Chip_Seal_IFB_2026.xlsx

XLSX spreadsheet 42 KB Posted

Attached to
ASPHALTIC EMULSION OIL (UPDATED)
Solicitation number
745-0616-27
Issued by
Trinity County, California

About this file

This is an Invitation for Bid (IFB) schedule and supporting documentation from the County of Solano, California, Department of Resource Management, Public Works Division, for the procurement of asphalt emulsion oil to support the County's chip seal program. The County is soliciting bids for approximately 650 tons of Polymer-Modified Rejuvenating Emulsions (PMRE), with acceptable polymers including latex, neoprene, butadiene, or styrene copolymer that meet specified parameters. The chip seal project schedule spans from August 17 through September 9, 2026, covering multiple roads across Solano County including Lake Herman Road, Goodyear Road, Ramsey Road, McCrory Road, and numerous other local roads. Daily oil requirements range from 29.8 to 89.8 tons distributed across the scheduled work dates. The file includes detailed logistics planning, including a roster of required personnel and equipment (dump trucks, rollers, sweepers, water trucks, flaggers, and loaders), transport schedules from August 26 through September 24, 2019, and comprehensive sweeping and striping schedules with specific daily assignments for multiple brooms and paint crews.

Bidders are required to quote a price per ton for asphalt emulsion oil delivered FOB to various locations within Solano County, with the bid price including the cost to spread the emulsion to the road surface. The tonnage amount of 650 tons represents the County's best estimate; however, the actual quantity required may be greater or less than this estimate. The project includes striping and button installation on approximately 26.64 miles of roads, with detailed striping schedules and specific route designations provided. Solano County project number 432 is associated with this work, and traffic control plans specify a 25 miles per hour speed limit with double lights on barricades for loose gravel areas.

View the file

Other files

File Type Posted
ASPHALTIC_EMULSION_OIL_(UPDATED).pdf PDF
Attachment_A_Emulsion_Oil_Chip_Seal_IFB_2026.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE

Date/RoadStartEndOil Amount (tons)
8/17/26
Lake Herman RoadSyar Entrance1.6 mi. E/Vallejo C/L36.4
Goodyear RoadCity of BeniciaMorrow Lane16.3
Daily Total52.7
8/18/26
Goodyear RoadMorrow LaneEnd76.3
Pierce LaneGoodyearEnd4.3
Daily Total80.7
8/19/26
Ramsey RoadCity of FFBridgeport Road49.6
Central WayCordelia RoadFairfield C/L6.1
Daily Total55.7
8/24/26
McCrory RoadNorth Gate RoadMeridian Road19.0
Fry RoadVacaville C/LMeridian Road14.0
Meridian RoadFry RoadSouth A Street13.3
Daily Total46.4
8/25/26
Chicorp RoadSouth end0.2 North of Holdener Road6.2
Holdner RoadA StreetLewis Road11.6
Hawkins RoadFox RoadPitt School Road49.8
Hawkins Road0.50 mi. E/Leisure Town RoadMeridian Road13.3
Daily Total80.9
8/26/26
Pitt School RoadHawkins RoadWeber Road78.3
Daily Total78.3
8/31/26
Pitt School RoadWeberDixon C/L51.9
Daily Total51.9
9/1/26
Dixon Ave EDixon C/LRobben Road27.9
Doyle LaneDixon C/LEnd1.9
Daily Total29.8
9/2/26
Bulkley RoadMaxwell LaneTremont Road28.7
Sparling RoadKidwell RdNorth End15.6
Daily Total44.4
9/8/26
Sievers RoadStevenson Bridge RoadHalley Road89.8
Seivers RoadGarnet LaneHalley Road
Daily Total89.8
9/9/26
Joslin LaneEndSteiger Hill Road10.0
Joslin LaneSteiger Hill RoadEnd
Serenity Hills RoadEndGibson Canyon Road28.4
Daily Total38.4
Grand Totals649.0

&"-,Bold"&20 2026 Chip Seal Schedule

ROSTER

PositionEmployee
Chip Box
Dump Trucks
Rollers
Holiday Crew
Brooms
Sweeper
Water truck
Flaggers
Loader
Transport
Striping
Stenciling
Personnel still available
Contact Information
Haulers
Oil
Rental Rollers
Other information
Project numbersSolano county #432

Traffic Control Plans Loose Gravel 25 M.P.H. Double Light on Barricade

&"-,Bold"&18 2025 Roster

STOCKPILES

Stockpile location Tons Rock Plant Rock size ZONE

Total rock= 0

&"-,Bold"&18 2025 Stockpiles

TRANSPORT

DATEWHENMOVE
Prior to chip project-Prior to Chip
Monday 8/26/19Start of Day 1
Monday 8/26/19End of Day 1
Tuesday 8/27/19Start of Day 2
Tuesday 8/27/19End of Day 2
Wednesday 8/28/19Start of Day 3
Wednesday 8/28/19End of Day 3
Tuesday 9/03/19Start of Day 4
Tuesday 9/03/19End of Day 4
Wednesday 9/04/19Start of Day 5
Wednesday 9/04/19End of Day 5
Monday 9/09/19Start of Day 6
Monday 9/09/19End of Day6
Tuesday 9/10/19Start of Day 7
Tuesday 9/10/19End of Day 7
Wednesday 9/11/19Start of Day 8
Wednesday 9/11/19End of Day 8
Monday 9/16/19Start of Day 9
Monday 9/16/19End of Day 9
Tuesday 9/17/19End of Day 10
Wednesday 9/18/19Start of Day 11
9/18-9/19Before Day 12
Monday 9/23/19Start of Day 12
Monday 9/23/19End of Day 13
Tuesday 9/24/19After Chip

&"-,Bold"&18 2025 TRANSPORT SCHEDULE

SWEEPING

DATEBROOM 1 (Name)BROOM 2 (Name)BROOM 3 (Name)
Friday 8/28/20Pre sweep day 1Pre sweep day 1Pre sweep day 2
Monday 8/31/20Pre sweep day 1, Meat line (during chip), Post sweep day 1 (after chip)Pre sweep day 1, Cover utilities/ driveways, Post sweep day 1 (+3 hrs)Pre sweep day 2, Post sweep day 1 (+3 hrs)
Tuesday 9/01/20Pre sweep day 2, Meat line (during chip), Post sweep day 2 (after chip)Pre sweep day 2, Cover utilities/ driveways, Resweep day 1, Post sweep day 2 (+3 hrs)Resweep day 1, Post sweep day 2 (+3 hrs)
Wednesday 9/02/20Pre sweep day 3, Meat line (during chip), Post sweep day 3 (after chip)Pre sweep day 3, Cover utilities/ driveways, Resweep day 2, Post sweep day 3 (+3 hrs)Resweep day 2, Post sweep day 3 (+3 hrs)
Thursday 9/03/20Sweep roads for striping, Sweep all roads from week 1Sweep all roads from week 1Sweep all roads from week 1
Friday 9/04/20Sweep roads for striping, Sweep all roads from week 1Sweep all roads from week 1, Pre sweep week 2Sweep all roads from week 1, Pre sweep week 2
Tuesday 9/08/20Pre sweep day 4, Meat line (during chip), Post sweep day 4 (after chip)Pre sweep day 4, Cover utilities/ driveways, Post sweep day 2 (+3 hrs)Resweep day 5, Post sweep day 4 (+3 hrs)
Wednesday 9/09/20Pre sweep day 5, Meat line (during chip), Post sweep day 5 (after chip)Pre sweep day 5, Cover utilities/ driveways, Resweep day 4, Post sweep day 3 (+3 hrs)Resweep day 4, Post sweep day 5 (+3 hrs)
Thursday 9/10/20Sweep roads for striping, Sweep all roads from week 2Sweep all roads from week 2Sweep all roads from week 2
Friday 9/11/20Sweep roads for striping, Sweep all roads from week 1Sweep all roads from week 2, Pre sweep week 3Sweep all roads from week 2, Pre sweep week 3
Monday 9/14/20Pre sweep day 6, Meat line (during chip), Post sweep day 6 (after chip)Pre sweep day 6, Cover utilities/ driveways, Post sweep day 6 (+3 hrs)Pre sweep day 7, Post sweep day 6 (+3 hrs)
Tuesday 9/15/20Pre sweep day 7, Meat line (during chip), Post sweep day 7 (after chip)Pre sweep day 7, Cover utilities/ driveways, Resweep day 6, Post sweep day 7 (+3 hrs)Resweep day 6, Post sweep day 7 (+3 hrs)
Wednesday 9/16/20Pre sweep day 8, Meat line (during chip), Post sweep day 8 (after chip)Pre sweep day 8, Cover utilities/ driveways, Resweep day 7, Post sweep day 8 (+3 hrs)Resweep day 7, Post sweep day 8 (+3 hrs)
Thursday 9/17/20Sweep roads for striping, Sweep all roads from week 3Sweep all roads from week 3Sweep all roads from week 3
Friday 9/18/20Sweep roads for striping, Sweep all roads from week 3Sweep all roads from week 3, Pre sweep week 4Sweep all roads from week 3, Pre sweep week 4
Monday 9/21/20Pre sweep day 9, Meat line (during chip), Post sweep day 9 (after chip)Pre sweep day 9, Cover utilities/ driveways, Post sweep day 9 (+3 hrs)Pre sweep day 10, Post sweep day 9 (+3 hrs)
Tuesday 9/22/20Pre sweep day 10, Meat line (during chip), Post sweep day 10 (after chip)Pre sweep day 10, Cover utilities/ driveways, Resweep day 9, Post sweep day 7 (+3 hrs)Resweep day 9, Post sweep day 10 (+3 hrs)
Wednesday 9/23/20Pre sweep day 11, Meat line (during chip), Post sweep day 11 (after chip)Pre sweep day 11, Cover utilities/ driveways, Resweep day 10, Post sweep day 11 (+3 hrs)Resweep day 10, Post sweep day 11 (+3 hrs)
Thursday 9/24/20Sweep roads for striping, Sweep all roads from week 4Sweep all roads from week 4Sweep all roads from week 4
Friday 9/25/20Sweep roads for striping, Sweep all roads from week 4Sweep all roads from week 4Sweep all roads from week 4

&"-,Bold"&18 2025 BROOM SCHEDULE

PAINT

DATEGRIND THERMOTRPM'SLAYOUTSTRIPINGSTENCILING
Before Chip Start
Friday 8/26/22
Monday 8/29/22
Tuesday 8/30/22
Wednesday 8/31/22
Thursday 9/01/22
Friday 9/02/22
Tuesday 9/06/22
Wednesday 9/07/22
Thursday 9/08/22
Friday 9/09/22
Monday 9/12/22
Tuesday 9/13/22
Wednesday 9/14/22
Thursday 9/15/22
Friday 9/16/22
Thursday 9/29/22
Tuesday 9/21/21
Wednesday 9/21/22
Thursday 9/22/22
Friday 9/23/22
Monday 9/26/22
Tuesday 9/27/22
Wednesday 9/28/22

&"-,Bold"&18 2025 PAINT SCHEDULE

STRIPING-BUTTONS

RoadStartEndLength
(miles)ThermoCenter lineFog line/ Lane WidthRPM'sComments
Mills LaneEndElsworth Road0.5
Elsworth RoadVacaville C/LQuinn Road0.22
Willow RoadMaple RoadVacaville C/L1
Walnut RoadVacaville C/LEnd0.67
Cantelow RoadPleasants Valley RoadTimm Rd6.33
Shelton Lane.27 mi N/O Brown Valley RoadEnd0.38
Gish CourtPeaceful Glen RoadEnd at Culdesac0.05
Olivas RoadPeaceful Glen RoadEnd0.79
Bucktown RoadVaca Valley RoadEnd1.91
Pleasants Hills Ranch WayEndEnd0.52
Marie CourtPleasant Hills Ranch WayEnd0.1
La Vera CourtPleasant Hills Ranch WayEnd0.1
Chester WayPleasant Hills Ranch WayPleasants Valley Road0.1
Gates Canyon RoadPleasants Valley Road2.73 mi W/O Pleasants Valley Road2.73
Cherry Glen Road800' N/O Vacaville C/LVacaville C/L ( at I-80)0.35
Cherry Glen RoadPleasants Valley RoadVacaville C/L0.26
Nelson RoadFairifeld C/LVacaville C/L0.34
Gordon Valley RoadMankas Corner RoadNapa County Line2.16
Ledgewood RoadSuisun Valley RoadMankas Corner Road0.82
Lambert RoadManaks Corner RoadSuisun Valley Road0.4
Chadbourne RoadRockville RoadEnd0.2
Russel RoadEndRockville Road0.49
Delu DriveGreen Valley RoadEnd0.36
Brynes RoadHawkins RoadHorse Creek Channel1
Clark RoadFry RoadHawkins Road1.5
Meridian Road NorthVacaville C/L at I-80Vacaville C/L0.31
Fox RoadHawkins RoadWeber Road3.05

Total: 26.64

&"-,Bold"&18 2025 STRIPING AND BUTTONS image1.png