This is a construction plan document prepared by KEWO Engineering Corporation for the City of Thousand Oaks, California, detailing the installation of electric vehicle charging infrastructure at the Civic Arts Plaza. The project, designated CI 5708 CAP Level 2 EVSE Project, involves the installation of thirteen (13) single-port Level 2 EV chargers and associated electrical infrastructure across multiple levels of a multi-story parking structure located at 2100 East Thousand Oaks Boulevard. The scope of work includes removing and replacing existing conduit and circuit breakers, installing two new electrical panelboards (EV3 and EV6), each rated 208Y/120V, 3-phase, 4-wire, 225-amp service, installing seven 100-amp circuit breakers and one 200-amp circuit breaker at panelboard EV3, installing ten 100-amp circuit breakers at panelboard EV6, installing power cables and conduits from the panelboards to the charging stations, installing communication conduits and CAT6 cable between charging units, and testing and commissioning all equipment per manufacturer instructions. The project plans are designated as 100% design documents issued for plan check, with revisions updated per plan check comments dated March 12, 2026. The chargers are designated for fleet vehicles only and are not available to the general public, with signage and striping to be installed by the City.
The plans specify that all work must comply with the 2025 California Building Code, 2025 California Electrical Code, 2025 California Fire Code, 2025 California Green Building Standards Code, and 2023 NFPA 70 National Electric Code Article 625 for electrical vehicle power transfer systems. The contractor must possess a valid Class A General Engineering License and is required to call USA Underground Service Alert at least two days but not more than seven days prior to construction to locate existing underground utilities. All electrical equipment shall be UL-listed and installed in accordance with manufacturer instructions and applicable electrical codes. The contractor is responsible for field verification of existing conditions, checking all dimensions and clearances, maintaining a clean worksite, repairing any structures damaged during construction, and notifying the authority having jurisdiction for required inspections. The existing Civic Arts Plaza facility contains 757 parking spaces and 24 accessible spaces; installation of the new chargers allows for the removal of only two accessible spaces while maintaining the required minimum of 16 accessible spaces. All new materials and equipment must be furnished and installed by the contractor, except for the EV chargers themselves, which are to be furnished and installed by others.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF THOUSAND OAKS DWG. _________
CITY OF THOUSAND OAKSCITY OF THOUSAND OAKS
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK0
KEWO
ENGINEERING
CORPORATION
02/03/26
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
100% DESIGN. ISSUED FOR PLAN CHECK.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/261 03/12/26100% DESIGN. UPDATED PER PLAN CHECK COMMENTS.
SHEET INDEX
SHT. NO. DESCRIPTION
VICINITY MAP
NO SCALE
PUBLIC WORKS DEPARTMENT
101 FREEW
AY
FR
EEW
A Y
F R
E E
W A
Y
R D
RD.
R D
W
ES
TL
AK
E
RD.
OAKS
OLS
EN
RD.
E R
B E S
M O
O R
P A
R K
BLVD.
LYNN
RD.
LYN
N
HILLCREST
DR.
HILLCREST
D R
THOUSAND
BLVD.
BORCHARD
RD.
R
AN
C H
O
C
N E J
O B
L V
D
KANAN
R D
J A
N S S
ARBOLES
AVENIDA
DE
LOS
R E
IN
O
R D
W E
N D
Y D
R
POTRERO
RD.
TITLE SHEET
PROJECT SITE
NO SCALE
SITE MAP
SINGLE LINE DIAGRAM AND PANEL SCHEDULE
GENERAL NOTES
POWER PLAN (LEVEL 3)
CITY COUNCIL
CITY ENGINEER
PUBLIC WORKS DIRECTOR
CITY MANAGER
ANDREW P. POWERS
AL ADAM
C. TIE GUTIERREZ
BOB ENGLER
NADER HEYDARI
TED GERBER
PUBLIC UTILITIES WITHIN CITY OF THOUSAND OAKS
WATER:
WASTEWATER:
TELEPHONE:
GAS:
CABLE TV:
FIBER:
ELECTRICITY:
805- 432-5750
EMANUAL BARAJAS
NEWBURY PARK, CA 91320
2439 W HILLCREST DRIVE
CALIFORNIA AMERICAN WATER
805-449-5033
PATRICK McCULLOCH
THOUSAND OAKS, CA 91362
2100 EAST THOUSAND OAKS BOULEVARD
CITY OF THOUSAND OAKS
805-445-9116
CAMARILLO, CA 93012
201 FLYNN ROAD
JASON EISEL
FRONTIER
213-231-5629
BEN PENA
SIMI VALLEY, CA 93065
977 CHAMBERS LANE
SOUTHERN CALIFORNIA GAS COMPANY
805-494-7013
BOB MIGLIORE
THOUSAND OAKS, CA 91361
3589 FOOTHILL DRIVE
SOUTHERN CALIFORNIA EDISON COMPANY
800-654-3110
FIBER DIG
CANONSBURG, PA 15317
1500 CORPORATE DRIVE
CROWN CASTLE FIBER
805-626-8231
ERIC PINGREE
VENTURA, CA 93003
2525 KNOLL DRIVE
SPECTRUM
NOTICE TO CONTRACTOR:
NOTICE TO CONTRACTOR:
CONTRACTOR SHALL POSSES A VALID CLASS "A" GENERAL ENGINEERING LICENSE
LESS THAN TWO DAYS NOR MORE THAN SEVEN DAYS PRIOR TO CONSTRUCTION.
UNDERGROUND ALERT FOR LOCATION OF EXISTING UNDERGROUND UTILITIES NO
IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO CALL THE USA
TO EXISTING UTILITIES DURING CONSTRUCTION
THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY DAMAGE DONE
CI 5708
CAP LEVEL 2 EVSE PROJECT
D A L L A S
D
IV
E
E R B E S
R O
A D
N E J
H O
L
A D
LOS FELIZ DRIVE
HILLCREST DRIVE
THOUSAND OAKS BOULEVARD
U S
PROJECT SITE
MIKE TAYLOR, MAYOR
DAVID NEWMAN
SECTIONS AND DETAILS (LEVEL 3)
SECTIONS AND DETAILS (LEVEL 6) AND CUTSHEET
SIXTH FLOOR PLAN (LEVEL 7)
THIRD FLOOR PLAN (LEVEL 4)
FOURTH FLOOR PLAN (LEVEL 5)
POWER PLAN (LEVEL 6)
SHEET 1 OF 10
TITLE SHEET
25-06A
5/20/2026
5/21/2026
BID SET 5/20/2026
05/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26
AREA
PROJECT
VEN
TU
R
Y FW
Y
D A L L A S D
R
IV
E
PROJECT AREA PROJECT DESCRIPTION PROPOSED EV CHARGERS
GENERAL NOTES
GENERAL
MATERIALS AND EQUIPMENT
INSTALLATION
CONDUIT
ORDERING ANY MATERIALS OR EQUIPMENT.
CONTRACTOR SHALL PROVIDE SUBMITTALS BEFORE 11.
OCCUPATIONAL SAFETY HEALTH ADMINISTRATION (OSHA).
LABORATORY (NRTL) ACCREDITED BY THE UNITED STATES
OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING
ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, 10.
UNLESS OTHERWISE NOTED.
AND FURNISHED AND INSTALLED BY CONTRACTO
ALL WORK/MATERIALS SHOWN ON PLANS SHALL BE NEW 9.
CONTRACTOR SHALL MAINTAIN A CLEAN WORKSITE.8.
CONSTRUCTION.
STRUCTURES DAMAGED BY THE CONTRACTOR DURING
AT
CONTRACTOR SHALL REPAIR AND/OR REPLACE, 7.
JURISDICTION FOR ANY INSPECTIONS.
CONTRACTOR SHALL NOTIFY AUTHORITY HAVING 6.
ORDINANCES, AND REQUIREMENTS.
COMPLETED IN ACCORDANCE WITH APPLICABLE CODES,
CONTRACTOR SHALL ENSURE THAT ALL WORK IS 5.
PERMIT HAS BEEN ISSUED.
NOT AUTHORIZE ANY WORK TO BE PERFORMED UNTIL A
APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES 4.
IMPROVEMENTS.
PRIOR TO CONSTRUCTION OF THE PROPOSED
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS 3.
FOR THE FLITTING OF ALL EQUIPMENT AND MATERIALS.
CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY
AND VERIFY ALL DIMENSIONS, SIZES, AND REQUIRED
APPROXIMATE. CONTRACTOR SHALL CAREFULLY CHECK
ALL EQUIPMENT LOCATIONS ON DRAWINGS ARE 2.
REGULATIONS AND/OR BUILDING CODES.
CONTRACTOR FROM COMPLYING WITH THE LAWS,
AND/OR DESIGN INFORMATION THAT PREVENTS
THE DRAWINGS, SPECIFICATIONS, AND FIELD CONDITIONS;
ENGINEER OF RECORD OF ANY DISCREPANCIES BETWEEN
CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND 1.
PROPERTY INFORMATION
VICINITY MAP CODES AND STANDARDS
COMPLY WITH SECTION 11B-228.3.2.
BY A DESIGNATED VEHICLE OR DRIVER SHALL NOT BE REQUIRED TO
EVCS NOT AVAILABLE TO THE GENERAL PUBLIC AND INTENDED FOR USE
CBC 11B-228.3.2 EXCEPTION 1:
SYSTEM
2023 NFPA 70 ARTICLE 625 ELECTRICAL VEHICLE POWER TRANSFER
2023 NFPA 70 NATIONAL ELECTRIC CODE
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE PART 11
2025 CALIFORNIA FIRE CODE PART 9
2025 CALIFORNIA ELECTRICAL CODE (CEC) PART 3
2025 CALIFORNIA BUILDING CODE (CBC) PART 2
2025 BUILDING STANDARDS ADMINISTRATIVE CODE PART 1
CALIFORNIA CODE OF REGULATIONS, TITLE 24:
EV CHARGERS ARE FOR DESIGNATED FLEET VEHICLES ONLY AND ARE NOT FOR PUBLIC USE.
THOUSAND OAKS BOULEVARD
ON FLOOR 3 & 6
PROJECT LOCATION
INSTALL, TEST & COMMISSION EVSES PER MANUFACTURER INSTRUCTIONS.8.
INSTALL COMMUNICATION CONDUITS AND CAT6 CABLE BETWEEN EVSES.7.
FROM PANELBOARD 'EV3' TO PANELBOARD 'EV6', AND FROM PANELBOARD 'EV6' TO EVSES.
INSTALL POWER CABLES AND CONDUITS FROM PANELBOARD 'EV3' TO EVSES, 6.
INSTALL PANEL 'EV6' 208Y/120V, 3PH, 4W, 225A.5.
INSTALL PANEL 'EV3' 208Y/120V, 3PH, 4W, 225A.4.
INSTALL TEN (10) 100A CIRCUIT BREAKERS AT NEW 'EV6'.3.
INSTALL SEVEN (7) 100A CIRCUIT BREAKERS AND ONE (1) 200A CIRCUIT BREAKER AT NEW 'EV3'.2.
FOR FUTURE EVSES AT LEVEL 3.
REMOVE AND REPLACE EXISTING CONDUITS, ASSOCIATED CABLES AND CIRCUIT BREAKERS OF EXISTING EVSES1.
SCOPE OF WORK INCLUDES:
INSTALL THIRTEEN (13) SINGLE PORT LEVEL 2 EV CHARGERS AND ASSOCIATED MATERIALS.
PARKING COUNT DATA
WHILE STILL MEETING THE MINIMUM.
ADA REQUIRED, 2 ACCESSIBLE SPACES MAY BE REMOVED
ACCESSIBLE SPACES; ONLY 16 ACCESSIBLE SPACES ARE
CIVIC ARTS PLAZA HAS 757 PARKING SPACES AND 24 24.
DISTRIBUTION AND BRANCH CIRCUITRY SYSTEM.
SHALL NOT EXCEED 5% WITHIN THE ENTIRE ELECTRICAL
BUILDING CODE. THE MAXIMUM FEEDER VOLTAGE DROP
VOLTAGE DROP MUST COMPLY WITH 2025 CEC AND LOCAL 23.
NOTED.
ALL CABLES SHALL BE XHHW-2 90°C, UNLESS OTHERWISE 22.
NOTED.
BASED ON “XHHW-2” COPPER CABLES, UNLESS OTHERWISE
ALL CONDUIT SIZES AND CONDUCTOR AMPACITIES ARE 21.
ALL NEW STUB CONDUITS SHALL HAVE BUSHING ON END.20.
CABLES.
NECESSARY TO FACILITATE PULLING AND INSTALLATION OF
INSTALL CONDULETS AND INTERMEDIATE PULLBOXES AS 19.
NOT SUBJECT TO PHYSICAL DAMAGE.
EMT CONDUITS ALLOWED FOR ALL OTHER EXPOSED AREAS
AREAS SUBJECT TO PHYSICAL DAMAGE, SHALL BE GRC.
EXPOSED CONDUITS ALONG FLOOR SURFACE, OR ANY 18.
INSTALLED BY THE CITY.
STRIPINGS AND ADA SIGNAGES SHALL BE PROVIDED AND 17.
COORDINATED BETWEEN CONTRACTOR AND OWNER.
FINAL LOCATIONS OF EV CHARGERS SHALL BE
EV CHARGER LOCATIONS ARE SHOWN FOR REFERENCE. 16.
250.4.
ENCLOSURES, AND RACEWAYS IN ACCORDANCE WITH NEC
NON-CURRENT CARRYING CONDUCTIVE MATERIALS,
GROUND AND BOND ELECTRICAL SYSTEMS AND 15.
INSTALLED IN ACCORDANCE WITH NEC 240.
OVERCURRENT PROTECTION EQUIPMENT SHALL BE 14.
CALIFORNIA ELECTRICAL CODE.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH 2025 13.
INSTALLATION INSTRUCTIONS.
INSTALLED IN ACCORDANCE WITH MANUFACTURER’S
ELECTRIC VEHICLE CHARGING SYSTEM SHALL BE 12.
THOUSAND OAKS, CA 91362.
2100 E THOUSAND OAKS BLVD,
CIVIC ARTS PLAZA THEATRES,ADDRESS:
SHEET 2 OF 10
GENERAL NOTES
EV CHARGERS SHALL BE
FURNISHED AND INSTALLED BY OTHERS.
25-06A
TCONTRACTOR’S EXPENSE, ANY EQUIPMENT OR
(BY OTHERS).
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26.
UTILITY TRANSFORMER
TO EXISTING
EVSE EVSE EVSE
EVSE EVSE EVSE EVSE EVSE EVSE EVSE
SCE METER
225A, 10KAIC, NEMA 3R
208/120VAC, 3PH, 4W
(N) PANELBOARD "EV6"
EVSE EVSE EVSE
3PH 4W
75KVA, 480-208V
'(E) T-EV'
400A, NEMA 1
480/277VAC, 3PH, 4W
(E) MAIN SWITCHBOARD
M
225A, 10KAIC, NEMA 1
208/120VAC, 3PH, 4W
(N) PANELBOARD "EV3"
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
2P
100A
3P
200A
MECHANICAL ROOM
TO
3P
200A
3P
200A
EVSE COMMS CAT6 S/FTP CMX.3.
4#300 + 1#4 GND.
PANELBOARD 'EV3' TO PANELBOARD 'EV6' 2.
EVSE POWER 2#2 + 1#8 GND.1.
CABLE
COMPATIBILITY.
MANUFACTURER'S INSTRUCTIONS TO ENSURE
INSTALL AND CONFIGURE LITE-ON EVSE PER
IMPLEMENT EV GATEWAY LOAD MANAGEMENT. 4.
CHAINED ETHERNET CABLES.
REMAINING EVSE COMMUNICATE VIA DAISY
CELLULAR NETWORK USING BUILT-IN SIM CARD.
THE FIRST EVSE SHALL ACCES THE INTERNET VIA 3.
THHN/THWN-2 OR XHHW-2.
ALL WIRING SHALL BE COPPER (CU), TYPE 2.
(CEC) AND APPLICABLE LOCAL CODES.
EDITION OF THE CALIFORNIA ELECTRICAL CODE
ALL WORK SHALL CONFORM TO THE LATEST 1.
NOTES:
2P
100A
2P
100A
2P
100A
2P
100A
SURFACE MOUNT, NEMA 3R.
PANELBOARD 'EV6' 208Y/120V, 3PH 4W, 225A, 3.
AT LEVEL 3.
OUTGOING CONDUITS TO EXISTING EVSE
EXISTING EV PANEL IN ELECTRICAL ROOM AND
SURFACE MOUNT, NEMA 1. REMOVE AND REPLACE
PANELBOARD 'EV3' 208Y/120V, 3PH, 4W, 225A, 2.
CABLE MANAGEMENT SYSTEM LOAD MANAGED.
SINGLE PORT, WALL MOUNT, 25FT CABLE W/
EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.
EQUIPMENT
MECHANICAL ROOM
TO
SHEET 3 OF 10
SINGLE LINE DIAGRAM AND PANEL SCHEDULE
FURNISHED AND INSTALLED BY OTHERS.
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26
(E) STRIPING COMM 0.5"C
INSTALL TO COMM PULL BOX
0.5"C COMM CABLE
75KVA
(E) XFMR 'T-EV'
COMM 0.5"C
E V -1
SH. 9
DETAIL 3
SH. 9
DETAIL 1
(CONTINUED TO SHEET 5)
0.5"C COMM UP TO LEVEL 6
1.5"C
0.5"C COMM TO LEVEL 6
1.5"C TO EV3 PANELBOARD
(CONTINUED TO SHEET 5)
2"C UP TO EV6 PANELBOARD LEVEL 6
2"C TO EV6 PANELBOARD LEVEL 6
EVEVEV
10'-5"
PANELBOARD
1.5"C TO EV3
LEVEL 6
2''C TO EV6 PANELBOARD
TO REMAIN.
STRIPINGS AND ADA SIGNAGES
WHEELSTOP, 6' X 6" X 4"4
EXISTING EV CHARGERS TO REMAIN.3.
AT LEVEL 3.
OUTGOING CONDUITS TO EXISTING EVSE
EXISTING EV PANEL IN ELECTRICAL ROOM AND
SURFACE MOUNT, NEMA 1. REMOVE AND REPLACE
PANELBOARD 'EV3' 208Y/120V, 3PH, 4W, 225A, 2.
CABLE MANAGEMENT SYSTEM LOAD MANAGED.
SINGLE PORT, WALL MOUNT, 25FT CABLE W/
EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.
EQUIPMENT#
FLEXIBLE DELINEATORS
E V -5
SECOND FLOOR PLAN (LEVEL 3)
9'-0"
E V -2
0.5"C COMM
25'-5"
ONLY
CHARGI
NG
EV
ONLY
CHARGI
NG
EV
ONLY
CHARGI
NG
EV
(E) ROOF DRAIN
18'-10"18'-10"18'-10"18'-10"
SHEET 4 OF 10
POWER PLAN (LEVEL 3)
FURNISHED AND
INSTALLED BY OTHERS. FURNISHED AND
INSTALLED BY OTHERS.
FURNISHED AND INSTALLED BY OTHERS.
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
LOBBY
SPOTS
2 EXISTING ADA
THIRD FLOOR PLAN (LEVEL 4)
SHEET 5 OF 10
THIRD FLOOR PLAN (LEVEL 4)
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
LOBBY
SPOTS
2 EXISTING ADA
FOURTH FLOOR PLAN (LEVEL 5)
SHEET 6 OF 10
FOURTH FLOOR PLAN (LEVEL 5)
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26.
(E) STRIPING
EV6-17, 19
EV6-18, 20 EV6-14, 16
EV6-13, 15
EV6-10, 12
EV6-9, 11
EV6-6, 8
EV6-5, 7
EV6-2, 4
EV6-1, 3 SH. 10
DETAIL 1
FIFTH FLOOR PLAN (LEVEL 6)
0.5"C COMM (5) 1.25"C(4) 1.25"C
(3) 1.25"C(2) 1.25"C
(1) 1.25"C
SPOTS
2 EXISTING ADA
0.5"C COMM
(CONTINUED TO SHEET 5)
0.5"C COMM DOWN TO LEVEL 6
(CONTINUED TO SHEET 4)
2"C DOWN TO EV6 PANELBOARD LEVEL 3
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
ONLY
CHARGING
EV
WHEELSTOP, 6' X 6" X 4"3.
SURFACE MOUNT, NEMA 3R.
PANELBOARD 'EV6' 208Y/120V, 3PH, 4W, 225A, 2.
CABLE MANAGEMENT SYSTEM LOAD MANAGED.
SINGLE PORT, WALL MOUNT, 25FT CABLE W/
EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.
EQUIPMENT
SHEET 7 OF 10
POWER PLAN (LEVEL 6)
FURNISHED AND INSTALLED BY OTHERS.
FURNISHED AND
INSTALLED BY OTHERS.
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
LOBBY
SPOTS
2 EXISTING ADA
SIXTH FLOOR PLAN (LEVEL 7)
SHEET 8 OF 10
SIXTH FLOOR PLAN (LEVEL 7)
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26
PLAN VIEW LEVEL 3 1
2SECTION VIEW LEVEL 3
COLUMN
INSTALLATION.
CONDUIT BODIES AS NEEDED TO FACILITATE CABLE
CONTRACTOR SHALL INSTALL PULL BOXES OR 3.
ENTRY ALIGN WITH PANEL FEED.
FACE. ENSURE MOUNTING HEIGHT AND CONDUIT
CHARGER WIDTH. ANCHOR DIRECTLY TO COLUMN
OF (2) HORIZONTAL CHANNELS, SPANNING ACROSS
PROVIDE UNISTRUT SUPPORT FRAME CONSISTING
FOR CHARGERS INSTALLED ON EXISTING COLUMNS: 2.
STRUCTURE OR WALL CAP.
BOLTED CONNECTIONS TYPICAL ANCHORED TO
VERTICAL AND (2) HORIZONTAL CHANNELS,
PROVIDE UNISTRUT FRAME CONSISTING OF (2)
FOR PANELBOARD INSTALLED ON HALF WALLS, 1.
GENERAL NOTES:
4SECTION VIEW LEVEL 3
PLAN VIEW LEVEL 3
LEVEL 3
SECTION VIEW
DETAIL 2
PARKING STRIPES PARKING STRIPES
COMM 0.5"C
PANELBOARD
1.5"C TO EV3
COLUMN
1"C FLEX CONDUIT
1"C FLEX CONDUIT
COMM 0.5"C
COMM 0.5"C
(2) COMM 0.5"C
WHEELSTOP, 6' X 6" X 4"4.
PULL BOX NEMA 3R, 10"x10"x4". 3.
PULL BOX NEMA 3R, 12"x12"x6".2.
CABLE MANAGEMENT SYSTEM LOAD MANAGED.
SINGLE PORT, WALL MOUNT, 25FT CABLE W/
EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.
EQUIPMENT
LEVEL 3
SECTION VIEW
DETAIL 4
4 4
1'-8"
(E) ROOF DRAIN
SHEET 9 OF 10
SECTIONS AND DETAILS (LEVEL 3)
FURNISHED AND
INSTALLED BY OTHERS.
FURNISHED AND
INSTALLED BY OTHERS.
FURNISHED AND INSTALLED BY OTHERS.
FURNISHED AND
INSTALLED BY OTHERS.
FURNISHED AND
INSTALLED BY
OTHERS.
FURNISHED AND
INSTALLED BY
OTHERS.
25-06A
5/20/2026
5/21/2026
DATE
CHECKED
DATE
DATE
DESIGNED
DRAFTED BY
PREPARED BY
C.T.O.DATER.C.E. DATEREV.SYMBOL DESCRIPTION OF CHANGEUNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA
CALL 811
AT LEAST TWO DAYS
BEFORE YOU DIG
DATEENGINEERING DIVISION MANAGER
DATE
REVIEWED BY:
APPROVED BY:
DATEPROJECT ENGINEER
REVIEWED BY:
IW
AP
BK
KEWO
ENGINEERING
CORPORATION
03/12/26
TED GERBER, CITY ENGINEER
CI 5708 CAP LEVEL 2 EVSE PROJECT
Know what'sbelow.
Callbefore you dig.
N G
T E
A
NRO
A
ET
FO LCA FI
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
N G
T E
A
NRO
A
ET
FO LCA FI
No. E19688
ST
I E
G S
R
I
E N E
I R
EED
R
RO
P
ISSFE NA
O
L
O W
EK .B N
AI
R B
L A
CIRTC
E
L
E
03/12/26
03/12/26.
LEVEL 6
SECTION VIEW
DETAIL 2
1PLAN VIEW LEVEL 6
2SECTION VIEW LEVEL 6
PARKING STRIPES
WALL
COLUMN
COLUMN
WALL
INSTALLATION.
CONDUIT BODIES AS NEEDED TO FACILITATE CABLE
CONTRACTOR SHALL INSTALL PULL BOXES OR 3.
ENTRY ALIGN WITH PANEL FEED.
FACE. ENSURE MOUNTING HEIGHT AND CONDUIT
CHARGER WIDTH. ANCHOR DIRECTLY TO COLUMN
OF (2) HORIZONTAL CHANNELS, SPANNING ACROSS
PROVIDE UNISTRUT SUPPORT FRAME CONSISTING
FOR CHARGERS INSTALLED ON EXISTING COLUMNS: 2.
STRUCTURE OR WALL CAP.
BOLTED CONNECTIONS TYPICAL ANCHORED TO
VERTICAL AND (2) HORIZONTAL CHANNELS,
PROVIDE UNISTRUT FRAME CONSISTING OF (2)
FOR PANELBOARD INSTALLED ON HALF WALLS, 1.
GENERAL NOTES:
3LITE-ON IC80A EV CHARGER | DATASHEET
1"C FLEX CONDUIT
PULL BOX NEMA 3R, 10"x10"x4". 4.
PULL BOX NEMA 3R, 12"x12"x6".3.
SURFACE MOUNT, NEMA 3R.
PANELBOARD 'EV6' 208Y/120V, 3PH, 4W, 225A, 2.
CABLE MANAGEMENT SYSTEM LOAD MANAGED.
SINGLE PORT, WALL MOUNT, 25FT CABLE W/
EVSE, LITE-ON IC80A, 80A, 16.6KW, @208V, 1.
EQUIPMENT
1.25"C
2"C
1'-8"
SECTIONS AND DETAILS (LEVEL 6) AND CUTSHEET
SHEET 10 OF 10
FURNISHED AND INSTALLED BY OTHERS.
FURNISHED AND INSTALLED BY OTHERS
FURNISHED AND INSTALLED BY OTHERS.
25-06A