The document provided is an addendum for the Centennial High School Pool Ventilation Repairs project, located in Multnomah County, Oregon and the City of Portland. The scope of work includes removing and replacing various mechanical components of the natatorium's HVAC system, such as the exhaust fan, outside air preheat coils, supply and return air dampers, and the galvanized fan housing. The project also involves installing new exhaust fans, a hot water circulation pump, and a 3-way control valve. The bid due date is Thursday, March 9, 2023 at 4:00 PM.
The document includes detailed performance specifications for the replacement exhaust fans, including motor data, fan curves, and sound power levels. It also provides the original and new design parameters for the supply and exhaust fans. Pricing details for the various equipment components are provided, with an estimated total weight of 1,248 lbs. No information is given regarding pricing terms, set asides, incumbents, funding sources, or other commercial terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHS POOL VENTILATION REPAIRS
PROJECT NO.: 230309-02
February 23, 2023
ADDENDUM NO. ONE (1)
PAGE 1 OF 1 (PLUS ATTACHMENTS)
THE FOLLOWING CHANGES, ADDITIONS, AND DELETIONS TO THE CONTRACT DOCUMENTS
DATED February 15, 2023 HEREBY BECOME A PART OF THE CONTRACT DOCUMENTS.
NOTIFY ALL SUBCONTRACTORS AFFECTED BY THIS ADDENDUM.
BID DUE: Thursday, March 9, 2023 at 4:00 PM
SPECIFICATIONS
a. Section 01 11 00 Summary of Work: Under Part 3, Scope of Work, add the attached narrative for further clarification and direction.
END OF ADDENDUM ONE (1)
https://eeiengineers.sharepoint.com/projects/0321234 Centennial SD Automation Control Sys Rpl/Drawings/Natatorium Design/Centennial High School Natatorium Mechanical Refurbishment Project Narrative.docx ©Engineering Economics Inc. 2023 www.eeiengineers.com
Centennial High School Natatorium Mechanical Refurbishment Project
The scope of work for the refurbishment of the mechanical systems is to essentially return the systems to their original functionality and design intent. Over the years, a number of changes were made to the mechanical systems which have negatively impacted the functionality and resulted in destructive corrosion of the various HVAC components. Recently some of the ductwork has been replaced with stainless steel ducting and this ducting will remain in place as part of this work scope. Additionally, the existing fan motor, bearings and shaft have been replaced recently which will also remain in place as part of this work scope. The following is a detailed list of deficiencies to be remedied under this work scope.
• Remove the existing galvanized sheet metal bulkhead that separates the outside air concrete vault into two vaults
(half outside air intake and half return air)
• Remove the existing exhaust fan located outside the natatorium on the concrete outside air vault, disconnect and remove the electrical connections from this area along with curbs, conduit, etc. Verify the existing grate is intact and spans the entire area of the outside air vault.
• Remove and discard the existing outside air preheat coils.
• Repair/replace the fan plenum sheet metal where rusted or broken. Install new access doors as necessary and install a new filter rack in front of the new heating coil which will replace the existing coil, albeit slightly larger.
February 21, 2023 https://eeiengineers.sharepoint.com/projects/0321234 Centennial SD Automation Control Sys Rpl/Drawings/Natatorium Design/Centennial
©Engineering Economics Inc. 2022 www.eeiengineers.com
• Remove and replace air handler heating coils (see attached). Field verify the coil size, orientation, and spacing in the fan plenum housing. Replace the existing pneumatic heating coil valves with new electric actuated valves and connect to the existing heating water supply.
• Install new supply, return, and mixed air dampers with electric actuators. Coordinate the actuator signal type with the controls contractor. The following is NOT in the scope of this work and is documented here for the controls contract following this work scope: Connect new valve actuators to the new DDC control system. Install at a minimum a discharge air temperature sensor, heating water supply temperature sensor, return air temperature sensor, mixed air temperature sensor, zone (natatorium) temperature sensor, and heating water control valve with actuator all to be tied into and controlled by the new DDC system in the school.
• Replace corroded existing galvanized fan housing sheet metal as necessary.
• Replace existing PVC piping currently supplying hot water to the existing fan coil with black iron piping.
• Clean out the existing perimeter deck mounted supply diffusers ductwork and replace existing diffusers with similar with opposing blade dampers.
• Remove the (4) existing skylights over the pool and install (4) new exhaust fans with back draft dampers and ECM motors (see attached for example). Install new roof curbs for the fans if necessary and run electrical from the existing electrical panel in the pool mechanical room below deck.
• Install a hot water circulation pump for the new HVAC coil and a 3-way valve for the heating coil along with well mounted immersion sensors on supply and return lines. The confined nature of the piping in an existing tunnel may make this impossible as an existing return line does not exist to the boiler and running a new return line through the existing mechanical may be difficult at best. If running a return line is not possible, provide a bypass line from the discharge side of the pump with a circuit setter to be balanced by the test and balance contractor.
Original Design Parameters:
Supply Fan: 15830 CFM @ ¾ SP and 4000 FPM Coils (2): Ability to heat 7915 CFM from 55 degrees to 100 degrees using steam. 30” x 80” Exhaust Fans (4): 3800 CFM @ ¼ SP and 900 FPM
New Design Parameters:
February 21, 2023 https://eeiengineers.sharepoint.com/projects/0321234 Centennial SD Automation Control Sys Rpl/Drawings/Natatorium Design/Centennial
©Engineering Economics Inc. 2022 www.eeiengineers.com
Supply Fan 15830 @ 1” SP Coil (1), EWT 158 , LWT 130.9 @ 45 gpm Exhaust fans (4): 4000 CFM @ ¼” SP
Note that the Fan Energy Index (FEI) is an overall efficiency (wire-to-air) metric which includes not only the impact of the fan efficiency, but also each of the drive components used to operate the fan.
The Fan Electrical Input Power (FEP) is the amount of power of a given fan at an operating point characterized by a value of flow and pressure.
Construction Features
Efficiency: Standard
Altitude: 0 ftTemperature: 70 °F
Approximate weight each, includes fan, motor and accessories.
312240DBCRD4
0.250 0.344813,800
TEFC115V/1/601,7501/2
BCRD - Centrifugal Roof Exhauster, Downblast, Belt Driven
Description Qty Model Size
Motor Data
CFM RPM
Performance
HP RPM Volt/Ph/Hz Encl
Wt (lb.)
Oper. BHPSP (in WC)
N/AN/A0.361.79
FEIDepartment of
Energy FEP (KW) System FEI System FEP (KW)
• Spun aluminum construction
• Backwardly curved, non-overloading wheel.
• Wheel, motor, and drive assembly are isolated from the fan supports by rubber isolators.
• Top cap provides quick access to the wheel, motor, and drive assembly.
• Re-greaseable pillow block ball bearings provide an average life of 500,000 hours.
• Curb cap/venturi assembly.
• Entire fan assembly is balanced and tested.
• Galvanized birdscreen.
• Disconnect switch.
7.151663847556063687276Level at Inlet Sound Data
Octave Bands 1 2 3 4
LwA: The overall (single value) fan sound power level in dB re.
dBA: Estimated sound pressure level (re:0.0002 microbar) based on a single ducted installation at 5 ft., using a directivity factor of 1.
5 6 7 8 LwA dBA Sones
-12
Watts, ‘A’ weighted.
Accessories Included
Birdscreen - Aluminum
Backdraft Damper, ALUM
Stainless Steel Shaft
Stainless Steel Hardware
Coating: Exterior; Polyurethane Acrylic;
Polyurethane Liquid - Gray; Prep: Tool Clean & Wash; Curing: Air Dry
Variable Speed V-Belt Drive, 1.5 SF
Disc Switch-Unfused (NEMA 1), Shipped Loose
SUBMITTAL
Customer:
Job ID:
Job Name: CHS Pool
CHSPool July 29, 2022Date:
Tag: EF-1
All quotations per Twin City Fan Terms and Conditions found at www.tcf.com/terms-and-conditions
Ver 10.1 October 2018 - Created 07-29-2022 Updated 07-29-2022 Owner Eric Danielson Air Reps
Air/Gas PropertiesDescription Performance
Design Temperature
Inlet Temperature
Altitude above sea level
Outlet Velocity
Standard Power
Standard SP
Drive method
Wheel Diameter
Discharge
Rotation
Arrangement
Width
Model
Quantity
BCRD
Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .240D
N/A
N/A
Class . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .N/A
N/A
DBD
28.0
Belt
Percentage width . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .100%
Percentage diameter . . . . . . . . . . . . . . . . . . . . . . . . . . . .100%
0.34
Inlet Pressure 0.000
Oper. Power
Static Efficiency
44.03%
0.250
Estimated Density0.34
Max RPM for Class
Total Efficiency
Tip Speed
0.075
Outlet Area
Operating SP
RPM
49.08%
5.6
3,800
0.250
CFM
(in WC)
(in WC)
(FPM)
BHP
BHP
(sq.ft)
(FPM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .(in)
(°F)
(°F)
(lb/ft³)
(ft)
(in WC)
Motor position
Volumetric Flow
FEI
FEP (KW)
System FEI
System FEP (KW)
1.79
0.36
N/A
N/A
FEG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .FEG60
Gas Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standard air
Motor Data
Power (HP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1/2
Enclosure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .TEFC
Speed (RPM)
Voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .115V
Frame Size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Unknown
Phase
Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60Hz
*To estimate dBA level for ducted inlet and ducted outlet (into and out of the room) type installation, deduct 20 from the LwA value
Using a directivity factor of 2. Estimated Sound Pressure based on free field, spherical (Q = 2) radiation at stated distance.shown.
Definitions:
Estimated sound pressure level in dBA (re: 0.0002 microbar) based on a single
* ducted installation:
dBA
LwA The overall (single value) fan sound power level, 'A' weighted.
-12
The environment for each fan installation influences its measured sound value, therefore dBA levels cannot be guaranteed. Consult AMCA Publication 303 for further details. A fan's dBA is influenced by nearby reflective surfaces.
Sound
Sound Power Levels in dB re.10 Watts:
531ftDistance in
555969dBA at inletLevel at Inlet Octave Bands
LwA
FAN DETAILS
Customer:
Job ID:
Job Name: CHS Pool
CHSPool July 29, 2022Date:
Tag: EF-1
SUBMITTAL
Customer:
Job ID:
Job Name: CHS Pool
CHSPool July 29, 2022Date:
Tag: EF-1
FAN DETAILS
Customer:
Job ID:
Job Name: CHS Pool
CHSPool July 29, 2022Date:
Tag: EF-1
Pricing Detail
300lbBCRD 240D Bare fan
0 lbBirdscreen - Aluminum
12 lbBackdraft Damper, ALUM
0 lbStainless Steel Shaft
0 lbStainless Steel Hardware
0 lbCoating: Exterior; Polyurethane Acrylic; Polyurethane Liquid - Gray; Prep: Tool Clean & Wash;
Curing: Air Dry
0 lbMotor 1/2 HP, 1750 RPM, 115V, 1Ph, 60Hz , TEFC - Standard
0 lbVariable Speed V-Belt Drive, 1.5 SF
0 lbDisc Switch-Unfused (NEMA 1), Shipped Loose
Extended Weight . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1,248 lb
312 lbEach Weight
Coil Rating 4.8.4
Job Name:
Serpentine
Fin Height
Fin Length
Rows / FPI
Total Face Area
Conn. Location
Qty / Size
Return Connection
Tube Detail - Primary Surface
O.D.
Wall Thickness
Spacing
Internal
Thickness
Configuration
Date:
Type Material
Material
Tag: Pool 1
Construction
Supply Connection
Qty / Size
Type
Operating Conditions
Notes:
GPM - Total
EFT
EDB
Elevation
SCFM - Total
Entering Leaving
Sensible Heat
LDB
APD
LFT
Fluid Velocity
FPD
Quantity
1.000
60.00
48.00
20.0 sq.ft
Same End
MPT / Red Brass
MPT / Red Brass
1 / 2.50"
1 / 2.50"
5/8"
0.020"
1.5" x 1.299"
Smooth
Copper
Pool HW Coil
16,749 Corrected for Elev. & EDB
0 ft
Water
158.0 °F
76.4
0.0000
15,800
675,437 Btu/Hr
790 fpm
77.2 °F
0.39 in.WG
2.1 fps
140.0 °F
2.7 ft
40.0 °F
0.008"
Aluminum
5WC - 2 - 60 x 48 x 2 - 8 AL
7/29/2022
Hot Water
ACFM - Total
Fluid Type
FFI
Actual Face Vel.
Fin Detail - Secondary Surface
Corrugated, Waffle with Straight Edge
2 / 8
(FH > FL) falls outside the range of AHRI Cer<fied Coils
Coil is outside the scope of AHRI Standard 410.
Hot water velocity is below recommended minimum of 2.5 fps www.nortekair.com