCIL

CITY ENGINEER

PUBLIC WORKS DIRECTOR

CITY MANAGER

ANDREW P. POWERS

AL ADAM

C. TIE GUTIERREZ

BOB ENGLER

NADER HEYDARI

TED GERBER

PUBLIC UTILITIES WITHIN CITY OF THOUSAND OAKS

WATER:

WASTEWATER:

TELEPHONE:

GAS:

CABLE TV:

FIBER:

ELECTRICITY:

805- 432-5750

EMANUAL BARAJAS

NEWBURY PARK, CA 91320

2439 W HILLCREST DRIVE

CALIFORNIA AMERICAN WATER

805-449-5033

PATRICK McCULLOCH

THOUSAND OAKS, CA 91362

2100 EAST THOUSAND OAKS BOULEVARD

CITY OF THOUSAND OAKS

805-445-9116

CAMARILLO, CA 93012

201 FLYNN ROAD

JASON EISEL

FRONTIER

213-231-5629

BEN PENA

SIMI VALLEY, CA 93065

977 CHAMBERS LANE

SOUTHERN CALIFORNIA GAS COMPANY

805-494-7013

BOB MIGLIORE

THOUSAND OAKS, CA 91361

3589 FOOTHILL DRIVE

SOUTHERN CALIFORNIA EDISON COMPANY

800-654-3110

FIBER DIG

CANONSBURG, PA 15317

1500 CORPORATE DRIVE

CROWN CASTLE FIBER

805-626-8231

ERIC PINGREE

VENTURA, CA 93003

2525 KNOLL DRIVE

SPECTRUM

NOTICE TO CONTRACTOR:

NOTICE TO CONTRACTOR:

CONTRACTOR SHALL POSSES A VALID CLASS "A" GENERAL ENGINEERING LICENSE

LESS THAN TWO DAYS NOR MORE THAN SEVEN DAYS PRIOR TO CONSTRUCTION.

UNDERGROUND ALERT FOR LOCATION OF EXISTING UNDERGROUND UTILITIES NO

IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO CALL THE USA

TO EXISTING UTILITIES DURING CONSTRUCTION

THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY DAMAGE DONE

CI 5708

CAP LEVEL 2 EVSE PROJECT

D A L L A S

D

IV

E

E R B E S

R O

A D

N E J

H O

L

A D

LOS FELIZ DRIVE

HILLCREST DRIVE

THOUSAND OAKS BOULEVARD

U S

PROJECT SITE

MIKE TAYLOR, MAYOR

DAVID NEWMAN

SECTIONS AND DETAILS (LEVEL 3)

SECTIONS AND DETAILS (LEVEL 6) AND CUTSHEET

SIXTH FLOOR PLAN (LEVEL 7)

THIRD FLOOR PLAN (LEVEL 4)

FOURTH FLOOR PLAN (LEVEL 5)

POWER PLAN (LEVEL 6)

SHEET 1 OF 10

TITLE SHEET

25-06A

5/20/2026

5/21/2026

BID SET 5/20/2026

05/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26

AREA

PROJECT

VEN

TU

R

Y FW

Y

D A L L A S D

R

IV

E

PROJECT AREA PROJECT DESCRIPTION PROPOSED EV CHARGERS

GENERAL NOTES

GENERAL

MATERIALS AND EQUIPMENT

INSTALLATION

CONDUIT

ORDERING ANY MATERIALS OR EQUIPMENT.

CONTRACTOR SHALL PROVIDE SUBMITTALS BEFORE 11.

OCCUPATIONAL SAFETY HEALTH ADMINISTRATION (OSHA).

LABORATORY (NRTL) ACCREDITED BY THE UNITED STATES

OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING

ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, 10.

UNLESS OTHERWISE NOTED.

AND FURNISHED AND INSTALLED BY CONTRACTO

ALL WORK/MATERIALS SHOWN ON PLANS SHALL BE NEW 9.

CONTRACTOR SHALL MAINTAIN A CLEAN WORKSITE.8.

CONSTRUCTION.

STRUCTURES DAMAGED BY THE CONTRACTOR DURING

AT

CONTRACTOR SHALL REPAIR AND/OR REPLACE, 7.

JURISDICTION FOR ANY INSPECTIONS.

CONTRACTOR SHALL NOTIFY AUTHORITY HAVING 6.

ORDINANCES, AND REQUIREMENTS.

COMPLETED IN ACCORDANCE WITH APPLICABLE CODES,

CONTRACTOR SHALL ENSURE THAT ALL WORK IS 5.

PERMIT HAS BEEN ISSUED.

NOT AUTHORIZE ANY WORK TO BE PERFORMED UNTIL A

APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES 4.

IMPROVEMENTS.

PRIOR TO CONSTRUCTION OF THE PROPOSED

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS 3.

FOR THE FLITTING OF ALL EQUIPMENT AND MATERIALS.

CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY

AND VERIFY ALL DIMENSIONS, SIZES, AND REQUIRED

APPROXIMATE. CONTRACTOR SHALL CAREFULLY CHECK

ALL EQUIPMENT LOCATIONS ON DRAWINGS ARE 2.

REGULATIONS AND/OR BUILDING CODES.

CONTRACTOR FROM COMPLYING WITH THE LAWS,

AND/OR DESIGN INFORMATION THAT PREVENTS

THE DRAWINGS, SPECIFICATIONS, AND FIELD CONDITIONS;

ENGINEER OF RECORD OF ANY DISCREPANCIES BETWEEN

CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND 1.

PROPERTY INFORMATION

VICINITY MAP CODES AND STANDARDS

COMPLY WITH SECTION 11B-228.3.2.

BY A DESIGNATED VEHICLE OR DRIVER SHALL NOT BE REQUIRED TO

EVCS NOT AVAILABLE TO THE GENERAL PUBLIC AND INTENDED FOR USE

CBC 11B-228.3.2 EXCEPTION 1:

SYSTEM

2023 NFPA 70 ARTICLE 625 ELECTRICAL VEHICLE POWER TRANSFER

2023 NFPA 70 NATIONAL ELECTRIC CODE

2025 CALIFORNIA GREEN BUILDING STANDARDS CODE PART 11

2025 CALIFORNIA FIRE CODE PART 9

2025 CALIFORNIA ELECTRICAL CODE (CEC) PART 3

2025 CALIFORNIA BUILDING CODE (CBC) PART 2

2025 BUILDING STANDARDS ADMINISTRATIVE CODE PART 1

CALIFORNIA CODE OF REGULATIONS, TITLE 24:

EV CHARGERS ARE FOR DESIGNATED FLEET VEHICLES ONLY AND ARE NOT FOR PUBLIC USE.

THOUSAND OAKS BOULEVARD

ON FLOOR 3 & 6

PROJECT LOCATION

INSTALL, TEST & COMMISSION EVSES PER MANUFACTURER INSTRUCTIONS.8.

INSTALL COMMUNICATION CONDUITS AND CAT6 CABLE BETWEEN EVSES.7.

FROM PANELBOARD 'EV3' TO PANELBOARD 'EV6', AND FROM PANELBOARD 'EV6' TO EVSES.

INSTALL POWER CABLES AND CONDUITS FROM PANELBOARD 'EV3' TO EVSES, 6.

INSTALL PANEL 'EV6' 208Y/120V, 3PH, 4W, 225A.5.

INSTALL PANEL 'EV3' 208Y/120V, 3PH, 4W, 225A.4.

INSTALL TEN (10) 100A CIRCUIT BREAKERS AT NEW 'EV6'.3.

INSTALL SEVEN (7) 100A CIRCUIT BREAKERS AND ONE (1) 200A CIRCUIT BREAKER AT NEW 'EV3'.2.

FOR FUTURE EVSES AT LEVEL 3.

REMOVE AND REPLACE EXISTING CONDUITS, ASSOCIATED CABLES AND CIRCUIT BREAKERS OF EXISTING EVSES1.

SCOPE OF WORK INCLUDES:

INSTALL THIRTEEN (13) SINGLE PORT LEVEL 2 EV CHARGERS AND ASSOCIATED MATERIALS.

PARKING COUNT DATA

WHILE STILL MEETING THE MINIMUM.

ADA REQUIRED, 2 ACCESSIBLE SPACES MAY BE REMOVED

ACCESSIBLE SPACES; ONLY 16 ACCESSIBLE SPACES ARE

CIVIC ARTS PLAZA HAS 757 PARKING SPACES AND 24 24.

DISTRIBUTION AND BRANCH CIRCUITRY SYSTEM.

SHALL NOT EXCEED 5% WITHIN THE ENTIRE ELECTRICAL

BUILDING CODE. THE MAXIMUM FEEDER VOLTAGE DROP

VOLTAGE DROP MUST COMPLY WITH 2025 CEC AND LOCAL 23.

NOTED.

ALL CABLES SHALL BE XHHW-2 90°C, UNLESS OTHERWISE 22.

NOTED.

BASED ON “XHHW-2” COPPER CABLES, UNLESS OTHERWISE

ALL CONDUIT SIZES AND CONDUCTOR AMPACITIES ARE 21.

ALL NEW STUB CONDUITS SHALL HAVE BUSHING ON END.20.

CABLES.

NECESSARY TO FACILITATE PULLING AND INSTALLATION OF

INSTALL CONDULETS AND INTERMEDIATE PULLBOXES AS 19.

NOT SUBJECT TO PHYSICAL DAMAGE.

EMT CONDUITS ALLOWED FOR ALL OTHER EXPOSED AREAS

AREAS SUBJECT TO PHYSICAL DAMAGE, SHALL BE GRC.

EXPOSED CONDUITS ALONG FLOOR SURFACE, OR ANY 18.

INSTALLED BY THE CITY.

STRIPINGS AND ADA SIGNAGES SHALL BE PROVIDED AND 17.

COORDINATED BETWEEN CONTRACTOR AND OWNER.

FINAL LOCATIONS OF EV CHARGERS SHALL BE

EV CHARGER LOCATIONS ARE SHOWN FOR REFERENCE. 16.

250.4.

ENCLOSURES, AND RACEWAYS IN ACCORDANCE WITH NEC

NON-CURRENT CARRYING CONDUCTIVE MATERIALS,

GROUND AND BOND ELECTRICAL SYSTEMS AND 15.

INSTALLED IN ACCORDANCE WITH NEC 240.

OVERCURRENT PROTECTION EQUIPMENT SHALL BE 14.

CALIFORNIA ELECTRICAL CODE.

ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2025 13.

INSTALLATION INSTRUCTIONS.

INSTALLED IN ACCORDANCE WITH MANUFACTURER’S

ELECTRIC VEHICLE CHARGING SYSTEM SHALL BE 12.

THOUSAND OAKS, CA 91362.

2100 E THOUSAND OAKS BLVD,

CIVIC ARTS PLAZA THEATRES,ADDRESS:

SHEET 2 OF 10

GENERAL NOTES

EV CHARGERS SHALL BE

FURNISHED AND INSTALLED BY OTHERS.

25-06A

TCONTRACTOR’S EXPENSE, ANY EQUIPMENT OR

(BY OTHERS).

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26.

UTILITY TRANSFORMER

TO EXISTING

EVSE EVSE EVSE

EVSE EVSE EVSE EVSE EVSE EVSE EVSE

SCE METER

225A, 10KAIC, NEMA 3R

208/120VAC, 3PH, 4W

(N) PANELBOARD "EV6"

EVSE EVSE EVSE

3PH 4W

75KVA, 480-208V

'(E) T-EV'

400A, NEMA 1

480/277VAC, 3PH, 4W

(E) MAIN SWITCHBOARD

M

225A, 10KAIC, NEMA 1

208/120VAC, 3PH, 4W

(N) PANELBOARD "EV3"

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

2P

100A

3P

200A

MECHANICAL ROOM

TO

3P

200A

3P

200A

EVSE COMMS CAT6 S/FTP CMX.3.

4#300 + 1#4 GND.

PANELBOARD 'EV3' TO PANELBOARD 'EV6' 2.

EVSE POWER 2#2 + 1#8 GND.1.

CABLE

COMPATIBILITY.

MANUFACTURER'S INSTRUCTIONS TO ENSURE

INSTALL AND CONFIGURE LITE-ON EVSE PER

IMPLEMENT EV GATEWAY LOAD MANAGEMENT. 4.

CHAINED ETHERNET CABLES.

REMAINING EVSE COMMUNICATE VIA DAISY

CELLULAR NETWORK USING BUILT-IN SIM CARD.

THE FIRST EVSE SHALL ACCES THE INTERNET VIA 3.

THHN/THWN-2 OR XHHW-2.

ALL WIRING SHALL BE COPPER (CU), TYPE 2.

(CEC) AND APPLICABLE LOCAL CODES.

EDITION OF THE CALIFORNIA ELECTRICAL CODE

ALL WORK SHALL CONFORM TO THE LATEST 1.

NOTES:

2P

100A

2P

100A

2P

100A

2P

100A

SURFACE MOUNT, NEMA 3R.

PANELBOARD 'EV6' 208Y/120V, 3PH 4W, 225A, 3.

AT LEVEL 3.

OUTGOING CONDUITS TO EXISTING EVSE

EXISTING EV PANEL IN ELECTRICAL ROOM AND

SURFACE MOUNT, NEMA 1. REMOVE AND REPLACE

PANELBOARD 'EV3' 208Y/120V, 3PH, 4W, 225A, 2.

CABLE MANAGEMENT SYSTEM LOAD MANAGED.

SINGLE PORT, WALL MOUNT, 25FT CABLE W/

EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.

EQUIPMENT

MECHANICAL ROOM

TO

SHEET 3 OF 10

SINGLE LINE DIAGRAM AND PANEL SCHEDULE

FURNISHED AND INSTALLED BY OTHERS.

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26

(E) STRIPING COMM 0.5"C

INSTALL TO COMM PULL BOX

0.5"C COMM CABLE

75KVA

(E) XFMR 'T-EV'

COMM 0.5"C

E V -1

SH. 9

DETAIL 3

SH. 9

DETAIL 1

(CONTINUED TO SHEET 5)

0.5"C COMM UP TO LEVEL 6

1.5"C

0.5"C COMM TO LEVEL 6

1.5"C TO EV3 PANELBOARD

(CONTINUED TO SHEET 5)

2"C UP TO EV6 PANELBOARD LEVEL 6

2"C TO EV6 PANELBOARD LEVEL 6

EVEVEV

10'-5"

PANELBOARD

1.5"C TO EV3

LEVEL 6

2''C TO EV6 PANELBOARD

TO REMAIN.

STRIPINGS AND ADA SIGNAGES

WHEELSTOP, 6' X 6" X 4"4

EXISTING EV CHARGERS TO REMAIN.3.

AT LEVEL 3.

OUTGOING CONDUITS TO EXISTING EVSE

EXISTING EV PANEL IN ELECTRICAL ROOM AND

SURFACE MOUNT, NEMA 1. REMOVE AND REPLACE

PANELBOARD 'EV3' 208Y/120V, 3PH, 4W, 225A, 2.

CABLE MANAGEMENT SYSTEM LOAD MANAGED.

SINGLE PORT, WALL MOUNT, 25FT CABLE W/

EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.

EQUIPMENT#

FLEXIBLE DELINEATORS

E V -5

SECOND FLOOR PLAN (LEVEL 3)

9'-0"

E V -2

0.5"C COMM

25'-5"

ONLY

CHARGI

NG

EV

ONLY

CHARGI

NG

EV

ONLY

CHARGI

NG

EV

(E) ROOF DRAIN

18'-10"18'-10"18'-10"18'-10"

SHEET 4 OF 10

POWER PLAN (LEVEL 3)

FURNISHED AND

INSTALLED BY OTHERS. FURNISHED AND

INSTALLED BY OTHERS.

FURNISHED AND INSTALLED BY OTHERS.

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

LOBBY

SPOTS

2 EXISTING ADA

THIRD FLOOR PLAN (LEVEL 4)

SHEET 5 OF 10

THIRD FLOOR PLAN (LEVEL 4)

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

LOBBY

SPOTS

2 EXISTING ADA

FOURTH FLOOR PLAN (LEVEL 5)

SHEET 6 OF 10

FOURTH FLOOR PLAN (LEVEL 5)

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26.

(E) STRIPING

EV6-17, 19

EV6-18, 20 EV6-14, 16

EV6-13, 15

EV6-10, 12

EV6-9, 11

EV6-6, 8

EV6-5, 7

EV6-2, 4

EV6-1, 3 SH. 10

DETAIL 1

FIFTH FLOOR PLAN (LEVEL 6)

0.5"C COMM (5) 1.25"C(4) 1.25"C

(3) 1.25"C(2) 1.25"C

(1) 1.25"C

SPOTS

2 EXISTING ADA

0.5"C COMM

(CONTINUED TO SHEET 5)

0.5"C COMM DOWN TO LEVEL 6

(CONTINUED TO SHEET 4)

2"C DOWN TO EV6 PANELBOARD LEVEL 3

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

ONLY

CHARGING

EV

WHEELSTOP, 6' X 6" X 4"3.

SURFACE MOUNT, NEMA 3R.

PANELBOARD 'EV6' 208Y/120V, 3PH, 4W, 225A, 2.

CABLE MANAGEMENT SYSTEM LOAD MANAGED.

SINGLE PORT, WALL MOUNT, 25FT CABLE W/

EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.

EQUIPMENT

SHEET 7 OF 10

POWER PLAN (LEVEL 6)

FURNISHED AND INSTALLED BY OTHERS.

FURNISHED AND

INSTALLED BY OTHERS.

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

LOBBY

SPOTS

2 EXISTING ADA

SIXTH FLOOR PLAN (LEVEL 7)

SHEET 8 OF 10

SIXTH FLOOR PLAN (LEVEL 7)

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26

PLAN VIEW LEVEL 3 1

2SECTION VIEW LEVEL 3

COLUMN

INSTALLATION.

CONDUIT BODIES AS NEEDED TO FACILITATE CABLE

CONTRACTOR SHALL INSTALL PULL BOXES OR 3.

ENTRY ALIGN WITH PANEL FEED.

FACE. ENSURE MOUNTING HEIGHT AND CONDUIT

CHARGER WIDTH. ANCHOR DIRECTLY TO COLUMN

OF (2) HORIZONTAL CHANNELS, SPANNING ACROSS

PROVIDE UNISTRUT SUPPORT FRAME CONSISTING

FOR CHARGERS INSTALLED ON EXISTING COLUMNS: 2.

STRUCTURE OR WALL CAP.

BOLTED CONNECTIONS TYPICAL ANCHORED TO

VERTICAL AND (2) HORIZONTAL CHANNELS,

PROVIDE UNISTRUT FRAME CONSISTING OF (2)

FOR PANELBOARD INSTALLED ON HALF WALLS, 1.

GENERAL NOTES:

4SECTION VIEW LEVEL 3

PLAN VIEW LEVEL 3

LEVEL 3

SECTION VIEW

DETAIL 2

PARKING STRIPES PARKING STRIPES

COMM 0.5"C

PANELBOARD

1.5"C TO EV3

COLUMN

1"C FLEX CONDUIT

1"C FLEX CONDUIT

COMM 0.5"C

COMM 0.5"C

(2) COMM 0.5"C

WHEELSTOP, 6' X 6" X 4"4.

PULL BOX NEMA 3R, 10"x10"x4". 3.

PULL BOX NEMA 3R, 12"x12"x6".2.

CABLE MANAGEMENT SYSTEM LOAD MANAGED.

SINGLE PORT, WALL MOUNT, 25FT CABLE W/

EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.

EQUIPMENT

LEVEL 3

SECTION VIEW

DETAIL 4

4 4

1'-8"

(E) ROOF DRAIN

SHEET 9 OF 10

SECTIONS AND DETAILS (LEVEL 3)

FURNISHED AND

INSTALLED BY OTHERS.

FURNISHED AND

INSTALLED BY OTHERS.

FURNISHED AND INSTALLED BY OTHERS.

FURNISHED AND

INSTALLED BY OTHERS.

FURNISHED AND

INSTALLED BY

OTHERS.

FURNISHED AND

INSTALLED BY

OTHERS.

25-06A

5/20/2026

5/21/2026

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

DATEENGINEERING DIVISION MANAGER

DATE

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

IW

AP

BK

KEWO

ENGINEERING

CORPORATION

03/12/26

TED GERBER, CITY ENGINEER

CI 5708 CAP LEVEL 2 EVSE PROJECT

Know what'sbelow.

Callbefore you dig.

N G

T E

A

NRO

A

ET

FO LCA FI

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

N G

T E

A

NRO

A

ET

FO LCA FI

No. E19688

ST

I E

G S

R

I

E N E

I R

EED

R

RO

P

ISSFE NA

O

L

O W

EK .B N

AI

R B

L A

CIRTC

E

L

E

03/12/26

03/12/26.

LEVEL 6

SECTION VIEW

DETAIL 2

1PLAN VIEW LEVEL 6

2SECTION VIEW LEVEL 6

PARKING STRIPES

WALL

COLUMN

COLUMN

WALL

INSTALLATION.

CONDUIT BODIES AS NEEDED TO FACILITATE CABLE

CONTRACTOR SHALL INSTALL PULL BOXES OR 3.

ENTRY ALIGN WITH PANEL FEED.

FACE. ENSURE MOUNTING HEIGHT AND CONDUIT

CHARGER WIDTH. ANCHOR DIRECTLY TO COLUMN

OF (2) HORIZONTAL CHANNELS, SPANNING ACROSS

PROVIDE UNISTRUT SUPPORT FRAME CONSISTING

FOR CHARGERS INSTALLED ON EXISTING COLUMNS: 2.

STRUCTURE OR WALL CAP.

BOLTED CONNECTIONS TYPICAL ANCHORED TO

VERTICAL AND (2) HORIZONTAL CHANNELS,

PROVIDE UNISTRUT FRAME CONSISTING OF (2)

FOR PANELBOARD INSTALLED ON HALF WALLS, 1.

GENERAL NOTES:

3LITE-ON IC80A EV CHARGER | DATASHEET

1"C FLEX CONDUIT

PULL BOX NEMA 3R, 10"x10"x4". 4.

PULL BOX NEMA 3R, 12"x12"x6".3.

SURFACE MOUNT, NEMA 3R.

PANELBOARD 'EV6' 208Y/120V, 3PH, 4W, 225A, 2.

CABLE MANAGEMENT SYSTEM LOAD MANAGED.

SINGLE PORT, WALL MOUNT, 25FT CABLE W/

EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.

EQUIPMENT

1.25"C

2"C

1'-8"

SECTIONS AND DETAILS (LEVEL 6) AND CUTSHEET

SHEET 10 OF 10

FURNISHED AND INSTALLED BY OTHERS.

FURNISHED AND INSTALLED BY OTHERS

FURNISHED AND INSTALLED BY OTHERS.

25-06A

5/20/2026

5/21/2026