Christian2020 WLS.pdf

PDF 431 KB Posted

Attached to
RoW Mow Trim & Litter Christian County D2
Solicitation number
RFB 605 2000000404 1
Issued by
Clark County, Kentucky

About this file

This is a mowing and litter removal maintenance document for Christian County, Kentucky, outlining road maintenance services for state and local routes under project number FE01 024. The scope of work encompasses 16 routes totaling 146.71 miles of roadway requiring mowing and litter removal services. The mowing operation covers approximately 1,703.5 acres across three annual cycles, with litter removal spanning 78.4 miles across three cycles per year. Routes marked with asterisks permit the use of batwing mowers, and one route (US 41A) includes two retention basins requiring mowing. The maximum time to complete each cycle is 15 working days. The routes vary in classification, including Interstate 24, U.S. highways (41, 41A, 68, and 68B), and various Kentucky state routes (109, 189, 800, 813, 1348, 1682, 1914, and 788), with service areas extending from Todd County to the Tennessee state line and Hopkins County boundaries.

The document specifies a three-cycle annual maintenance schedule, representing 3/5 cycles for the Christian County 2020 contract year. No pricing information, set-asides, incumbent contractor details, funding sources, or contract term specifications are provided in this document. The detailed route information includes specific milepost markers, project lengths, and acreage allocations for each route segment, providing contractors with precise geographic and operational parameters for bid preparation and service execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Route

Number System County Project Number From To

Project

Length

Type 3

Mowing

Acres

Number of Cycles

Litter

Removal

Miles

Number of Cycles

I-24*# I Christian FE01 024 I24

069-093

Trigg Co Line

(MP 69.760)

Tennesee St Line

(MP 93.303)

23.543 639 3 24 5

KY 109 RS Christian FE01 024 0109

010-033

US 41/68

(MP 10.945)

Hopkins Co Line

(MP 33.858)

22.913 147 3

KY 189 RS/MP Christian FE01 024 0189

000-016

Todd Co Line

(MP 0.00)

Muhlenberg Co Line

(MP 16.111)

16.111 77 3

KY 800 SU/RS Christian FE01 024 0800

006-014

US 41

(MP 6.535)

KY 189

(MP 14.463)

7.928 39 3

KY 813 RS Christian FE01 024 0813

000-004

KY 189

(MP 0.00)

Hopkins Co Line

(MP 4.326)

4.326 14 3

KY 1348 RS Christian FE01 024 1348

000-010

KY 398

(MP 0.00)

KY 800

(MP 10.159)

10.159 40 3

KY 1914 RS Christian FE01 024 1914

000-005

KY 800

(MP 0.00)

KY 189

(MP 5.931)

5.931 23 3

US 41*# MP Christian FE01 024 0041

000-011 M

Todd Co Line

(MP 0.000)

Pennyrile Pkwy (MP

10.390)

10.39 52 3 10.3 3

US 41A*#^ MP Christian FE01 024 0041A

000-014 M

Tennessee State

Line (MP 0.000)

Pennyrile Pkwy (MP

13.243)

13.243 137 3 13.2 3

US 68B*# MP Christian FE01 024 0068B

000-012 M

US 68

(MP 0.000)

US 68

(MP 11.026)

11.026 166 3 11 3

KY 1682*# MP Christian FE01 024 1682

000-005 m

US 68

(MP 0.000)

KY 107

(MP 5.894)

5.894 80 3 5.8 3

US 68*# MP Christian FE01 024-0068

000-008

Trigg Co Line

(MP 0.00)

KY 1682

(MP 7.137)

7.137 126 3 7.1 3

US 68*# MP Christian FE01 024-0068

014-022

US 68B

(MP 14.120)

Todd Co Line

(MP 21.114)

6.994 153 3 7 3

KY 788*# MP Christian FE01 024-0788

000-001

Ft. Campbell

Military (0.00)

US 41A

(1.111)

1.111 10.5 3

Total 146.71 1703.5 78.4

* A Batwing Mower may be used on this route(s).

#Remove Litter on these routes

^There are 2 retention basins to be mowed with this route

Christian Co 2020 (3/5 Cycles)

Maximum time to complete a cycle: 15 working days.

File details come from the government source that posted it. Updated .